time1: 0 time2: 0 time3: 0 time4: 0 total: 0 Project Title2014This project aims to: 1. Monitor the mobile env
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

Project Title2014This project aims to: 1. Monitor the mobile env

Project Title2014This project aims to: 1. Monitor the mobile env」於資料集「EPQSummary_NoiseAndVibration」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:50。 欄位Project Title的內容是 , 欄位Project Subject的內容是This project aims to: 1. Monitor the mobile environment and traffic noise in Tainan City; 2. Assist the implementation of environmental petition of temporary noise and traffic noise; 3. Complete the EPA enforcement and implementation of noisy measurement for motor vehicles in situ; 4. Amend items noise control 7-9 according to announcement or correction for noise control act; 5. Finish the EPA performance to enhance public satisfaction by referring to noise petition inspection and improvement of pollution. In Tainan, the measurements of noise are conducted at 12 environment-noise monitoring sites and 12 road traffic-noise ones. The former include : 2 sites for 1st class control area, 4 sites for 2nd class control area, 4 sites for 3rd class control area, and 2 sites for 4th class control area;and the latter include: 2 sites for 1st class control area, 4 sites for 2nd class control area, 4 sites for 3rd class control area, and 2 sites for 4th class control area. The monitoring sites will be modified if the noise control zone is redrawn and announced during the project implementation. The project starts from January 2014 and the monitoring works of 1st to 4th quarters are completed in 2014, in which, 192 locations are for the environment and traffic monitoring (48 locations, 2-day monitoring for each location.). For noise inspection work, 777 cases during the project time frame are completed. In addition to the repeated noise petition cases inspection work, the project also needs to assist reviewing denounce cases for re-inspection work, the night time auditing work and the pollution investigation cases assigning by Tainan BEP. The treatment results of the proceeding cases must be feedback and reported to Tainan BEP immediately. For the management of noise petitions, those regarding the entertainment and business are tackled first. The main reason for the last petitions is due to the improper use for amplification equipment in public sites. According to the statistics, using amplification equipment (a loud speaker) between 09:00 to 10:59 and using amplification equipment between 00:00 to 00:59 (PUB, Karaoke); these two kinds of petition is the most serious period. In 2014, denounced cases have been improved after reviewing. Only exceptional cases of repeated petition still cannot be resolved due to the unable measuring by the informant. Most cases are with regard to people’s notifications, anonymous reports, no evidence for the fact of pollution, or petitioners’ unclear information of positions, etc. There were 2 events of explanation session and expert counseling in announced items. For vehicles in use in situ measurement of the noise, to handling the total of 48 events at 2014 was check and inspection in order to the total of 1,287 vehicles. For the portion of car, the number of check were 212 sets which 34 sets were inspected and there were 31 failed so the failure rate was 91.2%; for the portion of motorcycles and heavy motorcycles, the number of check were 1,075 sets which 180 sets were inspected and there were 158 failed so the failure rate was 93.8%; there were 56 failed vehicles returned to inspected and complete the improvement. The team has against unqualified vehicles or made website report. If failed vehicles have not respond for twice, it has been recommended that to BEP for punishment denounced. , 欄位Project Year的內容是2014 , 欄位Organizer的內容是Environmental Protection Bureau of Tainan City , 欄位Executive Unit的內容是祥威環境科技有限公司 , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=91895&proj_id=1031827585&doc_kind=1 , 欄位Publish Date的內容是20150601

Project Title

Project Subject

This project aims to: 1. Monitor the mobile environment and traffic noise in Tainan City; 2. Assist the implementation of environmental petition of temporary noise and traffic noise; 3. Complete the EPA enforcement and implementation of noisy measurement for motor vehicles in situ; 4. Amend items noise control 7-9 according to announcement or correction for noise control act; 5. Finish the EPA performance to enhance public satisfaction by referring to noise petition inspection and improvement of pollution. In Tainan, the measurements of noise are conducted at 12 environment-noise monitoring sites and 12 road traffic-noise ones. The former include : 2 sites for 1st class control area, 4 sites for 2nd class control area, 4 sites for 3rd class control area, and 2 sites for 4th class control area;and the latter include: 2 sites for 1st class control area, 4 sites for 2nd class control area, 4 sites for 3rd class control area, and 2 sites for 4th class control area. The monitoring sites will be modified if the noise control zone is redrawn and announced during the project implementation. The project starts from January 2014 and the monitoring works of 1st to 4th quarters are completed in 2014, in which, 192 locations are for the environment and traffic monitoring (48 locations, 2-day monitoring for each location.). For noise inspection work, 777 cases during the project time frame are completed. In addition to the repeated noise petition cases inspection work, the project also needs to assist reviewing denounce cases for re-inspection work, the night time auditing work and the pollution investigation cases assigning by Tainan BEP. The treatment results of the proceeding cases must be feedback and reported to Tainan BEP immediately. For the management of noise petitions, those regarding the entertainment and business are tackled first. The main reason for the last petitions is due to the improper use for amplification equipment in public sites. According to the statistics, using amplification equipment (a loud speaker) between 09:00 to 10:59 and using amplification equipment between 00:00 to 00:59 (PUB, Karaoke); these two kinds of petition is the most serious period. In 2014, denounced cases have been improved after reviewing. Only exceptional cases of repeated petition still cannot be resolved due to the unable measuring by the informant. Most cases are with regard to people’s notifications, anonymous reports, no evidence for the fact of pollution, or petitioners’ unclear information of positions, etc. There were 2 events of explanation session and expert counseling in announced items. For vehicles in use in situ measurement of the noise, to handling the total of 48 events at 2014 was check and inspection in order to the total of 1,287 vehicles. For the portion of car, the number of check were 212 sets which 34 sets were inspected and there were 31 failed so the failure rate was 91.2%; for the portion of motorcycles and heavy motorcycles, the number of check were 1,075 sets which 180 sets were inspected and there were 158 failed so the failure rate was 93.8%; there were 56 failed vehicles returned to inspected and complete the improvement. The team has against unqualified vehicles or made website report. If failed vehicles have not respond for twice, it has been recommended that to BEP for punishment denounced.

Project Year

2014

Organizer

Environmental Protection Bureau of Tainan City

Executive Unit

祥威環境科技有限公司

Publish Date

20150601

「Project Title2014This project aims to: 1. Monitor the mobile env」所屬的資料集:「EPQSummary_NoiseAndVibration」的其他資料

Project Title: The review plan of Tainan City noise monitoring and aviation noise control area in year 2011
Project Subject: This plan is to complete the operation and public pleads in the noise monitoring of Tainan City appl
Project Year: 2011
Organizer: Environmental Protection Bureau of Tainan City

Project Title: The Impact of Electromagnetic Field (EMF) on the Environment Project
Project Subject: The objectives of this project include: to collect analyze the latest international information on n
Project Year: 2011
Organizer: Department of Air Quality Protection & Noise Control

Project Title: 2022 Research and Management Program on Noise Control Technologies for Air and Ground Transportation
Project Subject: 一、 Air and ground transportation In terms of aircraft noise, completed suggestion and revision of re
Project Year: 2022
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Taichung City: Noise Pollution Inspection on Public sentiment and Control Plan for 2020
Project Subject: This project has been executed since Jan., 2020 , including motor vehicle noise control, traffic noi
Project Year: 2020
Organizer: Environmental Protection Bureau, Taichung City

Project Title: 101 year and 102 year diesel car power station maintenance management plan
Project Subject: Kaohsiung diesel power station maintenance and management plans were an operation and maintenance of
Project Year: 2012
Organizer: Environmental Protection Bureau Kauhsiung City Government

Project Title: The study of traffic and environmental noise control and improvable measures
Project Subject: This study collected and reviewed the measurement results of traffic and environmental noise from en
Project Year: 2011
Organizer: Department of Air Quality Protection & Noise Control

Project Title: The project for reporting、joint inspection and control exhaust pipe certification of vehicle noise.
Project Subject: This project was mainly to assist the EPA to grasp the results of vehicle noise inspections in vario
Project Year: 2020
Organizer: Department of Air Quality Protection & Noise Control

Project Title:
Project Subject: This project aims to: 1. Monitor the mobile environment and traffic noise in Tainan City; 2. Assist
Project Year: 2014
Organizer: Environmental Protection Bureau of Tainan City

Project Title: Hualien electric locomotive promotion and installation plan in 110
Project Subject: The 110 Hualien County Electric Locomotive Promotion and Installation Plan will be implemented from
Project Year: 2021
Organizer: Environmental Protection Bureau, Hualien County

Project Title: "Control measures for in-using motor vehicle’s noise and for prone to noise emission facilities"
Project Subject: "This project assisted the EPA to operate and maintain the in-use vehicles noise reporting website s
Project Year: 2014
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: The Project of Air Pollution Petitions Inspecting Control of Changhua County in 2016
Project Subject: “The Project of Air Pollution Petitions Inspecting control of Changhua County in 2016” had begun fro
Project Year: 2016
Organizer: Environmental Protection Bureau Changhua County

Project Title: Project for traffic noise control and improving noise abatement projects
Project Subject: The purpose of this research project is first to collect the literature on the anti-noise measures t
Project Year: 2013
Organizer: Department of Air Quality Protection & Noise Control

Project Title: "Noise behaviors and Aviation Noise Control Project"
Project Subject: "Through the implementation of this project, it is hoped to understand the current situation and tre
Project Year: 2015
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: Checking on motor vehicles emission testing institutions 2015
Project Subject: This project was commissioned by the National Institute of Environmental Analysis, Environmental Pro
Project Year: 2015
Organizer:

Project Title: The Noise Control Management Information System and Noise Control
Project Subject: The goals of this project included system maintenance and data collection of “The Noise Control Mana
Project Year: 2013
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Light pollution control strategic planning and build
Project Subject: The impact of light pollution on people is become increasingly serious, petition cases also increase
Project Year: 2012
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Aviation Noise Control Project
Project Subject: Defects are commonly seen in the operation of the aviation noise monitoring stations and control (mo
Project Year: 2016
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Performance enhancement on traffic noise control and reduction measures
Project Subject: In Taiwan, the Noise Control Act was amended in 2008 to include new regulations governing ground tra
Project Year: 2012
Organizer: Department of Air Quality Protection & Noise Control

Project Title: A project for traffic noise control
Project Subject: Because of the urban development, traffic are getting more congested. And in order to mitigate the
Project Year: 2015
Organizer: Department of Air Quality Protection & Noise Control

Project Title: The Study of Facilities and Regulations of Sound Insulation in Buildings of Nearby Transportation Sy
Project Subject: (一)Collection and analysis for facilities (include openings of exterior wall in buildings ) and regu
Project Year: 2013
Organizer: Department of Air Quality Protection & Noise Control

Project Title: 2012 Chiayi City Diesel-Fueled Vehicles air pollution control project & audit plan
Project Subject: Diesel engines are extensively used in passenger and cargo transportation vehicles and military and
Project Year: 2012
Organizer: Environmental Protection Bureau, Chiayi City

Project Title: 2019 ChiaYi City fugitive emission sources audit control plan
Project Subject: The dust pollution problem caused by construction site is generally existed in crowded urban area an
Project Year: 2019
Organizer: Environmental Protection Bureau, Chiayi City

Project Title: Noise Monitoring and Noise Recognition and Control of Motor Vehicles Exhaust Pipes in Tainan City, 2
Project Subject: 1. Project Title: Noise Monitoring and Noise Recognition and Control of Motor Vehicles Exhaust Pipes
Project Year: 2021
Organizer: Environmental Protection Bureau of Tainan City

Project Title: The Control Measure of In-use Vehicle Noise
Project Subject: This project assisted the EPA to operate and maintain the in-use vehicles noise reporting website sy
Project Year: 2013
Organizer: Department of Air Quality Protection & Noise Control

Project Title: ""
Project Subject: "This project aims to: 1. Monitor the mobile environment and traffic noise in Tainan City; 2. Assist
Project Year: 2014
Organizer: "Environmental Protection Bureau of Tainan City"

Project Title: "The project for reporting、joint inspection and control exhaust pipe certification of vehicle noise.
Project Subject: "This project was mainly to assist the EPA to grasp the results of vehicle noise inspections in vari
Project Year: 2020
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: "Research on the measurement of low-frequency non-ionizing radiation and the calibration of monitori
Project Subject: "In order to ensure the accuracy and reliability of long-term monitoring data, this plan conducts re
Project Year: 2017
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: Implement of the new vehicle type approval with regard to noise, the new vehicle spot check and the
Project Subject: The main work items of this project included: assist EPA (Environmental Protection Administration) t
Project Year: 2012
Organizer: Department of Air Quality Protection & Noise Control

Project Title: The study of environmental noise quality analysis
Project Subject: 1. To collect the framework information of foreign long-term noise monitoring system. 2. To propose
Project Year: 2014
Organizer: Department of Air Quality Protection & Noise Control

Project Title: A project for traffic noise control
Project Subject: As urban developments are getting better everyday, so are transportation systems that are getting mo
Project Year: 2014
Organizer: Department of Air Quality Protection & Noise Control

行政院環境保護署 的其他資料集

環境教育申報單位之有效護照開通率

每3月更新,56

李小姐 | 02-23117722#2724 | 2023-07-27 01:02:54

行政院環境保護署

環評主管機關受理審查之環境影響差異分析報告

每2月更新,168

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:20

行政院環境保護署

公民營廢棄物清除機構資料

每月更新更新,159

何先生 | 02-2311-7722#2653 | 2022-01-14 01:26:25

行政院環境保護署

高雄市水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,39

程先生 | 02-2311-7722#2833 | 2023-08-09 01:04:09

行政院環境保護署

應回收廢棄物回收量資料

每年更新更新,43

廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:23:55

行政院環境保護署

空氣品質小時值_高雄市_左營站

每1時更新,224

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:39

行政院環境保護署

紫外線測站位置圖

不定期更新更新,45

陳先生 | 02-2311-7722#2386 | 2023-08-09 01:04:55

行政院環境保護署

行政院環境保護署環境保護人員訓練所法定預算

每1年更新,43

陳先生 | 03-4020789#580 | 2023-08-09 01:05:49

行政院環境保護署

已公告之飲用水取水口一定距離一覽表

不定期更新更新,119

黃先生 | 02-23117722#2881 | 2023-07-27 01:02:59

行政院環境保護署

重點事業廢棄物-有害性集塵灰之處理方式

每月更新更新,165

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:12

行政院環境保護署

南投縣重要環保統計資料

每1月更新,205

顏先生 | 02-23117722#2109 | 2023-08-07 01:00:08

行政院環境保護署

環保專案摘要資料_資源循環

不定期更新更新,59

陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:42

行政院環境保護署

推薦機關(薦舉)環境教育人員認證申請書

不定期更新更新,40

盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:27

行政院環境保護署

違規公司與產品消息資料

每1月更新,78

盧小姐 | 02-23117722#2943 | 2023-07-27 01:03:54

行政院環境保護署

環評監督委員會監督委員名單

2年更新,41

陳先生 | 04-2252-1718#51207 | 2022-01-15 01:13:16

行政院環境保護署

碳粉匣對應型號

每1月更新,136

黃小姐 | 02-23117722#2932 | 2023-07-30 01:01:22

行政院環境保護署

環境教育設施場所認證申請作業指引

不定期更新,39

蘇小姐 | (03)4020789分機669 | 2022-01-15 01:11:02

行政院環境保護署

機車排氣檢驗站執行機車排氣檢驗業務費用

每1月更新,37

李先生 | 02-23117722#6314 | 2023-07-27 01:03:50

行政院環境保護署

環保新聞

每3日更新,274

陳小姐 | 02-2311-7722#2343 | 2023-07-30 00:59:20

行政院環境保護署

使用中機動車輛噪音資料-汽油車

不定期更新更新,114

林先生 | 02-23712121-6403 | 2022-01-14 01:18:53

行政院環境保護署

噪音陳情案件數(依年度)

不定期更新更新,52

謝先生 | 02-23712121-6403 | 2023-07-27 01:03:47

行政院環境保護署

各工廠空氣污染物排放資料

每季更新更新,141

黃先生 | 02-23712121#6210 | 2022-01-15 01:12:09

行政院環境保護署

重金屬污染農地管理及改善技術評析計畫

每6月更新,295

黃先生 | 02-23832389#8204 | 2023-07-30 01:01:14

行政院環境保護署

建檔公廁明細-苗栗縣

不定期更新更新,121

賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:05

行政院環境保護署

廢(污)水產生量及排放量

每1年更新,115

顏先生 | 02-23117722#2109 | 2023-07-30 01:01:05

行政院環境保護署

環保署職員官等性別統計資料

每3月更新,52

嚴小姐 | 02-23117722#2133 | 2023-07-30 01:02:14

行政院環境保護署

管制事業、下水道系統下水道查核、處分資料資訊平台

不定期更新更新,42

陳先生 | 02-2311-7722#2827 | 2023-08-09 01:04:16

行政院環境保護署

固定污染源戴奧辛、重金屬(鉛、鎘、汞)及氯化氫排放檢測資料

每季更新更新,276

江先生 | 02-23117722#6201 | 2022-01-15 01:12:33

行政院環境保護署

行政院環境保護署環境教育設施場所認證展延申請書

不定期更新,63

蘇小姐 | (03)4020789分機669 | 2022-01-15 01:11:08

行政院環境保護署

環保標章審議會決議事項

每1月更新,42

黃先生 | 02-23117722#2932 | 2023-07-30 01:03:37

行政院環境保護署