Term Report of the “Emergent Site Investigation and Cleanup Plan」於資料集「EPQSummary_ChemicalSubstanceManagement」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:48。 欄位Project Title的內容是Term Report of the “Emergent Site Investigation and Cleanup Planning of the Illegal Disposal Site along San-Yeh River and Erren River in Tainan City” sponsored by Tainan Environmental Protection Bureau , 欄位Project Subject的內容是This project was to conduct with the Er-Jen River Remediation and Reclamation. It finished the investigation work of unidentified disposed wastes between Sanye Gong Xi of the north side of the Er-Jen River to the river mouth to the sea, including investigation perimeter allocation, ground radar detection, sampling plan, 30 locations of on-site excavation and 10 locations of soil profiling, 44 sets of sampling, XRF screening, TCLP heavy metal tests, wastes volume estimation, and clean-up planning. The results showed that the concentration of the TCLP test for Zone A was over the legal limit, and the specific metals were lead, copper, and cadmium. The dioxin concentration in Zone A was also over the limit. This concluded that Zone A contained heavy metal and dioxin contaminations. Among Zones B, G, and H, the investigation results did not show the evidence of wastes. Zones D and E contained general industrial wastes but not hazardous ones. Zone C was found large amount of waste building materials containing majorly backfill soil and small amount of hazardous wastes. The TCLP test results of Zones F and G showed containing hazardous wastes, as well as Zone I. Zone I also showed some concerns regarding dioxins concentrations that were close to the legal limit, although they were not over it. Zone A results showed dioxins concentration over the limit, and it was operated by several unregistered metal extracting plants, indicating the contamination caused by business activities in the past still existed. In conclusion, the 8 investigated zones contained about 70,930 m3 of general industrial wastes and 20,460 m3 of hazardous wastes. If the cleanup work lasts about 16 months, the estimated cost for cleanup is about NT$ 644,000,000. In order to safe guard the residents’ living and surrounding quality, it is suggested to group relative personnel responsible for the later-on waste cleanup and site remediation works. , 欄位Project Year的內容是2008 , 欄位Organizer的內容是Environmental Protection Bureau of Tainan City , 欄位Executive Unit的內容是工研院 , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=462&proj_id=DHFKEULBSJ&doc_kind=1 , 欄位Publish Date的內容是20090301

Project Title

Term Report of the “Emergent Site Investigation and Cleanup Planning of the Illegal Disposal Site along San-Yeh River and Erren River in Tainan City” sponsored by Tainan Environmental Protection Bureau

Project Subject

This project was to conduct with the Er-Jen River Remediation and Reclamation. It finished the investigation work of unidentified disposed wastes between Sanye Gong Xi of the north side of the Er-Jen River to the river mouth to the sea, including investigation perimeter allocation, ground radar detection, sampling plan, 30 locations of on-site excavation and 10 locations of soil profiling, 44 sets of sampling, XRF screening, TCLP heavy metal tests, wastes volume estimation, and clean-up planning. The results showed that the concentration of the TCLP test for Zone A was over the legal limit, and the specific metals were lead, copper, and cadmium. The dioxin concentration in Zone A was also over the limit. This concluded that Zone A contained heavy metal and dioxin contaminations. Among Zones B, G, and H, the investigation results did not show the evidence of wastes. Zones D and E contained general industrial wastes but not hazardous ones. Zone C was found large amount of waste building materials containing majorly backfill soil and small amount of hazardous wastes. The TCLP test results of Zones F and G showed containing hazardous wastes, as well as Zone I. Zone I also showed some concerns regarding dioxins concentrations that were close to the legal limit, although they were not over it. Zone A results showed dioxins concentration over the limit, and it was operated by several unregistered metal extracting plants, indicating the contamination caused by business activities in the past still existed. In conclusion, the 8 investigated zones contained about 70,930 m3 of general industrial wastes and 20,460 m3 of hazardous wastes. If the cleanup work lasts about 16 months, the estimated cost for cleanup is about NT$ 644,000,000. In order to safe guard the residents’ living and surrounding quality, it is suggested to group relative personnel responsible for the later-on waste cleanup and site remediation works.

Project Year

2008

Organizer

Environmental Protection Bureau of Tainan City

Executive Unit

工研院

Publish Date

20090301

「Term Report of the “Emergent Site Investigation and Cleanup Plan」所屬的資料集:「EPQSummary_ChemicalSubstanceManagement」的其他資料

Project Title: Major Stationary Pollution Evaluation and Examination Project.
Project Subject: This plan collected and analyzed yearly test data of quality and quantity for dioxin and odor produc
Project Year: 2009
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Promoting professional and technical service project of prevention and preparedness at emvironmenta
Project Subject: The dedicated environmental accident consulting and monitoring center has five groups focusing on pa
Project Year: 2015
Organizer: Department of Environmental Sanitation & Toxic Substance Management

Project Title: Assessing the Background Serum Concentrations of PCDDs/PCDFs in the Residents Neighboring one Electr
Project Subject:
Project Year: 2002
Organizer: Department of Air Quality Protection & Noise Control

Project Title: The Project of Evaluation Management and Import/Export Permit Reviewing for Toxic and Concerned Chem
Project Subject: This project aims to keep up with the international chemical substances regulations and keep track o
Project Year: 2022
Organizer: Toxic and Chemical Substances Bureau

Project Title: The project of draft control stratgy and emission investigation for Dioxins, Polycyclic aromatic hyd
Project Subject: The scope of work for this project includes: 1) emission inventory establishment and update; 2) test
Project Year: 2010
Organizer: Department of Air Quality Protection & Noise Control

Project Title: "Promotion of the Toxic Chemical Substances Flow Tracking Management Project and Manpower Extension
Project Subject: "本計畫執行期間106年1月1日至2月20日,圓滿達成計畫預期之成效,除全力配合環保署化學局之要求外,對於本計畫各項工作均全力以赴,以求達到計畫執行目標,以下為本計畫之執行成果結論。一、支援中央及縣市
Project Year: 2017
Organizer: "Toxic and Chemical Substances Bureau"

Project Title: "2019 Taiwan-Southeast Asia Regional Cooperation and Training Program"
Project Subject: "Our team had completed the 2019 Taiwan-Southeast Asia Regional Cooperation and Training Program f
Project Year: 2019
Organizer: "Toxic and Chemical Substances Bureau"

Project Title: 2017 The Program of Environmental Agent s Management System Operation and Proficiency.
Project Subject: This year’s project is divided into four parts, which includes the review of environmental agent pro
Project Year: 2017
Organizer: Toxic and Chemical Substances Bureau

Project Title: Project of Auditing and Certification Body on Obliged Recyclable Waste (Waste Plastic Containers)
Project Subject: Environmental Protection Administration Executive Yuan (EPA) promulgated “Recyclable Waste Auditing
Project Year: 2008
Organizer: Recycling Fund Management Board

Project Title: "The Project of Implementation Management and Import/Export Permit Reviewing for Toxic Chemical Subs
Project Subject: "The core of this project is to cooperate with the amendments direction and contents of Toxic and Co
Project Year: 2020
Organizer: "Toxic and Chemical Substances Bureau"

Project Title: "Strengthening Toxic Chemicals Flowing Management and information system Project"
Project Subject: "There are four major aspects in the implementation of this year’s Plan: System planning: the Plan e
Project Year: 2015
Organizer: "Department of Environmental Sanitation & Toxic Substance Management"

Project Title: 2018 The Program of Environmental Agents Manage System Operation
Project Subject: This project primarily focuses on website maintenance on environmental agents (MDC) for involved ind
Project Year: 2018
Organizer: Toxic and Chemical Substances Bureau

Project Title: The Inspection and Certification Third Party on Due Recycled Waste (Waste Lubricants)
Project Subject: The main purposes of this project were auditing the collected and recycled quantity, operation proce
Project Year: 2008
Organizer: Recycling Fund Management Board

Project Title: "Year 107~108Project for Constructing a Safe and Comfortable Homeland: The Plan for the Setup of Sou
Project Subject: "This project aimed to set up southern environmental incidents specialist teams with one team each i
Project Year: 2018
Organizer: "Toxic and Chemical Substances Bureau"

Project Title: The Project for Risk Assessment Tools and Information Inventory of Chemical Substances
Project Subject: There are 3 main tasks in this project. First, we assisted in reviewing the risk assessment informat
Project Year: 2022
Organizer: Toxic and Chemical Substances Bureau

Project Title: The project of professional management training to Recycling Management Fund
Project Subject: Now is the era of information explosion and keen competition, a person of talent is core element of
Project Year: 2005
Organizer: Recycling Fund Management Board

Project Title: The Inspection and Certification Third Party on Due Recycled Waste(Non-Plastic Waste Containers and
Project Subject: The execution results of the Project conducted by FTIS during the project period, April 01, 2005 to
Project Year: 2005
Organizer: Recycling Fund Management Board

Project Title: Raising the Collection and Recycling Efficiency and Testing the Heavy Metal Contents of Waste Batter
Project Subject: The project period was from Mar 2, 2009 to Dec 31, 2009. The tasks included analysis of the foreign
Project Year: 2009
Organizer: Recycling Fund Management Board

Project Title: Supervision, Auditing and Account Reconciliation Program for Stationary Pollution Source Air Polluti
Project Subject: The introduction of second phase air pollution control fee has been more than ten years, and the rel
Project Year: 2009
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Implementation of Green Chemistry Principles on Toxic Chemical Substances Management and Communicati
Project Subject: The study first evaluates the strategies of the Sustainable Development Goals (SDGs), and the report
Project Year: 2019
Organizer: Toxic and Chemical Substances Bureau

Project Title: The Project of Establishing a DSS for Preventing and Handling Toxic Chemical Incidents, Improving th
Project Subject: When a toxic chemical disaster breaks out, it causes casualty and property loss as well as environme
Project Year: 2011
Organizer: Department of Environmental Sanitation & Toxic Substance Management

Project Title: "The Environmental Survey of Toxic Chemicals in Taiwan., 2014-2015"
Project Subject: "The objectives of this project were to (1) collect sediment and fish samples from ten major Taiwane
Project Year: 2014
Organizer: "Department of Environmental Sanitation & Toxic Substance Management"

Project Title: The study of traffic and environmental noise control and improvable measures
Project Subject: This study collected the environmental noise and traffic noise measurement results from local gover
Project Year: 2009
Organizer: Department of Air Quality Protection & Noise Control

Project Title:
Project Subject: This project is to monitor from source to destination with real-time tracking systems Global Positio
Project Year: 2012
Organizer: Department of Environmental Sanitation & Toxic Substance Management

Project Title: Research Project on “Program for Development of Indoor Noise Determination and Environmental Recomme
Project Subject: In recent years, with the change of people’s living and transportation behaviors, there is a similar
Project Year: 2009
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Emission Inventory of Volatile Organic Compounds from Main Manufacturing Processes and Establishing
Project Subject: This project attempts to characterize volatile organic compounds (VOCs) emitted from industrial stac
Project Year: 2005
Organizer: Department of Air Quality Protection & Noise Control

Project Title: The Preliminary Establishment of Taiwan Air Benefit and Cost and Attainment Assessment System(ABaCAS
Project Subject: As a bilateral cooperation project between Taiwan EPA and USEPA, this project aim to provide integra
Project Year: 2013
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Project for Audit and Control of Toxic Air Pollutants
Project Subject: There were 729 factories, which operated toxic chemical substances in Taoyuan City, and the amount o
Project Year: 2018
Organizer: Taoyuan County Government Environment Protection Bureau

Project Title: "Analysis and Promotion Plan for Chemical Risk Management and Communication"
Project Subject: "The chemical risk management and analysis report for Taiwan in 2030 is prepared by sorting out a co
Project Year: 2018
Organizer: "Toxic and Chemical Substances Bureau"

Project Title: "Project for constructing a safe and comfortable homeland : The plan for the setup of southern envir
Project Subject: "This project aimed to set up southern environmental incidents specialist teams with one team each i
Project Year: 2017
Organizer: "Toxic and Chemical Substances Bureau"

行政院環境保護署 的其他資料集

符合噪音管制標準車輛-國產柴油引擎車

不定期更新更新,217

林先生 | 02-23712121-6403 | 2022-01-14 01:18:57

行政院環境保護署

阿公店溪及愛河環境優化願景聯繫會報

不定期更新,52

葉先生 | 02-2311-7722#2846 | 2022-01-15 01:12:50

行政院環境保護署

應回收廢棄物處理業者資料

每1年更新,145

廖小姐 | 02-2370-5888#3103 | 2023-07-27 00:59:29

行政院環境保護署

環保證照訓練近期開班訊息

每月更新更新,125

魏小姐 | 03-4020789#603 | 2022-01-15 01:11:05

行政院環境保護署

空氣品質小時值_桃園市_平鎮站

每小時更新更新,203

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:51

行政院環境保護署

建檔公廁明細-金門縣

不定期更新更新,122

賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:07

行政院環境保護署

0800資源回收免費專線-一般件問題查詢廢機動車輛統計

每年更新更新,42

莊先生 | 02-23705888#3108 | 2022-01-14 01:24:24

行政院環境保護署

全國場址更新率統計報表

不定期更新更新,166

賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:16

行政院環境保護署

環境影響評估案件概況

每1年更新,172

顏先生 | 02-23117722#2109 | 2023-07-30 01:00:47

行政院環境保護署

教育部事業廢棄物再利用機構資料

每年更新更新,36

李小姐 | 02-2311-7722#2633 | 2022-01-14 01:26:13

行政院環境保護署

環保署年度施政績效報告

不定期更新更新,35

施小姐 | 02-2311-7722#2912 | 2022-01-15 01:10:15

行政院環境保護署

焚化爐煙囪位置圖

不定期更新更新,56

張小姐 | 02-23712121#5907 | 2023-07-27 01:06:06

行政院環境保護署

垃圾處理場(廠)統計

每半年更新更新,38

掩先生 | (04)2252-1718#53513,#53518,#53522 | 2022-01-14 01:22:10

行政院環境保護署

光化測站(橋頭)小時值資料

不定期更新更新,168

陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:34

行政院環境保護署

水污染源許可及申報資料

每半年更新更新,95

陳先生 | 02-2311-7722#2827 | 2022-01-15 01:12:30

行政院環境保護署

公民營廢棄物清除機構數

每1年更新,109

顏先生 | 02-23117722#2109 | 2023-07-27 01:00:41

行政院環境保護署

環保署環境影響評估審查委員會簡報資料

每2月更新,127

黃先生 | 02-23117722#2748 | 2023-08-05 01:00:55

行政院環境保護署

建檔公廁明細-基隆市

不定期更新更新,271

曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:14:53

行政院環境保護署

行政院環境保護署會計月報

每月更新更新,46

陳小姐 | 02-2311-7722#2159 | 2022-01-14 01:22:16

行政院環境保護署

環保標章旅館環境即時通地圖資料

每日更新更新,58

呂小姐 | 02-23117722#2929 | 2022-01-14 01:18:02

行政院環境保護署

公告飲用水水質處理藥劑

不定期更新更新,48

黃先生 | 02-23117722-2881 | 2023-08-09 01:05:33

行政院環境保護署

環境音量監測結果統計(依管制區分)

不定期更新更新,144

章小姐 | 02-23712121#6407 | 2023-08-03 01:04:06

行政院環境保護署

區域性地下水水質監測井基本資料

不定期更新更新,128

謝小姐 | 02-23117722#2386 | 2022-01-14 01:23:17

行政院環境保護署

酸雨監測小時值(每小時提供)

每小時更新更新,84

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:11

行政院環境保護署

行政院環境保護署環境教育人員認證展延研習開課申請書

不定期更新更新,53

盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:21

行政院環境保護署

縣市(桃園市)小時值-每小時

每小時更新更新,117

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:46

行政院環境保護署

環境檢驗測定機構許可資料

每1月更新,175

楊先生 | (03)491-5818轉2103 | 2023-07-27 01:01:42

行政院環境保護署

縣市(彰化縣)小時值-每小時

每1時更新,197

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:50

行政院環境保護署

經過水庫集水區之環境影響說明書件

每2月更新,72

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:03

行政院環境保護署

重點事業廢棄物-生物醫療廢棄物之處理方式

每月更新更新,157

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:07

行政院環境保護署