"The 105 annual plan of supervision, management and checking wor」於資料集「EPQSummary_SoilAndGroundwater」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:52。 欄位Project Title的內容是"The 105 annual plan of supervision, management and checking work relating to China Petrochemical Development Co. An-Shun Remediation Site" , 欄位Project Subject的內容是"This project was carried out from March 3, 2016 to May 2, 2018 for a total duration of 26 months, in which, the period between September 2, 2017 and May 2, 2018 was for contract extension. The major tasks completed in this project including the following: 1.Reviewing pollution remediation plan and other associated documents This project assisted the Environmental Protection Bureau (EPB) to review a total of 128 project reports and construction plans submitted by China Petrochemical Development Corporation (CPDC). 2.On-site construction supervision and staffing On-site duty staffs were responsible for various project tasks, such as supervising construction quality, site health and safety, remediation progress and daily logging of all situations and deficiency related to the project. As of the end of May 2, 2018, there were 4 remediation projects behind schedule, which were “Thermal Treatment Plant Operation”, “Wet Treatment Plant Operation”, “Area B of Seawater Storage Pool Contaminant Removal” and “single botany Excavation”, respectively. During the project, on-site duty staffs had issued a total of 10 violation tickets regarding construction quality and site health and safety. In addition,issued a total of 82 site contact lists and daily reminder. All tickets required CPDC to make proper correction within the given time. 3.Site and perimeter control zone management On-site duty staffs had conducted perimeter control zone inspection daily (including weekend) and prepared daily reports. A total of 28 deficiencies, including 6 environmental inspections and 22 fish farms inspections, were noted. 4.Verification sampling during remediation period One flue gas sample from thermal treatment plant was collected monthly. The analyzed results from a total of 7 samples were all below emission standard. As for the performance verification of thermal treatment for contaminated soil, a total of 5 samples were collected to verify the treatment performance. The results were all lower than the soil pollution control standards and 15,077.4 tonnes in volume of treated soil had been verified. Additionally, one off gas sample from wet treatment was collected quarterly. The analyzed results from a total of 2 samples were all below emission standard. As for the performance verification of wet treatment for contaminated soil, a total of 14 samples were collected to verify the treatment performance. The results were all lower than the soil pollution control standards and 15,077.4 tonnes in volume of treated soil had been verified. 5.Environmental quality monitoring during remediation period This project collected one effluent sample each month, for a total of 25 samples. 15 out of the 25 effluent samples results exceeded effluent standards stated in the remediation plan. In addition, 4 groundwater samples were collected every quarter, the results for a total of 32 samples were all lower than the groundwater pollution control standards. Finally, 4 ambient air samples were collected every month. Total suspended particulate (TSP) and fine suspended particles (PM10) results were in compliance with air quality standards. Fine suspended particles (PM2.5) exhibited higher concentration during winter periods but still in close correlation with surrounding ambient air concentration. 6.Groundwater pollution investigation and assessment This project had set up one groundwater standard monitoring well (MW1), the location was near south of pentachloro-phenol plant. The analyzed result of groundwater was no 2,4,5-trichlorophenol and 2,4,6-trichlorophenol, the pentachlorophenol was lower than the groundwater pollution control standards. 7.Emergency response measures and claim petition reactions One Feed soil sample,11 performance verification soil samples, 7 flue gas samples and 7 air samples were collected when the thermal treatment plant was test peri..." , 欄位Project Year的內容是2016 , 欄位Organizer的內容是"Environmental Protection Bureau of Tainan City" , 欄位Executive Unit的內容是"環興科技股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=176460 , 欄位Publish Date的內容是20181114

Project Title

"The 105 annual plan of supervision, management and checking work relating to China Petrochemical Development Co. An-Shun Remediation Site"

Project Subject

"This project was carried out from March 3, 2016 to May 2, 2018 for a total duration of 26 months, in which, the period between September 2, 2017 and May 2, 2018 was for contract extension. The major tasks completed in this project including the following: 1.Reviewing pollution remediation plan and other associated documents This project assisted the Environmental Protection Bureau (EPB) to review a total of 128 project reports and construction plans submitted by China Petrochemical Development Corporation (CPDC). 2.On-site construction supervision and staffing On-site duty staffs were responsible for various project tasks, such as supervising construction quality, site health and safety, remediation progress and daily logging of all situations and deficiency related to the project. As of the end of May 2, 2018, there were 4 remediation projects behind schedule, which were “Thermal Treatment Plant Operation”, “Wet Treatment Plant Operation”, “Area B of Seawater Storage Pool Contaminant Removal” and “single botany Excavation”, respectively. During the project, on-site duty staffs had issued a total of 10 violation tickets regarding construction quality and site health and safety. In addition,issued a total of 82 site contact lists and daily reminder. All tickets required CPDC to make proper correction within the given time. 3.Site and perimeter control zone management On-site duty staffs had conducted perimeter control zone inspection daily (including weekend) and prepared daily reports. A total of 28 deficiencies, including 6 environmental inspections and 22 fish farms inspections, were noted. 4.Verification sampling during remediation period One flue gas sample from thermal treatment plant was collected monthly. The analyzed results from a total of 7 samples were all below emission standard. As for the performance verification of thermal treatment for contaminated soil, a total of 5 samples were collected to verify the treatment performance. The results were all lower than the soil pollution control standards and 15,077.4 tonnes in volume of treated soil had been verified. Additionally, one off gas sample from wet treatment was collected quarterly. The analyzed results from a total of 2 samples were all below emission standard. As for the performance verification of wet treatment for contaminated soil, a total of 14 samples were collected to verify the treatment performance. The results were all lower than the soil pollution control standards and 15,077.4 tonnes in volume of treated soil had been verified. 5.Environmental quality monitoring during remediation period This project collected one effluent sample each month, for a total of 25 samples. 15 out of the 25 effluent samples results exceeded effluent standards stated in the remediation plan. In addition, 4 groundwater samples were collected every quarter, the results for a total of 32 samples were all lower than the groundwater pollution control standards. Finally, 4 ambient air samples were collected every month. Total suspended particulate (TSP) and fine suspended particles (PM10) results were in compliance with air quality standards. Fine suspended particles (PM2.5) exhibited higher concentration during winter periods but still in close correlation with surrounding ambient air concentration. 6.Groundwater pollution investigation and assessment This project had set up one groundwater standard monitoring well (MW1), the location was near south of pentachloro-phenol plant. The analyzed result of groundwater was no 2,4,5-trichlorophenol and 2,4,6-trichlorophenol, the pentachlorophenol was lower than the groundwater pollution control standards. 7.Emergency response measures and claim petition reactions One Feed soil sample,11 performance verification soil samples, 7 flue gas samples and 7 air samples were collected when the thermal treatment plant was test peri..."

Project Year

2016

Organizer

"Environmental Protection Bureau of Tainan City"

Executive Unit

"環興科技股份有限公司"

Publish Date

20181114

「"The 105 annual plan of supervision, management and checking wor」所屬的資料集:「EPQSummary_SoilAndGroundwater」的其他資料

Project Title: "Control and Investigation Project for National Agricultural Land with High Potential of Heavy Metal
Project Subject: "The “Control and Investigation Project for National Agricultural Land with High Potential for Heavy
Project Year: 2016
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Application of geophysical prospecting to investigation ,verification and evaluation of soil and gr
Project Subject: "This project is in the second period of the project. With the tests in three waste and landfill sit
Project Year: 2016
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Project of review and adjustment on the soil and groundwater pollution remediation fees systems"
Project Subject: "This project attempts to deliver specific and feasible suggestions for the amendment on the soil an
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "105 annual Keelung soil and groundwater pollution investigation and verification work"
Project Subject: "The plan was signed on March 3, 105 and the implementation date was until 31 December 105. The tota
Project Year: 2016
Organizer: "Bureau of Environmental Protection, Keelung City"

Project Title: "Analysis on Pollution Control Strategy of Concern Substances and Area in Groundwater"
Project Subject: "The purpose of this project is to investigate and review the standards of concerned groundwater con
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Hsinchu City 101 annual soil and groundwater pollution investigation and verification work program"
Project Subject: "Hsinchu City is located in the northwest of Taiwan, Taiwan is the northern region, between Taipei a
Project Year: 2012
Organizer: "Bureau of Environmental Protection Hsin-Chu"

Project Title: "Hsinchu City 105 years of soil and groundwater pollution investigation and verification work progra
Project Subject: "The overall progress of the project is 98.9% (due to the current situation of emergency response fu
Project Year: 2016
Organizer: "Bureau of Environmental Protection Hsin-Chu"

Project Title: "The Inspection, Consultation and Auditing of Declaration Reports for Underground Storage Tanks Proj
Project Subject: "The Environmental Protection Agency (EPA) has continued to implement the The Inspection, Consultati
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Development of National Soil and Groundwater Management and Decision Support System"
Project Subject: "This year’s project is significantly different from those of previous years. In previous years, the
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Early warning management and mechanism development on Arsenic-rich groundwater and soil in farmland
Project Subject: "This project has aggregated rice testing data from Taiwan Agriculture Chemicals and Toxic Substance
Project Year: 2020
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Tracing sources of Cu in contaminated soils of Taiwan with stable Cu isotopic ratios (1/4)"
Project Subject: "This study is the first year of the project “Tracing sources of Cu in contaminated soils of Taiwan
Project Year: 2021
Organizer: "Environmental Analysis Laboratory"

Project Title: "2018 Reexamination of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject: "The main purpose of this project is to improve the management of payers of soil and groundwater pol
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The Pollution Improvement Project by Soil Excavation Method with Clean Backfilled Farmland Pollutio
Project Subject: "The project aims to improve soil pollution control farmland of Taoyuan County. To get rid of the l
Project Year: 2015
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: "The project for platform planning and system management of soil and groundwater health risk assessm
Project Subject: "This project contains main parts, including “Planning to construct solid and groundwater health and
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Soil and Groundwater Investigation and Verification Project"
Project Subject: "This project continues work in “Soil and Groundwater Investigation and Verification Project” of New
Project Year: 2016
Organizer: "Environmental Protection Bureau, Taipei County"

Project Title: "Project Study for Managerial Technologies of the Remanufactured Products Containing Off-site Treate
Project Subject: "This project collected information regarding the technologies of the reuse and recycle of the treat
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: " Investigation and Determination of the Sources of High Concentration of Arsenic in Groundwater in
Project Subject: "The program is scheduled for August 7, 2015 to January 5, 2017. The aim of this program was to inve
Project Year: 2015
Organizer: "Environmental Protection Bureau, Pingtung County"

Project Title: " The 2019 Project on the Inspection and Verification of Soil and Groundwater Pollution in Pingtung"
Project Subject: "The project period starts from the contract signing date on January 1, 2019 to December 20, 2019. T
Project Year: 2019
Organizer: "Environmental Protection Bureau, Pingtung County"

Project Title: "Project of Soil and Groundwater Pollution Survey and Investigation in HsinChu Country,2014"
Project Subject: "AbstractThis project has been completed all works with the contract (see table 摘-1). And the result
Project Year: 2014
Organizer: "HsinChu County Environment Protection Bureau"

Project Title: "Research and Analysis of Soil Dioxin Contamination Investigation and Management in Taiwan Region (T
Project Subject: "In order to establish baseline dioxin concentrations in soil and develop related pollution control
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: " 2019 Project of investigating and verifying pollution for Taichung soil and groundwater"
Project Subject: "Taichung Environmental Protection Bureau (TCEPB) has carried out the work to manage the current qua
Project Year: 2019
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "Soil and Groundwater monitoring and investigating in Taoyuan area for 2010"
Project Subject: " The tasks of this project consisted of implementing soil and groundwater pollution investigatio
Project Year: 2010
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: " 無"
Project Subject: " 無"
Project Year: 2017
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "Application of Environmental Forensics on Investigation of Chlorinated Hydrocarbon Contaminated Sit
Project Subject: "This project focuses on the chlorinated ethenes (CEs) contaminated sites. Thepurpose was to apply e
Project Year: 2013
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: ""
Project Subject: "“Soil and Groundwater Pollution Remediation Act”(hereunder referred to as “the Act”) was promulgate
Project Year: 2013
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Survey and verification work plan for soil and groundwater pollution in Nantou County in 107"
Project Subject: "The 107th Nantou County Soil and Groundwater Pollution Investigation and Verification Work Plan is
Project Year: 2018
Organizer: "Nantou County Environmental Protection Bureau"

Project Title: "Program for Managing Contaminated Sediments in Taiwan from 2013"
Project Subject: "In the recent years, there were many sediment sites found contaminated in Taiwan. Whether removal
Project Year: 2013
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Sediment pollution transfer model technology demonstration project"
Project Subject: "The objectives of this project include using the supplemental investigation data, strengthening the
Project Year: 2016
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Soil and Groundwater monitoring and investigating in Kaohsiung area for 2015"
Project Subject: " This project was contracted by the Environmental Protection Bureau of Kaohsiung City (Kaohsiung
Project Year: 2015
Organizer: "Environmental Protection Bureau Kauhsiung City Government"

Project Title: "2019 Filing for and Verification of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject: "To remediate the soil and groundwater pollution in Taiwan, the Environmental Protection Administrat
Project Year: 2019
Organizer: "Soil and Groundwater Remediation Fund Management Board"

行政院環境保護署 的其他資料集

南投縣重要環保統計資料

每1月更新,160

顏先生 | 02-23117722#2109 | 2023-08-07 01:00:08

行政院環境保護署

環評監督追蹤之作業架構

不定期更新更新,42

陳先生 | 04-22521718#51207 | 2022-01-15 01:13:26

行政院環境保護署

環訓所年度年報彙編

每年更新更新,48

湯小姐 | 03-4020789#544 | 2022-01-15 01:10:11

行政院環境保護署

0800資源回收免費專線-一般件問題查詢廢資訊物品統計

每年更新更新,56

莊先生 | 02-23705888#3108 | 2022-01-14 01:24:26

行政院環境保護署

行政院環境保護署前瞻基礎建設計畫特別預算會計月報

每1月更新,51

鄭小姐 | 02-23117722#2156 | 2023-08-09 01:05:39

行政院環境保護署

斯德哥爾摩公約出國報告

每年更新更新,40

劉小姐 | 23257399#55531 | 2022-01-15 01:10:07

行政院環境保護署

資源回收業(站、點)資料

不定期更新,113

范小姐 | 02-23117722#2622 | 2022-01-14 01:26:05

行政院環境保護署

應回收廢棄物處理業者(廢乾電池類)最大處理量資料

每年更新更新,45

廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:03

行政院環境保護署

總碳氫化合物(THC)監測小時值

每1日更新,103

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:32

行政院環境保護署

汽車新車審驗資料

每月更新更新,161

王先生 | 02-23712121#6306 | 2022-01-14 01:18:29

行政院環境保護署

核能四廠環境監測資料

不定期更新更新,36

陳先生 | 04-22521718#51207 | 2022-01-14 01:22:00

行政院環境保護署

苗栗縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,39

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:44

行政院環境保護署

廢棄物質最終處置資訊網相關新聞

每月更新更新,53

許先生 | 02-2311-7722#2641 | 2022-01-14 01:24:14

行政院環境保護署

廢棄物稽查次數

每1年更新,149

顏先生 | 02-23117722#2109 | 2023-07-27 01:00:46

行政院環境保護署

工程會列管重大公共建設計畫

每1月更新,155

蕭先生 | 02-2311-7722#2344 | 2023-07-28 11:38:59

行政院環境保護署

歷年燈號變換情形

每半年更新更新,192

詹小姐 | 02-23832389#8204 | 2022-01-14 01:20:22

行政院環境保護署

環保署考核直轄市及縣(市)政府環境保護績效作業要點

不定期更新更新,36

陳先生 | (02)2311-7722分機2971 | 2023-08-07 01:03:24

行政院環境保護署

彰化縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,49

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:46

行政院環境保護署

工業區燈號分級現況

每6月更新,87

黃先生 | 02-23832389#8204 | 2023-07-27 01:03:38

行政院環境保護署

MajorEnvironmentalPolicies

每3月更新,168

陳小姐 | (02)23117722#2753,(02)23117722#2756 | 2023-07-30 01:03:45

行政院環境保護署

廢家具修繕DIY

不定期更新更新,43

林小姐 | 04-22521718#53511 | 2023-08-09 01:04:04

行政院環境保護署

EPQSummary_WasteManagement

不定期更新更新,136

郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:53

行政院環境保護署

垃圾處理場(廠)座數

每1年更新,164

顏先生 | 02-23117722#2109 | 2023-07-27 01:00:41

行政院環境保護署

經過山坡地之環境影響說明書件

每2月更新,211

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:01

行政院環境保護署

毒性化學物質禁止運作事項資料

不定期更新更新,43

許先生 | 02-23257399#55328 | 2023-07-30 00:59:58

行政院環境保護署

空氣品質小時值_彰化縣_線西站

每1時更新,100

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:55

行政院環境保護署

室內空氣品質公告場所定期檢測結果

不定期更新更新,136

蔣小姐 | 02-23117722#6406 | 2023-07-30 01:04:48

行政院環境保護署

空氣品質預報資料

30分鐘更新,98

謝小姐 | 02-2311-7722#2386 | 2022-01-15 01:00:10

行政院環境保護署

環境教育終身學習有效護照人數

每季更新更新,48

李小姐 | 02-23117722#2724 | 2022-01-15 01:10:48

行政院環境保護署

地下水場置性監測井位置圖

每1月更新,46

呂小姐 | 02-2383-2389#8110 | 2023-08-09 01:04:52

行政院環境保護署