time1: 0 time2: 0 time3: 0 time4: 0 total: 0 "2015 Project on Incorporation and Maintenance of Newly Added Fu
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

"2015 Project on Incorporation and Maintenance of Newly Added Fu

"2015 Project on Incorporation and Maintenance of Newly Added Fu」於資料集「EPQSummary_WasteManagement」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:53。 欄位Project Title的內容是"2015 Project on Incorporation and Maintenance of Newly Added Functions of the Resources Recycling Management Information System (RRMS)" , 欄位Project Subject的內容是"Enforcement of this plan started on January 1, 2015, which covered some service targets, i.e. recycling and disposal industry, audit certification organizations, local environmental protection agency, EPA and unit of plan authorized by EPA, etc. Enforcement target in this year expected to establish and maintain resources recycling management information system based on four major indicators, i.e. “integration”, “maintenance”, “value-added” and “safety”. Enforcement project in this year aimed at handling CCTV real-time monitoring images, maintenance and operation of measuring equipment timely online transmission system platform, maintaining every function of Resource Recovery Management Information System (RRMS), promoting electronic management operation continuously, and making analysis and statistics report needed for recycling of resources achievement or decision, establishment and integration of information system, in order to ensure the security of database and data transmission, it also did operation related to information security. Regarding system maintenance, this plan used electronic system to import audit certification mode. CCTV monitoring images of subsidized treatment plant recycling waste were all online; it monitored the operation situation of subsidized treatment plants recycling waste all over the country by global internet. The CCTV system could keep the online camera images over 3 months, access historical imagery online 24 hours, receive more than 1200 of the video cameras simultaneously and upload video files 24 hours one day, etc. It also combined real-time measurement equipment wiring systems, and measurement equipment related audit certification matching function to assist audit certification operation and improve the accuracy of data. Regarding system integration, the plan handled online reporting between RRMS and the liability companies' operating capacity, integration of management system, for the sake of the efficiency of integration of resource recovery management and real-time sharing of information and resource consistency. When merging the operating capacity management system, we adopted the system database backend data automatically switching technology to obtain the real-time data and solved the problem of data repeated login or uploading, it also redesigned home page layout for operating capacity declare application system and improved the function of off-line application, so that the system picture could offer liability companies more and more real-time relevant information, reduce the liability companies’ time of application and operation. Regarding system value-added, because the data management of EPA funded supervising primarily focus on MS-SQL, this plan transacted some relevant operation about waste vehicle recycling in waste motor vehicle recycling management system database from My SQL to Ms-SQL, there were total 229 procedures finishing the conversion needle “incentive payment application data table”, 418 procedures of “customers basic data table”, “usage behavior data table” Moreover, the internal and external tests have been completed, so as to enhance the database using and the management efficiency. Regarding system safety, in addition to providing and maintaining citizen digital certification login, this plan assisted Department of Environmental Monitoring & Information Management of Environmental Protection Agency to handle various information securities drills. This plan established and maintained resources recycling management information system to actually achieve various performance indicators in accordance with four targets. Information sharing and convenience could be reached through data horizontal series connection to improve quality of decision making to quickly provide decision with required data and enhance information capability of overall resource recycling system." , 欄位Project Year的內容是2015 , 欄位Organizer的內容是"Recycling Fund Management Board" , 欄位Executive Unit的內容是"環資國際有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw , 欄位Publish Date的內容是20160401

Project Title

"2015 Project on Incorporation and Maintenance of Newly Added Functions of the Resources Recycling Management Information System (RRMS)"

Project Subject

"Enforcement of this plan started on January 1, 2015, which covered some service targets, i.e. recycling and disposal industry, audit certification organizations, local environmental protection agency, EPA and unit of plan authorized by EPA, etc. Enforcement target in this year expected to establish and maintain resources recycling management information system based on four major indicators, i.e. “integration”, “maintenance”, “value-added” and “safety”. Enforcement project in this year aimed at handling CCTV real-time monitoring images, maintenance and operation of measuring equipment timely online transmission system platform, maintaining every function of Resource Recovery Management Information System (RRMS), promoting electronic management operation continuously, and making analysis and statistics report needed for recycling of resources achievement or decision, establishment and integration of information system, in order to ensure the security of database and data transmission, it also did operation related to information security. Regarding system maintenance, this plan used electronic system to import audit certification mode. CCTV monitoring images of subsidized treatment plant recycling waste were all online; it monitored the operation situation of subsidized treatment plants recycling waste all over the country by global internet. The CCTV system could keep the online camera images over 3 months, access historical imagery online 24 hours, receive more than 1200 of the video cameras simultaneously and upload video files 24 hours one day, etc. It also combined real-time measurement equipment wiring systems, and measurement equipment related audit certification matching function to assist audit certification operation and improve the accuracy of data. Regarding system integration, the plan handled online reporting between RRMS and the liability companies' operating capacity, integration of management system, for the sake of the efficiency of integration of resource recovery management and real-time sharing of information and resource consistency. When merging the operating capacity management system, we adopted the system database backend data automatically switching technology to obtain the real-time data and solved the problem of data repeated login or uploading, it also redesigned home page layout for operating capacity declare application system and improved the function of off-line application, so that the system picture could offer liability companies more and more real-time relevant information, reduce the liability companies’ time of application and operation. Regarding system value-added, because the data management of EPA funded supervising primarily focus on MS-SQL, this plan transacted some relevant operation about waste vehicle recycling in waste motor vehicle recycling management system database from My SQL to Ms-SQL, there were total 229 procedures finishing the conversion needle “incentive payment application data table”, 418 procedures of “customers basic data table”, “usage behavior data table” Moreover, the internal and external tests have been completed, so as to enhance the database using and the management efficiency. Regarding system safety, in addition to providing and maintaining citizen digital certification login, this plan assisted Department of Environmental Monitoring & Information Management of Environmental Protection Agency to handle various information securities drills. This plan established and maintained resources recycling management information system to actually achieve various performance indicators in accordance with four targets. Information sharing and convenience could be reached through data horizontal series connection to improve quality of decision making to quickly provide decision with required data and enhance information capability of overall resource recycling system."

Project Year

2015

Organizer

"Recycling Fund Management Board"

Executive Unit

"環資國際有限公司"

Reporting download URL

https://epq.epa.gov.tw

Publish Date

20160401

「"2015 Project on Incorporation and Maintenance of Newly Added Fu」所屬的資料集:「EPQSummary_WasteManagement」的其他資料

Project Title: "Recycling of waste automotive laminated glass"
Project Subject: "PVB (polyvinyl butyral) is expensive and has recycled value. However, there is no recycling system
Project Year: 2019
Organizer: "Recycling Fund Management Board"

Project Title: "Management and Tactics Proposing for the Collection and Recycling systems of Waste Batteries and Wa
Project Subject: "The project period was from Jan18, 2019 to Dec 31, 2019. The information of secondary Lithium batte
Project Year: 2019
Organizer: "Recycling Fund Management Board"

Project Title: "Development and verification on pollutants emission reduction during the automobile shredder residu
Project Subject: "In recent years, to increase recycling rate of the end-of-life vehicle (ELV), some researches have
Project Year: 2020
Organizer: "Recycling Fund Management Board"

Project Title: "Integration of Environmental Protection Permitting system,and online Management and Monitoring Func
Project Subject: "This project mainly aims to assist the Environmental Protection Administration (EPA) with the promo
Project Year: 2017
Organizer: "Department of Waste Management"

Project Title: "Regulated Recyclable Containers of Collection Recycling system management project"
Project Subject: "In terms of waste container distributing surveys, this project has completed surveys of 150 recycli
Project Year: 2021
Organizer: "Recycling Fund Management Board"

Project Title: "Innovation module for recycling collection vehicle application design research by evidence-based de
Project Subject: "This project uses evidence-based design to optimize resource recovery vehicles. By grasping the exi
Project Year: 2020
Organizer: "Recycling Fund Management Board"

Project Title: "Project of Industrial Wastes Export Management and International Conventions Participation"
Project Subject: "The major outcomes of this project were composed of as following: (1) We have attended and joined t
Project Year: 2017
Organizer: "Department of Waste Management"

Project Title: "Resource Recycling Work Plan of Pingtung County in 2018"
Project Subject: "The work team implemented the Resource Recycling Work Plan of Pingtung County in 2018. The resource
Project Year: 2018
Organizer: "Environmental Protection Bureau, Pingtung County"

Project Title: "2013 Automatic Add Value Service System for MRT Integrated ARM Pass and Promotion Program"
Project Subject: " To further apply the Self-service concept into resources recycling, the Environmental Protection B
Project Year: 2013
Organizer: "Environmental Protection Bureau Kauhsiung City Government"

Project Title: "2019 Recycling Project Plan of Chiayi City"
Project Subject: "To continue promoting the work of resources recycling, the Environmental Protection Bureau, Chiayi
Project Year: 2019
Organizer: "Environmental Protection Bureau, Chiayi City"

Project Title: "Environmental communication plan for reusing recycled aggregate in public construction projects"
Project Subject: "To expand the application range and usage of recycled aggregate in public construction projects, th
Project Year: 2019
Organizer: "Department of Waste Management"

Project Title: "Waste recycling guidance and control , promote and set the village of recycling station in Taichung
Project Subject: "Waste recycling guidance and control , promote and set the village of recycling station in Taichung
Project Year: 2017
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "The Third-party Inspection and Certification on Waste Information Technology Appliances and Electri
Project Subject: "From January 1, 2013 to December 31 , 2014, the totally certificated amount of waste Electronic and
Project Year: 2013
Organizer: "Recycling Fund Management Board"

Project Title: "Technology development for recycling of plastic lampshade from waste LED lighting sources"
Project Subject: " Compared with traditional illumination light sources, LED lighting sources are more environmen
Project Year: 2021
Organizer: "Recycling Fund Management Board"

Project Title: "2016 Taipei City Project of Recycling Appearance Trasformation and Property Management"
Project Subject: "2016 Taipei City Project of Recycling Appearance Trasformation and Property Management"
Project Year: 2016
Organizer: "Department of Environmental Protection, Taipei City Government"

Project Title: "The auditing and certification project of the regulated recyclable waste (Waste Vehicles)"
Project Subject: "The performed results of the Project conducted by FTIS during the project period, January 01, 2019
Project Year: 2019
Organizer: "Recycling Fund Management Board"

Project Title: "The Application of Remote Sensing Technologies to Illegal dumping of waste Monitoring"
Project Subject: "This project is to 1) collect information on illegal disposal of waste sitesand relevant spatial da
Project Year: 2016
Organizer: "Bureau of Environmental Inspection"

Project Title: "The Waste container collection recycling system management project"
Project Subject: "The project was from January 10, 2017 to December 31, 2017, the main purpose of the project is to r
Project Year: 2017
Organizer: "Recycling Fund Management Board"

Project Title: "The project of investigating the scope of the regulated recyclable waste and improving the recyclin
Project Subject: "The project was divided to three sections, following elaboration explains the project in detail.Fir
Project Year: 2017
Organizer: "Recycling Fund Management Board"

Project Title: "Automotive Shredder Residue Separation and Refuse Derived Fuel Production Program"
Project Subject: "After end-of-life vehicle (ELV) shredding, separating, and recycling the valuable materials by the
Project Year: 2020
Organizer: "Recycling Fund Management Board"

Project Title: "Guidance and bookkeeping examination of designated responsible manufacturing/import enterprises wi
Project Subject: "This project, executed from 5 June 2019 to 31 December 2020, aimed to audit designated enterprises
Project Year: 2019
Organizer: "Recycling Fund Management Board"

Project Title: "Project of cooking oil flow estimating and site inspection"
Project Subject: "This Project was implemented over the period from December 30, 2014 to the end of April, 2015. The
Project Year: 2014
Organizer: "Department of Waste Management"

Project Title: "Bookkeeping examination of responsible enterprises to the manufacturing/import volume of articles d
Project Subject: "This project, executed from 1 January 2018 to 31 December 2019, aimed to audit designated enterpris
Project Year: 2018
Organizer: "Recycling Fund Management Board"

Project Title: "Project of promoting low carbon clearance and planning complementary measures on introducing biofue
Project Subject: "In order to maintain the effectiveness of replacing refuse collection vehicles in the past years, t
Project Year: 2014
Organizer: "Department of Waste Management"

Project Title: "The Registration of Registered Persons, Taichung,2019"
Project Subject: "The main objective of this project was to strengthen supervision over various types of announcement
Project Year: 2019
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: ""
Project Subject: "This project was starting from September 27,2013 to November 30, 2014. In order to establish an aut
Project Year: 2013
Organizer: "Recycling Fund Management Board"

Project Title: "Purification of rare resources recovered from regulated recyclable waste by supported liquid membra
Project Subject: "Indium is a precious rare metal which has outstanding conductivity and light transmittance properti
Project Year: 2014
Organizer: "Recycling Fund Management Board"

Project Title: "Evaluation the Application of Recycling Inorganic Waste Products."
Project Subject: "In recent years, Environmental Protection Administration has achieved preliminary results in promot
Project Year: 2019
Organizer: "Department of Waste Management"

Project Title: "The Inspection and Certification Third Party on Due Recycled Waste(waste batteries and waste lamps)
Project Subject: "The project period was from January 1, 2019 to December 31, 2020. The main objectives of the projec
Project Year: 2019
Organizer: "Recycling Fund Management Board"

Project Title: "Preliminary Project Plan for constructing Municipal Waste Bio-engery Center"
Project Subject: "According to the policy review and adjustments of promotion by EPA, “adjustments of promotion stra
Project Year: 2014
Organizer: "Department of Waste Management"

行政院環境保護署 的其他資料集

環境教育及訓練電子報

不定期更新更新,49

葉小姐 | 03-4020789#607 | 2022-01-15 01:13:29

行政院環境保護署

環保署廉政會報會議紀錄

不定期更新更新,49

張先生 | 02-23117722#2226 | 2022-01-15 01:12:52

行政院環境保護署

屏東縣重要環保統計資料

每1月更新,295

顏先生 | 02-23117722#2109 | 2023-08-07 01:00:01

行政院環境保護署

柴油新車審驗資料-合格證明

不定期更新更新,49

李小姐 | 02-2311-7722#6311 | 2023-08-09 01:04:48

行政院環境保護署

環境教育終身學習網影片專區使用人次

每季更新更新,55

李小姐 | 02-23117722#2724 | 2022-01-15 01:10:50

行政院環境保護署

環保標章廠商資料

每1月更新,247

盧小姐 | 02-23117722#2943 | 2023-07-27 01:01:48

行政院環境保護署

管制事業、下水道系統下水道查核、處分資料資訊平台

不定期更新更新,52

陳先生 | 02-2311-7722#2827 | 2023-08-09 01:04:16

行政院環境保護署

移動污染源空氣污染防制費收費統計

每1月更新,173

周小姐 | 02-2311-7722#6304 | 2023-07-28 11:35:52

行政院環境保護署

審核事業或污水下水道系統放流水水質濃度限值處理原則

不定期更新,56

簡小姐 | 02-2311-7722#2818 | 2022-01-15 01:13:05

行政院環境保護署

縣市(彰化縣)小時值-每小時

每1時更新,258

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:50

行政院環境保護署

水污染罰鍰次數

每年更新更新,209

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:27

行政院環境保護署

連江縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,73

程先生 | 02-2311-7722#2833 | 2023-08-09 01:04:05

行政院環境保護署

空氣品質小時值_雲林縣_臺西站

每1時更新,344

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:49

行政院環境保護署

飲用水設備維護管理稽查成果

不定期更新更新,293

黃先生 | 02-23117722-2881 | 2022-01-15 01:10:29

行政院環境保護署

行政院環境保護署環境保護人員訓練所單位決算

每1年更新,62

江先生 | 03-4020789 #583 | 2023-08-09 01:05:48

行政院環境保護署

公民營廢棄物乙級處理機構許可資料

每1月更新,213

盧小姐 | 02-2311-7722#2651 | 2023-07-28 11:35:17

行政院環境保護署

各公告類別申報事業廢棄物流向統計

每1年更新,161

林先生 | 02-2311-7722#2671 | 2023-08-07 01:02:02

行政院環境保護署

環境影響評估報告書環境敏感區位調查表

每2月更新,248

黃先生 | 02-23117722#2748 | 2023-08-05 01:00:55

行政院環境保護署

建檔公廁明細-新竹市

不定期更新更新,215

曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:15:00

行政院環境保護署

苗栗縣重要環保統計資料

每1月更新,235

顏先生 | 02-23117722#2109 | 2023-08-07 01:00:15

行政院環境保護署

環境影響評估技術顧問機構評鑑成果

2年更新,58

劉先生 | 02-23117722#2743 | 2022-01-15 01:12:19

行政院環境保護署

空氣品質小時值_高雄市_橋頭站

每1時更新,465

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:43

行政院環境保護署

全國公廁建檔資料

每1日更新,186

賴先生 | 04-2252-1718#53686 | 2023-08-05 00:59:29

行政院環境保護署

廠商獲頒產品數統計(第二類)

每季更新更新,62

孫小姐 | 02-23117722#2926 | 2022-01-14 01:17:49

行政院環境保護署

環境影響評估開發案公開說明會資料

每2月更新,202

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:15

行政院環境保護署

空氣品質小時值_新北市_新莊站

每小時更新更新,162

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:24

行政院環境保護署

空氣品質小時值_高雄市_大寮站

每小時更新更新,120

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:21

行政院環境保護署

縣市(金門縣)小時值-每小時

每1時更新,250

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:36

行政院環境保護署

自備飲料杯優惠店家資料

不定期更新更新,218

林先生 | 02-2311-7722#2614 | 2022-01-14 01:24:10

行政院環境保護署

水庫水質監測點基本資料

不定期更新更新,184

郭先生 | 2311-7722#2399 | 2023-08-07 00:59:33

行政院環境保護署