time1: 0 time2: 0 time3: 0 time4: 0 total: 0 "107 Water Pollution Source Control and Water Environment Improv
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

"107 Water Pollution Source Control and Water Environment Improv

"107 Water Pollution Source Control and Water Environment Improv」於資料集「EPQSummary_WaterQualityProtection」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:47。 欄位Project Title的內容是"107 Water Pollution Source Control and Water Environment Improvement Project in Yilan County" , 欄位Project Subject的內容是"The implementation of this project focuses on assisting the Environmental Protection Agency to promote the inspection and control of water pollution sources and water quality monitoring in the area under its jurisdiction. It does grasp the current situation of water pollution prevention and control of water pollution sources within the jurisdiction of Yilan County, and supervises the management of the management through the inspection and control of the project. The business unit implements the operation and maintenance of the water pollution prevention and control facilities, and achieves the goal of improving the water quality of the stations in each jurisdiction. The results of the final report from January 24, 2007 to November 30, 2007 are as follows: I. Assisting in the investigation of water pollution source management (1) A total of 699 inspections of water pollution sources (including inspection, sampling and sample delivery in industrial areas), 607 in the execution part of the project, including 178 in industrial inspections, assisting in water sampling There were 105 inspections, and the 11-month inspections and industrial inspections were carried out, all of which have reached the annual target value of 100% or more. (2) There are a total of 42 water pollution source management units in the key station of Dezikouxi, which is announced by the Environmental Protection Agency. During the planning period, a total of 33 inspections were carried out, and 37 cumulative implementations were carried out. The key stations were within the scope of pollution collection. The inspection control rate reached 79% (33/42), and the discharge water quality sampling was performed a total of 18 times. (3) The implementation of the inspection of water pollution sources found that violations of the relevant provisions of the Water Pollution Law, after confirmation, the total number of disciplinary actions was 89, and the total fine was NT$15,617,527. According to the industry, the livestock industry (1) was cut 24 times, accounting for 27.0%, most of which were inconsistent with the results of the discharge water test; followed by the non-administrators, 23 cases, accounting for 25.8%; the third Food manufacturing, accounting for 7.9%. Among the violations, Article 7 of the Water Pollution Prevention Law is the most, followed by Article 18 of the Water Pollution Prevention Law, which accounts for 51.8% of the President's Office. Therefore, it is recommended that the continuous operation of the waste water treatment facilities in the future will be properly maintained and maintained. Regulations to comply with regulatory requirements. Second, handle water pollution prevention permit review and database construction (1) A total of 362 license examinations (675), the average number of license examinations was 9.1 days, of which 33 were due to the incomplete return of documents, and 51 applications were rejected due to data changes and corrections were overdue. The average number of days the water system is typed after the license is approved or issued is 1.0 days. (2) Handling the management, construction, maintenance and renewal of the water pollution prevention permit document database, a total of 1,316 cases were executed, of which 697 were the number of audit records, and the license application cases (emission permit, water pollution prevention measures plan, construction) There were 556 pieces of construction site runoff wastewater reduction plan, and 63 cases were completed. Third, functional evaluation and proper treatment of wastewater treatment facilities (1) For the public and private places with improved space for the 107 wastewater treatment facilities, the preliminary evaluation of the functional evaluation of the secondary water pollution source wastewater treatment equipment, sampling, re-evaluation and negotiation of unit fac..." , 欄位Project Year的內容是2018 , 欄位Organizer的內容是"Environmental Protection Bureau of Yi-Lan County" , 欄位Executive Unit的內容是"康廷工程顧問企業有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=190440 , 欄位Publish Date的內容是20190301

Project Title

"107 Water Pollution Source Control and Water Environment Improvement Project in Yilan County"

Project Subject

"The implementation of this project focuses on assisting the Environmental Protection Agency to promote the inspection and control of water pollution sources and water quality monitoring in the area under its jurisdiction. It does grasp the current situation of water pollution prevention and control of water pollution sources within the jurisdiction of Yilan County, and supervises the management of the management through the inspection and control of the project. The business unit implements the operation and maintenance of the water pollution prevention and control facilities, and achieves the goal of improving the water quality of the stations in each jurisdiction. The results of the final report from January 24, 2007 to November 30, 2007 are as follows: I. Assisting in the investigation of water pollution source management (1) A total of 699 inspections of water pollution sources (including inspection, sampling and sample delivery in industrial areas), 607 in the execution part of the project, including 178 in industrial inspections, assisting in water sampling There were 105 inspections, and the 11-month inspections and industrial inspections were carried out, all of which have reached the annual target value of 100% or more. (2) There are a total of 42 water pollution source management units in the key station of Dezikouxi, which is announced by the Environmental Protection Agency. During the planning period, a total of 33 inspections were carried out, and 37 cumulative implementations were carried out. The key stations were within the scope of pollution collection. The inspection control rate reached 79% (33/42), and the discharge water quality sampling was performed a total of 18 times. (3) The implementation of the inspection of water pollution sources found that violations of the relevant provisions of the Water Pollution Law, after confirmation, the total number of disciplinary actions was 89, and the total fine was NT$15,617,527. According to the industry, the livestock industry (1) was cut 24 times, accounting for 27.0%, most of which were inconsistent with the results of the discharge water test; followed by the non-administrators, 23 cases, accounting for 25.8%; the third Food manufacturing, accounting for 7.9%. Among the violations, Article 7 of the Water Pollution Prevention Law is the most, followed by Article 18 of the Water Pollution Prevention Law, which accounts for 51.8% of the President's Office. Therefore, it is recommended that the continuous operation of the waste water treatment facilities in the future will be properly maintained and maintained. Regulations to comply with regulatory requirements. Second, handle water pollution prevention permit review and database construction (1) A total of 362 license examinations (675), the average number of license examinations was 9.1 days, of which 33 were due to the incomplete return of documents, and 51 applications were rejected due to data changes and corrections were overdue. The average number of days the water system is typed after the license is approved or issued is 1.0 days. (2) Handling the management, construction, maintenance and renewal of the water pollution prevention permit document database, a total of 1,316 cases were executed, of which 697 were the number of audit records, and the license application cases (emission permit, water pollution prevention measures plan, construction) There were 556 pieces of construction site runoff wastewater reduction plan, and 63 cases were completed. Third, functional evaluation and proper treatment of wastewater treatment facilities (1) For the public and private places with improved space for the 107 wastewater treatment facilities, the preliminary evaluation of the functional evaluation of the secondary water pollution source wastewater treatment equipment, sampling, re-evaluation and negotiation of unit fac..."

Project Year

2018

Organizer

"Environmental Protection Bureau of Yi-Lan County"

Executive Unit

"康廷工程顧問企業有限公司"

Publish Date

20190301

「"107 Water Pollution Source Control and Water Environment Improv」所屬的資料集:「EPQSummary_WaterQualityProtection」的其他資料

Project Title: "-"
Project Subject: "-"
Project Year: 2017
Organizer: "Environmental Protection Bureau, Pingtung County"

Project Title: "-"
Project Subject: "This project mainly aimed at normal operation of central region mutual aid system to maintain smoot
Project Year: 2016
Organizer: "Nantou County Environmental Protection Bureau"

Project Title: "Daikecan,Taoyuan County, Tahan River natural water purification project detail design plan"
Project Subject: "Constructed wetland can purify waste water, so it is usually set to handle the sewage. In order to
Project Year: 2011
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: "-"
Project Subject: "-"
Project Year: 2014
Organizer: "Taitung County Environment Protection Bureau"

Project Title: " Industrial Sewerage System Water Pollution Control and Continuous Water Monitoring System(CWMS) Ma
Project Subject: "This is a one year administrative assisting project and with the following goals: 1.To improve the
Project Year: 2020
Organizer: "Department of Water Quality Protection"

Project Title: "The 2015 Fengshan River Basin Management Project, Kaohsiung City, Taiwan"
Project Subject: "In this study, the hydrologic investigation for the Fengshan River were conducted and the recent w
Project Year: 2015
Organizer: "Environmental Protection Bureau Kauhsiung City Government"

Project Title: "Educational Training of Water Environment and Management Strategy of the River Patrol Teams"
Project Subject: "The theme of the year is empowerment, to continue management assessment strategies and strengthen r
Project Year: 2018
Organizer: "Department of Water Quality Protection"

Project Title: "Investigation of industrial wastewater characteristic and analysis of management strategy"
Project Subject: "This project investigated the concentration of pharmaceuticals and personal care products (PPCPs) i
Project Year: 2020
Organizer: "Department of Water Quality Protection"

Project Title: "2020 Promoting Public Participate on Water Environment Watch and Training Programs in Southern Taiw
Project Subject: "Being the regional center to assist the seven cities and counties in the Southern Taiwan to manage
Project Year: 2020
Organizer: "Department of Water Quality Protection"

Project Title: "無"
Project Subject: "The main purpose of water environment patrol system was, through the association of residents in th
Project Year: 2016
Organizer: "Department of Environmental Protection, Taipei City Government"

Project Title: "Validation of an Automation community Wastewater Treatment and Recycling system of MCFSBR"
Project Subject: "This project developed by combining CFSBR processing systems and membrane filtration systems, throu
Project Year: 2014
Organizer: "Office of Sustainable Development"

Project Title: "107 Years of Pingtung County River Water Quality Monitoring Project"
Project Subject: "The plan will be the result of the water quality sampling analysis of the water quality monitoring
Project Year: 2018
Organizer: "Environmental Protection Bureau, Pingtung County"

Project Title: "Industrial wastewater pollution control and standards management effects analysis of the proposed p
Project Subject: "This project analyzed the regulated items, including 10 samples of dioxin and 10 ammonia-nitrogen-c
Project Year: 2019
Organizer: "Department of Water Quality Protection"

Project Title: "“Plan of Taichung City Drainage Basin Total Maximum Daily Load, Water Pollution Control Fee Collect
Project Subject: "Implementation of the plan shall be commenced from April 12, 2016 until December 31, 2016. The main
Project Year: 2016
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "Beigang River Drainage Basin, Yunlin County water pollution resource inspection project"
Project Subject: "This project’s main purpose is to inspect local industries’ wastewater treatment facility operation
Project Year: 2019
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "the Plan of Private Enterprises Joint Action to Emergency Response of Water Pollution Incident in S
Project Subject: "The plan is divided into two parts, namely, the Plan of Private Enterprises Joint Action to Emergen
Project Year: 2016
Organizer: "Environmental Protection Bureau, Chiayi City"

Project Title: "The Plan of Water Quality Forward-Looking Comprehensive Management for Reservoirs(Middle District)"
Project Subject: "In this study, the mobile GPS real-time monitoring module has been continued to develop since 2017,
Project Year: 2018
Organizer: "Department of Water Quality Protection"

Project Title: "Risk Management of Industrial Wastewater and Pollution Control Measures"
Project Subject: "Taiwan’s Environmental Protection Administration (EPA) has set the strategy behind Article 14-1 in
Project Year: 2016
Organizer: "Department of Water Quality Protection"

Project Title: "The System Enhancement Project for Industries' or Sewage Systems' Regulatory Reporting Data Managem
Project Subject: " Web-based “Industries' or Sewage Systems' Regulatory Reporting Data Management System” has served
Project Year: 2018
Organizer: "Department of Water Quality Protection"

Project Title: "Year 2016 Kaohsiung City Water Environment Patrol Program Promotional & Educational Training Projec
Project Subject: "Based on the understanding of the objectives and contents of the work, the Company will divide the
Project Year: 2016
Organizer: "Environmental Protection Bureau Kauhsiung City Government"

Project Title: "Water quality improvement plan for Effluent Standard regulation"
Project Subject: "This project analyzed and investigated the critical items (including dioxin, mercury and pharmaceut
Project Year: 2018
Organizer: "Department of Water Quality Protection"

Project Title: "2017-2018 Registered professional environmental engineer certification case review and management i
Project Subject: "The objectives of the EPA’s (Environmental Protection Administration) registered professional envir
Project Year: 2017
Organizer: "Department of Supervision Evaluation & Dispute Resolution"

Project Title: "108 Natural Purification and Conservation Plan of Zhongnanjing Settlement in Ludao Township"
Project Subject: "With the natural sewage purification facilities at Zhongnanlou, Ludao, it is hoped that the sewage,
Project Year: 2019
Organizer: "Taitung County Environment Protection Bureau"

Project Title: "Scientific Support and Monitoring for Marine Pollution Emergency Response"
Project Subject: "The plan of year 2014 is to run the oil spill and chemical dispersion simulation modeling software,
Project Year: 2014
Organizer: "Department of Water Quality Protection"

Project Title: " Forward-Looking Plan for River Water Quality Management in Southern Taiwan,2021"
Project Subject: "The purpose of this project is to assistantly execute the “Forward-Looking Infrastructure Developme
Project Year: 2021
Organizer: "Department of Water Quality Protection"

Project Title: "MARINE POLLUTION PREVENTION AND MANAGEMENT SYSTEM SUPPORT AND MAINTANCE INTEGRATION PROJECT"
Project Subject: "Marine pollution prevention system which has great results in the command of spatial and property i
Project Year: 2014
Organizer: "Department of Water Quality Protection"

Project Title: "Industrail Sewerage System Water Pollution Control and Continuous Water Monitoring System(CWMS) Man
Project Subject: "This is a one-year administrative assisting project, and with three goals as follows:1. To Enhanced
Project Year: 2018
Organizer: "Department of Water Quality Protection"

Project Title: "The Application of Remote Sensing Technologies to Marine Pollution Monitoring and Response"
Project Subject: "The marine pollution monitoring in sea territories project is using data acquired from satellite re
Project Year: 2017
Organizer: "Department of Water Quality Protection"

Project Title: " In response to climate change, drinking water management and adaptation, regulation and policy rei
Project Subject: "To adjust the drinking water management policies in response to climate change, the aim of this pro
Project Year: 2021
Organizer: "Department of Water Quality Protection"

Project Title: "Pollutant Investigation Data Analysis and Application of Water and Sediment in River"
Project Subject: "To improve the applicative value of river water quality analysis, this study evaluate the measureme
Project Year: 2021
Organizer: "Environmental Analysis Laboratory"

行政院環境保護署 的其他資料集

空氣品質小時值_臺中市_西屯站

每1時更新,92

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:57

行政院環境保護署

環保署環境影響評估審查委員會會議資料

每2月更新,70

黃先生 | 02-23117722#2748 | 2023-08-05 01:00:47

行政院環境保護署

PM2.5化學成分監測數據

每1月更新,161

蘇先生 | (03)491-5818#2204 | 2023-07-27 01:03:08

行政院環境保護署

廢棄物罰鍰次數

每年更新更新,82

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:30

行政院環境保護署

環境影響說明書環境敏感區位調查表

每2月更新,119

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:02

行政院環境保護署

空氣品質指標(AQI)概況

每月更新更新,112

謝小姐 | 02-23117722#2103 | 2022-01-14 01:20:51

行政院環境保護署

廚餘堆肥製作DIY

不定期更新更新,31

林先生 | 04-22521718#53515 | 2022-01-14 01:25:54

行政院環境保護署

重點事業廢棄物-有害性集塵灰之處理方式

每月更新更新,144

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:12

行政院環境保護署

空氣品質小時值_高雄市_前鎮站

每1時更新,98

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:38

行政院環境保護署

歷年土壤調查_環保署土壤重金屬含量調查(1公頃)

不定期更新更新,125

謝小姐 | (02)23832389*8302 | 2022-01-14 01:20:18

行政院環境保護署

場址列管公文

不定期更新更新,111

賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:18

行政院環境保護署

國內公害糾紛司法案件資料

不定期更新更新,70

陳小姐 | (02)2311-7722分機2932 | 2023-07-30 01:03:23

行政院環境保護署

臺北市重要環保統計資料

每月更新更新,122

謝小姐 | 02-23117722#2103 | 2022-01-14 01:20:37

行政院環境保護署

經過海岸保護區之環境影響評估報告書件

每2月更新,47

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:05

行政院環境保護署

建檔公廁明細-臺中市

不定期更新更新,111

賴先生 | 04-2252-1718#53686 | 2023-07-27 01:01:56

行政院環境保護署

環境影響差異分析報告專案小組審查會議紀錄

每2月更新,79

黃先生 | 02-23117722#2748 | 2023-08-06 01:02:18

行政院環境保護署

公害糾紛裁決書

每1年更新,38

李先生 | 02-2311-7722#2962 | 2023-08-09 01:04:45

行政院環境保護署

環保署補、捐(獎)助團體及個人情形表

每3月更新,102

蘇小姐 | 02-2311-7722#2155 | 2023-07-27 01:04:57

行政院環境保護署

Environmental Policy Monthly

不更新更新,169

楊先生 | (02)23117722#2217,(02)23117722#2216 | 2022-01-15 01:13:03

行政院環境保護署

MajorEnvironmentalPolicies

每3月更新,163

陳小姐 | (02)23117722#2753,(02)23117722#2756 | 2023-07-30 01:03:45

行政院環境保護署

空氣品質小時值_高雄市_美濃站

每1時更新,132

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:44

行政院環境保護署

中科后里環境監測資料

不定期更新更新,47

陳先生 | 04-22521718#51207 | 2023-08-09 01:05:06

行政院環境保護署

全國細懸浮微粒手動監測資料

3天更新,108

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:18

行政院環境保護署

環境教育(教學)人員(經歷)認證申請書

不定期更新更新,41

盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:30

行政院環境保護署

緊急防制辦法空品狀況

每小時更新更新,96

謝小姐 | 02-23117722轉2386 | 2022-01-14 01:05:55

行政院環境保護署

國際環保新聞週報

不更新更新,109

楊先生 | (02)23117722#2217,(02)23117722#2216 | 2022-01-14 01:18:04

行政院環境保護署

空氣污染稽查次數

每年更新更新,133

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:38

行政院環境保護署

符合噪音管制標準車輛-進口汽油引擎車

不定期更新更新,131

林先生 | 02-23712121-6403 | 2022-01-14 01:18:56

行政院環境保護署

各級環保單位歲出決算

每月更新更新,76

謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:35

行政院環境保護署

模場試驗專案期末報告電子檔

不定期更新,50

蘇先生 | 02-2311-7722#8110 | 2022-01-15 01:10:09

行政院環境保護署