time1: 0 time2: 0 time3: 1 time4: 0 total: 1 Monitoring Measurements of Noise and Vibration of Land Transportation System
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

Monitoring Measurements of Noise and Vibration of Land Transportation System

Monitoring Measurements of Noise and Vibration of Land Transportation System」於資料集「EPQSummary_ChemicalSubstanceManagement」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:48。 欄位Project Title的內容是Monitoring Measurements of Noise and Vibration of Land Transportation System , 欄位Project Subject的內容是In this project, the monitoring measurement data of noise and ground-borne vibrations have been carried out at a number of selected locations alongside the land transportation systems (LTS). Totally, the numbers of monitoring sites are:(1)10 noise-sensitive sites and 17 noise-complaint sites alongside the Taiwan High Speed Rail Transportation (HSRT); and 15 ground-borne vibration-sensitive and/or ground-borne vibration-compliant sites.(2)33 noise-sensitive and/or noise-compliant sites for the transportation systems other than the HSRT, which are 6 sites for the freeway system, 8 sites for the highway system, 2 sites for the common roads, 6 sites for the mass rapid transportation system, and 11 sites for the common railway system; in addition, 15 ground-borne vibration-sensitive and/or vibration-complaint sites alongside the remaining LTS, which are 5 sites for the highway system, 3 sites for the freeway system, 1 sites for the MRT systems and 6 sites for the common railway system. From the monitoring measurement data the noise and vibrations levels can be seen that: (1)In the 24 hours monitoring results at the 10 noise-sensitive sites, all are in compliance with the new noise control standards (NCS) of the LTS, while at the 17 noise-complaint, there are (2 or 3) sites are not in compliance with the NCS of the LTS. Amongst the 6 monitoring sites for the MRT system, there are 2 sites not in compliance with the NCS of the LTS, in which, 1 sites is owing to the exceedance of Leq,1h the other sites is owing to the exceedance, of both Leq,1h and Lmax,mean,1h. Amongst the 11 monitoring sites for the common railway system, there are 5 sites not in compliance with the NCS of the LTS, owing to the exceedance of the Lmax,mean,1h but all the monitoring sites are in compliance with the NCS for the Leq,1h. Amongst the 6 monitoring sites for the freeway system, all are in compliance with the NCS of the LTS. Amongst 8 monitoring sites for the highway system and 2 monitoring sites for the common roads, there are 2 sites are not in compliance with the NCS of the LTS due to the exceedance of the Leq,1h. (2)Base on the recommended vibration standard of JIS C1510, the vibrations of 2 sites alongside the HSRT, 2sites alongside the highway and 1 site alongside the freeway do not comply with the standard. (3)As the Noise Control Standards of the Land Transportation Systems promulgated and started to execute on January 21, 2010, some new control effect to the traffic noise has been emerged. While the new requirements encompassed in the standard are: (i) to limit the Lmax,mean,1h for the track traffic systems, and (ii) to isolate the control of the traffic noise out of the original Environmental Noise standards, and to require the operation institution to propose the noise improvement project or the noise subsidy project to attenuate the noise impact in a limited period once the traffic noise exceeding the Standard’s level. These measures arouse the transportation operation institutions to pay serious attention and action to the impact of traffic noise. Other achievements and suggestion include: (1)The prototype format of the raw data for the complaint cases and the countermeasures of traffic noise have been established in chapter 6. As time elapses and the database expands, the methodology to take the traffic noise can be viewed and emulated by each other works of the county (city) governments. (2)From the sound field simulations of the past 15 traffic noise complaint events, it show that the simulation analysis is a very important process to assess the noise improvement effects, and the precision can reach to an extent of ±3dB. (3)The model examples and remarks for the noise improvement plan and the noise subsidy plan are valuable for reference, since these are the consequences and conclusions of a number of consulting meetings, demonstration f... , 欄位Project Year的內容是2010 , 欄位Organizer的內容是Department of Air Quality Protection & Noise Control , 欄位Executive Unit的內容是中華民國振動與噪音工程學會 , 欄位Reporting download URL的內容是https://epq.epa.gov.tw , 欄位Publish Date的內容是20110301

Project Title

Monitoring Measurements of Noise and Vibration of Land Transportation System

Project Subject

In this project, the monitoring measurement data of noise and ground-borne vibrations have been carried out at a number of selected locations alongside the land transportation systems (LTS). Totally, the numbers of monitoring sites are:(1)10 noise-sensitive sites and 17 noise-complaint sites alongside the Taiwan High Speed Rail Transportation (HSRT); and 15 ground-borne vibration-sensitive and/or ground-borne vibration-compliant sites.(2)33 noise-sensitive and/or noise-compliant sites for the transportation systems other than the HSRT, which are 6 sites for the freeway system, 8 sites for the highway system, 2 sites for the common roads, 6 sites for the mass rapid transportation system, and 11 sites for the common railway system; in addition, 15 ground-borne vibration-sensitive and/or vibration-complaint sites alongside the remaining LTS, which are 5 sites for the highway system, 3 sites for the freeway system, 1 sites for the MRT systems and 6 sites for the common railway system. From the monitoring measurement data the noise and vibrations levels can be seen that: (1)In the 24 hours monitoring results at the 10 noise-sensitive sites, all are in compliance with the new noise control standards (NCS) of the LTS, while at the 17 noise-complaint, there are (2 or 3) sites are not in compliance with the NCS of the LTS. Amongst the 6 monitoring sites for the MRT system, there are 2 sites not in compliance with the NCS of the LTS, in which, 1 sites is owing to the exceedance of Leq,1h the other sites is owing to the exceedance, of both Leq,1h and Lmax,mean,1h. Amongst the 11 monitoring sites for the common railway system, there are 5 sites not in compliance with the NCS of the LTS, owing to the exceedance of the Lmax,mean,1h but all the monitoring sites are in compliance with the NCS for the Leq,1h. Amongst the 6 monitoring sites for the freeway system, all are in compliance with the NCS of the LTS. Amongst 8 monitoring sites for the highway system and 2 monitoring sites for the common roads, there are 2 sites are not in compliance with the NCS of the LTS due to the exceedance of the Leq,1h. (2)Base on the recommended vibration standard of JIS C1510, the vibrations of 2 sites alongside the HSRT, 2sites alongside the highway and 1 site alongside the freeway do not comply with the standard. (3)As the Noise Control Standards of the Land Transportation Systems promulgated and started to execute on January 21, 2010, some new control effect to the traffic noise has been emerged. While the new requirements encompassed in the standard are: (i) to limit the Lmax,mean,1h for the track traffic systems, and (ii) to isolate the control of the traffic noise out of the original Environmental Noise standards, and to require the operation institution to propose the noise improvement project or the noise subsidy project to attenuate the noise impact in a limited period once the traffic noise exceeding the Standard’s level. These measures arouse the transportation operation institutions to pay serious attention and action to the impact of traffic noise. Other achievements and suggestion include: (1)The prototype format of the raw data for the complaint cases and the countermeasures of traffic noise have been established in chapter 6. As time elapses and the database expands, the methodology to take the traffic noise can be viewed and emulated by each other works of the county (city) governments. (2)From the sound field simulations of the past 15 traffic noise complaint events, it show that the simulation analysis is a very important process to assess the noise improvement effects, and the precision can reach to an extent of ±3dB. (3)The model examples and remarks for the noise improvement plan and the noise subsidy plan are valuable for reference, since these are the consequences and conclusions of a number of consulting meetings, demonstration f...

Project Year

2010

Organizer

Department of Air Quality Protection & Noise Control

Executive Unit

中華民國振動與噪音工程學會

Reporting download URL

https://epq.epa.gov.tw

Publish Date

20110301

「Monitoring Measurements of Noise and Vibration of Land Transportation System」所屬的資料集:「EPQSummary_ChemicalSubstanceManagement」的其他資料

Project Title: Project for the Certification and Authorization of Imported Motor Vehicle Air Pollutants&the establi
Project Subject: The main four objectives for the project include implementing the process for imported vehicle emiss
Project Year: 2010
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Immobile Pollutants Air Pollution Continuous Emission Monitoring System (CEMS) Auditing and Counsell
Project Subject: This project is mainly aiming at checking and counseling continuous emission monitoring system (CEMS
Project Year: 2004
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Examination and Analysis of Declaration in Air Pollution Control Fee of Stationary Pollutant Sources
Project Subject: In order to realize the pollution to pay fee the social just principle, and by the economical induce
Project Year: 2006
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Waste Reduction and Recycling Project of Yi Lan County 2004
Project Subject: For the puspose of increasing recycling rate of Yi Lan County, Yi Lan Environmental Protection Burea
Project Year: 2004
Organizer: Environmental Protection Bureau of Yi-Lan County

Project Title: The project of emission inventory investigation and draft control strategy for air toxic pollutants
Project Subject: The scope of work for this project includes: 1) emission inventory establishment (or updating) for d
Project Year: 2007
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Waste dry battery recycling promotion project report
Project Subject: With the development of the information technology, the boundaries between countries have disappeare
Project Year: 2004
Organizer: Recycling Fund Management Board

Project Title: "2017 development of public health pesticide formulation standard"
Project Subject: "This study aims to create a consistent and unified standard for the registration and control of pub
Project Year: 2017
Organizer: "Toxic and Chemical Substances Bureau"

Project Title: The Subsidy to debase the price of LP-Gas
Project Subject: Works of reviewing subsidy application cases and allocating fund were conducted during the period fr
Project Year: 2005
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Total capacity control planning
Project Subject: The project is in response to the 1999 amendment of the Air Pollution Control Act (APCA) regarding t
Project Year: 2003
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Project for Restructuring of Environmental Agents Management Information System (2021)
Project Subject: The system in this project included environmental agents management information system, environmenta
Project Year: 2021
Organizer: Toxic and Chemical Substances Bureau

Project Title: The Third-party Inspection and Certification on Waste Plastic Containers
Project Subject: TUV Rheinland Taiwan Ltd. was entrusted by Taiwan EPA to implement the project ” The Third-party Ins
Project Year: 2003
Organizer: Recycling Fund Management Board

Project Title: "Research plan for the technology tracking flow direction of chemicals"
Project Subject: "The plan will introduce five mature identification and tracking technologies, initially for applica
Project Year: 2017
Organizer: "Toxic and Chemical Substances Bureau"

Project Title: Feasibility analysis for the expansion of the Designated Recycling Items List of information technol
Project Subject: The purpose of this project, Feasibility analysis for the expansion of the Designated Recycling Item
Project Year: 2003
Organizer: Recycling Fund Management Board

Project Title: Project for constructing a safe and comfortable homeland : The plan for the setup of northern enviro
Project Subject: The goal of this project is to assist the EPA in establishing technical teams for northern Taiwan en
Project Year: 2014
Organizer: Department of Environmental Sanitation & Toxic Substance Management

Project Title: The Environmental database of Persistent Organic Pollutants and Establishment for Toxic Substance Re
Project Subject: The achievements made in this project included: 1) The latest international control strategies extra
Project Year: 2012
Organizer: Department of Environmental Sanitation & Toxic Substance Management

Project Title: The application of Fourier Transform Infrared (FTIR) in measuring flares and equipment units in petr
Project Subject: The fenceline VOCs monitoring of petrochemical plants were investigated by Open-Path Fourier Transfo
Project Year: 2010
Organizer: Department of Air Quality Protection & Noise Control

Project Title: The Optimum Carbon Accounting、 Management and Monitoring Strategies for Taiwan s Biosphere
Project Subject: The global warming has drawn the world’s attention to the serious over-emission of greenhouse gases,
Project Year: 2004
Organizer: Department of Air Quality Protection & Noise Control

Project Title: The analysis of air quality protection outcomes of Local EPB s in 2004
Project Subject: This project sets up the outcomes website of air quality protection in this year. The website provid
Project Year: 2004
Organizer: Department of Air Quality Protection & Noise Control

Project Title: The recycling technology of waste Compact Disks
Project Subject: Waste compact disks are identified to be hazardous waste in Taiwan. If we recycle the waste compact
Project Year: 2005
Organizer: Office of Sustainable Development

Project Title: "Project for constructing a safe and comfortable homeland : The plan for the setup of southern envir
Project Subject: "This project aimed to set up southern environmental incidents specialist teams with one team each i
Project Year: 2017
Organizer: "Toxic and Chemical Substances Bureau"

Project Title: 110 Year Miaoli County Poisons and Chemicals of Concern Source Check Management Plan
Project Subject: This plan will end on November 1, 2010, and all work will be carried out in accordance with the plan
Project Year: 2021
Organizer: Environmental Protection Bureau Miaoli County Government

Project Title: Audit, Evaluate of Chassis Dynamometer Smoke Test(CDST) station and to trace used small diesel vehic
Project Subject: Mobile pollutant source is the main cause for the urban air quality decline, the diesel vehicle exha
Project Year: 2004
Organizer: Department of Air Quality Protection & Noise Control

Project Title: ""
Project Subject: "Recycling and Grant Review Related Works: Until December 31, 2013, the recurrent funding of 2013 ha
Project Year: 2013
Organizer: "Recycling Fund Management Board"

Project Title: The 2009 Environmental Cup Resources Recycling Debate Competition
Project Subject: The 2009 Environmental Cup “Resources Recycling” Debate Competition attracted a total of 32 universi
Project Year: 2009
Organizer: Recycling Fund Management Board

Project Title: The Subsidy to debase the price of LPG gas
Project Subject: Works of reviewing subsidy application cases and allocating fund were conducted during the period fr
Project Year: 2003
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Project for Audit and Control of Toxic Air Pollutants
Project Subject: There were 734 factories which operated toxic chemical substances in Taoyuan City and the amount of
Project Year: 2016
Organizer: Taoyuan County Government Environment Protection Bureau

Project Title: Motor Vehicle Remote Emissions Sensing Project
Project Subject: The main purpose of this project is to verify remote sensing technology. Overall speaking, the proje
Project Year: 2006
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Project of inspection and certification fair body on the collection, clearance, disposal of the gene
Project Subject: From January 2009 to December 2010, this company conducted total 2,444 numbers of auditing and certi
Project Year: 2009
Organizer: Recycling Fund Management Board

Project Title: The Sampling and Analysis Project of Municipal Solid Waste in Taiwan (2003)
Project Subject: Municipal Solid Waste (MSW) composition established studies are important to the proper management o
Project Year: 2003
Organizer: Bureau of Environmental Inspection

Project Title: 2010 Taoyuan County,Recycling,integrated source management plan
Project Subject: 1. To carry out the resource recycle work of government organizations and inspect the achievement of
Project Year: 2010
Organizer: Taoyuan County Government Environment Protection Bureau

行政院環境保護署 的其他資料集

毒性化學物質禁止運作事項資料

不定期更新更新,56

許先生 | 02-23257399#55328 | 2023-07-30 00:59:58

行政院環境保護署

彰化縣重要環保統計資料

每1月更新,179

陳先生 | 02-23117722#2108 | 2023-08-07 01:00:11

行政院環境保護署

歷年毒性化學物質環境流布調查成果手冊

每年更新更新,45

陳小姐 | 23257399#55337 | 2022-01-14 01:22:52

行政院環境保護署

全國年度例行性計畫成果統計表 (摘要)

不定期更新更新,144

楊小姐 | 02-2383-2389#8106 | 2022-01-14 01:22:08

行政院環境保護署

光化測站(朴子)小時值資料

每月更新更新,241

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:29

行政院環境保護署

0800資源回收免費專線-整體話務達成狀況統計

每年更新更新,56

莊先生 | 02-23705888#3108 | 2022-01-14 01:24:32

行政院環境保護署

光化測站小時值資料

每1月更新,121

陳先生 | 02-2311-7722#2386 | 2023-08-03 00:59:17

行政院環境保護署

執行機關一般廢棄物處理量

每1月更新,213

顏先生 | 02-23117722#2109 | 2023-07-27 01:01:19

行政院環境保護署

環保署工程施工查核小組、問答集

不定期更新更新,43

蔡先生 | 04-22521718#51205 | 2023-08-09 01:05:14

行政院環境保護署

環境影響評估案件摘要資料

每2月更新,251

黃先生 | 02-23117722#2748 | 2023-08-06 01:03:57

行政院環境保護署

空氣品質監測日最大值

每1日更新,189

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:18

行政院環境保護署

光化測站(萬華)小時值資料

不定期更新更新,144

陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:37

行政院環境保護署

環評會議公告

每2月更新,173

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:22

行政院環境保護署

特殊性工業區測站資訊

不定期更新更新,73

丁小姐 | 02-2371-2121#6101 | 2022-01-14 01:04:55

行政院環境保護署

全國各縣市之責任業者列管家數統計

每1年更新,78

廖小姐 | 02-2370-5888#3103 | 2023-07-27 00:59:42

行政院環境保護署

焚化廠底渣原始檢測資料

每1月更新,262

莊先生 | 04-22521718#53523 | 2023-08-07 01:02:33

行政院環境保護署

行政院環境保護署環境保護產品申請審查作業規範

每季更新更新,50

孫小姐 | 02-23117722#2926 | 2022-01-15 01:13:10

行政院環境保護署

臺中市重要環保統計資料

每1月更新,213

顏先生 | 02-23117722#2109 | 2023-08-07 01:00:21

行政院環境保護署

空氣品質小時值_彰化縣_二林站

每1時更新,138

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:55

行政院環境保護署

MajorEnvironmentalPolicies

每3月更新,205

陳小姐 | (02)23117722#2753,(02)23117722#2756 | 2023-07-30 01:03:45

行政院環境保護署

公民營廢棄物丙級清除機構許可資料

每1月更新,134

盧小姐 | 02-2311-7722#2651 | 2023-07-27 01:03:15

行政院環境保護署

環境教育設施場所手冊

不定期更新更新,75

蘇小姐 | (03)4020789分機669 | 2022-01-15 01:11:06

行政院環境保護署

公告列管材質回收率統計資料

每1年更新,68

廖小姐 | 02-2370-5888#3103 | 2023-07-27 01:00:12

行政院環境保護署

噪音監測站資料

不定期更新更新,183

王先生 | 02-23712121#6401 | 2022-01-14 01:18:45

行政院環境保護署

南科樹谷環境監測資料

不定期更新更新,48

陳先生 | 04-22521718#51207 | 2022-01-14 01:22:03

行政院環境保護署

環保署補助地方政府設置完成之現地處理設施

不定期更新,60

黃先生 | 02-2311-7722#2839 | 2022-01-14 01:22:19

行政院環境保護署

縣市(苗栗縣)小時值-每小時

每小時更新更新,864

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:51

行政院環境保護署

Environmental Policy Monthly

不更新更新,232

楊先生 | (02)23117722#2217,(02)23117722#2216 | 2022-01-15 01:13:03

行政院環境保護署

全國年度例行性計畫成果統計表(詳情)

不定期更新更新,199

賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:15

行政院環境保護署

綠色消費暨環境保護產品推動使用作業要點

每季更新更新,49

孫小姐 | 02-23117722#2926 | 2022-01-15 01:13:09

行政院環境保護署