Inclusion Criteria for Construction Works Required for EIA of transmission line

Inclusion Criteria for Construction Works Required for EIA of transmission line」於資料集「EPQSummary_EnvironmentalImpactAssessment」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:43。 欄位Project Title的內容是Inclusion Criteria for Construction Works Required for EIA of transmission line , 欄位Project Subject的內容是According to Taiwan’s “Inclusion Criteria for Construction Works Required for Environmental Impact Assessment (ICCWREIA)”, it is necessary for a transmission line with a voltage of 345 kilo voltages (kv) and a length of 100 kilo meters (km) to go through an EIA procedure before construction can be initiated. As the length of nearly all newly constructed transmission lines has been far less than 100 km in recent years; and there has been growing public concern over the potential health risks from exposure to power frequency electromagnetic fields, the above inclusion criteria for the construction of transmission line to be assessed need to be revised. The purpose of this study was to make suggestions, particularly from health risk perspectives, regarding the elements that need to be considered when the revision is eventually made necessary. This study explored the information on the background of Taiwan’s ICCWREIA, which was thereafter compared to the relevant information (including act, regulation, case study, etc.) of numerous nations/organizations/areas such as European Union, Hong Kong, Canada, Japan, World Health Organization, and United States. In order to estimate the additional health risks associated with exposure to high-voltage (69/161/345 kv) generated power frequency magnetic field in Taiwan, we took on-site measurements of magnetic field, using EMDEX II dosimeters, at seven locations in Taipei and Taoyuan areas. Measurements were made within 100 meters of high-voltage transmission lines at a one-meter high location. The magnetic field strength ranged from 0.8-114 mili-Gauss (mG) for 345 kv power lines. The range was 0.6-57 mG and 0.3-46 mG for 161 kv and 69 kv power lines, respectively. Based on the assumption that the population is homogeneously distributed in each township, we estimated, using the Geographic Information System (GIS) (Arc View 8.2), that 469,801 out of 4,975,970 (or 9.4%) children (aged under 15) were residing within 100 meters away from 161 or 345 kV power lines in 2000. With the information on on-site measurement data, percentage of exposed (within 100 m of high-voltage power lines) child population, and magnetic filed strength specific relative risk estimates (ranging from 0.84 to 3.44) derived from previous epidemiological data, and the assumption of causal link between power frequency magnetic field and childhood leukemia, we estimated that 8.9 cases and 7.1 cases childhood (<15 years) leukemia can be attributable to exposure to elevated magnetic field emitted from 345 kv and 161 kv power lines. We made, based on the above information and the conclusions from two sessions of expert meeting, the following suggestions regarding the possible revision of ICCWREIA. “A construction of 345/161 kv power lines should go through an environmental impact assessment procedure if the construction work is less than 100 meters away from residences, school, or hospitals, or the planned power lines may pass over the sky of national parks or reserved/protected areas for wild animals” With respect to the potential health risks of 69 kv power lines and underground cables, we need to collect more data before any recommendations or conclusions that can be made. , 欄位Project Year的內容是2002 , 欄位Organizer的內容是Department of Comprehensive Planning , 欄位Executive Unit的內容是國立陽明大學醫學院 , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=3570&proj_id=A000000302684&doc_kind=1 , 欄位Publish Date的內容是20141031

Project Title

Inclusion Criteria for Construction Works Required for EIA of transmission line

Project Subject

According to Taiwan’s “Inclusion Criteria for Construction Works Required for Environmental Impact Assessment (ICCWREIA)”, it is necessary for a transmission line with a voltage of 345 kilo voltages (kv) and a length of 100 kilo meters (km) to go through an EIA procedure before construction can be initiated. As the length of nearly all newly constructed transmission lines has been far less than 100 km in recent years; and there has been growing public concern over the potential health risks from exposure to power frequency electromagnetic fields, the above inclusion criteria for the construction of transmission line to be assessed need to be revised. The purpose of this study was to make suggestions, particularly from health risk perspectives, regarding the elements that need to be considered when the revision is eventually made necessary. This study explored the information on the background of Taiwan’s ICCWREIA, which was thereafter compared to the relevant information (including act, regulation, case study, etc.) of numerous nations/organizations/areas such as European Union, Hong Kong, Canada, Japan, World Health Organization, and United States. In order to estimate the additional health risks associated with exposure to high-voltage (69/161/345 kv) generated power frequency magnetic field in Taiwan, we took on-site measurements of magnetic field, using EMDEX II dosimeters, at seven locations in Taipei and Taoyuan areas. Measurements were made within 100 meters of high-voltage transmission lines at a one-meter high location. The magnetic field strength ranged from 0.8-114 mili-Gauss (mG) for 345 kv power lines. The range was 0.6-57 mG and 0.3-46 mG for 161 kv and 69 kv power lines, respectively. Based on the assumption that the population is homogeneously distributed in each township, we estimated, using the Geographic Information System (GIS) (Arc View 8.2), that 469,801 out of 4,975,970 (or 9.4%) children (aged under 15) were residing within 100 meters away from 161 or 345 kV power lines in 2000. With the information on on-site measurement data, percentage of exposed (within 100 m of high-voltage power lines) child population, and magnetic filed strength specific relative risk estimates (ranging from 0.84 to 3.44) derived from previous epidemiological data, and the assumption of causal link between power frequency magnetic field and childhood leukemia, we estimated that 8.9 cases and 7.1 cases childhood (<15 years) leukemia can be attributable to exposure to elevated magnetic field emitted from 345 kv and 161 kv power lines. We made, based on the above information and the conclusions from two sessions of expert meeting, the following suggestions regarding the possible revision of ICCWREIA. “A construction of 345/161 kv power lines should go through an environmental impact assessment procedure if the construction work is less than 100 meters away from residences, school, or hospitals, or the planned power lines may pass over the sky of national parks or reserved/protected areas for wild animals” With respect to the potential health risks of 69 kv power lines and underground cables, we need to collect more data before any recommendations or conclusions that can be made.

Project Year

2002

Organizer

Department of Comprehensive Planning

Executive Unit

國立陽明大學醫學院

Publish Date

20141031

「Inclusion Criteria for Construction Works Required for EIA of transmission line」所屬的資料集:「EPQSummary_EnvironmentalImpactAssessment」的其他資料

Project Title: Air Pollution Control and Carbon Reduction Plan-Four Aspects of Reduction Project in Authorities and
Project Subject: Regarding to the issue that energy saving and carbon reduction has became a global trend, the Govern
Project Year: 2012
Organizer: Taoyuan County Government Environment Protection Bureau

Project Title: The evaluation of Technical Consulting Firms Compiling Environmental Impact Assessment Reports for
Project Subject: The Environmental Protection Administration (EPA) has initiated “The evaluation of Technical Consult
Project Year: 2010
Organizer: Department of Comprehensive Planning

Project Title: Study on Cumulative Environmental Impacts Assessment Standard and Integrate to Geographic Informatio
Project Subject: This study continues the project of ”Study on Cumulative Environmental Impacts Assessment Standard a
Project Year: 2003
Organizer: Department of Comprehensive Planning

Project Title: "Project for Assistance on Holding Environmental Impact Assessment Review Meetings in 2015"
Project Subject: "To improve the efficiency and quality of the Environmental Impact Assessment (EIA) review, document
Project Year: 2014
Organizer: "Department of Comprehensive Planning"

Project Title: Environmental Impact Assessment Inquiry Application System Management and Maintenance Project
Project Subject: This project had developed many results this year in the Environmental Impact Assessment inquiry app
Project Year: 2021
Organizer: Department of Comprehensive Planning

Project Title: Environmental resource management and decision support project
Project Subject: The purpose of this project is to assist the Environmental Impact Assessment (EIA) Committee in revi
Project Year: 2011
Organizer: Department of Comprehensive Planning

Project Title: Environmental impact assessment review operations Project after the Implementation of the Geology Ac
Project Subject: Geology Act. is promulgated by the Ministry of Economic Affairs on December 1st 2011. “Geologically
Project Year: 2019
Organizer: Department of Comprehensive Planning

Project Title: "Digitizing species data in environmental impact assessment reports"
Project Subject: "Species distribution data are crucial information in ecology. To date, many conservation organizati
Project Year: 2014
Organizer: "Department of Comprehensive Planning"

Project Title: ""
Project Subject: "The purpose of this project is to revise the current Technical Specification on Plant Ecology Evalu
Project Year: 2016
Organizer: "Department of Comprehensive Planning"

Project Title: The Feasibility of Biodegradable Plastic Bags and Containers Decomposed in Commercial Composting Sys
Project Subject: Biodegradable plastics are plastics that can be decomposed by microbes into water, carbon dioxide, a
Project Year: 2020
Organizer: Recycling Fund Management Board

Project Title: Reviewal and amendment for the institution and regulations of Strategic Environmental Assessment
Project Subject: The administration continuously carried out the tasks of Strategic Environmental Assessment (SEA) on
Project Year: 2011
Organizer: Department of Comprehensive Planning

Project Title: Installation of Environmental Impact Assessment Inquiry System
Project Subject: In order to carry out the information to be public, provides the populace to consummate of environme
Project Year: 2007
Organizer: Department of Comprehensive Planning

Project Title: ""
Project Subject: "The purposes of this project are to investigate the conditions of dam in Taiwan, to list the priori
Project Year: 2015
Organizer: "Solution integration office"

Project Title: A project of Greenhouse Gas emission reduction management system and impact assessment
Project Subject: This project includes four main work items; the implementation results achieved for each work item a
Project Year: 2018
Organizer: Department of Environmental Sanitation &amp; Toxic Substance Management

Project Title: EIA Documents Data Processing (II)
Project Subject: In order to improve accuracy and prompt data processing and data transporting in Environmental Impa
Project Year: 2002
Organizer: Department of Comprehensive Planning

Project Title: A study of voluntary carbon reduction mechanism design and cost-benefit analysis on GHGs management
Project Subject: There are three main work items in this project; the implementation results achieved for each work i
Project Year: 2020
Organizer: Department of Environmental Sanitation &amp; Toxic Substance Management

Project Title: Environmental resource management and decision-making supporting project in 2013
Project Subject: The aim of this project is to assist the Environmental Impact Assessment (EIA) Committee in reviewin
Project Year: 2012
Organizer: Department of Comprehensive Planning

Project Title: "A Study of the Application of Technical Guidelines for Social Impact Assessment in Environmental Im
Project Subject: "The aim of environmental impact assessment (EIA) is to make the potential impacts of development pr
Project Year: 2016
Organizer: "Department of Comprehensive Planning"

Project Title: "Environmental Impact Assessment Inquiry Application System Management and Maintenance Project"
Project Subject: "This project had developed many results this year in the Environmental Impact Assessment inquiry ap
Project Year: 2016
Organizer: "Department of Comprehensive Planning"

Project Title: Total Load Control Plan for Environmental Impact Assessment in Slope-Land Areas—Case Study of Chia-Y
Project Subject: According to the environmental carrying capacity, total load control aimed to develop and use enviro
Project Year: 2003
Organizer: Department of Comprehensive Planning

Project Title:
Project Subject: The purposes of this project are to investigate the conditions of dam in Taiwan, to list the priorit
Project Year: 2015
Organizer: Solution integration office

Project Title: Evaluation of Technical Consulting Firms on Environmental Impact Assessment in Fiscal Year 91
Project Subject: The Environmental Protection Administration (EPA) has started the work of “Technical Consulting Firm
Project Year: 2002
Organizer: Department of Comprehensive Planning

Project Title: 109 Annual Poison and Chemical Source Inspection Management Plan
Project Subject: In order to effectively check and manage the operation and use of the environmental impact assessmen
Project Year: 2020
Organizer: Environmental Protection Bureau, Chiayi County

Project Title: "Environmental resource management and decision-making supporting project in 2017"
Project Subject: "The 2017 environmental resource management and decision support project was contracted to the IER b
Project Year: 2016
Organizer: "Department of Comprehensive Planning"

Project Title: Evaluation of EIA Technical Consulting Organizations, Certification of Evaluators and Conferences
Project Subject: The Environment Protection Administration (EPA) has been annually undertaking the Evaluation of Envi
Project Year: 2013
Organizer: Department of Comprehensive Planning

Project Title: The renewed plans of Environmental Impact Assessment inquiry system (included modifiable cases)
Project Subject: Environmental Impact Assessment cases investigated by Environmental Impact Assessment Review Committ
Project Year: 2006
Organizer: Department of Comprehensive Planning

Project Title: Project for Assistance on Holding EIA Review Meetings in 2020, Evaluation of EIA Technical Consultin
Project Subject: The main objective of this project is to improve the efficiency and quality of the Environmental Imp
Project Year: 2020
Organizer: Department of Comprehensive Planning

Project Title: Research on Non-ionizing Radiation Management and Environmental Monitoring Empirical Technology
Project Subject: This project completed the measurement and evaluation of electromagnetic field levels in specific ar
Project Year: 2020
Organizer: Department of Air Quality Protection &amp; Noise Control

Project Title: "Project for Assistance on Holding EIA Review Meetings in 2017, Evaluation EIA Technical Consulting
Project Subject: "  The main objective of this project is to improve the efficiency and quality of the Environmental
Project Year: 2017
Organizer: "Department of Comprehensive Planning"

Project Title: "An Examination and Application of the Social Cost-benefit Analysis in Environmental Impact Assessme
Project Subject: "This study has accomplished three major tasks. First, we investigate the application of cost and be
Project Year: 2012
Organizer: "Department of Comprehensive Planning"

行政院環境保護署 的其他資料集

重點事業廢棄物-廢酸鹼之處理方式

每1月更新,102

林先生 | 02-2311-7722#2671 | 2023-08-07 01:01:59

行政院環境保護署

環境現況差異分析及對策檢討報告專案小組審查會議紀錄

每2月更新,74

黃先生 | 02-23117722#2748 | 2023-08-06 01:02:16

行政院環境保護署

飲用水設備維護管理稽查成果

不定期更新更新,62

黃先生 | 02-23117722-2881 | 2022-01-15 01:10:29

行政院環境保護署

全國模範清潔人員名單

每年更新更新,30

林小姐 | (04)2252-1718#53610 | 2022-01-14 01:18:05

行政院環境保護署

環保人員數

每月更新更新,89

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:43

行政院環境保護署

EPQSummary_EnvironmentalMonitoringAndTesting

不定期更新更新,132

陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:45

行政院環境保護署

空氣品質小時值_澎湖縣_馬公站

每小時更新更新,140

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:49

行政院環境保護署

建檔公廁明細-金門縣

不定期更新更新,103

賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:07

行政院環境保護署

公文統計資料

不定期更新更新,47

賴先生 | 02-2311-7722#2347 | 2022-01-14 01:22:15

行政院環境保護署

毒性化學物質釋放量公開資訊

不定期更新更新,112

李小姐 | (02)23257399#55318 | 2023-07-27 01:00:19

行政院環境保護署

空氣品質小時值_苗栗縣_頭份站

每1時更新,197

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:03

行政院環境保護署

空氣品質指標(AQI)概況

每月更新更新,102

謝小姐 | 02-23117722#2103 | 2022-01-14 01:20:51

行政院環境保護署

EPQSummary_EnvironmentalEducation

不定期更新更新,178

郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:14:02

行政院環境保護署

毒性化學物質許可證資料

每6月更新,151

許先生 | 02-23257399#55328 | 2023-07-30 00:59:58

行政院環境保護署

環境教育講習件數統計資料

每季更新更新,39

李小姐 | 02-23117722#2724 | 2022-01-15 01:10:41

行政院環境保護署

酸雨監測值(歷史資料)

每1日更新,146

陳先生 | 02-2311-7722#2386 | 2023-08-08 00:58:43

行政院環境保護署

行政院環境保護署環境保護產品驗證機構管理要點

每季更新更新,42

孫小姐 | 02-23117722#2926 | 2022-01-15 01:13:11

行政院環境保護署

基隆市重要環保統計資料

每月更新更新,80

謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:45

行政院環境保護署

道路交通音量監測不合格時段數

每3月更新,90

陳先生 | 02-23117722#2108 | 2023-07-30 01:01:06

行政院環境保護署

空氣品質小時值_桃園市_觀音站

每小時更新更新,128

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:49

行政院環境保護署

EPQSummary_Other

不定期更新更新,60

郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:14:18

行政院環境保護署

河川揚塵監測資料

每1時更新,140

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:59:03

行政院環境保護署

環境影響評估案件摘要資料

每2月更新,204

黃先生 | 02-23117722#2748 | 2023-08-06 01:03:57

行政院環境保護署

EPQSummary_PublicNuisanceDispute

不定期更新更新,114

陳先生 | 02-2311-7722#2386 | 2023-07-27 01:02:16

行政院環境保護署

空氣品質小時值_高雄市_前金站

每1時更新,127

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:39

行政院環境保護署

清潔隊員節慶祝活動

每年更新更新,36

蔡先生 | (04)2252-1718#53606 | 2022-01-14 01:18:06

行政院環境保護署

全國一般廢棄物處理量

每月更新更新,75

謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:11

行政院環境保護署

空氣品質小時值_新北市_淡水站

每小時更新更新,94

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:29

行政院環境保護署

噪音陳情案件數(依音源)

不定期更新更新,48

謝先生 | 02-23712121-6403 | 2023-07-27 01:03:47

行政院環境保護署

經濟部事業廢棄物再利用機構資料

每年更新更新,97

李小姐 | 02-2311-7722#2633 | 2022-01-14 01:26:11

行政院環境保護署