"Project on collection and utilization of the soil and groundwat
「"Project on collection and utilization of the soil and groundwat」於資料集「EPQSummary_SoilAndGroundwater」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:52。 欄位Project Title的內容是"Project on collection and utilization of the soil and groundwater pollution remediation fees" , 欄位Project Subject的內容是"The modified Regulations Governing Collection of Soil and Groundwater Pollution Remediation Fees has been implemented for two years. Therefore, other than the constant investigation of the effectiveness in collecting the soil and groundwater pollution remediation fee and assisting on both the promotion of remediation fee collection system and collection operation, the key objective of the program also included proposing the planning suggestion for the demand of the subsequent funding, the refund system of the remediation fee, as well as the announcements for the charging methods and the rate adjustment. Moreover, the various economic impact and the package measures for the proposed adjustment plans and the modification plans are evaluated. The implementation result for the program is listed below:
1.The current situation of remediation fee collection is analyzed and accomplished a total of 548 cases (from 362 companies) of secondary review on remediation fee declaration, 39 cases of exporting refund applications, 41 cases of insurance refund, 25 cases of engineering refund, and 20 times of on-site inspection and analysis.
2.The remediation data of contaminated sites on Soil and Groundwater Information Management System (SGM) is analyzed that the parameters for estimating the remediation fee are revised. The demand for future remediation fund is estimated at around $2824.1 billion dollars. In addition, the remediation fee collection plans were proposed at which pointed out the affected and the most-affected industries, as well as an evaluation on the overall economic impact as the accordance for subsequent research budget.
3.Coordinated with the Environmental Protection Administration policies, a screening procedure for the new announcement items of individual substances and wastes is established. A fee collection program is proposed for the substances and wastes with soil and groundwater pollution risks..
4.A transformation program for remediation fee refund system is proposed based on the analysis result of engineering insurance refund. The proposed program optimized the current engineering refund process with the opinions consulted from dealers, experts, and scholars, as well as a suggestion of incorporating green mediation engineering as the focal point for designing the future incentives.
5.Coordinated with the rate structure of remediation fee declared by the fee payers, a simplified solution for remediation fee declaration is proposed. The opinion from fee payers collected through questionnaires is investigated as references for the future administration in order to achieve streamline administration for the convenience to the public.
6.A total of three expert consultation meetings are completed with different themes (1) the transformation program for engineering and insurance refund system, (2) the discussion on the calculation of remediation cost and the scale of fund demand, (3) the establishment of credit guarantee system as well as the questionnaire on the adjustment on the declaration frequency of remediation fee, the electronic collection, and the engineering insurance refund transformation to be included as the reference for future law modification.
" , 欄位Project Year的內容是2018 , 欄位Organizer的內容是"Soil and Groundwater Remediation Fund Management Board" , 欄位Executive Unit的內容是"晶淨科技股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw , 欄位Publish Date的內容是20200930 。
Project Title
"Project on collection and utilization of the soil and groundwater pollution remediation fees"
Project Subject
"The modified Regulations Governing Collection of Soil and Groundwater Pollution Remediation Fees has been implemented for two years. Therefore, other than the constant investigation of the effectiveness in collecting the soil and groundwater pollution remediation fee and assisting on both the promotion of remediation fee collection system and collection operation, the key objective of the program also included proposing the planning suggestion for the demand of the subsequent funding, the refund system of the remediation fee, as well as the announcements for the charging methods and the rate adjustment. Moreover, the various economic impact and the package measures for the proposed adjustment plans and the modification plans are evaluated. The implementation result for the program is listed below: 1.The current situation of remediation fee collection is analyzed and accomplished a total of 548 cases (from 362 companies) of secondary review on remediation fee declaration, 39 cases of exporting refund applications, 41 cases of insurance refund, 25 cases of engineering refund, and 20 times of on-site inspection and analysis. 2.The remediation data of contaminated sites on Soil and Groundwater Information Management System (SGM) is analyzed that the parameters for estimating the remediation fee are revised. The demand for future remediation fund is estimated at around $2824.1 billion dollars. In addition, the remediation fee collection plans were proposed at which pointed out the affected and the most-affected industries, as well as an evaluation on the overall economic impact as the accordance for subsequent research budget. 3.Coordinated with the Environmental Protection Administration policies, a screening procedure for the new announcement items of individual substances and wastes is established. A fee collection program is proposed for the substances and wastes with soil and groundwater pollution risks.. 4.A transformation program for remediation fee refund system is proposed based on the analysis result of engineering insurance refund. The proposed program optimized the current engineering refund process with the opinions consulted from dealers, experts, and scholars, as well as a suggestion of incorporating green mediation engineering as the focal point for designing the future incentives. 5.Coordinated with the rate structure of remediation fee declared by the fee payers, a simplified solution for remediation fee declaration is proposed. The opinion from fee payers collected through questionnaires is investigated as references for the future administration in order to achieve streamline administration for the convenience to the public. 6.A total of three expert consultation meetings are completed with different themes (1) the transformation program for engineering and insurance refund system, (2) the discussion on the calculation of remediation cost and the scale of fund demand, (3) the establishment of credit guarantee system as well as the questionnaire on the adjustment on the declaration frequency of remediation fee, the electronic collection, and the engineering insurance refund transformation to be included as the reference for future law modification. "
Project Year
2018
Organizer
"Soil and Groundwater Remediation Fund Management Board"
Executive Unit
"晶淨科技股份有限公司"
Reporting download URL
Publish Date
20200930
「"Project on collection and utilization of the soil and groundwat」所屬的資料集:「EPQSummary_SoilAndGroundwater」的其他資料
Project Title:
"The Survey of the Soil and Groundwater Contamination in Yunlin County in 2014"
Project Subject:
"For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year:
2014
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Investigation of Persistent Organic Pollutants in Soil and Management Policy Research Project"
Project Subject:
"This project continued the work of the previous project of soil dioxin contamination investigation.
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"2016 The Maintenance, and Performance Improvement Plan for the Soil and Groundwater Pollution Remed
Project Subject:
"To improve online reporting of and search for soil and groundwater pollution remediation fees, this
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"The Survey of the Soil and Groundwater Contamination in Yunlin County in 2013"
Project Subject:
"For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year:
2013
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Promotion of Soil and Groundwater Pollution Site Remediation and Project Management Plan"
Project Subject:
"The implementation period of this plan has been from February 7, 2017 to May 6, 2018. The summary o
Project Year:
2017
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"The Inspection, Consultation and Auditing of Declaration Reports for Underground Storage Tanks Proj
Project Subject:
"The Environmental Protection Agency (EPA) has continued to implement the The Inspection, Consultati
Project Year:
2018
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"2017 Filing for and Verification of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject:
"To remediate the soil and groundwater pollution in Taiwan, the Environmental Protection Administrat
Project Year:
2017
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Investigation, Inspection and Technical Support for the Soil and Groundwater Contamination Project
Project Subject:
" In 2019, the major tasks of this two-year’s project were to establish a response team that assist
Project Year:
2019
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"The project on Investigation and Verificationof Soil and Groundwater Pollution in Yilan County, 201
Project Subject:
"In order to prevent soil and groundwater from contamination, the local competent authority must reg
Project Year:
2017
Organizer:
"Environmental Protection Bureau of Yi-Lan County"
Project Title:
"FY 2021 Supervision and Inspection Plan for the Quality Assurance of Projects Relevant to Soil and
Project Subject:
"The 2021 “Supervision and Inspection Plan for the Quality Assurance of Projects Relevant to Soil an
Project Year:
2021
Organizer:
"Environmental Analysis Laboratory"
Project Title:
"Project of Soil and Groundwater Pollution Survey and Investigation in HsinChu Country,2018"
Project Subject:
"The total cost of this project is NT $ 10,700,000, and the overall working period ended on December
Project Year:
2018
Organizer:
"HsinChu County Environment Protection Bureau"
Project Title:
"Project of review and adjustment on the soil and groundwater pollution remediation fees systems"
Project Subject:
"This project attempts to deliver specific and feasible suggestions for the amendment on the soil an
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Application of Environmental Forensics on Investigation of Chlorinated Hydrocarbon Contaminated Sit
Project Subject:
"This project focuses on the chlorinated ethenes (CEs) contaminated sites. Thepurpose was to apply e
Project Year:
2013
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Project of contaminated sites oversight investigation, verification and control track check by ente
Project Subject:
"The purpose of this plan is to assess the effectiveness of Soil and Groundwater Pollution Sites Adm
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
""
Project Subject:
"As at mid-term report (November 30, 2014), the contents of the project were completed as follows:1.
Project Year:
2014
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"2017 Reexamination and Auditing of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject:
"The main purpose of this project is to improve the management of payers of soil and groundwater pol
Project Year:
2017
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Investigation and Verification of Soil and Groundwater Pollution in Tainan City"
Project Subject:
"Project Accomplishment
The project, Investigation and Verification of Soil and Groundwater Contamin
Project Year:
2018
Organizer:
"Environmental Protection Bureau of Tainan City"
Project Title:
"Investigation and Verification of Soil and Groundwater Pollution of Taipei City in 2016"
Project Subject:
"Implementation of the investigation and verification of soil and groundwater pollution in Taipei Ci
Project Year:
2016
Organizer:
"Department of Environmental Protection, Taipei City Government"
Project Title:
"Project Study for Managerial Technologies of the Remanufactured Products Containing Off-site Treate
Project Subject:
"This project collected information regarding the technologies of the reuse and recycle of the treat
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"The audition and review plan on evaluation, investigation and testing results reports of potential
Project Subject:
"The purpose of this project was to assist local environmental protection bureaus on reviewing and a
Project Year:
2015
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Remediation of Emerging Industry Special Metal"
Project Subject:
"This project will be carried out to improve energy crops Sunflower Research and Analysis of heavy m
Project Year:
2015
Organizer:
"Office of Sustainable Development"
Project Title:
"Hsinchu City 100 annual soil and groundwater pollution investigation and verification work program"
Project Subject:
"Hsinchu City is located in the northwest of Taiwan, Taiwan is the northern region, between Taipei a
Project Year:
2011
Organizer:
"Bureau of Environmental Protection Hsin-Chu"
Project Title:
"Year 2013 Soil and Groundwater Pollution Investigation and Verification project"
Project Subject:
"For the prevention of soil and groundwater pollution, local competent authority must carry out regu
Project Year:
2013
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"Investigation and Determination of the Sources and Pathways of Farmlands Contaminated with Heavy Me
Project Subject:
"Farmland soil contamination cases happened in cities and counties continuously, funding of remediat
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Aboveground storage tank systems pilot project-pollution prevention management and investigation"
Project Subject:
"The Environmental Protection Administration (EPA) implemented the project to understand the interna
Project Year:
2019
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"2016 Project of investigating and verifying pollution for Taichung soil and groundwater"
Project Subject:
"Taichung Environmental Protection Bureau (TCEPB) has carried out the work to manage the
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"Investigation of Concern Substances in Groundwater and Analysis of Pollution Control Strategy"
Project Subject:
"The purposes of this project is to investigate the groundwater contamination potential of hazardous
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Soil Pollution Assessment, Investigation, and Audit Project on the Lands of Enterprises Officially
Project Subject:
" The objective of this project was to assist the Environmental Protection Administration (EPA)
Project Year:
2020
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Apply Phase II Environmental Site Assessment Process to Execute Soil and Groundwater Pollution Pote
Project Subject:
"In order to prevent and remediate soil and groundwater pollution, ensure the sustainable use of la
Project Year:
2018
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
" 107 Soil and Groundwater Pollution Survey and Verification Work Plan - Keelung City"
Project Subject:
"The overall progress of the project from the date of performance (February 14, 2007) to November 15
Project Year:
2018
Organizer:
"Bureau of Environmental Protection, Keelung City"
行政院環境保護署 的其他資料集
縣市(基隆市)小時值-每小時
每1時更新,307陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:57
行政院環境保護署不法利得宣導資料
不定期更新更新,68全先生 | (04)2252-1718#337 | 2023-08-09 01:04:30
行政院環境保護署空氣品質小時值_南投縣_埔里站
每1時更新,196陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:26
行政院環境保護署工業區燈號分級現況
每6月更新,91黃先生 | 02-23832389#8204 | 2023-07-27 01:03:38
行政院環境保護署地下水場置性監測井位置圖
每1月更新,47呂小姐 | 02-2383-2389#8110 | 2023-08-09 01:04:52
行政院環境保護署
事業廢棄物委託或共同處理申報量統計
每月更新更新,143陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:34
行政院環境保護署南投縣重要環保統計資料
每1月更新,203顏先生 | 02-23117722#2109 | 2023-08-07 01:00:08
行政院環境保護署垃圾回收清除車輛數
每月更新更新,87謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:32
行政院環境保護署空氣品質小時值_屏東縣_恆春站
每小時更新更新,183謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:31
行政院環境保護署臺北市水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,47吳小姐 | 02-2383-2389#8303 | 2022-01-18 01:24:38
行政院環境保護署
空氣品質指標(AQI)概況
每月更新更新,142謝小姐 | 02-23117722#2103 | 2022-01-14 01:20:51
行政院環境保護署建檔公廁明細-宜蘭縣
不定期更新更新,167賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:08
行政院環境保護署空氣品質小時值_高雄市_左營站
每1時更新,172陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:39
行政院環境保護署公害糾紛裁決委員會委員名單
不定期更新更新,40謝先生 | 02-2311-7722#2962 | 2022-01-15 01:12:55
行政院環境保護署通過逐車審驗運送車輛
每月更新更新,124林先生 | 02-2325-7399#55232 | 2022-01-14 01:25:47
行政院環境保護署
應回收廢棄物處理業者(廢容器類)最大處理量資料
每1年更新,44廖小姐 | 02-2370-5888#3103 | 2023-08-03 00:59:54
行政院環境保護署因應對策專案小組初審會議紀錄
不定期更新更新,47劉先生 | 02-23117722#2743 | 2022-01-15 01:12:39
行政院環境保護署焚化爐廠區範圍圖
不定期更新更新,32張小姐 | 02-23712121#5907 | 2022-01-15 01:16:17
行政院環境保護署空氣品質小時值_彰化縣_二林站
每1時更新,122陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:55
行政院環境保護署台灣地區垃圾處理場(廠)互惠緊急支援要點
不定期更新,36蔡先生 | 04-2252-1718#53508 | 2022-01-15 01:13:13
行政院環境保護署
綠色消費暨環境保護產品審議會設置要點
每季更新更新,34陳先生 | 02-23117722#2936 | 2022-01-15 01:13:12
行政院環境保護署公民營廢棄物乙級處理機構許可資料
每1月更新,136盧小姐 | 02-2311-7722#2651 | 2023-07-28 11:35:17
行政院環境保護署0800資源回收免費專線-整體話務達成狀況統計
每年更新更新,48莊先生 | 02-23705888#3108 | 2022-01-14 01:24:32
行政院環境保護署建檔公廁明細-南投縣
不定期更新更新,128賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:06
行政院環境保護署沙塵預報資料
不定期更新更新,43陳先生 | 02-2311-7722#2386 | 2023-08-07 01:02:14
行政院環境保護署
縣市(臺東縣)小時值-每小時
每1時更新,149陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:38
行政院環境保護署環境影響說明書專案小組初審會議紀錄
不定期更新更新,60劉先生 | 02-2311-7722#2743 | 2022-01-15 01:12:35
行政院環境保護署營運中公有掩埋場掩埋場容量統計表
不定期更新更新,115彭先生 | 04-22521718#53510 | 2023-08-07 01:02:35
行政院環境保護署位於野生動物保護或棲息區之環境影響說明書件
每2月更新,79黃先生 | 02-23117722#2748 | 2023-08-06 01:04:08
行政院環境保護署空氣品質小時值_新竹縣_竹東站
每1時更新,186陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:04
行政院環境保護署