"Year 2011 Air-pollution Control Plan / Year End Report on Construction Project"
「"Year 2011 Air-pollution Control Plan / Year End Report on Construction Project"」於資料集「EPQSummary_Air」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:50。 欄位Project Title的內容是"Year 2011 Air-pollution Control Plan / Year End Report on Construction Project" , 欄位Project Subject的內容是"This year, the plan is focused on the examination of the facility management methods and supplemented with 5S Cleaning Movement (5S was invented in Japan, and stands for five Japanese words that start with the letter 'S': Seiri, Seiton, Seiso, Seiketsu, and Shitsuke.), green railings, surrounding road cleaning and adoption, introductory seminars, training and visits, to strengthen the pollution control on construction projects. The plan this year started from the contract signing date of 8 April 2011 to 31 March 2012. During this period, 23,311examinations (including 727examinations conducted on public holidays) have been carried out. Counseling to improve the facilities that do not qualified the Construction Facility Management Regulations.This is to encourage the industry to improve through face-to-face communication. This year, the Workplace 5S Cleaning Movement is further expanded with Green Workplace, Frequent Tidying-up in the Work Process, “Frequent Cleaning of the External Area”, “Clean Machine and Fuel” and “Disciplined Construction Workplace”. It is aimed to promote eco-friendly operation from the internal to external environment for large construction projects. It covers the whole pollution area of the construction zone, and takes care of the air-pollution prevention of the work surface and construction tools, planting for the railings of the construction site, and the maintenance of the external environment of the site. There are 78 sites participating in the Workplace 5S Cleaning Movement and all the sites have completed planting for the railings. The particulate reduction rate was 69.4% during the movement, which is around 15% higher than the particulate reduction rate of all the construction projects in the city. 15,962.17 km of road has been cleaned. Around 220 tons of TSP has been reduced. Diesel vehicles voluntarily turned up for examination380times. The general public generally views construction sites as having “Uninteresting Appearance with Messy Content”. In order to improve this image, green construction sites are highly promoted this year. This is aimed to show the other side of construction sites and nourish the new “clean and beautiful image in people’s minds. From April 2011 to April 2012, railing beautification for 93 sites has been conducted. Of which 19 sites using the green planting methods, 14 sites to use canvas or fake flowers and landscaping. Strengthens the path and the pipeline project construct control also for this year key point work. Impetus pipeline construction pollution management operational procedure. When carries on doing an inspection of the small pipeline project. Impels the spent clay not to fall to the ground outside the policy. And requests to complete sweeps clear and pollutes against system measure. We grasp the health status of sewer construction, Until 2013April pipeline project the proportion of waste soil is not ground has been raised to 82%. In addition, construction projects continue to promote this year's road sweeping around the crisis.During April 2011 to April 2012, statistics of 78 new construction projects to promote participation in activities of road adoption. The accumulation recognizes raises the length is 30.16 kilometers, the wash and sweep mileage as 30,139 kilometers. The plan continued to control the particulate pollution of construction site, and the pollutant emission of construction machines. 202 inspections have been conducted randomly on the fuel of the construction machines,40 times the sulfur content of oil for testing. And punishment has been imposed on 1 business owners who failed the inspection. Further guidance was also provided for these 1 owners to use the fuel legally. On the application for air-pollution relief for construction projects, examination has been completed on 1,812cases of final bid projects, and revision has been done on..." , 欄位Project Year的內容是2011 , 欄位Organizer的內容是"Department of Environmental Protection, Taipei City Government" , 欄位Executive Unit的內容是"新系環境技術有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=171471 , 欄位Publish Date的內容是20180701 。
Project Title
"Year 2011 Air-pollution Control Plan / Year End Report on Construction Project"
Project Subject
"This year, the plan is focused on the examination of the facility management methods and supplemented with 5S Cleaning Movement (5S was invented in Japan, and stands for five Japanese words that start with the letter 'S': Seiri, Seiton, Seiso, Seiketsu, and Shitsuke.), green railings, surrounding road cleaning and adoption, introductory seminars, training and visits, to strengthen the pollution control on construction projects. The plan this year started from the contract signing date of 8 April 2011 to 31 March 2012. During this period, 23,311examinations (including 727examinations conducted on public holidays) have been carried out. Counseling to improve the facilities that do not qualified the Construction Facility Management Regulations.This is to encourage the industry to improve through face-to-face communication. This year, the Workplace 5S Cleaning Movement is further expanded with Green Workplace, Frequent Tidying-up in the Work Process, “Frequent Cleaning of the External Area”, “Clean Machine and Fuel” and “Disciplined Construction Workplace”. It is aimed to promote eco-friendly operation from the internal to external environment for large construction projects. It covers the whole pollution area of the construction zone, and takes care of the air-pollution prevention of the work surface and construction tools, planting for the railings of the construction site, and the maintenance of the external environment of the site. There are 78 sites participating in the Workplace 5S Cleaning Movement and all the sites have completed planting for the railings. The particulate reduction rate was 69.4% during the movement, which is around 15% higher than the particulate reduction rate of all the construction projects in the city. 15,962.17 km of road has been cleaned. Around 220 tons of TSP has been reduced. Diesel vehicles voluntarily turned up for examination380times. The general public generally views construction sites as having “Uninteresting Appearance with Messy Content”. In order to improve this image, green construction sites are highly promoted this year. This is aimed to show the other side of construction sites and nourish the new “clean and beautiful image in people’s minds. From April 2011 to April 2012, railing beautification for 93 sites has been conducted. Of which 19 sites using the green planting methods, 14 sites to use canvas or fake flowers and landscaping. Strengthens the path and the pipeline project construct control also for this year key point work. Impetus pipeline construction pollution management operational procedure. When carries on doing an inspection of the small pipeline project. Impels the spent clay not to fall to the ground outside the policy. And requests to complete sweeps clear and pollutes against system measure. We grasp the health status of sewer construction, Until 2013April pipeline project the proportion of waste soil is not ground has been raised to 82%. In addition, construction projects continue to promote this year's road sweeping around the crisis.During April 2011 to April 2012, statistics of 78 new construction projects to promote participation in activities of road adoption. The accumulation recognizes raises the length is 30.16 kilometers, the wash and sweep mileage as 30,139 kilometers. The plan continued to control the particulate pollution of construction site, and the pollutant emission of construction machines. 202 inspections have been conducted randomly on the fuel of the construction machines,40 times the sulfur content of oil for testing. And punishment has been imposed on 1 business owners who failed the inspection. Further guidance was also provided for these 1 owners to use the fuel legally. On the application for air-pollution relief for construction projects, examination has been completed on 1,812cases of final bid projects, and revision has been done on..."
Project Year
2011
Organizer
"Department of Environmental Protection, Taipei City Government"
Executive Unit
"新系環境技術有限公司"
Reporting download URL
Publish Date
20180701
「"Year 2011 Air-pollution Control Plan / Year End Report on Construction Project"」所屬的資料集:「EPQSummary_Air」的其他資料
Project Title:
"105CEMS"
Project Subject:
"Project objectives:(A) the implementation of continuous automatic monitoring facilities regulations
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Chiayi County"
Project Title:
"105Hualien County Low - carbon life practice and adjustment performance performance appraisal plan"
Project Subject:
"Hualien County to build an international low-carbon city, the program will be low-carbon life advoc
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Hualien County"
Project Title:
"The study of PM2.5 pollution sources survey and air quality forecast/warning response at Yunlin Cou
Project Subject:
"This year project implementation period from June 8, 2016 to June 7, 2017, completed 12 times disch
Project Year:
2016
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Chiayi City Yisan pollution source inspection control plan"
Project Subject:
"The sources of fugitive particulate emissions in Chiayi city come mostly from constructions. Additi
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"The Promotion of Cross-strait Cooperation Mechanism for Carbon-related Industries"
Project Subject:
"An opportunity to promote cross-strait collaboration on energy saving and carbon reduction issues h
Project Year:
2014
Organizer:
"Office of Greenhouse Gases Reduction Management"
Project Title:
"Promotion of eco-driving and green-transportation, and vehicle carbon dioxide reduction technology
Project Subject:
"Since 2015, the EPA has implemented the CO2 emission standards for passenger vehicles this project
Project Year:
2015
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"2013 Pingtung County Project on strengthening traffic management measures and promoting illegal oil
Project Subject:
"The main content of this project included: Parking idling-flameout advocacy and auditing operations
Project Year:
2014
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"Taipei City Plan for Strengthening Auditing of Air Pollutants Emitted by Mobile Pollution Sources (
Project Subject:
"Taipei City has a large number of motorcycle users, and motorcycles constitute one of the main poll
Project Year:
2018
Organizer:
"Department of Environmental Protection, Taipei City Government"
Project Title:
"2013 Taipei City F&B Industry Air Pollution Controlling & Improving Plan"
Project Subject:
"In order to decrease the food and beverage (F&B) industry complaining cases and offer citizen a bet
Project Year:
2013
Organizer:
"Department of Environmental Protection, Taipei City Government"
Project Title:
"2017 Hualien City Mobile Pollution Source control and Parking idling flameout management Project"
Project Subject:
"Hualien County locomotive inspection rate has reached nearly 70 percent, the general roadside inspe
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Hualien County"
Project Title:
"Checking on motor vehicles emission testing institutions 2015"
Project Subject:
"This project was commissioned by the National Institute of Environmental Analysis, Environmental Pr
Project Year:
2015
Organizer:
"Environmental Analysis Laboratory"
Project Title:
"Yunlin County 106 annual execution plans in response to climate change"
Project Subject:
"The influence of the global climate change and the greenhouse effect has become increasingly signif
Project Year:
2017
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Exposure Assessment of PM2.5 in Central Taiwan Air Basin"
Project Subject:
"Thirty-three micro-environmental and one continuous sites area selected and overall 66 plus 7 sampl
Project Year:
2014
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"2017「Diesel vehicle control and Low-pollution vehicles a promotion plan」"
Project Subject:
"The main objectives of the project include: diesel vehicle-related control operations, parking idle
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"Penhu County 2017 Mobile Sources Audition and Control Project"
Project Subject:
"On motorbike pollution control, according to the data on EPA moter vehicles emission regular test i
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Penghu County"
Project Title:
"2016 Chiayi County Diesel Vehicles Dynamometer Exhaust Smoke Test and Alishan Air Quality Control C
Project Subject:
"Abstract Plan Title: “2016 Chiayi County Diesel Vehicles Dynamometer Exhaust Smoke Test and Alisha
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Chiayi County"
Project Title:
"The Project of construction pollution control and inspection for Yunlin County in 2018."
Project Subject:
"1.The primary objects are to give assistance with tighten up construction management business, incl
Project Year:
2018
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"2013 Control plan on permits to stationary pollution source and air pollution fees"
Project Subject:
"This project is a continuous regulatory or control plan that was executed in the following 3 main s
Project Year:
2013
Organizer:
"Taoyuan County Government Environment Protection Bureau"
Project Title:
"Investigations of real would emissions from light-duty diesel vehicles with portable emission measu
Project Subject:
"The Environmental Protection Administration in Taiwan (Taiwan EPA) has been working on strengthenin
Project Year:
2016
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"The project of CEMS installation institution review and information management of the stationary so
Project Subject:
"As the issue of air pollution has gradually been taken seriously by the public, the government has
Project Year:
2018
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
""
Project Subject:
"This project is mainly divided into three categories. The first one is to process the impeaches of
Project Year:
2013
Organizer:
"Taoyuan County Government Environment Protection Bureau"
Project Title:
""
Project Subject:
"The objective of the plan is to correct farmers’ behaviors of handling agricultural wastes and burn
Project Year:
2015
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"Air Quality Maintenance and Integrated Management Plan in 2016."
Project Subject:
"In order to continue to achieve the goal of improving air quality, the “Yunlin County Air Quality M
Project Year:
2016
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Air Quality Monitoring Plan In New Taipei City"
Project Subject:
"The plan for the implementation of the New Taipei City air quality, noise,
indoor air quality and o
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Taipei County"
Project Title:
"The plan of Taichung Low-carbon city developments promotes and assesses in 2014 year"
Project Subject:
"In order to promote Taichung City as a low carbon demonstration city and a world-class of low carbo
Project Year:
2014
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"Hualien Diesel Power Exhaust Detection Station Inspection Project, 2017"
Project Subject:
" carry out the achievement Relevant environmental pollution that may cause in order to strengthen a
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Hualien County"
Project Title:
"Project for Reviewing Stationary Source Permit System and Controlling the People's Livelihood Issue
Project Subject:
"The goals of this project are to strengthen and put the management of stationary sources into pract
Project Year:
2018
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"Project for Promoting the Cross-Strait Communication and Cooperation in the field of Air Quality Ma
Project Subject:
"To make the effectiveness of the cross-Straits communication and cooperation last, the major task
Project Year:
2016
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"Promotion of eco-driving and green-transportation, and vehicle carbon dioxide reduction technology
Project Subject:
"Since 2015, the EPA has implemented the Corporate Average CO2 emission standards for passenger vehi
Project Year:
2016
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"The Project of PM2.5 Control and Local Sources Profile Establishment of Chiayi City in 2016"
Project Subject:
"This project aims to the following seven main parts: Reference reviewes, setup local PM2.5 fingerpr
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Chiayi City"
行政院環境保護署 的其他資料集
訴願審議委員會委員名單
不定期更新更新,55謝先生 | 02-2311-7722#2962 | 2022-01-15 01:12:54
行政院環境保護署建檔公廁明細-新北市
不定期更新更新,180賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:01
行政院環境保護署固定污染源CEMS監測數據紀錄值資料集(1小時紀錄值)
每1時更新,239洪小姐 | 02-23117722#6221 | 2023-08-02 00:58:28
行政院環境保護署水庫水質監測資料
不定期更新更新,148郭先生 | 2311-7722#2399 | 2023-08-07 01:02:05
行政院環境保護署歷年燈號變換情形
每半年更新更新,270詹小姐 | 02-23832389#8204 | 2022-01-14 01:20:22
行政院環境保護署
地方環保局環保實收罰鍰
每月更新更新,242謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:32
行政院環境保護署公告應回收項目之責任業者列管資料
每年更新更新,64廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:26:07
行政院環境保護署環境影響評估案件摘要資料
每2月更新,289黃先生 | 02-23117722#2748 | 2023-08-06 01:03:57
行政院環境保護署符合噪音管制標準車輛-進口柴油引擎車
不定期更新更新,234林先生 | 02-23712121-6403 | 2022-01-14 01:18:58
行政院環境保護署補助地方設置巨大廢棄物回收再利用廠一覽
不定期更新更新,57林小姐 | 04-22521718#53511 | 2023-08-07 00:59:54
行政院環境保護署
環境影響說明書修正審查結論
每2月更新,65黃先生 | 02-23117722#2748 | 2023-08-05 00:59:54
行政院環境保護署空氣品質小時值_新竹縣_湖口站
每1時更新,222陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:05
行政院環境保護署經過飲用水水源水質保護區之環境影響評估報告書
每2月更新,69黃先生 | 02-23117722#2748 | 2023-08-05 01:00:58
行政院環境保護署污水經處理後注入地下水體水質標準
不定期更新更新,45劉小姐 | 02-2311-7722#2824 | 2022-01-14 01:23:27
行政院環境保護署光化測站基本資料
不定期更新更新,63謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:01
行政院環境保護署
行政院環境保護署環境保護人員訓練所單位決算
每1年更新,62江先生 | 03-4020789 #583 | 2023-08-09 01:05:48
行政院環境保護署建檔公廁明細-彰化縣
不定期更新更新,182賴先生 | 04-2252-1718#53686 | 2023-07-27 01:01:58
行政院環境保護署焚化廠底渣原始檢測資料
每1月更新,316莊先生 | 04-22521718#53523 | 2023-08-07 01:02:33
行政院環境保護署環評主管機關受理審查之環境影響差異分析報告
每2月更新,251黃先生 | 02-23117722#2748 | 2023-08-05 01:01:20
行政院環境保護署環保人員數
每月更新更新,157謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:43
行政院環境保護署
環境保護工程之興建類別環境影響說明書
每2月更新,134黃先生 | 02-23117722#2748 | 2023-08-05 01:01:10
行政院環境保護署垃圾處理場(廠)座數
每1年更新,250顏先生 | 02-23117722#2109 | 2023-07-27 01:00:41
行政院環境保護署底泥品質檢測資料
每月更新更新,147張小姐 | 02-2383-2389 #8401 | 2022-01-14 01:20:32
行政院環境保護署臺南市水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,54許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:49
行政院環境保護署行政院環境保護署單位決算
每1年更新,44何先生 | 02-23117722#2158 | 2023-08-09 01:04:28
行政院環境保護署
空氣品質監測小時值資料(一般污染物,每日更新)
每日更新更新,186謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:20
行政院環境保護署應回收廢棄物(廢乾電池類)回收量資料
每年更新更新,63廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:39
行政院環境保護署空氣品質小時值_臺中市_西屯站
每1時更新,393陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:57
行政院環境保護署空氣品質小時值_臺南市_善化站
每1時更新,404陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:46
行政院環境保護署大眾捷運系統之開發類別環境影響評估報告書
每2月更新,52黃先生 | 02-23117722#2748 | 2023-08-05 01:01:06
行政院環境保護署