「"Plan for dynamometer testing of diesel-fueled vehicle exhausts 」於資料集「EPQSummary_Air」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:50。 欄位Project Title的內容是"Plan for dynamometer testing of diesel-fueled vehicle exhausts and the consultation and assessment " , 欄位Project Subject的內容是"(一) Diesel Vehicle Inspection Station has inspected 5,048 vehicles (included 234 no-load running vehicles) with 112.2% of the rate of target completion. (二) 17,998 vehicles have been conducted the visual determination and 6,470 vehicles have been successfully identified by the Automatic Vehicle Identification, for a grand total of 24468 vehicles and 108.3% of the rate of target completion. (三) 3,832 vehicles failed to pass the visual determination and received the notices with 100.8% of the rate of target completion。(四) Sending out 6,000 voluntary on-site checking notices to the vehicles of the age over 8 years, which surpassed our target setting of 1,500 notices in the plan contract, with 400% of the rate of target completion.(五) With the strict selecting mechanism, 436 vehicle fail in 694 roadside emission tests with a failure rate of 62.8% and 100% of the achievement rate. Due to its workload, it has a degree of difficulty to reach the specification goal of 500 in the contract. For that reason, according to the institute clause in the contract, if we have under 500 vehicles fail to pass the roadside inspection, it enable to use 3 Diesel Vehicle Dynamometer inspections in the place of 1 failure road emission test, that is to say, other than the completion of 4,500 diesel vehicles dynamometer inspection, it shall complete extra 192 diesel vehicles dynamometer inspection to do the replacement. Until the 10th of December, we have the grand total of 4,814 vehicles completed the dynamometer inspection (no-load running ones are excluded), which have enough amount to take the place of 64 vehicles of failing on the roadside inspection.(六) With regard to the oil sampling, 20 of samplings from the on-site checking vehicles and those of 30 from the e roadside inspection, for a grand total of 50 samplings. In them, 3 samplings fail to pass the inspection with 100% of the achievement rate (七) The Promotion consortium of Opacity inspection and autonomous management held on May 6 with 100% of the achievement rate.(八) Released 4 news on the newspaper in accordance with the contract specification with 100% of the achievement rate(九) The completion of purchasing 1,000 promotion products(十) The Outstanding Environmental Friendly Organization recognition activity held on December 11 to recognize 4 all-purpose Carriers like outstanding environmentally-friendly vehicle teams, etc.(十一) 5 all-purpose carriers have participated in the autonomous management guidance with 100% of the achievement rate.(十二) Inner auditing once a month during the planning period. (十三) During the planning period, shall submit the seasonal Quality Assurance information and sent inspection of records to Environment Protection Administration on April, July and October based on the contract specification.(十四) As for the training of Diesel Vehicle inspection Chang Yuan Motor Co., Ltd. have to become the car shop that can do both inspection and Maintenance, 1 vehicle mechanic has attained the diesel vehicle inspection license. While doing the smoke opacimeter correction screen reading and its relevant comparison for Chang Yuan Motor Co., Ltds, found having abnormal smoke reading, have asked the company sending for repair and will do the relevant comparison again in the beginning of 2014 after the maintenance.(十五) Two stations have been conducted 15 quality control tests and made the control chart. The result shows that the stations have normal ability to do the inspection with fine quality.(十六) Complete the integration of both Xi Shu and Liu Yi laboratories by merging their ISO files together and submitting the application of the combination of laboratories to Chinese National Laboratory Accreditation.(十七) After compared the relevant inspection, the result shows that the inspection of Tainan inspection station has no big difference with that of ..." , 欄位Project Year的內容是2014 , 欄位Organizer的內容是"Environmental Protection Bureau of Tainan City" , 欄位Executive Unit的內容是"春迪企業股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=92019 , 欄位Publish Date的內容是20150601 。
Project Title
"Plan for dynamometer testing of diesel-fueled vehicle exhausts and the consultation and assessment "
Project Subject
"(一) Diesel Vehicle Inspection Station has inspected 5,048 vehicles (included 234 no-load running vehicles) with 112.2% of the rate of target completion. (二) 17,998 vehicles have been conducted the visual determination and 6,470 vehicles have been successfully identified by the Automatic Vehicle Identification, for a grand total of 24468 vehicles and 108.3% of the rate of target completion. (三) 3,832 vehicles failed to pass the visual determination and received the notices with 100.8% of the rate of target completion。(四) Sending out 6,000 voluntary on-site checking notices to the vehicles of the age over 8 years, which surpassed our target setting of 1,500 notices in the plan contract, with 400% of the rate of target completion.(五) With the strict selecting mechanism, 436 vehicle fail in 694 roadside emission tests with a failure rate of 62.8% and 100% of the achievement rate. Due to its workload, it has a degree of difficulty to reach the specification goal of 500 in the contract. For that reason, according to the institute clause in the contract, if we have under 500 vehicles fail to pass the roadside inspection, it enable to use 3 Diesel Vehicle Dynamometer inspections in the place of 1 failure road emission test, that is to say, other than the completion of 4,500 diesel vehicles dynamometer inspection, it shall complete extra 192 diesel vehicles dynamometer inspection to do the replacement. Until the 10th of December, we have the grand total of 4,814 vehicles completed the dynamometer inspection (no-load running ones are excluded), which have enough amount to take the place of 64 vehicles of failing on the roadside inspection.(六) With regard to the oil sampling, 20 of samplings from the on-site checking vehicles and those of 30 from the e roadside inspection, for a grand total of 50 samplings. In them, 3 samplings fail to pass the inspection with 100% of the achievement rate (七) The Promotion consortium of Opacity inspection and autonomous management held on May 6 with 100% of the achievement rate.(八) Released 4 news on the newspaper in accordance with the contract specification with 100% of the achievement rate(九) The completion of purchasing 1,000 promotion products(十) The Outstanding Environmental Friendly Organization recognition activity held on December 11 to recognize 4 all-purpose Carriers like outstanding environmentally-friendly vehicle teams, etc.(十一) 5 all-purpose carriers have participated in the autonomous management guidance with 100% of the achievement rate.(十二) Inner auditing once a month during the planning period. (十三) During the planning period, shall submit the seasonal Quality Assurance information and sent inspection of records to Environment Protection Administration on April, July and October based on the contract specification.(十四) As for the training of Diesel Vehicle inspection Chang Yuan Motor Co., Ltd. have to become the car shop that can do both inspection and Maintenance, 1 vehicle mechanic has attained the diesel vehicle inspection license. While doing the smoke opacimeter correction screen reading and its relevant comparison for Chang Yuan Motor Co., Ltds, found having abnormal smoke reading, have asked the company sending for repair and will do the relevant comparison again in the beginning of 2014 after the maintenance.(十五) Two stations have been conducted 15 quality control tests and made the control chart. The result shows that the stations have normal ability to do the inspection with fine quality.(十六) Complete the integration of both Xi Shu and Liu Yi laboratories by merging their ISO files together and submitting the application of the combination of laboratories to Chinese National Laboratory Accreditation.(十七) After compared the relevant inspection, the result shows that the inspection of Tainan inspection station has no big difference with that of ..."
Project Year
2014
Organizer
"Environmental Protection Bureau of Tainan City"
Executive Unit
"春迪企業股份有限公司"
Reporting download URL
Publish Date
20150601
「"Plan for dynamometer testing of diesel-fueled vehicle exhausts 」所屬的資料集:「EPQSummary_Air」的其他資料
Project Title:
"Program for Promoting Public Climate Literacy"
Project Subject:
"In order to implement the Environmental Protection Administration (hereinafter EPA)’s program for P
Project Year:
2015
Organizer:
"Office of Greenhouse Gases Reduction Management"
Project Title:
"2016 Taichung motorcycle exhaust inspection regulation and regular inspection station management pl
Project Subject:
"Project objectives for 2016, in Taichung City area locomotives regular inspection of propaganda and
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"Integration project of air quality improvement for Kao-Pin air quality district (The Second Year)."
Project Subject:
"Kao-Pin area total quantity control plan was promulgated in 2015/6/30, and a public hearing for the
Project Year:
2015
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"Tightening the Control of Specific Pollution Sources in New Taipei City in 2015"
Project Subject:
"In July 2014, an underground propylene gas pipeline in Kaohsiung leaked and a subsequent explosion
Project Year:
2015
Organizer:
"Environmental Protection Bureau, Taipei County"
Project Title:
"CEMS"
Project Subject:
"The main work of this project includes: performing CEMS function check and evaluation, fixed pollut
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Chiayi County"
Project Title:
"2016 Inspection Plan of Diesel Vehicle Dynamometer in Smoke Exhaust Detection Station"
Project Subject:
"With regarding to diesel vehicle contamination control, in order to improve the air quality and pro
Project Year:
2016
Organizer:
"HsinChu County Environment Protection Bureau"
Project Title:
""
Project Subject:
"From March 4, 2016 to December 15, 2016, the results of the work are summarized as follows:(一) Prom
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"106 annual Taitung County low carbon sustainable home operation system and implementation of the ef
Project Subject:
"The Program for the Management of Low-carbon Sustainable Homeland Operation and Its Effectiveness f
Project Year:
2017
Organizer:
"Taitung County Environment Protection Bureau"
Project Title:
"105CEMS"
Project Subject:
"Project objectives:(A) the implementation of continuous automatic monitoring facilities regulations
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Chiayi County"
Project Title:
"Analysis of the causes of air pollution in Taiwan"
Project Subject:
"Air quality in Taiwan is improved because of Taiwan EPA pushed air control strategies positively in
Project Year:
2017
Organizer:
"Department of Environmental Monitoring & Information Management"
Project Title:
"Unpleasant-Odor Air Pollution Control Project of Stock Raising Industry and Food and Beverage Indus
Project Subject:
"This project contains three main tasks: (1) patrol and control of unpleasant-odor air pollution, (2
Project Year:
2018
Organizer:
"Nantou County Environmental Protection Bureau"
Project Title:
"The Project of Taichung City fugitive emissions sources、indoor air quality control and Greenhouse G
Project Subject:
"Taichung city which was once known for its clean air quality has taken a dramatic dip since the ris
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"Quality Assurance Program for (FRM) PM2.5 Performance Evaluation(2018~2020)"
Project Subject:
"This report provides information of quality assurance for PM2.5 sampling activities from October 27
Project Year:
2018
Organizer:
"Department of Environmental Monitoring & Information Management"
Project Title:
"Yilan County 103 annual diesel exhaust pollution control and power meter operation detection plan"
Project Subject:
"Fourth, carry out the achievement Relevant environmental pollution that may cause in order to stren
Project Year:
2014
Organizer:
"Environmental Protection Bureau of Yi-Lan County"
Project Title:
"The Integrated Plan of Air Quality Control and Immediate Reaction"
Project Subject:
"This project was carried out from July 2, 2017 to July 1, 2018. The primary objects were to supervi
Project Year:
2018
Organizer:
"Taoyuan County Government Environment Protection Bureau"
Project Title:
"106 annual project of the investigation and chemical analysis of PM2.5 emission from stationary sou
Project Subject:
"This aimed to investigate the PM2.5 composition analysis of stationary air pollution source in Hsin
Project Year:
2017
Organizer:
"HsinChu County Environment Protection Bureau"
Project Title:
"To develop and to construct the new computer system to achieve the enhanced management in R.O.C ( T
Project Subject:
"The project mainly focuses on sustaining the management requirement of obeying the “Montreal Protoc
Project Year:
2017
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"Coordination and Evaluation of River Fugitive Dust Management Plan"
Project Subject:
"The major purpose of this project is to assist EPA to accomplish “river fugitive dust prevention an
Project Year:
2014
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"2017 Yi-Lan Moving pollution source inspection control project and locomotive exhaust periodic insp
Project Subject:
"Mobile pollution sources is the main cause for the air quality decline, in order to improve the air
Project Year:
2017
Organizer:
"Environmental Protection Bureau of Yi-Lan County"
Project Title:
"The Inspection Project of the LPG Price Subsidy Program"
Project Subject:
"The content of the main work in this year can be divided into four parts. First part relates to imp
Project Year:
2014
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"The Project of Air Pollution Petitions Inspecting Control of Changhua County in 2016"
Project Subject:
"“The Project of Air Pollution Petitions Inspecting control of Changhua County in 2016” had begun fr
Project Year:
2016
Organizer:
"Environmental Protection Bureau Changhua County"
Project Title:
"Implement of the new model certification, conformity of production and the recall relative investig
Project Subject:
"The main objective of this project is to assist EPA to implement new gasoline vehicle emissions con
Project Year:
2017
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
""
Project Subject:
"The project was a continuous control project, whose execution could be mainly divided into three pa
Project Year:
2011
Organizer:
"Taoyuan County Government Environment Protection Bureau"
Project Title:
"Air Pollution Reduction and Control Regarding Temple Fairs in Chiayi City"
Project Subject:
" Aiming to replace joss paper with food offering, promote centralized burning of joss paper, and
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"The Integration Plan of Air Quality to Manintain, Improve, and scheme"
Project Subject:
"The work plan includes the air quality analysis, PAHs sampling and analysis, review of air pollutio
Project Year:
2010
Organizer:
"Environmental Protection Bureau, Taipei County"
Project Title:
"Preliminary assessment on the feasibility of economic incentive mechanism for greenhouse gas reduct
Project Subject:
"The impact of global warming on human society is increasingly severe, so in order to slow down the
Project Year:
2015
Organizer:
"Office of Greenhouse Gases Reduction Management"
Project Title:
"Adaptation strategy on Climate Change planning in 2014"
Project Subject:
" Climate change now is one of most important issues around world. Every country has been studyin
Project Year:
2014
Organizer:
"Office of Greenhouse Gases Reduction Management"
Project Title:
"107 years of migration pollution sources"
Project Subject:
"In order to solve the pollution caused by mobile pollution sources, it is imperative to audit and b
Project Year:
2018
Organizer:
"Taitung County Environment Protection Bureau"
"無"2017"無"
Project Title:
"無"
Project Subject:
"無"
Project Year:
2017
Organizer:
"Environmental Protection Bureau of Yi-Lan County"
Project Title:
"Promote local governments to establish air pollution emissions estimate"
Project Subject:
"As a reference of emission control, Taiwan Emission Data System (TEDS) is reviewed every 3 years an
Project Year:
2014
Organizer:
"Department of Air Quality Protection & Noise Control"
行政院環境保護署 的其他資料集
各公告類別事業廢棄物自行處理申報量統計
每月更新更新,165陳先生 | 02-2311-7722#2682 | 2022-01-14 01:25:33
行政院環境保護署廢棄物質最終處置資訊網會議資料
每月更新更新,40許先生 | 02-2311-7722#2641 | 2022-01-14 01:24:13
行政院環境保護署建檔公廁明細-新竹市
不定期更新更新,193曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:15:00
行政院環境保護署環境教育申報單位之有效護照開通率
每3月更新,62李小姐 | 02-23117722#2724 | 2023-07-27 01:02:54
行政院環境保護署中科后里環境監測資料
不定期更新更新,51陳先生 | 04-22521718#51207 | 2023-08-09 01:05:06
行政院環境保護署
行政院環境保護署事業廢棄物再利用機構資料
每年更新更新,68李小姐 | 02-2311-7722#2633 | 2022-01-14 01:26:21
行政院環境保護署空氣品質小時值_新北市_富貴角站
每1時更新,285陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:11
行政院環境保護署空氣品質小時值_新北市_永和站
每1時更新,206陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:27
行政院環境保護署年度環境保護人員訓練計畫
每1年更新,53湯小姐 | 03-4020789#544 | 2023-08-07 01:01:30
行政院環境保護署噪音實收罰鍰
每年更新更新,65謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:42
行政院環境保護署
應回收廢棄物(廢乾電池類)回收量資料
每年更新更新,55廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:39
行政院環境保護署空氣品質小時值_新北市_三重站
每小時更新更新,288謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:40
行政院環境保護署行政院環境保護署環境教育機構認證展延申請書
不定期更新,51蘇小姐 | (03)4020789分機669 | 2022-01-15 01:11:08
行政院環境保護署水污染稽查次數
每年更新更新,138謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:26
行政院環境保護署空氣品質小時值_新北市_汐止站
每小時更新更新,227謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:20
行政院環境保護署
機場之開發類別環境影響評估報告書
每2月更新,44黃先生 | 02-23117722#2748 | 2023-08-05 01:01:08
行政院環境保護署接受民間捐款鼓勵檢舉重大污染案件專案執行要點
不更新更新,53許小姐 | 04-22521718#58709 | 2022-01-14 01:18:01
行政院環境保護署焚化廠基本資料
每月更新更新,61吳先生 | 04-22521718#53526 | 2022-01-15 01:15:18
行政院環境保護署六輕相關計畫環評監督委員會會議紀錄
每季更新更新,53陳先生 | 04-22521718#51207 | 2022-01-14 01:21:58
行政院環境保護署空氣品質小時值_高雄市_美濃站
每1時更新,172陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:44
行政院環境保護署
重金屬污染農地管理及改善技術評析計畫
每6月更新,295黃先生 | 02-23832389#8204 | 2023-07-30 01:01:14
行政院環境保護署乾電池汞、鎘含量確認文件資料
不定期更新更新,133張先生 | 02-23117722#2615 | 2022-01-14 01:26:10
行政院環境保護署空氣品質監測月值
每1月更新,117陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:42
行政院環境保護署全國細懸浮微粒手動監測資料
3天更新,280謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:18
行政院環境保護署環境教育(教學)人員(專長)認證申請書
不定期更新更新,44盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:28
行政院環境保護署
貨品通關事前聲明確認作業指引
不定期更新,50金先生 | 23257399#55315 | 2022-01-14 01:22:20
行政院環境保護署行政院環境保護署毒物及化學物質局單位決算
不定期更新,46魏小姐 | 02-23257399#55432 | 2022-01-15 01:09:57
行政院環境保護署水污染罰鍰次數
每年更新更新,148謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:27
行政院環境保護署環保署環境影響評估審查委員會會議資料
每2月更新,78黃先生 | 02-23117722#2748 | 2023-08-05 01:00:47
行政院環境保護署審核事業或污水下水道系統放流水水質濃度限值處理原則
不定期更新,47簡小姐 | 02-2311-7722#2818 | 2022-01-15 01:13:05
行政院環境保護署