"The 2018 National Water Environment Clean River Project in Chiayi City"
「"The 2018 National Water Environment Clean River Project in Chiayi City"」於資料集「EPQSummary_WaterQualityProtection」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:47。 欄位Project Title的內容是"The 2018 National Water Environment Clean River Project in Chiayi City" , 欄位Project Subject的內容是"This project is mainly divided into four working items, i.e. (A) Set up bar screens on the river; (B) Clear and collect river garbage; (C) Report clear data for river garbage; and (4) Others. Summary of executive achievements is as follows:
(1) Propose the erection location of river garbage bar screens and the related specifications: The proposal for the erection location of bar screens and the related specifications in written has been sent to EPA (Environmental Protection Agency) on July 24, 2018 and EPA asked to supplement and correct the setup report on July 31, 2018; the revised erection location of bar screens and the related specifications in written has been sent to EPA on August 7, 2018 and EPA agreed it for future reference on August 15, 2018. Afterwards, the Luntsaiting Ditch drainage (Hsintsun drainage) in the Pachang River basin and Toukang branch in the Putzai River Basin were found the hot zone of river garbage in this city upon the river tour-inspection. Therefore, installation planning report for two additional locations as mentioned above was submitted to EPA on December 5, 2018 and EPA agreed it for future reference on December 12, 2018, with achievement rate up to 100%.
(2) At least set up river garbage bar screens at more than 9 locations: Completed river garbage bar screens at 5 locations on September 8, 2018, i.e. Luliao drainage, Hutsai internal drainage, Chiayi northern drainage, Houchuang direct drainage 1 and Central drainage; besides, completed bar screens at 4 locations on September 10, 2018, i.e. Pimachiao drainage, Minghsiung Industrial Park drainage, Chiayi western drainage and Houchuang Direct drainage 2. Afterwards, the Luntsaiting Ditch drainage (Hsintsun drainage) in the Pachang River basin and Toukang branch in the Putzai River Basin were found the hot zone of river garbage in this city upon the river tour-inspection. Therefore, two locations as mentioned above were set up on December 19, 2018. River garbage bar screens at total 11 locations have been set up, with achieving rate up to 100%.
(3) Tour-inspection twice a week for each river drainage, regional drainage into the river and rainfall drainage: Number of tour-inspection in total 44 on the frequency of twice a week was completed in the planned tour-inspection locations to search any place on the river and banks where there’re plenty of clearable drifter, garbage and water hyachinth waste.
(4) At least clear river garbage more than twice a month: The project tour-inspection was conducted in drainage basin where river garbage bar screens were set up at 11 locations by the city, including 5 times of clearance for Chungyi dike road side ditch in the Pachang River basin, 5 times for Hutsai internal drainage, 1 time for Luliao drainage, 3 times for Taokang Branch in Putze river basin, 2 times for Pimachiao drainage, 2 times for Minhsiung Industrial Park drainage, 2 times for Chiayi northern drainage, 2 times for Chiayi western drainage, 1 time for Houchuang direct drainage and 1 time for Niuchou River dike road, totaling clearance of 129.9 tons in 24 places. All garbage was carried to Chenghsi Crematory for disposal, with achieving rate about 37%.
" , 欄位Project Year的內容是2018 , 欄位Organizer的內容是"Environmental Protection Bureau, Chiayi City" , 欄位Executive Unit的內容是"技佳工程科技股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=192732 , 欄位Publish Date的內容是20190331 。
Project Title
"The 2018 National Water Environment Clean River Project in Chiayi City"
Project Subject
"This project is mainly divided into four working items, i.e. (A) Set up bar screens on the river; (B) Clear and collect river garbage; (C) Report clear data for river garbage; and (4) Others. Summary of executive achievements is as follows: (1) Propose the erection location of river garbage bar screens and the related specifications: The proposal for the erection location of bar screens and the related specifications in written has been sent to EPA (Environmental Protection Agency) on July 24, 2018 and EPA asked to supplement and correct the setup report on July 31, 2018; the revised erection location of bar screens and the related specifications in written has been sent to EPA on August 7, 2018 and EPA agreed it for future reference on August 15, 2018. Afterwards, the Luntsaiting Ditch drainage (Hsintsun drainage) in the Pachang River basin and Toukang branch in the Putzai River Basin were found the hot zone of river garbage in this city upon the river tour-inspection. Therefore, installation planning report for two additional locations as mentioned above was submitted to EPA on December 5, 2018 and EPA agreed it for future reference on December 12, 2018, with achievement rate up to 100%. (2) At least set up river garbage bar screens at more than 9 locations: Completed river garbage bar screens at 5 locations on September 8, 2018, i.e. Luliao drainage, Hutsai internal drainage, Chiayi northern drainage, Houchuang direct drainage 1 and Central drainage; besides, completed bar screens at 4 locations on September 10, 2018, i.e. Pimachiao drainage, Minghsiung Industrial Park drainage, Chiayi western drainage and Houchuang Direct drainage 2. Afterwards, the Luntsaiting Ditch drainage (Hsintsun drainage) in the Pachang River basin and Toukang branch in the Putzai River Basin were found the hot zone of river garbage in this city upon the river tour-inspection. Therefore, two locations as mentioned above were set up on December 19, 2018. River garbage bar screens at total 11 locations have been set up, with achieving rate up to 100%. (3) Tour-inspection twice a week for each river drainage, regional drainage into the river and rainfall drainage: Number of tour-inspection in total 44 on the frequency of twice a week was completed in the planned tour-inspection locations to search any place on the river and banks where there’re plenty of clearable drifter, garbage and water hyachinth waste. (4) At least clear river garbage more than twice a month: The project tour-inspection was conducted in drainage basin where river garbage bar screens were set up at 11 locations by the city, including 5 times of clearance for Chungyi dike road side ditch in the Pachang River basin, 5 times for Hutsai internal drainage, 1 time for Luliao drainage, 3 times for Taokang Branch in Putze river basin, 2 times for Pimachiao drainage, 2 times for Minhsiung Industrial Park drainage, 2 times for Chiayi northern drainage, 2 times for Chiayi western drainage, 1 time for Houchuang direct drainage and 1 time for Niuchou River dike road, totaling clearance of 129.9 tons in 24 places. All garbage was carried to Chenghsi Crematory for disposal, with achieving rate about 37%. "
Project Year
2018
Organizer
"Environmental Protection Bureau, Chiayi City"
Executive Unit
"技佳工程科技股份有限公司"
Reporting download URL
Publish Date
20190331
「"The 2018 National Water Environment Clean River Project in Chiayi City"」所屬的資料集:「EPQSummary_WaterQualityProtection」的其他資料
Project Title:
"Project of ocean pollution control inspection and environmental education propaganda for Yunlin cou
Project Subject:
"This project was carried out from Feb. 26th, 2018 to the end of Nov. 30th, 2018. To help Yunlin cou
Project Year:
2018
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Water Environment Reconstruction Plan for Daxichuo Community (Pimajiao Drainage), Chiayi City, 2018
Project Subject:
"The Chiayi City Government has taken into account the river pollution remediation and the construct
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Impetus of the working of contaminants screening for drinking water quality regulation"
Project Subject:
"This project established the rules and process of contaminants screening for drinking water quality
Project Year:
2012
Organizer:
"Department of Environmental Sanitation & Toxic Substance Management"
Project Title:
"Year 2016 Kaohsiung City Water Environment Patrol Program Promotional & Educational Training Projec
Project Subject:
"Based on the understanding of the objectives and contents of the work, the Company will divide the
Project Year:
2016
Organizer:
"Environmental Protection Bureau Kauhsiung City Government"
Project Title:
"Forward-looking Infrastructure Plan for Water Quality Improvement of Critical Stations"
Project Subject:
"Taiwan’s Environmental Protection Administration is aggressively implementing measures to reduce po
Project Year:
2019
Organizer:
"Department of Water Quality Protection"
Project Title:
"Hsinchu City 105 years of water pollution and water pollution inspection fee regulation plan"
Project Subject:
"In order to improve the quality of water quality in the whole river basin of Hsinchu City, the Envi
Project Year:
2016
Organizer:
"Bureau of Environmental Protection Hsin-Chu"
Project Title:
"Maintenance and Response Resource Integration Program for Marine Pollution Control and Management S
Project Subject:
" The goal of this program for this year was to improve the system’s management performance for resp
Project Year:
2015
Organizer:
"Department of Water Quality Protection"
Project Title:
"Source apportionment of metal elements and organic compounds in a river: a example at Sincheng Rive
Project Subject:
"This project attempted to investigate spatial and temporal distributions of water pollution sources
Project Year:
2017
Organizer:
"Environmental Analysis Laboratory"
Project Title:
"“Plan of Taichung City Drainage Basin Total Maximum Daily Load, Water Pollution Control Fee Collect
Project Subject:
"Implementation of the plan shall be commenced from February 14, 2018 until December 31, 2018. The m
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"2014 River water quality improvement support and evaluation plan"
Project Subject:
"The Project analyzes the changes in 54 rivers that have been under EPA’s regular monitoring for the
Project Year:
2014
Organizer:
"Department of Water Quality Protection"
Project Title:
"The study of biological toxicity evaluations and characteristics in high-tech industry effluent (2/
Project Subject:
"This study establishes the toxicity identification evaluation (TIE) procedure for use in high-tech
Project Year:
2014
Organizer:
"Environmental Analysis Laboratory"
Project Title:
"2016 Plan of Changhua County’s Implementation of Water Pollution Source Inspection, Water Pollution
Project Subject:
"In order to improve the water quality of rivers within the jurisdiction and enhance the environment
Project Year:
2016
Organizer:
"Environmental Protection Bureau Changhua County"
Project Title:
"Scientific Support and Monitoring for Marine Pollution Emergency Response"
Project Subject:
"The plan of year 2014 is to run the oil spill and chemical dispersion simulation modeling software,
Project Year:
2014
Organizer:
"Department of Water Quality Protection"
Project Title:
"Marine pollution prevention and emergency response effectiveness evaluation project"
Project Subject:
"The occurrence of marine oil pollution incidents has a massive impact on marine environment conserv
Project Year:
2016
Organizer:
"Department of Water Quality Protection"
Project Title:
"Test plan for forward-looking treatment technology of car wash wastewater"
Project Subject:
" In recent years, Taiwan's environmental awareness has risen and environmental issues have recei
Project Year:
2020
Organizer:
"Department of Water Quality Protection"
Project Title:
"The Integrated Management and Upgrade Project of Drinking Water Source Management System"
Project Subject:
"To fulfill the contract requirements and meet the needs of EPA(Environmental Protection Administrat
Project Year:
2021
Organizer:
"Department of Water Quality Protection"
Project Title:
""
Project Subject:
"Abstract This project aims to assist Yilan County Government Environmental Protection Bureau in pro
Project Year:
2014
Organizer:
"Environmental Protection Bureau of Yi-Lan County"
Project Title:
"Daikecan,Taoyuan County, Tahan River natural water purification project detail design plan"
Project Subject:
"Constructed wetland can purify waste water, so it is usually set to handle the sewage. In order to
Project Year:
2011
Organizer:
"Taoyuan County Government Environment Protection Bureau"
Project Title:
"The Plan of Water Quality Sustainable Management for Reservoir (North District) "
Project Subject:
"To enhance the reservoir watershed soil conservation and improve its water quality, the Executive Y
Project Year:
2018
Organizer:
"Department of Water Quality Protection"
Project Title:
"Forward-Looking Plan for Integrated Management of Water Environment Improvement Project in Northern
Project Subject:
"To promote the “National Water Environment Improvement Project,” which has been designed to achieve
Project Year:
2018
Organizer:
"Department of Water Quality Protection"
Project Title:
"Environmental Protection Bureau Changhua County Changhua County River & Marine Pollution Control cu
Project Subject:
"For the purpose of improving water quality in river water bodies and to promote environmental quali
Project Year:
2015
Organizer:
"Environmental Protection Bureau Changhua County"
Project Title:
"The Industrial Wastewater Management and Database Maintenance Project"
Project Subject:
"The achievement of this project focuses mainly on three areas, including wastewater regulations ame
Project Year:
2016
Organizer:
"Department of Water Quality Protection"
Project Title:
"107-year submarine (drift) garbage removal and environmental education promotion and vitality marin
Project Subject:
"The 107th Taitung County Submarine (Floating) Garbage Removal and Environmental Education Promotion
Project Year:
2018
Organizer:
"Taitung County Environment Protection Bureau"
Project Title:
"Collection and Check Plan of Water Pollution Control Fee of Pingtung County in 2018"
Project Subject:
"The plan has been implemented since February 3, 2018. As of November 30, the progress of each tasks
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Pingtung County"
"102"2013"102"
Project Title:
"102"
Project Subject:
"102"
Project Year:
2013
Organizer:
"HsinChu County Environment Protection Bureau"
Project Title:
"The Study of Pollutant Characteristics of Industrial Wastewater and Pollution Control Measures"
Project Subject:
"Since 2010, based on a series of surveys on industrial wastewater characteristics, the Environmenta
Project Year:
2014
Organizer:
"Department of Water Quality Protection"
Project Title:
"The Plan of Water Quality Sustainable Management for Reservoirs (South District)"
Project Subject:
"The Baihe Reservoir is selected as a case study model for the current project entitled as “The Plan
Project Year:
2018
Organizer:
"Department of Water Quality Protection"
"-"2017"-"
Project Title:
"-"
Project Subject:
"-"
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"The Project of Management of Control Measures Application and Declaration in Wastewater Prevention
Project Subject:
"The primary work and achievement of this project focused on the amendments of regulations for indus
Project Year:
2020
Organizer:
"Department of Water Quality Protection"
Project Title:
"Pollutant Investigation Data Analysis and Application of Water and Sediment in River"
Project Subject:
"To improve the applicative value of river water quality analysis, this study evaluate the measureme
Project Year:
2021
Organizer:
"Environmental Analysis Laboratory"
行政院環境保護署 的其他資料集
行政院環境保護署環境保護人員訓練所單位決算
每1年更新,42江先生 | 03-4020789 #583 | 2023-08-09 01:05:48
行政院環境保護署臺北市水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,45吳小姐 | 02-2383-2389#8303 | 2022-01-18 01:24:38
行政院環境保護署河川揚塵監測資料
每1時更新,140陳先生 | 02-2311-7722#2386 | 2023-08-02 00:59:03
行政院環境保護署環境荷爾蒙管理計畫執行成果
不定期更新更新,30黃先生 | 02-23257399#55532 | 2023-07-27 01:02:28
行政院環境保護署固定污染源-煙道基本參數檔
不定期更新更新,95陳小姐 | 02-2371-2121#6216 | 2022-01-14 01:02:45
行政院環境保護署
0800資源回收免費專線-一般件問題查詢廢機動車輛統計
每年更新更新,38莊先生 | 02-23705888#3108 | 2022-01-14 01:24:24
行政院環境保護署環境教育機構認證資料
每1月更新,38盧小姐 | 03-4020789#606 | 2023-07-27 01:02:47
行政院環境保護署焚化廠空污監測資料
每月更新更新,122吳先生 | 04-22521718#53526 | 2022-01-15 01:15:31
行政院環境保護署六輕相關計畫環境監測資料
每季更新更新,42陳先生 | 04-22521718#51207 | 2022-01-15 01:14:25
行政院環境保護署土壤及地下水污染場址位置圖
不定期更新更新,43賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:16:34
行政院環境保護署
交通事業廢棄物再利用機構資料
每1年更新,68李小姐 | 02-2311-7722#2626 | 2023-07-27 00:59:36
行政院環境保護署我國重要環保統計資料
每月更新更新,154謝小姐 | 02-23117722#2103 | 2022-01-14 01:20:33
行政院環境保護署環保標章旅館環境即時通地圖資料
每日更新更新,54呂小姐 | 02-23117722#2929 | 2022-01-14 01:18:02
行政院環境保護署空氣品質小時值_高雄市_前鎮站
每1時更新,109陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:38
行政院環境保護署新化學物質標準登錄表單
不定期更新更新,58金先生 | 23257399#55315 | 2022-01-14 01:22:59
行政院環境保護署
面源網格空氣污染排放量(TWD97)
每2年更新,117劉小姐 | 02-23117722#6111 | 2023-07-30 01:04:44
行政院環境保護署應回收廢棄物(廢機動車輛類)回收量資料
每年更新更新,33廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:35
行政院環境保護署各級環保單位歲出決算
每月更新更新,76謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:35
行政院環境保護署紫外線測站基本資料
不定期更新更新,62陳先生 | 02-2311-7722#2386 | 2023-08-07 00:59:36
行政院環境保護署應回收廢棄物處理業者(廢乾電池類)最大處理量資料
每年更新更新,43廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:03
行政院環境保護署
非甲烷碳氫化合物(NMHC)監測小時值(每小時提供)
每1時更新,89陳先生 | 02-2311-7722#2386 | 2023-08-08 00:58:48
行政院環境保護署二氧化碳-小時值-每小時
每1時更新,222陳先生 | 02-2311-7722#2386 | 2023-08-07 00:58:21
行政院環境保護署南科樹谷環境監測資料
不定期更新更新,37陳先生 | 04-22521718#51207 | 2022-01-14 01:22:03
行政院環境保護署經濟部輔導設置處理設施許可資料
不定期更新更新,91何先生 | 02-2311-7722#2653 | 2022-01-14 01:26:03
行政院環境保護署環保署環境影響評估審查委員會會議資料
每2月更新,70黃先生 | 02-23117722#2748 | 2023-08-05 01:00:47
行政院環境保護署
EPQSummary_Air
不定期更新更新,141郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:50
行政院環境保護署環境檢驗測定機構許可資料
每1月更新,162楊先生 | (03)491-5818轉2103 | 2023-07-27 01:01:42
行政院環境保護署公告應回收廢物品及容器回收量
每1月更新,63顏先生 | 02-23117722#2109 | 2023-07-30 01:00:53
行政院環境保護署環境影響評估報告書環境敏感區位調查表
每2月更新,112黃先生 | 02-23117722#2748 | 2023-08-05 01:00:55
行政院環境保護署環境影響評估報告書附表五:廢棄物、毒化物
每2月更新,31黃先生 | 02-23117722#2748 | 2023-08-05 01:00:51
行政院環境保護署