time1: 0 time2: 0 time3: 0 time4: 0 total: 0 "Project for Management and Appraisal Work of Refuse Incineratio
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

"Project for Management and Appraisal Work of Refuse Incineratio

"Project for Management and Appraisal Work of Refuse Incineratio」於資料集「EPQSummary_WasteManagement」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:53。 欄位Project Title的內容是"Project for Management and Appraisal Work of Refuse Incineration Plants and Public-owned Landfills" , 欄位Project Subject的內容是"A. Refuse Incineration Plant Portion In order to ensure the effective supervision of the management of refuse incineration plants, the Environmental Protection Administration (EPA) has conducted following tasks and prepared relevant laws, regulations and systems from year 2001:  The propagation of ‘The implementation guidance for operation, examination and performance appraisal of the operated refuse incineration plants’ on April 20, 2001. (amended on April 18, 2002 and abolished on July 26, 2006)  The propagation of ‘The essentials of the examination and appraisal of refuse resource recovery from incineration plants for the EPA’ on April 13, 2004. (amended on July 13, 2005 and July 26, 2006 and August 10, 2009) The main implementation results of the project during 2019~2020: 1. Handling the management and appraisal work of 24 refuse incineration plants in operation. Including monthly reorganization, review and analysis of operation data, review of annual operation results report, conduct irregular inspections, conduct the appraisal of Taitung plant construction subsidies, conduct the committee meetings, technical forums, and handling the matters assigned by the EPA and committee. 2. The function of SWIMS was added, screening and provides various reports and consulting, sharing the information to the other EPA systems. 3. Sampling and analysis of exhaust gas dioxin from 4 incineration plants. B. Landfill Portion In order to solve the problem of the gradual reductive volume of the original landfill, but still need the space to bury the incineration bottom slag, fly ash stabilizing compound and unsuitable waste, and temporarily place the post-disaster wastes in response to the incineration plant's old repair and natural disasters, the EPA subsidizes local governments to carry out the old landfill activation project. Through the existing survey and supervision methods to ensure the construction quality of the activation and construction projects to create recycling and reuse benefits. In addition, the EPA conducts a 3rd level inspection of environmental protection facilities such as landfills, transfer stations and closed/ rehabilitation sites to grasp the current status of its operation and maintenance and the supervision of the Environmental Protection Bureau. The main implementation results of the project during 2018: 1. Handling 10 site survey and visit counseling works at Luzhu Dist., Kaohsiung City、Minxiong Township, Chiayi County and Annan Dist., Tainan City and track the progress of each project and compare the contents of the three activation projects. 2. Co-organized the 3rd level inspection of environmental protection facilities in 90 sessions, and provided suggestions for improvement to the Environmental Protection Bureau and the management units in response to the current situation for the landfill can be function properly handle or temporarily dispose of the waste. 3. The function of the landfill information system was added, and the 3rd level inspection results of the EPA were added to provide users with quick information and progress." , 欄位Project Year的內容是2019 , 欄位Organizer的內容是"Bureau of Environmental Inspection" , 欄位Executive Unit的內容是"環興科技股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw , 欄位Publish Date的內容是20210630

Project Title

"Project for Management and Appraisal Work of Refuse Incineration Plants and Public-owned Landfills"

Project Subject

"A. Refuse Incineration Plant Portion In order to ensure the effective supervision of the management of refuse incineration plants, the Environmental Protection Administration (EPA) has conducted following tasks and prepared relevant laws, regulations and systems from year 2001:  The propagation of ‘The implementation guidance for operation, examination and performance appraisal of the operated refuse incineration plants’ on April 20, 2001. (amended on April 18, 2002 and abolished on July 26, 2006)  The propagation of ‘The essentials of the examination and appraisal of refuse resource recovery from incineration plants for the EPA’ on April 13, 2004. (amended on July 13, 2005 and July 26, 2006 and August 10, 2009) The main implementation results of the project during 2019~2020: 1. Handling the management and appraisal work of 24 refuse incineration plants in operation. Including monthly reorganization, review and analysis of operation data, review of annual operation results report, conduct irregular inspections, conduct the appraisal of Taitung plant construction subsidies, conduct the committee meetings, technical forums, and handling the matters assigned by the EPA and committee. 2. The function of SWIMS was added, screening and provides various reports and consulting, sharing the information to the other EPA systems. 3. Sampling and analysis of exhaust gas dioxin from 4 incineration plants. B. Landfill Portion In order to solve the problem of the gradual reductive volume of the original landfill, but still need the space to bury the incineration bottom slag, fly ash stabilizing compound and unsuitable waste, and temporarily place the post-disaster wastes in response to the incineration plant's old repair and natural disasters, the EPA subsidizes local governments to carry out the old landfill activation project. Through the existing survey and supervision methods to ensure the construction quality of the activation and construction projects to create recycling and reuse benefits. In addition, the EPA conducts a 3rd level inspection of environmental protection facilities such as landfills, transfer stations and closed/ rehabilitation sites to grasp the current status of its operation and maintenance and the supervision of the Environmental Protection Bureau. The main implementation results of the project during 2018: 1. Handling 10 site survey and visit counseling works at Luzhu Dist., Kaohsiung City、Minxiong Township, Chiayi County and Annan Dist., Tainan City and track the progress of each project and compare the contents of the three activation projects. 2. Co-organized the 3rd level inspection of environmental protection facilities in 90 sessions, and provided suggestions for improvement to the Environmental Protection Bureau and the management units in response to the current situation for the landfill can be function properly handle or temporarily dispose of the waste. 3. The function of the landfill information system was added, and the 3rd level inspection results of the EPA were added to provide users with quick information and progress."

Project Year

2019

Organizer

"Bureau of Environmental Inspection"

Executive Unit

"環興科技股份有限公司"

Reporting download URL

https://epq.epa.gov.tw

Publish Date

20210630

「"Project for Management and Appraisal Work of Refuse Incineratio」所屬的資料集:「EPQSummary_WasteManagement」的其他資料

Project Title: "The Project on supplementary investigation and assessment for Dapingding particular area of high po
Project Subject: "The project objectives are to investigate and assess the illegal dumping waste of high pollution co
Project Year: 2015
Organizer: "Environmental Protection Bureau Kauhsiung City Government"

Project Title: "Recovery technology of ammonia refrigerant from waste absorption refrigerator"
Project Subject: "Refrigerators can be divided into compressor refrigeration and absorption depending on the cooling
Project Year: 2021
Organizer: "Recycling Fund Management Board"

Project Title: "The Evaluation Plan for the Diversity Utilization of Changhua County Agricultural Wooden Materials
Project Subject: " In order to promote the recycling and utilization of agricultural wooden materials in Chang-Hua Co
Project Year: 2020
Organizer: "Department of Waste Management"

Project Title: "2017 Chiayi City Recycling Work Plan"
Project Subject: "The main purpose of this project is to control and improve the resource recycling conditions in Chi
Project Year: 2017
Organizer: "Environmental Protection Bureau, Chiayi City"

Project Title: "Technology for preparing cylindrical activated carbon from waste tire carbon black"
Project Subject: "This project is the application study of converting carbon black from waste tire to pillar activate
Project Year: 2020
Organizer: "Recycling Fund Management Board"

Project Title: "Hydrothermal conversion of scrap tire to activated carbon for mercury vapor"
Project Subject: "This project joint to prepare and to characterize activated carbon hydrothermally converted from sc
Project Year: 2018
Organizer: "Recycling Fund Management Board"

Project Title: "Cradle-to-Cradle Design Principles Promotion Project – Workplan"
Project Subject: "The main work items of the project were as follows: (1) Undertaking work related to the promotion o
Project Year: 2016
Organizer: "Department of Waste Management"

Project Title: "Develop the system of IoT auto-monitor and verification management to the waste tire recycler"
Project Subject: "Most of fire incidents in waste tire recycler had happened in the non-auditing and certification pe
Project Year: 2021
Organizer: "Recycling Fund Management Board"

Project Title: "2016,Inspection and Promotion, on Resource Recycling in Yunlin County"
Project Subject: "The implementation period is from 26 February 2016 to 31 December 2016, mainly including the garbag
Project Year: 2016
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "Project of promoting to the renewal of low carbon refuse trucks and compiling information of refuse
Project Subject: "This project carried out from February 8, 2018 to December 31, 2018.The implementation results of t
Project Year: 2018
Organizer: "Department of Waste Management"

Project Title: "Life Waste Reduction Planning Project 2015"
Project Subject: "This Project was implemented over the period from February 16, 2015 to December 31, 2015. The main
Project Year: 2015
Organizer: "Department of Waste Management"

Project Title: "The Auditing and Certification Project of the Regulated Recyclable Waste (Non-Plastics Waste Contai
Project Subject: "According to the results of non-plastic waste containers auditing and certification from Jan 01, 20
Project Year: 2017
Organizer: "Recycling Fund Management Board"

Project Title: ""
Project Subject: "All these decades, vehicles had become necessary transportation in people’s lives. In Taiwan, more
Project Year: 2015
Organizer: "Recycling Fund Management Board"

Project Title: "Project of Recycling for Laminated Packaging With Aluminum"
Project Subject: "Most laminated packaging waste with aluminum is viewed as garbage so that it is incinerated in the
Project Year: 2014
Organizer: "Department of Waste Management"

Project Title: "Project of improving recycling management, supervision and inspection for the incineration fly ash
Project Subject: "In order to improve the management of the recycling for the incineration bottom ash from incinerat
Project Year: 2020
Organizer: "Bureau of Environmental Inspection"

Project Title: "The 2017 Project on the Industrial Waste Flow Control Administration and Management Review of Indus
Project Subject: "The Executive Yuan’s Environmental Protection Agency commissioned the “2017 Project on the Industri
Project Year: 2017
Organizer: "Department of Waste Management"

Project Title: "Project on Improvement to Waste Home Appliances and Waste IT Equipment Processing Technology and C
Project Subject: "This project aims to improve the outcomes of the recycling processing system. Below are the tasks t
Project Year: 2016
Organizer: "Recycling Fund Management Board"

Project Title: "2020-2021 Project of Counseling and Improving Environmental Protection Facilities"
Project Subject: "There are 368 Cleaning Squadrons across the country. They are responsible for environmental cleanin
Project Year: 2020
Organizer: "Bureau of Environmental Inspection"

Project Title: "Chiayi County waste incineration bottom slag re-use plan in 2016"
Project Subject: "Chiayi County waste incineration bottom slag re-use plan in 2016,adopt an open tender, the minimum
Project Year: 2016
Organizer: "Environmental Protection Bureau, Chiayi County"

Project Title: "2014 project for creative promotion on resource recycling"
Project Subject: "This project combined with relevant units for processing advocacy activities of environmental resou
Project Year: 2014
Organizer: "Environmental Protection Bureau Kauhsiung City Government"

Project Title: "Recycling Fee Rate Reviewing and Management Improving for the Collection and Recycling Systems of W
Project Subject: "The project period was from Mar 6, 2020 to Nov 30, 2020. The waste batteries collection campaign ha
Project Year: 2020
Organizer: "Recycling Fund Management Board"

Project Title: "Recycle-Clearance-DisposalFee, Articles of responsibility, registered responsible enterprises"
Project Subject: "The main objective of this project was to strengthen supervision over various types of announcement
Project Year: 2018
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "Evaluation on Industrial Waste Disposal Management"
Project Subject: "The project included five major work items, the following described five parts results of the work.
Project Year: 2018
Organizer: "Department of Waste Management"

Project Title: "The program for promoting recycled aggregates to engineering verification as well as management sys
Project Subject: "The program is a verification system for promoting bottom ash resource product as well as the produ
Project Year: 2017
Organizer: "Department of Waste Management"

Project Title: "Bookkeeping examination of responsible enterprises to the manufacturing /import volume of articles
Project Subject: "This project is for examination into bookkeeping of responsible enterprises with relation to volume
Project Year: 2014
Organizer: "Recycling Fund Management Board"

Project Title: "The Project of Researching on the Land Requirement for Construction of Waste Recycling,Clearance or
Project Subject: "The purpose of the project plan for the Research and Analysis waste recycling, cleared the status
Project Year: 2014
Organizer: "Department of Waste Management"

Project Title: "no"
Project Subject: "no"
Project Year: 2012
Organizer: "Nantou County Environmental Protection Bureau"

Project Title: "Reviewing the application of incentive on waste vehicles recycle project."
Project Subject: "The government has taken action to reduce the environmental problems that result from improper hand
Project Year: 2020
Organizer: "Recycling Fund Management Board"

Project Title: "Separation and recovery of rare earth cerium and lanthanum from spent glass polishing powder of opt
Project Subject: "The purpose of this study was to apply the supported liquid membranes with strip dispersion (SLM-SD
Project Year: 2015
Organizer: "Office of Sustainable Development"

Project Title: "Future waste treatment policy and waste bio-energy transforming programme"
Project Subject: "This main job of this project included analyzing the output and quality of the garbage, tracking cu
Project Year: 2015
Organizer: "Department of Waste Management"

行政院環境保護署 的其他資料集

空氣品質小時值_彰化縣_彰化站

每1時更新,397

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:56

行政院環境保護署

空氣品質區範圍圖

不定期更新更新,48

簡先生 | 02-23712121#6103 | 2023-07-27 01:06:02

行政院環境保護署

探礦、採礦類別環境影響說明書

每2月更新,80

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:11

行政院環境保護署

宜蘭縣重要環保統計資料

每1月更新,218

顏先生 | 02-23117722#2109 | 2023-08-07 01:00:20

行政院環境保護署

空氣品質監測小時值資料(一般污染物,每日更新)

每日更新更新,141

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:20

行政院環境保護署

EPQSummary_EnvironmentalHealth

不定期更新更新,215

陳先生 | 02-2311-7722#2386 | 2023-08-01 01:01:21

行政院環境保護署

環保署工程施工查核小組、問答集

不定期更新更新,42

蔡先生 | 04-22521718#51205 | 2023-08-09 01:05:14

行政院環境保護署

公告應回收項目之責任業者列管家數統計

每1年更新,48

廖小姐 | 02-2370-5888#3103 | 2023-07-27 00:59:42

行政院環境保護署

環保標章驗證機構資料

每1月更新,51

盧小姐 | 02-23117722#2943 | 2023-07-28 11:36:20

行政院環境保護署

公民營製造業、用水、電力及燃氣供應業污染防治支出

每1年更新,54

顏先生 | 02-23117722#2109 | 2023-07-30 01:00:38

行政院環境保護署

經過活動斷層範圍環境影響說明書

每2月更新,97

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:11

行政院環境保護署

行政院環境保護署環境保護基金附屬單位會計月報

不定期更新,49

蘇小姐 | 02-23117722#2193 | 2022-01-15 01:09:33

行政院環境保護署

環評主管機關受理審查之變更內容對照表

每2月更新,223

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:30

行政院環境保護署

環境影響評估報告書修正審查結論

每2月更新,52

黃先生 | 02-23117722#2748 | 2023-08-05 00:59:54

行政院環境保護署

空氣品質小時值_臺北市_萬華站

每小時更新更新,377

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:40

行政院環境保護署

經過海岸保護區之環境影響評估報告書件

每2月更新,66

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:05

行政院環境保護署

包裝及盛裝飲用水水源水質抽驗資料

不定期更新更新,148

黃先生 | 02-23117722-2881 | 2022-01-15 01:10:28

行政院環境保護署

新竹縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,50

程先生 | 02-2311-7722#2833 | 2023-08-09 01:04:14

行政院環境保護署

環境荷爾蒙管理計畫執行成果

不定期更新更新,42

黃先生 | 02-23257399#55532 | 2023-07-27 01:02:28

行政院環境保護署

底泥品質檢測資料

每月更新更新,144

張小姐 | 02-2383-2389 #8401 | 2022-01-14 01:20:32

行政院環境保護署

機關綠色採購績效評核作業要點

不定期更新更新,53

王先生 | 02-23117722#2921 | 2022-01-14 01:18:00

行政院環境保護署

道路交通音量監測結果統計(依管制區分)

每季更新更新,199

林先生 | 02-23712121#6403 | 2022-01-14 01:18:41

行政院環境保護署

水污染稽查次數

每年更新更新,190

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:26

行政院環境保護署

縣市(雲林縣)小時值-每小時

每1時更新,179

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:48

行政院環境保護署

底泥申報各類水體數量

不定期更新更新,58

張小姐 | 02-2383-2389 #8401 | 2022-01-14 01:20:30

行政院環境保護署

各事業廢棄物代碼申報流向統計

每月更新更新,138

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:23:53

行政院環境保護署

列管毒性化學物質毒理資料

每年更新更新,157

劉先生 | 02-23257399#55427 | 2022-01-14 01:22:55

行政院環境保護署

空氣品質小時值_臺南市_臺南站

每1時更新,127

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:45

行政院環境保護署

一般民眾環境教育終身學習護照註冊及開通人數

每季更新更新,85

李小姐 | 02-23117722#2724 | 2022-01-15 01:10:43

行政院環境保護署

環保署書面之公共工程及採購契約

不定期更新,48

許小姐 | (02)23117722#2483 | 2022-01-15 01:10:14

行政院環境保護署