"2017 Tainan Air Quality Monitoring Station Information Display
「"2017 Tainan Air Quality Monitoring Station Information Display 」於資料集「EPQSummary_Air」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:50。 欄位Project Title的內容是"2017 Tainan Air Quality Monitoring Station Information Display System Operation, Maintenance and Analysis Work Plan" , 欄位Project Subject的內容是"This project covered the operation and maintenance works of Air Quality Monitoring Station (AQMS) in Tainan City in which assuring the normal conditions of facilities of AQMS and quality of sampling data, reporting the comprehensive maintenance records, summarizing the improvement measures as well as reporting latest conditions to Environmental Bureau. Taken into account assuring of maintenance work in compliance with standard of quality and assurance of AQMS, this project included the formulation a set of standard operation procedures and maintenance form. The major achievements of project, started from 11 May 2017 to 31 January 2018, were summarized as followings:1. Air Quality Monitoring Station Sampling Analysisa) Dustfall MeasurementDustfall collection and analysis was scheduled to be completed 108 times throughout the contract term. Sampling failed on May of 2017. As of 31 January 2018, it completed 95 times of dust fall collection and analysis and achieved 88% completion rate.b) Total Suspended Particulates (TSP) Sampling AnalysisTotal suspended particulates (TSP) sampling analysis was scheduled to be completed 216 times throughout the contract term. From the planning period to 31 January 2018, it completed 214 times of analysis and achieved 99% completion rate. The monitoring results at all stations met the air quality standards(TSP 24 hour 250 μg/m3). The geometric mean over the years were below the air quality standards(130 μg/m3)2. Air Quality Monitoring Station maintenance and Calibration Worksa) Maintenance Works of Analyzers and SamplersMaintenance of Analyzers and Samplers was scheduled to be completed 216 times throughout the contract term. From the planning period to 31 January 2018, it completed 214 times of operation and achieved 99% completion rate.b) Calibration Works of Analyzers and SamplersOne-point Flow Calibration and Multi-point Flow Calibration were scheduled to be completed 216 times and 36 times throughout the contract term. From the planning period to 31 January 2018, it completed 214 times and 36 times of operation and achieved 99% and 100% capture rate respectively. Timer Verification should be performed every July; the 24-hour error should not exceed 2 minutes. Timer Verification was performed on 7 July 2017, it was scheduled to be completed 12 times throughout the contract term and completed 12 times of operation and achieved 100% completion rate.c) Precision CheckPrecision check was completed 9 times throughout the contract term and achieved 100% completion rate.3. Operation, Maintenance and Calibration Works of Air Quality Monitoring StationMonthly, quarterly, bi-yearly and yearly maintenance works were completed 18, 6, 4 and 2 times respectively and achieved 100% completion rate.Excluding daily automatic calibration and data loss caused by regular maintenance, station at Chengxili Station and Nanxi Station achieved 90% valid data capture rate of the contract provisions. About the monitoring results, the high value occurred in the autumn and winter seasons in terms of the trend of the concentration of each pollutant. PM10 and PM2.5 were at lower concentrations in Chengxili Station near the seaside and Nanxi Station in the mountains. Because the Nanxi station were less affected by fixed or mobile sources, SO2 and NOx values were significantly lower than other stations. Due to the high zero point of Nanxi Station, the CO value of the station were relatively high. O3 were relatively high at Chengxili station due to its environmental impact. NMHC were generally higher in Tainan Station and Annan Station.4. Routine maintenance of LED electronic display broadRoutine maintenance of LED electronic display broad was scheduled to be completed 9 times throughout the project term. From the planning period to 31 January 2018, it recorded 9 times of work and reac..." , 欄位Project Year的內容是2017 , 欄位Organizer的內容是"Environmental Protection Bureau of Tainan City" , 欄位Executive Unit的內容是"捷思環能有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=169935 , 欄位Publish Date的內容是20180601 。
Project Title
"2017 Tainan Air Quality Monitoring Station Information Display System Operation, Maintenance and Analysis Work Plan"
Project Subject
"This project covered the operation and maintenance works of Air Quality Monitoring Station (AQMS) in Tainan City in which assuring the normal conditions of facilities of AQMS and quality of sampling data, reporting the comprehensive maintenance records, summarizing the improvement measures as well as reporting latest conditions to Environmental Bureau. Taken into account assuring of maintenance work in compliance with standard of quality and assurance of AQMS, this project included the formulation a set of standard operation procedures and maintenance form. The major achievements of project, started from 11 May 2017 to 31 January 2018, were summarized as followings:1. Air Quality Monitoring Station Sampling Analysisa) Dustfall MeasurementDustfall collection and analysis was scheduled to be completed 108 times throughout the contract term. Sampling failed on May of 2017. As of 31 January 2018, it completed 95 times of dust fall collection and analysis and achieved 88% completion rate.b) Total Suspended Particulates (TSP) Sampling AnalysisTotal suspended particulates (TSP) sampling analysis was scheduled to be completed 216 times throughout the contract term. From the planning period to 31 January 2018, it completed 214 times of analysis and achieved 99% completion rate. The monitoring results at all stations met the air quality standards(TSP 24 hour 250 μg/m3). The geometric mean over the years were below the air quality standards(130 μg/m3)2. Air Quality Monitoring Station maintenance and Calibration Worksa) Maintenance Works of Analyzers and SamplersMaintenance of Analyzers and Samplers was scheduled to be completed 216 times throughout the contract term. From the planning period to 31 January 2018, it completed 214 times of operation and achieved 99% completion rate.b) Calibration Works of Analyzers and SamplersOne-point Flow Calibration and Multi-point Flow Calibration were scheduled to be completed 216 times and 36 times throughout the contract term. From the planning period to 31 January 2018, it completed 214 times and 36 times of operation and achieved 99% and 100% capture rate respectively. Timer Verification should be performed every July; the 24-hour error should not exceed 2 minutes. Timer Verification was performed on 7 July 2017, it was scheduled to be completed 12 times throughout the contract term and completed 12 times of operation and achieved 100% completion rate.c) Precision CheckPrecision check was completed 9 times throughout the contract term and achieved 100% completion rate.3. Operation, Maintenance and Calibration Works of Air Quality Monitoring StationMonthly, quarterly, bi-yearly and yearly maintenance works were completed 18, 6, 4 and 2 times respectively and achieved 100% completion rate.Excluding daily automatic calibration and data loss caused by regular maintenance, station at Chengxili Station and Nanxi Station achieved 90% valid data capture rate of the contract provisions. About the monitoring results, the high value occurred in the autumn and winter seasons in terms of the trend of the concentration of each pollutant. PM10 and PM2.5 were at lower concentrations in Chengxili Station near the seaside and Nanxi Station in the mountains. Because the Nanxi station were less affected by fixed or mobile sources, SO2 and NOx values were significantly lower than other stations. Due to the high zero point of Nanxi Station, the CO value of the station were relatively high. O3 were relatively high at Chengxili station due to its environmental impact. NMHC were generally higher in Tainan Station and Annan Station.4. Routine maintenance of LED electronic display broadRoutine maintenance of LED electronic display broad was scheduled to be completed 9 times throughout the project term. From the planning period to 31 January 2018, it recorded 9 times of work and reac..."
Project Year
2017
Organizer
"Environmental Protection Bureau of Tainan City"
Executive Unit
"捷思環能有限公司"
Reporting download URL
Publish Date
20180601
「"2017 Tainan Air Quality Monitoring Station Information Display 」所屬的資料集:「EPQSummary_Air」的其他資料
Project Title:
"The study of PM2.5 and O3 events and control strategy development"
Project Subject:
""
Project Year:
2013
Organizer:
"Taoyuan County Government Environment Protection Bureau"
Project Title:
"2014 Air quality management development plan"
Project Subject:
""
Project Year:
2014
Organizer:
"Environmental Protection Bureau, Penghu County"
Project Title:
""
Project Subject:
"The main work items of Stationary air pollution source control project are: (1)Database establishme
Project Year:
2013
Organizer:
"Environmental Protection Bureau of Tainan City"
Project Title:
"Control of pollutions during constructions in Pingtung county-Year 2016"
Project Subject:
"Pintung county is well-known for its width and beautiful scenery, which bring lots of tourists and
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"2017 Yi-Lan Moving pollution source inspection control project and locomotive exhaust periodic insp
Project Subject:
"Mobile pollution sources is the main cause for the air quality decline, in order to improve the air
Project Year:
2017
Organizer:
"Environmental Protection Bureau of Yi-Lan County"
Project Title:
"2017 Inspection Plan of Diesel Vehicle Dynamometer in Smoke Exhaust Detection Station"
Project Subject:
"With regarding to diesel vehicle contamination control, in order to improve the air quality and pro
Project Year:
2017
Organizer:
"HsinChu County Environment Protection Bureau"
Project Title:
"2014~2015 Inspection and Management Plan of Vehicles Emission Inspection Station"
Project Subject:
" "
Project Year:
2014
Organizer:
"Environmental Protection Bureau Kauhsiung City Government"
Project Title:
"Established diesel construction engineering machines pollutant examination and improvement plan"
Project Subject:
"The number of diesel construction engineering machines approaches to one hundred thousand, and most
Project Year:
2015
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"Prevention and promotion to improve river dust programs of Jhuoshuei River in 2013."
Project Subject:
"This plan was from April 11, 2013 to April 10, 2014, all the works has been completed within schedu
Project Year:
2013
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Enhancing the control of street blowing dust near Cho-Shui river during the poor air quality period
Project Subject:
"The execution achievements and schedule met the contract requirements. The related achievements are
Project Year:
2016
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Study of the measurement method and control strategy of fine particulate matter emissions from stat
Project Subject:
"The purposes of this study are to evaluate the restriction of the PM2.5 measuring method, propose t
Project Year:
2018
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"Strengthen plans on the street washing and sweeping caused by wind-born dust for the Chiayi City in
Project Subject:
"I.Plan Name:Strengthen plans on the street washing and sweeping caused by wind-born dust for the Ch
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
""
Project Subject:
"This project started on August 8, 2015. All fifty nine announced premises of the first batch have g
Project Year:
2015
Organizer:
"Environmental Protection Bureau Kauhsiung City Government"
Project Title:
"Work Plan on Greenhouse Gas Reduction Of The Best Available Techniques Of The Pre-Assessment And Es
Project Subject:
"This program can be divided into four major subjects. The first subject is to collect and study the
Project Year:
2016
Organizer:
"Department of Environmental Sanitation & Toxic Substance Management"
Project Title:
"Collection of Air Pollution Control Fee and Inspection Control Project for Construction Projects in
Project Subject:
"The plan started from 2014 to 2015 of Impose Establish Construction Air Pollution Preventing Expens
Project Year:
2014
Organizer:
"Environmental Protection Bureau Kauhsiung City Government"
Project Title:
"Demonstration Project on Technology Monitoring Pollution in Sand and Gravel Washing Plants Zone of
Project Subject:
"The project was implemented on July 18, 2018. As of December 22, 2018, all task items have been com
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"The project achievement report of Environmental Protection Bureau, Yunlin County"
Project Subject:
"This project started from 1st of April in 2011 to 29th of February in 2012, lasting a year. It main
Project Year:
2011
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"2015 Chiayi City Mobile Pollution Source Control and Low Pollution Vehicle Promotion Project"
Project Subject:
"Motorcycles are a transportation means generates high level of pollution. They are difficult to ins
Project Year:
2015
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"2016 Yilan County stationary pollution permits, inspection control and CEMs facilities function che
Project Subject:
" "
Project Year:
2016
Organizer:
"Environmental Protection Bureau of Yi-Lan County"
Project Title:
""
Project Subject:
"The sources of fugitive particulate emissions in Chiayi city come mostly from constructions. Addit
Project Year:
2015
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Reviewal for Local Government Air Pollution Against Strategies"
Project Subject:
"The scope of this project is evaluated the effectiveness of the Environmental Protection Bureaus (E
Project Year:
2016
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"2017 of Penghu promotion of corresponding to climate change Practices and Adaptations plan"
Project Subject:
"『2017 of Penghu promotion of corresponding to climate change Practices and Adaptations plan』is from
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Penghu County"
Project Title:
"Chiayi City fixed pollution source permit inspection control and air pollution charge reminder chec
Project Subject:
"From March 2, 2018 to Dec 15, 2018, the results of the work are summarized as follows:(一) Promote l
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Chiayi City"
"-"2013"-"
Project Title:
"-"
Project Subject:
"-"
Project Year:
2013
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"FY 2016 Taipei Stationary Pollution Sources Permit System and Auditing Management Project"
Project Subject:
"The implementation period for this Plan was from April 8, 2016 to December 31, 2016. The Plan invol
Project Year:
2016
Organizer:
"Department of Environmental Protection, Taipei City Government"
Project Title:
"Volatile organic compounds emission control program of Hsinchu city, 2016"
Project Subject:
"The development of high-tech industry will promote the overall economic growth and promote the deve
Project Year:
2016
Organizer:
"Bureau of Environmental Protection Hsin-Chu"
Project Title:
"Photoassisted Selective Catalytic Reduction of Nitric Oxide with Ammonia over TiO2"
Project Subject:
"In this study, the highly-dispersed TiO2 sol was fabricated by the chemical coprecipitisation–pepti
Project Year:
2009
Organizer:
"Office of Sustainable Development"
Project Title:
"Plan of Electric Vehicles Operation and Recharging Service"
Project Subject:
"The objective of this project is to plan and develop the suitable operation and recharging models f
Project Year:
2014
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"2016 Hsinchu County air quality monitoring Project"
Project Subject:
"The duration of the program is 2016 years, work progress has reached 100%, every work is carried ou
Project Year:
2016
Organizer:
"HsinChu County Environment Protection Bureau"
Project Title:
"Yunlin County 2017 Project of construction pollution control and inspection"
Project Subject:
"The chief task of the project was to assist Environmental Protection Bureau to levy air pollution f
Project Year:
2017
Organizer:
"Environmental Protection Bureau Yunlin County"
行政院環境保護署 的其他資料集
應回收廢棄物處理業者(廢機動車輛類)最大處理量資料
每1年更新,70廖小姐 | 02-2370-5888#3103 | 2023-08-03 00:59:54
行政院環境保護署空氣品質小時值_桃園市_中壢站
每1時更新,356陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:29
行政院環境保護署特殊性工業區品保品管後監測值資料檔(有機光化前驅物)
每年更新更新,235丁小姐 | 02-2371-2121#6101 | 2022-01-15 01:09:11
行政院環境保護署環境影響評估報告書附表五:廢棄物、毒化物
每2月更新,43黃先生 | 02-23117722#2748 | 2023-08-05 01:00:51
行政院環境保護署光化測站(忠明)小時值資料
不定期更新更新,178陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:29
行政院環境保護署
空氣品質小時值_新北市_土城站
每1時更新,474陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:19
行政院環境保護署環境教育(教學)人員(專長)認證申請書
不定期更新更新,63盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:28
行政院環境保護署APEC Ocean and Fisheries Working Group (OFWG)
不定期更新更新,100陳小姐 | (02)23117722#2753 | 2023-08-02 01:03:43
行政院環境保護署行政院環境保護署毒物及化學物質局單位決算
不定期更新,52魏小姐 | 02-23257399#55432 | 2022-01-15 01:09:57
行政院環境保護署重點事業廢棄物-一般污泥之產出及清理流向
每月更新更新,239陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:16
行政院環境保護署
行政院環境保護署年度施政計畫
不定期更新更新,48賀先生 | 02-23117722轉2981 | 2023-07-27 01:03:02
行政院環境保護署汽車新車審驗資料
每月更新更新,218王先生 | 02-23712121#6306 | 2022-01-14 01:18:29
行政院環境保護署環境用藥微生物製劑常見菌種特性資料
不定期更新更新,279薛先生 | 02-2325-7399#55413 | 2023-07-27 01:02:59
行政院環境保護署環境防蟲用天然物質資料
每3月更新,103薛先生 | 02-2325-7399#55413 | 2023-07-27 01:02:57
行政院環境保護署環境音量監測結果統計(依時段分)
不定期更新更新,240章小姐 | 02-23712121#6407 | 2023-08-03 01:04:07
行政院環境保護署
行政院環境保護署環境保護基金附屬單位預算案
每年更新更新,55郭小姐 | 02-2311-7722#2164 | 2022-01-15 01:09:42
行政院環境保護署歷年土壤調查_環保署土壤重金屬含量調查(319公頃)
不定期更新更新,137謝先生 | (02)23832389*8302 | 2022-01-14 01:20:19
行政院環境保護署環保專案摘要資料_毒物管理
不定期更新更新,181郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:39
行政院環境保護署道路交通音量監測不合格時段數
每3月更新,174陳先生 | 02-23117722#2108 | 2023-07-30 01:01:06
行政院環境保護署室內空品公告場所
不定期更新更新,157謝先生 | 02-23117722#6410 | 2022-01-14 01:04:13
行政院環境保護署
空氣品質小時值_花蓮縣_花蓮站
每小時更新更新,371謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:36
行政院環境保護署建檔公廁明細-嘉義市
不定期更新更新,264賴先生 | 04-2252-1718#53686 | 2023-07-27 01:01:59
行政院環境保護署應回收廢棄物(廢電子電器及廢資訊物品類)回收量資料
每年更新更新,63廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:38
行政院環境保護署彰化縣水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,66許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:46
行政院環境保護署檢測機構環保標章檢測項目登錄認可清單
每季更新更新,53陳先生 | 02-23117722#2936 | 2022-01-14 01:17:45
行政院環境保護署
環境教育人員認證展延研習30小時課程認可審查作業說明
不定期更新更新,68盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:19
行政院環境保護署場址勘查紀錄表
不定期更新更新,213賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:17
行政院環境保護署0800資源回收免費專線-查詢非公告應回收廢棄物類統計
每年更新更新,59莊先生 | 02-23705888#3108 | 2022-01-14 01:24:29
行政院環境保護署重點事業廢棄物-一般污泥之處理方式
每月更新更新,250陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:13
行政院環境保護署環保署遊說法辦理情形
不定期更新更新,61包先生 | 02-23117722 #2223 | 2022-01-15 01:13:30
行政院環境保護署