time1: 0 time2: 0 time3: 0 time4: 0 total: 0 107 Hualien County Construction Project and Noise Inspection Control Plan
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

107 Hualien County Construction Project and Noise Inspection Control Plan

107 Hualien County Construction Project and Noise Inspection Control Plan」於資料集「EPQSummary_NoiseAndVibration」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:50。 欄位Project Title的內容是107 Hualien County Construction Project and Noise Inspection Control Plan , 欄位Project Subject的內容是According to the contract standard work items and contents, in accordance with the requirements of your office, complete the prescribed work items and report the work results in the year of 107, and submit the results of the previous month's implementation results at the beginning of each month, and each operation will be completed on December 31, 107. At the end of the construction site, the construction site completed a total of 49 consents for the independent management of the construction site (30 new in the year). In terms of road adoption, there are currently 49 (30 new additions), 47,806 km, 4,617 inspections and inspections of construction projects, and 2,823 levies on air pollution charges and collections (extraction/requests) The number of reminders reached 513. The implementation results of the other work from January to December are as follows: (1) Inspection and control operations The 107 site site pollution control inspections completed a total of 4,617 visits. The monthly inspections were compared with the inspection targets set at the beginning of the project, and the cumulative achievement rate reached 100%. Among them, the number of inspections in townships and cities was 1,387 in Hualien City and 865 in Ji'an Township, the largest in pollution load, followed by Xincheng Township (395 pieces) and Xiulin Township (322 pieces). In terms of engineering categories, 2,672 other projects and 804 construction (RC) projects were used as the main inspection focus. As for the number of inspections, there are currently 276 inspections, with the majority of other projects, followed by construction (RC) projects. According to the statistics of the inspections of various towns and towns, Hualien City and Ji'an Township are the main inspection key areas. Execution of noise control at the construction site until the end of December. 113 construction sites were surveyed for active noise surveys. Noise measurements were carried out based on the main construction equipment at the site. There were strange noise sources such as strangers, cranes, crushers and pre-mixed vehicles. According to the regulations, Leq and Lmax are measured according to the regulations. The implementation of the seven sites has exceeded the volume during the construction period. The noise sources are generated when the ground is broken and the building is demolished. The follow-up communication with the operators is improved and the improvement period is again. Review, there is no excessive standard situation. The noise measurement results of the 113 construction sites were counted. The Leq measurement range was between 54.3 and 90.0 dB(A), and the Lmax measurement range was between 67.7 and 96.3 dB(A). Most of the projects with higher Lmax values are concentrated in excavation and pile-laying operations. (2) First and second-level engineering control rates and regulatory compliance There were 3,921 management sites in 107, which belonged to 1,018 of the first-level projects, accounting for 26% of the total; 1,728 of the secondary projects accounted for 44% of the total; and 1,175 of the tertiary projects accounted for 30% of the total, and for the inspection of the project 107 In the year, a total of 2,976 sites were inspected, of which 849 were surveyed in the first-level project, the rate of management was 83%, and the second-level project was 1,388. The rate of management was 80%. The overall rate of construction of Hualien County was 76%. In terms of regulatory compliance, the compliance rate of the first-level regulations increased from 89% in January 2007 to 95% in December, and the compliance rate of secondary regulations increased from 90% in January 2007 to 91% in December, and will continue to strengthen control in the follow-up. Related work. (3) Air pollution control fee collection business for construction projects In 107 years, the... , 欄位Project Year的內容是2018 , 欄位Organizer的內容是Environmental Protection Bureau, Hualien County , 欄位Executive Unit的內容是康廷工程顧問企業有限公司 , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=195851&proj_id=1071255499&doc_kind=1 , 欄位Publish Date的內容是20190315

Project Title

107 Hualien County Construction Project and Noise Inspection Control Plan

Project Subject

According to the contract standard work items and contents, in accordance with the requirements of your office, complete the prescribed work items and report the work results in the year of 107, and submit the results of the previous month's implementation results at the beginning of each month, and each operation will be completed on December 31, 107. At the end of the construction site, the construction site completed a total of 49 consents for the independent management of the construction site (30 new in the year). In terms of road adoption, there are currently 49 (30 new additions), 47,806 km, 4,617 inspections and inspections of construction projects, and 2,823 levies on air pollution charges and collections (extraction/requests) The number of reminders reached 513. The implementation results of the other work from January to December are as follows: (1) Inspection and control operations The 107 site site pollution control inspections completed a total of 4,617 visits. The monthly inspections were compared with the inspection targets set at the beginning of the project, and the cumulative achievement rate reached 100%. Among them, the number of inspections in townships and cities was 1,387 in Hualien City and 865 in Ji'an Township, the largest in pollution load, followed by Xincheng Township (395 pieces) and Xiulin Township (322 pieces). In terms of engineering categories, 2,672 other projects and 804 construction (RC) projects were used as the main inspection focus. As for the number of inspections, there are currently 276 inspections, with the majority of other projects, followed by construction (RC) projects. According to the statistics of the inspections of various towns and towns, Hualien City and Ji'an Township are the main inspection key areas. Execution of noise control at the construction site until the end of December. 113 construction sites were surveyed for active noise surveys. Noise measurements were carried out based on the main construction equipment at the site. There were strange noise sources such as strangers, cranes, crushers and pre-mixed vehicles. According to the regulations, Leq and Lmax are measured according to the regulations. The implementation of the seven sites has exceeded the volume during the construction period. The noise sources are generated when the ground is broken and the building is demolished. The follow-up communication with the operators is improved and the improvement period is again. Review, there is no excessive standard situation. The noise measurement results of the 113 construction sites were counted. The Leq measurement range was between 54.3 and 90.0 dB(A), and the Lmax measurement range was between 67.7 and 96.3 dB(A). Most of the projects with higher Lmax values are concentrated in excavation and pile-laying operations. (2) First and second-level engineering control rates and regulatory compliance There were 3,921 management sites in 107, which belonged to 1,018 of the first-level projects, accounting for 26% of the total; 1,728 of the secondary projects accounted for 44% of the total; and 1,175 of the tertiary projects accounted for 30% of the total, and for the inspection of the project 107 In the year, a total of 2,976 sites were inspected, of which 849 were surveyed in the first-level project, the rate of management was 83%, and the second-level project was 1,388. The rate of management was 80%. The overall rate of construction of Hualien County was 76%. In terms of regulatory compliance, the compliance rate of the first-level regulations increased from 89% in January 2007 to 95% in December, and the compliance rate of secondary regulations increased from 90% in January 2007 to 91% in December, and will continue to strengthen control in the follow-up. Related work. (3) Air pollution control fee collection business for construction projects In 107 years, the...

Project Year

2018

Organizer

Environmental Protection Bureau, Hualien County

Executive Unit

康廷工程顧問企業有限公司

Publish Date

20190315

「107 Hualien County Construction Project and Noise Inspection Control Plan」所屬的資料集:「EPQSummary_NoiseAndVibration」的其他資料

Project Title: Implement of the new vehicle type approval with regard to noise, the new vehicle spot check and the
Project Subject: This project aims to assist EPA in examination of noise certificates for new vehicle types and all a
Project Year: 2016
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Project for traffic noise control and improving noise abatement projects
Project Subject: The purpose of this research project is first to collect the literature on the anti-noise measures t
Project Year: 2013
Organizer: Department of Air Quality Protection & Noise Control

Project Title: "Implement of the new vehicle type approval with regard to noise and diesel vehicle and quality cons
Project Subject: "This project aims to assist EPA in examination of noise and diesel vehicle certificates for new veh
Project Year: 2018
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: Research and Analysis of Public Nuisance Dispute Problem for Noise &Vibration of Mass Transportatio
Project Subject: This is a two-year research project which is sponsored by Environmental Protection Administration, d
Project Year: 2007
Organizer: Department of Supervision Evaluation & Dispute Resolution

Project Title: "The project for noise control of in-use vehicle and construction."
Project Subject: "This project assists the EPA in controlling noise from vehicles in use, including the inspection an
Project Year: 2021
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: 109 Taitung County Construction Project Pollution Control and Electronic e-System Installation Plan
Project Subject: With the rapid population growth in various regions of Taiwan, all metropolitan areas are growing ra
Project Year: 2020
Organizer: Taitung County Environment Protection Bureau

Project Title: "Research Project on Operating Procedures for Indoor Noise Monitoring and Verification of Measuremen
Project Subject: "In order to promote the enhancement of indoor acoustic quality in public places, the Environmental
Project Year: 2017
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: " Smart Noise System Applied to Environmental Sensing IoT"
Project Subject: "An EU Environmental Noise Directive has defined the “quiet zone” and required EU member states to i
Project Year: 2020
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: Taichung City: Noise Pollution Inspection on Public sentiment and Control Plan for 2021
Project Subject: This project has been executed since Jan.,2021, including motor 2 vehicle noise control, traffic no
Project Year: 2021
Organizer: Environmental Protection Bureau, Taichung City

Project Title: 2022 Hsinchu City Science and Technology Sensor Inspection Integration Plan
Project Subject: The annual quantitative goals have all reached more than 100% in accordance with the contract, and t
Project Year: 2022
Organizer: Bureau of Environmental Protection Hsin-Chu

Project Title: Motor vehicles pollution testing organization review plan 2021
Project Subject: The plan was in accordance with「Regulations Governing Motor Vehicle Air Pollutant and Noise Emission
Project Year: 2021
Organizer:

Project Title: Enhance implementation redelineation of each class of noise control zone in Tainan county
Project Subject: I.environmental noise measurement This plan carry out the test of environmental noise for all towns
Project Year: 2003
Organizer: Environmental Protection Bureau of Tainan City

Project Title: "A Study on Soundproof Efficiency and Regulations of Buildings Adjacent to Transportation Systems"
Project Subject: "Soundproof efficiency and regulations of façade openings on buildings adjacent to transportation sy
Project Year: 2014
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: 111 Hualien County Construction Projects and Noise Inspection and Control Plan
Project Subject: According to the contract to standardize the work items and content, cooperate with the requirements
Project Year: 2022
Organizer: Environmental Protection Bureau, Hualien County

Project Title: Kuan-Yin ELV Shredding Plant Operation Monitoring and ELV Recycling System Reviewing Project
Project Subject: The purpose of this project is to assist and monitor the contracted operation of Kuan-Yin Auto Shred
Project Year: 2004
Organizer: Recycling Fund Management Board

Project Title: Chiayi City Diesel Vehicle Air Pollution Control and Idling Motor Vehicle Park and Stop audit plan i
Project Subject: As diesel engine has high output horsepower, it consumes relatively less fuel comparing with petrol
Project Year: 2021
Organizer: Environmental Protection Bureau, Chiayi City

Project Title: 101 year and 102 year diesel car power station maintenance management plan
Project Subject: Kaohsiung diesel power station maintenance and management plans were an operation and maintenance of
Project Year: 2012
Organizer: Environmental Protection Bureau Kauhsiung City Government

Project Title: Investigation of Light Pollution Impacts on Human Perception and Cognitions
Project Subject: Objectives of this project are based on the domestic conditions of Taiwan to investigate and to anal
Project Year: 2013
Organizer: Department of Air Quality Protection & Noise Control

Project Title: "2016 Taipei City Noise Control Project"
Project Subject: "In Taipei City, because the population and building density is very high, and various business acti
Project Year: 2016
Organizer: "Department of Environmental Protection, Taipei City Government"

Project Title: Implement of the new vehicle type approval with regard to noise, the new vehicle spot check and the
Project Subject: The main work items of this project included: assist EPA (Environmental Protection Administration) t
Project Year: 2015
Organizer: Department of Air Quality Protection & Noise Control

Project Title: 2013 Taichung City Motorcycle Emission Inspection Station Management Project.
Project Subject: “2013 Taichung City motorcycle Emission Inspection Station Management Project” had begun from Feb.-0
Project Year: 2013
Organizer: Environmental Protection Bureau, Taichung City

Project Title: Chiayi City Diesel Vehicle Air Pollution Control and Idling Motor Vehicle Park and Stop audit plan i
Project Subject: As diesel engine has high output horsepower, it consumes relatively less fuel comparing with petrol
Project Year: 2020
Organizer: Environmental Protection Bureau, Chiayi City

Project Title: 2022 Jiayi City Diesel Vehicle Air Pollution Control, Idling Stop Inspection, and Sampling & testing
Project Subject: To effectively control the air pollution of diesel vehicles in Chiayi City, the roadside stop-and-in
Project Year: 2022
Organizer: Environmental Protection Bureau, Chiayi City

Project Title: "Stationary pollution sources, Chiayi County 101 year continuous emission monitoring systems (CEMS)
Project Subject: "1. Continuously the automatic monitor facility laws and regulations degree of conformity and the fu
Project Year: 2012
Organizer: "Environmental Protection Bureau, Chiayi County"

Project Title: "TBD"
Project Subject: "TBD"
Project Year: 2016
Organizer: "Department of Environmental Protection, Taipei City Government"

Project Title: Research Project for Study on Low-frequency Noise Indicators and Measurement Techniques for Aircraft
Project Subject: The corrective loop of sound perception (aka frequency-weighting) specified in current noise control
Project Year: 2016
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Checking on motor vehicles emission testing institutions 2015
Project Subject: This project was commissioned by the National Institute of Environmental Analysis, Environmental Pro
Project Year: 2015
Organizer:

Project Title: Noise Monitoring and Noise Recognition and Control of Motor Vehicles Exhaust Pipes in Tainan City, 2
Project Subject: 1. Project Title: Noise Monitoring and Noise Recognition and Control of Motor Vehicles Exhaust Pipes
Project Year: 2021
Organizer: Environmental Protection Bureau of Tainan City

Project Title: "Taipei City Noise Control Program Year 2012"
Project Subject: "The project provides counseling services of noise control technology by telephone, manufactures the
Project Year: 2012
Organizer: "Department of Environmental Protection, Taipei City Government"

Project Title: Investigation of Environment Low-frequency Noise and Vibration and Research Project for Improvement
Project Subject: The environmental vibration is a part of environmental protection goal in Taiwan. The EPA put in man
Project Year: 2016
Organizer: Department of Air Quality Protection & Noise Control

行政院環境保護署 的其他資料集

環境空氣戴奧辛監測資料

每6月更新,125

戴先生 | 02-2371-2121#6210 | 2023-08-07 01:03:23

行政院環境保護署

花蓮縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,46

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:53

行政院環境保護署

彰化縣重要環保統計資料

每1月更新,117

陳先生 | 02-23117722#2108 | 2023-08-07 01:00:11

行政院環境保護署

縣市(嘉義縣)小時值-每小時

每小時更新更新,92

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:01:00

行政院環境保護署

環保標章規格標準

每季更新更新,64

陳先生 | 02-23117722#2936 | 2022-01-14 01:16:50

行政院環境保護署

新化學物質登錄資訊系統工具(Chemist)

不定期更新更新,39

蔡小姐 | 23257399#55723 | 2022-01-14 01:23:00

行政院環境保護署

重點事業廢棄物-爐碴之產出及清理流向

每月更新更新,73

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:19

行政院環境保護署

符合噪音管制標準車輛-國產機車

不定期更新更新,258

章小姐 | 02-23712121#6407 | 2023-07-27 01:03:42

行政院環境保護署

公民營製造業、用水、電力及燃氣供應業污染防治支出

每1年更新,43

顏先生 | 02-23117722#2109 | 2023-07-30 01:00:38

行政院環境保護署

歷年土壤調查_環保署土壤重金屬含量調查(319公頃)

不定期更新更新,96

謝先生 | (02)23832389*8302 | 2022-01-14 01:20:19

行政院環境保護署

南科樹谷環評監督委員會會議紀錄

不定期更新更新,48

陳先生 | 04-2252-1718#51207 | 2022-01-14 01:21:54

行政院環境保護署

空氣品質小時值_新北市_新莊站

每小時更新更新,102

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:24

行政院環境保護署

EPQSummary_EnvironmentalHealth

不定期更新更新,121

陳先生 | 02-2311-7722#2386 | 2023-08-01 01:01:21

行政院環境保護署

縣市(新竹縣)小時值-每小時

每1時更新,105

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:53

行政院環境保護署

核能四廠環評監督委員會會議紀錄

不定期更新更新,36

陳先生 | 04-2252-1718#51207 | 2023-08-09 01:04:33

行政院環境保護署

地下水場置性監測井位置圖

每1月更新,44

呂小姐 | 02-2383-2389#8110 | 2023-08-09 01:04:52

行政院環境保護署

自來水水質抽驗結果(依項目)

每月提供6個月前資料更新,111

黃先生 | 02-23117722#2881 | 2022-01-15 01:10:24

行政院環境保護署

空氣品質小時值_澎湖縣_馬公站

每小時更新更新,141

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:49

行政院環境保護署

各事業廢棄物代碼申報流向統計

每月更新更新,82

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:23:53

行政院環境保護署

水庫水質監測資料

不定期更新更新,95

郭先生 | 2311-7722#2399 | 2023-08-07 01:02:05

行政院環境保護署

廢(污)水產生量及排放量

每1年更新,95

顏先生 | 02-23117722#2109 | 2023-07-30 01:01:05

行政院環境保護署

空氣品質小時值_宜蘭縣_宜蘭站

每1時更新,65

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:31

行政院環境保護署

縣市(新北市)小時值-每小時

每小時更新更新,104

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:40

行政院環境保護署

空氣品質小時值_桃園市_桃園站

每1時更新,107

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:09

行政院環境保護署

空氣品質小時值_新北市_板橋站

每1時更新,92

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:18

行政院環境保護署

公害糾紛處理法

不定期更新更新,42

陳小姐 | (02)2311-7722分機2932 | 2023-07-30 01:02:09

行政院環境保護署

重點事業廢棄物-一般污泥之產出及清理流向

每月更新更新,124

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:16

行政院環境保護署

空氣品質小時值_高雄市_仁武站

每小時更新更新,123

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:20

行政院環境保護署

基隆市重要環保統計資料

每月更新更新,80

謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:45

行政院環境保護署

重點事業廢棄物-生物醫療廢棄物之處理方式

每月更新更新,136

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:07

行政院環境保護署