「Simplification and Total Quantity Controls Pushed in EIA System」於資料集「Environmental Policy Monthly」由單位「行政院環境保護署」的楊先生所提供,聯繫電話是(02)23117722#2217,(02)23117722#2216,最近更新時間為:2022-01-15 01:13:03。 欄位編號的內容是720 , 欄位標題的內容是Simplification and Total Quantity Controls Pushed in EIA System , 欄位摘要的內容是Movement is underway to make Taiwan’s EIA system more rational. As part of conclusions reached at the National Economic Development Conference the EPA has requested the Hsinchu Science-based Industrial Park Administration to implement EIA response measures and total pollution quantity control policies. In the future, once factories are recognized as complying with industry park total quantity controls, they will not be required to perform environmental impact assessments. The EPA also plans to revise the EIA implementation rules by simplifying regulations governing the EIA review process.
Environmental impact assessment (EIA) requirements have been in place in Taiwan for 15 years, and the EIA system is as controversial as ever. The general public has high expectations of the EIA process, while industry feels EIA requirements greatly burden economic development.
During the National Economic Development Conference this January, the EIA system became the most heavily discussed environmental protection issue. Attendees at the Conference came up with the following conclusions:
1) Companies that apply to construct facilities within industrial parks, science parks, or export processing zones that have completed the EIA review process will not themselves be required to perform EIAs, provided their emissions will not cause the park to exceed originally approved total emissions quantities. The Hsinchu Science-based Industrial Park, which was established before EIA requirements were in place, must submit an EIA investigation, analysis and propose response measures according to Article 28 of the Environmental Impact Assessment Act. These tasks must be completed by the end of November.
2) The approval process for changes made to EIAs will be simplified. This will apply to changes such as planned capacity or scope reductions; modifications to the original construction site; improving the treatment capability or efficiency of environmental protection equipment; altering content in an environmentally beneficial way; or implementing environmental monitoring plans.
3) A pre-EIA review process will be implemented. In the future, companies in the early stages of project planning will only need to submit initial development plans, siting information, and relevant environmental background information in order to apply for a pre-EIA review. This will then determine assessment scope and the key points of future review processes.
The EPA reported that it has already reached agreement with the National Science Council for the Hsinchu Science-based Industrial Park (not including the fourth stage expansion) to submit an EIA investigation and analysis and propose response measures. This must be completed in accordance with Article 28 of the EIA Act before the end of November. The submitted measures must include approaches for controlling total pollution quantities within the park.
In addition, the EPA has finished revising the draft of the EIA Act Implementation Rules. Successive implementation of all of these measures will improve the efficiency of the EIA system. The EPA emphasized that increasing review efficiency will be conducted under the premise of total quantity controls and preservation of environmental quality. As a result, environmental protection goals will be upheld. , 欄位全文的內容是Movement is underway to make Taiwan’s EIA system more rational. As part of conclusions reached at the National Economic Development Conference the EPA has requested the Hsinchu Science-based Industrial Park Administration to implement EIA response measures and total pollution quantity control policies. In the future, once factories are recognized as complying with industry park total quantity controls, they will not be required to perform environmental impact assessments. The EPA also plans to revise the EIA implementation rules by simplifying regulations governing the EIA review process.
Environmental impact assessment (EIA) requirements have been in place in Taiwan for 15 years, and the EIA system is as controversial as ever. The general public has high expectations of the EIA process, while industry feels EIA requirements greatly burden economic development.
During the National Economic Development Conference this January, the EIA system became the most heavily discussed environmental protection issue. Attendees at the Conference came up with the following conclusions:
1) Companies that apply to construct facilities within industrial parks, science parks, or export processing zones that have completed the EIA review process will not themselves be required to perform EIAs, provided their emissions will not cause the park to exceed originally approved total emissions quantities. The Hsinchu Science-based Industrial Park, which was established before EIA requirements were in place, must submit an EIA investigation, analysis and propose response measures according to Article 28 of the Environmental Impact Assessment Act. These tasks must be completed by the end of November.
2) The approval process for changes made to EIAs will be simplified. This will apply to changes such as planned capacity or scope reductions; modifications to the original construction site; improving the treatment capability or efficiency of environmental protection equipment; altering content in an environmentally beneficial way; or implementing environmental monitoring plans.
3) A pre-EIA review process will be implemented. In the future, companies in the early stages of project planning will only need to submit initial development plans, siting information, and relevant environmental background information in order to apply for a pre-EIA review. This will then determine assessment scope and the key points of future review processes.
The EPA reported that it has already reached agreement with the National Science Council for the Hsinchu Science-based Industrial Park (not including the fourth stage expansion) to submit an EIA investigation and analysis and propose response measures. This must be completed in accordance with Article 28 of the EIA Act before the end of November. The submitted measures must include approaches for controlling total pollution quantities within the park.
In addition, the EPA has finished revising the draft of the EIA Act Implementation Rules. Successive implementation of all of these measures will improve the efficiency of the EIA system. The EPA emphasized that increasing review efficiency will be conducted under the premise of total quantity controls and preservation of environmental quality. As a result, environmental protection goals will be upheld. , 欄位年度的內容是2001 , 欄位月份的內容是4 , 欄位卷的內容是4 , 欄位期的內容是4 , 欄位順序的內容是1 , 欄位倒序的內容是2 , 欄位分類的內容是Environmental Impact Assessment , 欄位標題2的內容是Simplification and Total Quantity Controls Pushed in EIA System , 欄位檔案位置的內容是print/V4/V4-04 。
編號
720
標題
Simplification and Total Quantity Controls Pushed in EIA System
摘要
Movement is underway to make Taiwan’s EIA system more rational. As part of conclusions reached at the National Economic Development Conference the EPA has requested the Hsinchu Science-based Industrial Park Administration to implement EIA response measures and total pollution quantity control policies. In the future, once factories are recognized as complying with industry park total quantity controls, they will not be required to perform environmental impact assessments. The EPA also plans to revise the EIA implementation rules by simplifying regulations governing the EIA review process. Environmental impact assessment (EIA) requirements have been in place in Taiwan for 15 years, and the EIA system is as controversial as ever. The general public has high expectations of the EIA process, while industry feels EIA requirements greatly burden economic development. During the National Economic Development Conference this January, the EIA system became the most heavily discussed environmental protection issue. Attendees at the Conference came up with the following conclusions: 1) Companies that apply to construct facilities within industrial parks, science parks, or export processing zones that have completed the EIA review process will not themselves be required to perform EIAs, provided their emissions will not cause the park to exceed originally approved total emissions quantities. The Hsinchu Science-based Industrial Park, which was established before EIA requirements were in place, must submit an EIA investigation, analysis and propose response measures according to Article 28 of the Environmental Impact Assessment Act. These tasks must be completed by the end of November. 2) The approval process for changes made to EIAs will be simplified. This will apply to changes such as planned capacity or scope reductions; modifications to the original construction site; improving the treatment capability or efficiency of environmental protection equipment; altering content in an environmentally beneficial way; or implementing environmental monitoring plans. 3) A pre-EIA review process will be implemented. In the future, companies in the early stages of project planning will only need to submit initial development plans, siting information, and relevant environmental background information in order to apply for a pre-EIA review. This will then determine assessment scope and the key points of future review processes. The EPA reported that it has already reached agreement with the National Science Council for the Hsinchu Science-based Industrial Park (not including the fourth stage expansion) to submit an EIA investigation and analysis and propose response measures. This must be completed in accordance with Article 28 of the EIA Act before the end of November. The submitted measures must include approaches for controlling total pollution quantities within the park. In addition, the EPA has finished revising the draft of the EIA Act Implementation Rules. Successive implementation of all of these measures will improve the efficiency of the EIA system. The EPA emphasized that increasing review efficiency will be conducted under the premise of total quantity controls and preservation of environmental quality. As a result, environmental protection goals will be upheld.
全文
Movement is underway to make Taiwan’s EIA system more rational. As part of conclusions reached at the National Economic Development Conference the EPA has requested the Hsinchu Science-based Industrial Park Administration to implement EIA response measures and total pollution quantity control policies. In the future, once factories are recognized as complying with industry park total quantity controls, they will not be required to perform environmental impact assessments. The EPA also plans to revise the EIA implementation rules by simplifying regulations governing the EIA review process. Environmental impact assessment (EIA) requirements have been in place in Taiwan for 15 years, and the EIA system is as controversial as ever. The general public has high expectations of the EIA process, while industry feels EIA requirements greatly burden economic development. During the National Economic Development Conference this January, the EIA system became the most heavily discussed environmental protection issue. Attendees at the Conference came up with the following conclusions: 1) Companies that apply to construct facilities within industrial parks, science parks, or export processing zones that have completed the EIA review process will not themselves be required to perform EIAs, provided their emissions will not cause the park to exceed originally approved total emissions quantities. The Hsinchu Science-based Industrial Park, which was established before EIA requirements were in place, must submit an EIA investigation, analysis and propose response measures according to Article 28 of the Environmental Impact Assessment Act. These tasks must be completed by the end of November. 2) The approval process for changes made to EIAs will be simplified. This will apply to changes such as planned capacity or scope reductions; modifications to the original construction site; improving the treatment capability or efficiency of environmental protection equipment; altering content in an environmentally beneficial way; or implementing environmental monitoring plans. 3) A pre-EIA review process will be implemented. In the future, companies in the early stages of project planning will only need to submit initial development plans, siting information, and relevant environmental background information in order to apply for a pre-EIA review. This will then determine assessment scope and the key points of future review processes. The EPA reported that it has already reached agreement with the National Science Council for the Hsinchu Science-based Industrial Park (not including the fourth stage expansion) to submit an EIA investigation and analysis and propose response measures. This must be completed in accordance with Article 28 of the EIA Act before the end of November. The submitted measures must include approaches for controlling total pollution quantities within the park. In addition, the EPA has finished revising the draft of the EIA Act Implementation Rules. Successive implementation of all of these measures will improve the efficiency of the EIA system. The EPA emphasized that increasing review efficiency will be conducted under the premise of total quantity controls and preservation of environmental quality. As a result, environmental protection goals will be upheld.
年度
2001
月份
4
卷
4
期
4
順序
1
倒序
2
分類
Environmental Impact Assessment
標題2
Simplification and Total Quantity Controls Pushed in EIA System
檔案位置
print/V4/V4-04
「Simplification and Total Quantity Controls Pushed in EIA System」所屬的資料集:「Environmental Policy Monthly」的其他資料
編號:
441
標題:
EPA Active In Earthquake Emergency Response
摘要:
Following the September 21 earthquake in Taiwan the EPA immediately established a 24-hour emergency
全文:
Following the September 21 earthquake in Taiwan the EPA immediately established a 24-hour emergency
編號:
57
標題:
Mandatory Periodic Testing Planned for Stationary Air Pollution Sources
摘要:
Air Quality Stationary pollution sources will soon be subject to periodic emissions tests as cars a
全文:
Air Quality Stationary pollution sources will soon be subject to periodic emissions tests as cars a
編號:
995
標題:
Restrictions on Plastic Shopping Bags Introduced Successfully
摘要:
The EPA implemented the first stage of its plastic shopping bag use restriction policy on July 1. In
全文:
The EPA implemented the first stage of its plastic shopping bag use restriction policy on July 1. In
編號:
555
標題:
Annual Toxic Chemical Accident Drill Conducted
摘要:
As part of its efforts to prevent toxic chemical accidents the EPA recently staged its annual respon
全文:
As part of its efforts to prevent toxic chemical accidents the EPA recently staged its annual respon
編號:
615
標題:
River Inspections to be Strengthened Through Aerial Surveillance
摘要:
In order to overcome current limitations on inspecting river pollution the EPA will cooperate with t
全文:
In order to overcome current limitations on inspecting river pollution the EPA will cooperate with t
編號:
391
標題:
Dioxin Emissions Standards to be Set for Small Incinerators
摘要:
Due to domestic concerns over incinerator dioxin emissions the EPA decided to set dioxin emissions s
全文:
Due to domestic concerns over incinerator dioxin emissions the EPA decided to set dioxin emissions s
編號:
346
標題:
SOX Controls to be Intensified
摘要:
From July 1 limits on sulfur oxides in Nantou and Changhua Counties will be stricter; fuel must have
全文:
From July 1 limits on sulfur oxides in Nantou and Changhua Counties will be stricter; fuel must have
編號:
617
標題:
Administrator Lin Urges Local Governments to End Unreasonable Protests
摘要:
Public protests frequently scuttle plans to construct waste treatment facilities. This situation has
全文:
Public protests frequently scuttle plans to construct waste treatment facilities. This situation has
編號:
518
標題:
Assistance Program for Waste Clearance and Treatment Organizations Underway
摘要:
Encouraging the establishment of solid waste clearance and treatment firms has been a key administra
全文:
Encouraging the establishment of solid waste clearance and treatment firms has been a key administra
編號:
558
標題:
EPA Drafts Supporting Laws for Marine Pollution Control Act
摘要:
While the draft Marine Pollution Control Act is under review by the Legislative Yuan the EPA has beg
全文:
While the draft Marine Pollution Control Act is under review by the Legislative Yuan the EPA has beg
編號:
573
標題:
Environmental Protection Fundamentals Law Reviewed Administrator Proposes 12 New Policies
摘要:
On June 1st the Legislative Yuan began a review of the draft Environmental Protection Fundamentals L
全文:
On June 1st the Legislative Yuan began a review of the draft Environmental Protection Fundamentals L
編號:
787
標題:
More Recycling Collection Points Announced
摘要:
The EPA-announced Regulations Governing the Registration of Product or Packaged Good Vendors and Man
全文:
The EPA-announced Regulations Governing the Registration of Product or Packaged Good Vendors and Man
編號:
71
標題:
EPA Considers Classifying the Lack of Fuel Vapor Recycling Systems as Air Pollution Activity
摘要:
Air Quality The EPA is currently offering subsidies to gas stations for the cost of installing vapo
全文:
Air Quality The EPA is currently offering subsidies to gas stations for the cost of installing vapo
編號:
860
標題:
Environmental Excellence Awards for Construction Sites
摘要:
The EPA held the 2001 National Construction Site Environmental Excellence Awards Ceremony at the EPA
全文:
The EPA held the 2001 National Construction Site Environmental Excellence Awards Ceremony at the EPA
編號:
131
標題:
Government Policy EIA Performance Criteria Announced
摘要:
Environmental Impact Assessment On March 11 the Criteria for Performing Government Policy EIAs was
全文:
Environmental Impact Assessment On March 11 the Criteria for Performing Government Policy EIAs was
編號:
469
標題:
Review Guidelines Set for Tier 2 Eco-Products
摘要:
The EPA has finished the Guidelines for the Review of Tier 2 Eco-Products. According to the guidelin
全文:
The EPA has finished the Guidelines for the Review of Tier 2 Eco-Products. According to the guidelin
編號:
152
標題:
Regulations Governing Disease Prevention Businesses Formally Announced
摘要:
Environmental Sanitation On April 29 the EPA formally announced the Regulations Governing Disease
全文:
Environmental Sanitation On April 29 the EPA formally announced the Regulations Governing Disease
編號:
821
標題:
Soil and Groundwater Pollution Remediation to be Consolidated
摘要:
The EPA has already begun to make preparations for the operation of the Soil and Groundwater Polluti
全文:
The EPA has already begun to make preparations for the operation of the Soil and Groundwater Polluti
編號:
167
標題:
Public Hearing Held on Toxics Detection and Warning Guidelines
摘要:
Article 17 of the Toxic Chemical Substances Control Act stipulates that toxic substance transshipmen
全文:
Article 17 of the Toxic Chemical Substances Control Act stipulates that toxic substance transshipmen
編號:
274
標題:
Evaluation Process for EIA Consulting Firms Systematized
摘要:
In amending the EIA Act Enforcement Rules the EPA added stipulations regarding EIA consultant evalua
全文:
In amending the EIA Act Enforcement Rules the EPA added stipulations regarding EIA consultant evalua
編號:
666
標題:
Taiwan Promotes Regional Cooperation Thru Environmental Training
摘要:
On November 6 the EPA hosted the "International Training Courses for Environmental Professionals". T
全文:
On November 6 the EPA hosted the "International Training Courses for Environmental Professionals". T
編號:
743
標題:
Crematoriums Placed Under Emissions Controls
摘要:
Taiwan's public has long feared that emissions from crematoriums were generating dioxin pollution.
全文:
Taiwan's public has long feared that emissions from crematoriums were generating dioxin pollution.
編號:
426
標題:
Lead Content for Motor Vehicle Fuels Lowered Again
摘要:
Beginning August 26 motor vehicles in all air pollution control zones are prohibited from using fuel
全文:
Beginning August 26 motor vehicles in all air pollution control zones are prohibited from using fuel
編號:
337
標題:
EPA to Strengthen Industrial Waste Management
摘要:
In response to recent incidents involving the illegal disposal of solid waste the EPA will list for
全文:
In response to recent incidents involving the illegal disposal of solid waste the EPA will list for
編號:
169
標題:
Soil Pollution Control Act Readied
摘要:
A great deal of importance has recently been placed on groundwater and soil pollution problems. In r
全文:
A great deal of importance has recently been placed on groundwater and soil pollution problems. In r
編號:
1001
標題:
Economic Processing Zone Administration to Review Waste Disposal Plans
摘要:
To simplify industrial waste disposal plan review procedures on August 13 the EPA formally commissio
全文:
To simplify industrial waste disposal plan review procedures on August 13 the EPA formally commissio
編號:
143
標題:
EPA Promotes Monitoring of Fine Particulate Matter
摘要:
Air Quality The monitoring of suspended particles as an index of air quality in Taiwan has been li
全文:
Air Quality The monitoring of suspended particles as an index of air quality in Taiwan has been li
編號:
139
標題:
Environmental Agent Control Act Enforcement Rules Formally Announced
摘要:
Toxic Substance Management The EPA formally announced the Environmental Agent Control Act Enforceme
全文:
Toxic Substance Management The EPA formally announced the Environmental Agent Control Act Enforceme
編號:
986
標題:
EPA to Step up Crackdown on Illegal Diesel Fuel
摘要:
The EPA in coordination with revisions to the Air Pollution Control Act that allow for fines against
全文:
The EPA in coordination with revisions to the Air Pollution Control Act that allow for fines against
編號:
332
標題:
Complete Remediation Necessary for Granting Building Permit at Former RCA Site
摘要:
The Ministry of the Interior (MOI) reviewed the former RCA site land-use rezoning case on April 7. T
全文:
The Ministry of the Interior (MOI) reviewed the former RCA site land-use rezoning case on April 7. T
行政院環境保護署 的其他資料集
臺北港物流倉儲區環境監測結果
不定期更新更新,102許先生 | 02-2311-7722#2641 | 2022-01-15 01:12:24
行政院環境保護署空氣品質小時值_雲林縣_臺西站
每1時更新,309陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:49
行政院環境保護署公民營廢棄物甲級清除機構許可資料
每1月更新,189盧小姐 | 02-2311-7722#2651 | 2023-07-27 01:03:17
行政院環境保護署地方環保局環保罰鍰次數
每月更新更新,178謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:26
行政院環境保護署環保專案摘要資料_環境監測及檢測
不定期更新更新,153郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:42
行政院環境保護署
空氣品質預報資料
30分鐘更新,124謝小姐 | 02-2311-7722#2386 | 2022-01-15 01:00:10
行政院環境保護署0800資源回收免費專線-查詢非公告應回收廢棄物類統計
每年更新更新,55莊先生 | 02-23705888#3108 | 2022-01-14 01:24:29
行政院環境保護署垃圾全分類零廢棄方案第一階段執行計畫
不定期更新,46蔡先生 | 04-2252-1718#53508 | 2022-01-15 01:13:12
行政院環境保護署空氣品質小時值_新北市_新莊站
每小時更新更新,135謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:24
行政院環境保護署桃園市重要環保統計資料
每1月更新,128顏先生 | 02-23117722#2109 | 2023-08-07 01:00:19
行政院環境保護署
臺南市重要環保統計資料
每月更新更新,198謝小姐 | 02-23117722#2103 | 2022-01-14 01:20:38
行政院環境保護署紫外線即時監測資料
每1時更新,275陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:05
行政院環境保護署環保標章旅館環境即時通地圖資料
每日更新更新,64呂小姐 | 02-23117722#2929 | 2022-01-14 01:18:02
行政院環境保護署建檔公廁明細-屏東縣
不定期更新更新,236賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:06
行政院環境保護署行政院環境保護署環境檢驗所單位預算案
每1年更新,55莊小姐 | 03-4915818#3003 | 2023-08-09 01:05:42
行政院環境保護署
毒性化學物質許可目的用途資料
不定期更新更新,58許先生 | 02-23257399#55328 | 2023-07-27 01:00:25
行政院環境保護署點源網格空氣污染排放量(TWD97)
每2年更新,1028劉小姐 | 02-23117722#6111 | 2023-07-30 01:04:45
行政院環境保護署位於野生動物保護或棲息區之環境影響說明書件
每2月更新,89黃先生 | 02-23117722#2748 | 2023-08-06 01:04:08
行政院環境保護署探礦、採礦類別環境影響說明書
每2月更新,80黃先生 | 02-23117722#2748 | 2023-08-05 01:01:11
行政院環境保護署EPQSummary_WaterQualityProtection
不定期更新更新,171郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:47
行政院環境保護署
變更內容對照表專案小組初審會議紀錄
不定期更新更新,95劉先生 | 02-23117722#2743 | 2022-01-15 01:12:37
行政院環境保護署空氣品質小時值_雲林縣_麥寮站
每小時更新更新,158謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:51
行政院環境保護署建檔公廁明細-高雄市
不定期更新更新,284賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:04
行政院環境保護署行政院環境保護署毒物及化學物質局單位決算
不定期更新,49魏小姐 | 02-23257399#55432 | 2022-01-15 01:09:57
行政院環境保護署環保專案摘要資料_噪音振動
不定期更新更新,123陳先生 | 02-2311-7722#2386 | 2023-07-30 01:02:05
行政院環境保護署
特殊性工業區即時監測值資料檔 (一般空氣污染物)
每小時更新更新,183丁先生 | 02-2371-2121#6101 | 2022-01-14 01:04:59
行政院環境保護署空氣品質小時值_臺南市_安南站
每小時更新更新,217謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:16
行政院環境保護署固定污染源CEMS監測數據紀錄值資料集(1小時紀錄值)
每1時更新,200洪小姐 | 02-23117722#6221 | 2023-08-02 00:58:28
行政院環境保護署環保標章產品審查通過及有效數資料(第一類)
每季更新更新,154孫小姐 | 02-23117722#2926 | 2022-01-14 01:17:21
行政院環境保護署基隆市重要環保統計資料
每月更新更新,190謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:45
行政院環境保護署