time1: 0 time2: 0 time3: 0 time4: 0 total: 0 Simplification and Total Quantity Controls Pushed in EIA System
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

Simplification and Total Quantity Controls Pushed in EIA System

Simplification and Total Quantity Controls Pushed in EIA System」於資料集「Environmental Policy Monthly」由單位「行政院環境保護署」的楊先生所提供,聯繫電話是(02)23117722#2217,(02)23117722#2216,最近更新時間為:2022-01-15 01:13:03。 欄位編號的內容是720 , 欄位標題的內容是Simplification and Total Quantity Controls Pushed in EIA System , 欄位摘要的內容是Movement is underway to make Taiwan’s EIA system more rational. As part of conclusions reached at the National Economic Development Conference the EPA has requested the Hsinchu Science-based Industrial Park Administration to implement EIA response measures and total pollution quantity control policies. In the future, once factories are recognized as complying with industry park total quantity controls, they will not be required to perform environmental impact assessments. The EPA also plans to revise the EIA implementation rules by simplifying regulations governing the EIA review process. Environmental impact assessment (EIA) requirements have been in place in Taiwan for 15 years, and the EIA system is as controversial as ever. The general public has high expectations of the EIA process, while industry feels EIA requirements greatly burden economic development. During the National Economic Development Conference this January, the EIA system became the most heavily discussed environmental protection issue. Attendees at the Conference came up with the following conclusions: 1) Companies that apply to construct facilities within industrial parks, science parks, or export processing zones that have completed the EIA review process will not themselves be required to perform EIAs, provided their emissions will not cause the park to exceed originally approved total emissions quantities. The Hsinchu Science-based Industrial Park, which was established before EIA requirements were in place, must submit an EIA investigation, analysis and propose response measures according to Article 28 of the Environmental Impact Assessment Act. These tasks must be completed by the end of November. 2) The approval process for changes made to EIAs will be simplified. This will apply to changes such as planned capacity or scope reductions; modifications to the original construction site; improving the treatment capability or efficiency of environmental protection equipment; altering content in an environmentally beneficial way; or implementing environmental monitoring plans. 3) A pre-EIA review process will be implemented. In the future, companies in the early stages of project planning will only need to submit initial development plans, siting information, and relevant environmental background information in order to apply for a pre-EIA review. This will then determine assessment scope and the key points of future review processes. The EPA reported that it has already reached agreement with the National Science Council for the Hsinchu Science-based Industrial Park (not including the fourth stage expansion) to submit an EIA investigation and analysis and propose response measures. This must be completed in accordance with Article 28 of the EIA Act before the end of November. The submitted measures must include approaches for controlling total pollution quantities within the park. In addition, the EPA has finished revising the draft of the EIA Act Implementation Rules. Successive implementation of all of these measures will improve the efficiency of the EIA system. The EPA emphasized that increasing review efficiency will be conducted under the premise of total quantity controls and preservation of environmental quality. As a result, environmental protection goals will be upheld. , 欄位全文的內容是Movement is underway to make Taiwan’s EIA system more rational. As part of conclusions reached at the National Economic Development Conference the EPA has requested the Hsinchu Science-based Industrial Park Administration to implement EIA response measures and total pollution quantity control policies. In the future, once factories are recognized as complying with industry park total quantity controls, they will not be required to perform environmental impact assessments. The EPA also plans to revise the EIA implementation rules by simplifying regulations governing the EIA review process. Environmental impact assessment (EIA) requirements have been in place in Taiwan for 15 years, and the EIA system is as controversial as ever. The general public has high expectations of the EIA process, while industry feels EIA requirements greatly burden economic development. During the National Economic Development Conference this January, the EIA system became the most heavily discussed environmental protection issue. Attendees at the Conference came up with the following conclusions: 1) Companies that apply to construct facilities within industrial parks, science parks, or export processing zones that have completed the EIA review process will not themselves be required to perform EIAs, provided their emissions will not cause the park to exceed originally approved total emissions quantities. The Hsinchu Science-based Industrial Park, which was established before EIA requirements were in place, must submit an EIA investigation, analysis and propose response measures according to Article 28 of the Environmental Impact Assessment Act. These tasks must be completed by the end of November. 2) The approval process for changes made to EIAs will be simplified. This will apply to changes such as planned capacity or scope reductions; modifications to the original construction site; improving the treatment capability or efficiency of environmental protection equipment; altering content in an environmentally beneficial way; or implementing environmental monitoring plans. 3) A pre-EIA review process will be implemented. In the future, companies in the early stages of project planning will only need to submit initial development plans, siting information, and relevant environmental background information in order to apply for a pre-EIA review. This will then determine assessment scope and the key points of future review processes. The EPA reported that it has already reached agreement with the National Science Council for the Hsinchu Science-based Industrial Park (not including the fourth stage expansion) to submit an EIA investigation and analysis and propose response measures. This must be completed in accordance with Article 28 of the EIA Act before the end of November. The submitted measures must include approaches for controlling total pollution quantities within the park. In addition, the EPA has finished revising the draft of the EIA Act Implementation Rules. Successive implementation of all of these measures will improve the efficiency of the EIA system. The EPA emphasized that increasing review efficiency will be conducted under the premise of total quantity controls and preservation of environmental quality. As a result, environmental protection goals will be upheld. , 欄位年度的內容是2001 , 欄位月份的內容是4 , 欄位卷的內容是4 , 欄位期的內容是4 , 欄位順序的內容是1 , 欄位倒序的內容是2 , 欄位分類的內容是Environmental Impact Assessment , 欄位標題2的內容是Simplification and Total Quantity Controls Pushed in EIA System , 欄位檔案位置的內容是print/V4/V4-04

編號

720

標題

Simplification and Total Quantity Controls Pushed in EIA System

摘要

Movement is underway to make Taiwan’s EIA system more rational. As part of conclusions reached at the National Economic Development Conference the EPA has requested the Hsinchu Science-based Industrial Park Administration to implement EIA response measures and total pollution quantity control policies. In the future, once factories are recognized as complying with industry park total quantity controls, they will not be required to perform environmental impact assessments. The EPA also plans to revise the EIA implementation rules by simplifying regulations governing the EIA review process. Environmental impact assessment (EIA) requirements have been in place in Taiwan for 15 years, and the EIA system is as controversial as ever. The general public has high expectations of the EIA process, while industry feels EIA requirements greatly burden economic development. During the National Economic Development Conference this January, the EIA system became the most heavily discussed environmental protection issue. Attendees at the Conference came up with the following conclusions: 1) Companies that apply to construct facilities within industrial parks, science parks, or export processing zones that have completed the EIA review process will not themselves be required to perform EIAs, provided their emissions will not cause the park to exceed originally approved total emissions quantities. The Hsinchu Science-based Industrial Park, which was established before EIA requirements were in place, must submit an EIA investigation, analysis and propose response measures according to Article 28 of the Environmental Impact Assessment Act. These tasks must be completed by the end of November. 2) The approval process for changes made to EIAs will be simplified. This will apply to changes such as planned capacity or scope reductions; modifications to the original construction site; improving the treatment capability or efficiency of environmental protection equipment; altering content in an environmentally beneficial way; or implementing environmental monitoring plans. 3) A pre-EIA review process will be implemented. In the future, companies in the early stages of project planning will only need to submit initial development plans, siting information, and relevant environmental background information in order to apply for a pre-EIA review. This will then determine assessment scope and the key points of future review processes. The EPA reported that it has already reached agreement with the National Science Council for the Hsinchu Science-based Industrial Park (not including the fourth stage expansion) to submit an EIA investigation and analysis and propose response measures. This must be completed in accordance with Article 28 of the EIA Act before the end of November. The submitted measures must include approaches for controlling total pollution quantities within the park. In addition, the EPA has finished revising the draft of the EIA Act Implementation Rules. Successive implementation of all of these measures will improve the efficiency of the EIA system. The EPA emphasized that increasing review efficiency will be conducted under the premise of total quantity controls and preservation of environmental quality. As a result, environmental protection goals will be upheld.

全文

Movement is underway to make Taiwan’s EIA system more rational. As part of conclusions reached at the National Economic Development Conference the EPA has requested the Hsinchu Science-based Industrial Park Administration to implement EIA response measures and total pollution quantity control policies. In the future, once factories are recognized as complying with industry park total quantity controls, they will not be required to perform environmental impact assessments. The EPA also plans to revise the EIA implementation rules by simplifying regulations governing the EIA review process. Environmental impact assessment (EIA) requirements have been in place in Taiwan for 15 years, and the EIA system is as controversial as ever. The general public has high expectations of the EIA process, while industry feels EIA requirements greatly burden economic development. During the National Economic Development Conference this January, the EIA system became the most heavily discussed environmental protection issue. Attendees at the Conference came up with the following conclusions: 1) Companies that apply to construct facilities within industrial parks, science parks, or export processing zones that have completed the EIA review process will not themselves be required to perform EIAs, provided their emissions will not cause the park to exceed originally approved total emissions quantities. The Hsinchu Science-based Industrial Park, which was established before EIA requirements were in place, must submit an EIA investigation, analysis and propose response measures according to Article 28 of the Environmental Impact Assessment Act. These tasks must be completed by the end of November. 2) The approval process for changes made to EIAs will be simplified. This will apply to changes such as planned capacity or scope reductions; modifications to the original construction site; improving the treatment capability or efficiency of environmental protection equipment; altering content in an environmentally beneficial way; or implementing environmental monitoring plans. 3) A pre-EIA review process will be implemented. In the future, companies in the early stages of project planning will only need to submit initial development plans, siting information, and relevant environmental background information in order to apply for a pre-EIA review. This will then determine assessment scope and the key points of future review processes. The EPA reported that it has already reached agreement with the National Science Council for the Hsinchu Science-based Industrial Park (not including the fourth stage expansion) to submit an EIA investigation and analysis and propose response measures. This must be completed in accordance with Article 28 of the EIA Act before the end of November. The submitted measures must include approaches for controlling total pollution quantities within the park. In addition, the EPA has finished revising the draft of the EIA Act Implementation Rules. Successive implementation of all of these measures will improve the efficiency of the EIA system. The EPA emphasized that increasing review efficiency will be conducted under the premise of total quantity controls and preservation of environmental quality. As a result, environmental protection goals will be upheld.

年度

2001

月份

4

4

4

順序

1

倒序

2

分類

Environmental Impact Assessment

標題2

Simplification and Total Quantity Controls Pushed in EIA System

檔案位置

print/V4/V4-04

「Simplification and Total Quantity Controls Pushed in EIA System」所屬的資料集:「Environmental Policy Monthly」的其他資料

編號: 6
標題: From the Administrator's Desk
摘要: General Policy  Welcome to the first of the ENVIRON-MENTAL POLICY MONTHLY. As environmental protecti
全文: General Policy  Welcome to the first of the ENVIRON-MENTAL POLICY MONTHLY. As environmental protecti

編號: 194
標題: EPA Takes Over UV Ray Forecasting Efforts
摘要: Following completion of a trial year of ultraviolet (UV) ray forecasting by National Taiwan Universi
全文: Following completion of a trial year of ultraviolet (UV) ray forecasting by National Taiwan Universi

編號: 704
標題: Preliminary Soil Pollution Fund Management Framework Set
摘要: The EPA's Draft Organizational Regulations of the Soil And Groundwater Pollution Remediation Fund Ma
全文: The EPA's Draft Organizational Regulations of the Soil And Groundwater Pollution Remediation Fund Ma

編號: 252
標題: Recycling Plant for Discarded Consumer Electronics to Be Established
摘要: In line with efforts to promote the establishment of discarded home appliance processing plants the
全文: In line with efforts to promote the establishment of discarded home appliance processing plants the

編號: 488
標題: Drinking Water Protection Zones Now Viewable Online
摘要: Drinking water statutes require the delineation of protection zones for sources of drinking water.
全文: Drinking water statutes require the delineation of protection zones for sources of drinking water.

編號: 919
標題: Preliminary Assessment Regulations for Control Sites Drafted
摘要: The EPA has completed its draft of Regulations for the Preliminary Assessment of Control Sites. Thes
全文: The EPA has completed its draft of Regulations for the Preliminary Assessment of Control Sites. Thes

編號: 1001
標題: Economic Processing Zone Administration to Review Waste Disposal Plans
摘要: To simplify industrial waste disposal plan review procedures on August 13 the EPA formally commissio
全文: To simplify industrial waste disposal plan review procedures on August 13 the EPA formally commissio

編號: 3470
標題: Dengue Fever Vector Control in Taiwan
摘要: Environmental Sanitation Dengue Fever V ector Control in Taiwan In 2015, an outbreak of dengue fe
全文: Dengue Fever Vector Control in Taiwan In 2015, an outbreak of dengue fever in Tainan turned into

編號: 750
標題: Explosion Leads to First Activation of Toxic Chemical Disaster Response System
摘要: The explosion of a boiler and the resulting fire at the Fukuo Company in Hsinchu County led the EPA
全文: The explosion of a boiler and the resulting fire at the Fukuo Company in Hsinchu County led the EPA

編號: 804
標題: EPA to Issue Water Pollution Incident Response Handbook
摘要: The EPA is expected to soon complete the “Water Pollution Incident Response Operating Handbook” and
全文: The EPA is expected to soon complete the “Water Pollution Incident Response Operating Handbook” and

編號: 143
標題: EPA Promotes Monitoring of Fine Particulate Matter
摘要: Air Quality The monitoring of suspended particles as an index of air quality in Taiwan has been li
全文: Air Quality The monitoring of suspended particles as an index of air quality in Taiwan has been li

編號: 372
標題: Award Amount for Turning in Unwanted Vehicles Raised
摘要: On June 16 the EPA announced new vehicle recycling award amounts for the period of July 1, 1999, to
全文: On June 16 the EPA announced new vehicle recycling award amounts for the period of July 1, 1999, to

編號: 474
標題: EPA Urges Local Govts to Get Electric Bikes on the Road
摘要: In the last few years the EPA has decided to promote electric motorbikes (e-bikes) as an important w
全文: In the last few years the EPA has decided to promote electric motorbikes (e-bikes) as an important w

編號: 25
標題: Amendments to EIA Standards Implemented
摘要: Environmental Impact Assessment  To clarify the scope of the Environmental Impact Assessment Act the
全文: Environmental Impact Assessment  To clarify the scope of the Environmental Impact Assessment Act the

編號: 610
標題: Feature Article: Dual Approach Alleviates the Effects of Acid Rain
摘要: Collection of the air pollution control fee began in 1995. In conjunction with low sulfur fuel poli
全文: Collection of the air pollution control fee began in 1995. In conjunction with low sulfur fuel poli

編號: 724
標題: Administrator Hau Identifies Three Major Policy Points in Response to Public Opinion Poll
摘要: The Environmental Quality Protection Foundation announced that the 2001 Environmental Suffering Inde
全文: The Environmental Quality Protection Foundation announced that the 2001 Environmental Suffering Inde

編號: 808
標題: Water Pollution Permitting Procedures Simplified
摘要: In order to simplify water pollution permitting procedures the EPA announced the revision of Article
全文: In order to simplify water pollution permitting procedures the EPA announced the revision of Article

編號: 247
標題: Feature Article Nationwide Coastal Cleanup Plan Successfully Kicked-off
摘要: With the implementation of a two-day weekend every other week it is now more important than ever tha
全文: With the implementation of a two-day weekend every other week it is now more important than ever tha

編號: 532
標題: Reservoir Eutrophication Improves in 1999
摘要: The EPA has finished compiling results from 1999 monitoring of reservoir water quality. The results
全文: The EPA has finished compiling results from 1999 monitoring of reservoir water quality. The results

編號: 296
標題: Semiconductor Industry Air Emissions Standards Announced
摘要: On January 6 1999, air pollution emission standards for the semiconductor industry were announced by
全文: On January 6 1999, air pollution emission standards for the semiconductor industry were announced by

編號: 581
標題: Industrial Pollution Control Investments Top 15 billion in 1998
摘要: The EPA has completed statistics on factory investments and operation and maintenance expenditures f
全文: The EPA has completed statistics on factory investments and operation and maintenance expenditures f

編號: 339
標題: Guidelines for Applying to Handle and Use Bituminous Coal and Petroleum Coke to be Announced
摘要: The EPA has completed the draft guideline for obtaining handling and use permits for bituminous coal
全文: The EPA has completed the draft guideline for obtaining handling and use permits for bituminous coal

編號: 163
標題: Government Purchasing Act to Add Article on Green Consumerism
摘要: Eco-labeling According to Article 96 of the Government Purchasing Act passed by the Legislative Yu
全文: Eco-labeling According to Article 96 of the Government Purchasing Act passed by the Legislative Yu

編號: 519
標題: Data Management System for Environmental Agents Goes On-line
摘要: To enhance management efficiency and provide a convenient window for public comment the EPA recently
全文: To enhance management efficiency and provide a convenient window for public comment the EPA recently

編號: 684
標題: EPA Greets the Millennium with New Air Pollution Policies
摘要: The new millennium is upon us and the EPA, in addition to continuing to offer subsidies for the purc
全文: The new millennium is upon us and the EPA, in addition to continuing to offer subsidies for the purc

編號: 137
標題: Water Pollution Fee to be Postponed
摘要: Water Quality  According to EPA Administrator Hsung-Hsiung Tsai public opinion following announcemen
全文: Water Quality  According to EPA Administrator Hsung-Hsiung Tsai public opinion following announcemen

編號: 392
標題: EPA Plans for the Second Half of 1999
摘要: General Policy This special issue of the EPM introduces the EPA's work focus for the second half of
全文: This special issue of the EPM introduces the EPA's work focus for the second half of 1999. Each of

編號: 832
標題: Soil and Groundwater Pollution Sites to be Cleaned up in Three Categories
摘要: Controversy surrounding the collection of soil and groundwater pollution remediation fees and the di
全文: Controversy surrounding the collection of soil and groundwater pollution remediation fees and the di

編號: 825
標題: EPA Holds Oil Pollution Emergency Response Exercise
摘要: The 2001 “Large-scale Marine Oil Pollution Emergency Response Exercise” was held on October 23rd in
全文: The 2001 “Large-scale Marine Oil Pollution Emergency Response Exercise” was held on October 23rd in

編號: 414
標題: Recycling Rates in 100 Townships Should Hit 10% By the End of 2000
摘要: By the end of June 2000 the EPA plans to raise recycling rates in 50 townships to 10%. By the end of
全文: By the end of June 2000 the EPA plans to raise recycling rates in 50 townships to 10%. By the end of

行政院環境保護署 的其他資料集

地方環保局環保罰鍰次數

每月更新更新,121

謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:26

行政院環境保護署

環境教育申報單位之有效護照開通率

每3月更新,56

李小姐 | 02-23117722#2724 | 2023-07-27 01:02:54

行政院環境保護署

淡水河系水環境優化願景聯繫會報委員會議

不定期更新,48

葉先生 | 02-2311-7722#2846 | 2022-01-15 01:12:48

行政院環境保護署

行政院環境保護署環境教育設施場所認證展延申請書

不定期更新,63

蘇小姐 | (03)4020789分機669 | 2022-01-15 01:11:08

行政院環境保護署

新化學物質簡易登錄表單

不定期更新更新,41

蔡先生 | 02-23257399#55723 | 2023-08-09 01:04:23

行政院環境保護署

交通事業廢棄物再利用機構資料

每1年更新,74

李小姐 | 02-2311-7722#2626 | 2023-07-27 00:59:36

行政院環境保護署

空氣品質小時值_臺北市_古亭站

每1時更新,141

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:11

行政院環境保護署

全國公廁建檔資料

每1日更新,143

賴先生 | 04-2252-1718#53686 | 2023-08-05 00:59:29

行政院環境保護署

公民營廢棄物甲級處理機構許可資料

每月更新更新,106

何先生 | 02-2311-7722#2653 | 2022-01-14 01:25:59

行政院環境保護署

0800資源回收免費專線-查詢廢輪胎、鉛蓄電池統計

每年更新更新,58

莊先生 | 02-23705888#3108 | 2022-01-14 01:24:27

行政院環境保護署

空氣品質小時值_臺中市_忠明站

每1時更新,238

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:58

行政院環境保護署

行政院環境保護署單位決算

每1年更新,37

何先生 | 02-23117722#2158 | 2023-08-09 01:04:28

行政院環境保護署

環境影響說明書完成審查件數

每年更新更新,90

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:24

行政院環境保護署

公民營廢棄物清除機構資料

每月更新更新,159

何先生 | 02-2311-7722#2653 | 2022-01-14 01:26:25

行政院環境保護署

旅館或觀光旅館之興建或擴建類別環境影響說明書

每2月更新,62

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:08

行政院環境保護署

開發單位公開說明會訊息公聽會訊息

每2月更新,138

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:33

行政院環境保護署

全國土壤及地下水污染場址筆數及面積統計

每1年更新,62

呂小姐 | 02-2383-2389#8110 | 2023-07-30 01:03:53

行政院環境保護署

本署核准成立之環境保護財團法人名單

不定期更新更新,83

黃小姐 | (02)2311-7722#2714 | 2023-08-07 01:01:13

行政院環境保護署

縣市(南投縣)小時值-每小時

每1時更新,208

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:49

行政院環境保護署

生物源網格空氣污染排放量(TWD97)

不定期更新更新,173

柏小姐 | 02-23712121#6106 | 2022-01-14 01:05:47

行政院環境保護署

環保署補助地方政府設置完成之現地處理設施

不定期更新,53

黃先生 | 02-2311-7722#2839 | 2022-01-14 01:22:19

行政院環境保護署

環境檢測機構位置圖

每1年更新,55

楊先生 | (03)491-5818轉2103 | 2023-07-30 01:05:45

行政院環境保護署

經過活動斷層範圍環境影響說明書

每2月更新,89

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:11

行政院環境保護署

核能一廠、二廠相關計畫環評監督委員會會議紀錄

不定期更新更新,34

陳先生 | 04-22521718#51207 | 2023-08-09 01:05:12

行政院環境保護署

桃園市水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,46

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:41

行政院環境保護署

空氣品質小時值_新竹縣_湖口站

每1時更新,122

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:05

行政院環境保護署

垃圾處理場(廠)統計

每半年更新更新,38

掩先生 | (04)2252-1718#53513,#53518,#53522 | 2022-01-14 01:22:10

行政院環境保護署

重點事業廢棄物-生物醫療廢棄物之處理方式

每月更新更新,159

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:07

行政院環境保護署

Environmental Policy Monthly

不更新更新,205

楊先生 | (02)23117722#2217,(02)23117722#2216 | 2022-01-15 01:13:03

行政院環境保護署

行動監測車

每小時更新更新,143

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:21

行政院環境保護署