"Operation, maintenance and analysis plan of information display」於資料集「EPQSummary_EnvironmentalMonitoringAndTesting」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:45。 欄位Project Title的內容是"Operation, maintenance and analysis plan of information display system for Tainan air quality monitoring station in 105" , 欄位Project Subject的內容是"This project covered the operation and maintenance works of Air Quality Monitoring Station (AQMS) in Tainan City in which assuring the normal conditions of facilities of AQMS and quality of sampling data, reporting the comprehensive maintenance records, summarizing the improvement measures as well as reporting latest conditions to Environmental Bureau. Taken into account assuring of maintenance work in compliance with standard of quality and assurance of AQMS, this project included the formulation a set of standard operation procedures and maintenance form. The major achievements of project, started from 12 August 2016 to 8 May 2017, were summarized as followings: 1. Air Quality Monitoring Station Sampling Analysis a) Dust Measurement Dust collection and analysis was scheduled to be completed 108 times throughout the contract term. As the water-proof construction work on the rooftop of Minde Junior High School station, the dust measurement was suspended during the anticipated construction period from 1 April 2017 to 31 May 2017. As of the end of this project, it completed 107 times of dust collection and analysis and achieved 99% data capture rate. b) Total Suspended Particulates (TSP) Sampling Analysis Total suspended particulates (TSP) sampling analysis was scheduled to be completed 216 times throughout the contract term. As of the end of project term, it completed 214 times of analysis and achieved 99% data capture rate. 2. Air Quality Monitoring Station maintenance and Calibration Works a) Maintenance Works of Analyzers and Samplers Maintenance of Analyzers and Samplers was scheduled to be completed 216 times throughout the contract term. As of the end of project term, it completed 214 times of analysis and achieved 99% completion rate. b) Calibration Works of Analyzers and Samplers One-point Flow Calibration was scheduled to be completed 108 times throughout the contract term. As of the end of project term, it completed 107 times of analysis and achieved 99% capture rate. Multi-point Flow Calibration, Timer Verification and Level-one Flow Calibration were completed 36, 24 and 2 times respectively and achieved 100% completion rate throughout the project term. c) Precision Check Precision check was completed 9 times throughout the contract term and achieved 100% completion rate. 3. Operation, Maintenance and Calibration Works of Air Quality Monitoring Station Monthly maintenance work, quarterly maintenance work and bi-yearly maintenance work were completed 18, 6 and 4 times respectively and achieved 100% completion rate. 4. Total Suspended Particulate Continuous Monitoring Work Monthly total suspended particulate continuous sampling work was scheduled to be completed 6 times throughout the project term. As of the end of term, it recorded 11 times of monthly sampling and analysis works and reached 183% completion rate. 5. Fine Suspended Particulate Sampling Work Fine suspended particulate sampling work was completed 24 times throughout the project term and reached 100% completion rate. Composition analysis of collected fine suspended particulate was scheduled to be completed 7 times throughout the project term. As of the end of term, composition analysis was recorded 9 times and reached 129% completion rate. 6. Routine maintenance of LED electronic display broad Routine maintenance of LED electronic display broad was scheduled to be completed 9 times throughout the project term. As of the end of term, it recorded 10 times of work and reached 111% completion rate. In year 2016, the collaboration in preparation of broadcasting materials was in total (63 item 277 quantity) 7. Smart City Air Quality Monitoring Network Service " , 欄位Project Year的內容是2016 , 欄位Organizer的內容是"Environmental Protection Bureau of Tainan City" , 欄位Executive Unit的內容是"捷思環能有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=169937 , 欄位Publish Date的內容是20180501

Project Title

"Operation, maintenance and analysis plan of information display system for Tainan air quality monitoring station in 105"

Project Subject

"This project covered the operation and maintenance works of Air Quality Monitoring Station (AQMS) in Tainan City in which assuring the normal conditions of facilities of AQMS and quality of sampling data, reporting the comprehensive maintenance records, summarizing the improvement measures as well as reporting latest conditions to Environmental Bureau. Taken into account assuring of maintenance work in compliance with standard of quality and assurance of AQMS, this project included the formulation a set of standard operation procedures and maintenance form. The major achievements of project, started from 12 August 2016 to 8 May 2017, were summarized as followings: 1. Air Quality Monitoring Station Sampling Analysis a) Dust Measurement Dust collection and analysis was scheduled to be completed 108 times throughout the contract term. As the water-proof construction work on the rooftop of Minde Junior High School station, the dust measurement was suspended during the anticipated construction period from 1 April 2017 to 31 May 2017. As of the end of this project, it completed 107 times of dust collection and analysis and achieved 99% data capture rate. b) Total Suspended Particulates (TSP) Sampling Analysis Total suspended particulates (TSP) sampling analysis was scheduled to be completed 216 times throughout the contract term. As of the end of project term, it completed 214 times of analysis and achieved 99% data capture rate. 2. Air Quality Monitoring Station maintenance and Calibration Works a) Maintenance Works of Analyzers and Samplers Maintenance of Analyzers and Samplers was scheduled to be completed 216 times throughout the contract term. As of the end of project term, it completed 214 times of analysis and achieved 99% completion rate. b) Calibration Works of Analyzers and Samplers One-point Flow Calibration was scheduled to be completed 108 times throughout the contract term. As of the end of project term, it completed 107 times of analysis and achieved 99% capture rate. Multi-point Flow Calibration, Timer Verification and Level-one Flow Calibration were completed 36, 24 and 2 times respectively and achieved 100% completion rate throughout the project term. c) Precision Check Precision check was completed 9 times throughout the contract term and achieved 100% completion rate. 3. Operation, Maintenance and Calibration Works of Air Quality Monitoring Station Monthly maintenance work, quarterly maintenance work and bi-yearly maintenance work were completed 18, 6 and 4 times respectively and achieved 100% completion rate. 4. Total Suspended Particulate Continuous Monitoring Work Monthly total suspended particulate continuous sampling work was scheduled to be completed 6 times throughout the project term. As of the end of term, it recorded 11 times of monthly sampling and analysis works and reached 183% completion rate. 5. Fine Suspended Particulate Sampling Work Fine suspended particulate sampling work was completed 24 times throughout the project term and reached 100% completion rate. Composition analysis of collected fine suspended particulate was scheduled to be completed 7 times throughout the project term. As of the end of term, composition analysis was recorded 9 times and reached 129% completion rate. 6. Routine maintenance of LED electronic display broad Routine maintenance of LED electronic display broad was scheduled to be completed 9 times throughout the project term. As of the end of term, it recorded 10 times of work and reached 111% completion rate. In year 2016, the collaboration in preparation of broadcasting materials was in total (63 item 277 quantity) 7. Smart City Air Quality Monitoring Network Service "

Project Year

2016

Organizer

"Environmental Protection Bureau of Tainan City"

Executive Unit

"捷思環能有限公司"

Publish Date

20180501

「"Operation, maintenance and analysis plan of information display」所屬的資料集:「EPQSummary_EnvironmentalMonitoringAndTesting」的其他資料

Project Title: "2016 Environmental Quality Monitoring Station(including Mobile Monitoring Vehicle) Operation And Ma
Project Subject: "This project was implemented from Jan. 12, 2016 to Dec. 31, 2016. All tasks defined in the Environm
Project Year: 2016
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "Comparative study of survey techniques for aldehyde and ketone hazardous air pollutants in ambient
Project Subject: "The goal of this project is to develop samplings and analysis technology of hazardous air pollutant
Project Year: 2019
Organizer: "Environmental Analysis Laboratory"

Project Title: "Tainan Air Quality Monitoring Station Information Display System Operation, Maintenance and Analysi
Project Subject: "This project covered the operation and maintenance works of Air Quality Monitoring Station (AQMS) i
Project Year: 2018
Organizer: "Environmental Protection Bureau of Tainan City"

Project Title: "2014 Atmospheric Fine Particulates Monitoring and Analysis Project in Kinmen County"
Project Subject: "The project was carried out from Feb. 19th to Dec. 20, 2013. The main work items of this project in
Project Year: 2014
Organizer: "Environmental Protection Bureau, Kinmen County"

Project Title: "Sampling/Monitoring Program for(FRM) PM2.5 in Southern Taiwan"
Project Subject: " The purpose of this project was to monitor the mass concentration of fine suspended particle (PM
Project Year: 2012
Organizer: "Department of Environmental Monitoring & Information Management"

Project Title: "2012 fine suspended particulate monitoring, investigation and assessment plan"
Project Subject: "In recent years, the fine suspended particle (PM2.5) concentrations of Yunlin County exceeded the l
Project Year: 2012
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "Study of Indoor and Outdoor Long-term Environmental Non-Ionizing Radiation Monitoring Technologies"
Project Subject: "Nowadays, electricity and electromagnetic (EM) waves play a very important role in our daily lives
Project Year: 2014
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: "Sampling/Monitoring Program for(FRM) PM2.5 in Southern Taiwan"
Project Subject: " The purpose of this project was to monitor the mass concentration of fine suspended particle (P
Project Year: 2016
Organizer: "Department of Environmental Monitoring & Information Management"

Project Title: "Fine Particulate Matter (PM2.5) Chemical Speciation Monitoring Project during 2015-2016"
Project Subject: "This project collected PM2.5 for chemical speciation at the air quality monitoring stations of Taiw
Project Year: 2015
Organizer: "Department of Environmental Monitoring & Information Management"

Project Title: "Environmental Ambient Water Quality Monitoring of South Taiwan "
Project Subject: "  The main goal of this project is to monitor the water quality of nine cities and counties in the
Project Year: 2013
Organizer: "Department of Environmental Monitoring & Information Management"

Project Title: "The Peinan river dust control and to improve the promotion project "
Project Subject: "Dust potential survey to collect compile, to master the the Peinan easy dust emission potential are
Project Year: 2013
Organizer: "Taitung County Environment Protection Bureau"

Project Title: "Development of Halogenated Organic Pollutants On-line Measurement Technology in Stack"
Project Subject: "The major objective of the project aims to develop sampling and analysis technology of halogenated
Project Year: 2014
Organizer: "Environmental Analysis Laboratory"

Project Title: "Development and application of carbon isotopes analysis technology in fine particles"
Project Subject: "The objectives of this study was to analyze the characteristics of carbon and lead isotope composit
Project Year: 2018
Organizer: "Department of Environmental Monitoring & Information Management"

Project Title: "Taichung City, 106 river, sea quality monitoring program"
Project Subject: "456/5000Mùqián táizhōng shì héchuān shuǐzhì zhuàngkuàng lìnián lái dàzhì wěndìng, shòudào dìzhí yǐn
Project Year: 2017
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "2012 fine suspended particulate monitoring, investigation and assessment plan"
Project Subject: "In recent years, the fine suspended particle (PM2.5) concentrations of Yunlin County exceeded the l
Project Year: 2012
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "UV-Index Forecasting System and Instrument Calibration Laboratory"
Project Subject: "The main task of this project, “UV Forecast System and Monitoring Instrument Calibration Lab.-Fisca
Project Year: 2016
Organizer: "Department of Environmental Monitoring & Information Management"

Project Title: "The Enviroment Monitoring of the Water Quality in the Northern Area of Taiwan from 2018 to 2021"
Project Subject: "This project carries on water quality monitoring to four kinds of water bodies of ten counties and
Project Year: 2018
Organizer: "Department of Environmental Monitoring & Information Management"

Project Title: "Development of investigation technology for semi-volatile organic compounds such as nitrobenzene in
Project Subject: "Environmeantal Protection Administration (EPA) Executine Yuan announced the “Emission Standards for
Project Year: 2021
Organizer: "Environmental Analysis Laboratory"

Project Title: "Compound specific isotope analysis of diesel fuels in a forensic investigation"
Project Subject: "Based on the results accumulated in this project, we have achieved our goals to establish the proto
Project Year: 2019
Organizer: "Environmental Analysis Laboratory"

Project Title: "Air Quality Monitoring Van used in Petrochemical Industrial Park specifically operated and maintain
Project Subject: "The project started in June 10th, 2015, planned to include the petrochemical vehicle monitoring ope
Project Year: 2015
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "The evaluation and identification of biological effects in high-tech industry effluent (3/4) – oxid
Project Subject: "This study confirms that the toxicity order of oxidants (sodium hypochlorite, hydrogen peroxide) to
Project Year: 2015
Organizer: "Environmental Analysis Laboratory"

Project Title: "The enhancing project for air quality monitoring data collection, analysis and integration"
Project Subject: "As the rise in environmental awareness and the prosperous of technology, the quality of environment
Project Year: 2018
Organizer: "Department of Environmental Monitoring & Information Management"

Project Title: "2017 Ambient Mentioning and Risk Assessment of Wenshan Waste Incineration Plant of Taichung City"
Project Subject: "無"
Project Year: 2017
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "2018 Plan on the Establishment for the Technical Specifications of the Environmental Pesticides Eff
Project Subject: " The guideline of the efficacy test for environmental pesticides issued and implemented in 2001 s
Project Year: 2018
Organizer: "Toxic and Chemical Substances Bureau"

Project Title: "Project of river water pollution source identification formation and practice (2/3)"
Project Subject: "This project attempted to investigate spatial and temporal distributions of water pollution sources
Project Year: 2019
Organizer: "Environmental Analysis Laboratory"

Project Title: "Establishment and Application of New Measuring Technology for Oil Pollution Identification(2/2)"
Project Subject: "One-dimensional gas chromatography method such as GC-FID or GC-MS for the analysis of samples resol
Project Year: 2014
Organizer: "Environmental Analysis Laboratory"

Project Title: "Technology Innovation for Carbon Fixation of Flue Gas by Microalgae "
Project Subject: "In this project, novel technology for using microalgae to fix CO2 in industrial flue gas was develo
Project Year: 2010
Organizer: "Environmental Analysis Laboratory"

Project Title: "Monitoring Project for the River & Ocean Water Quality of Taichung City in 2015"
Project Subject: "To achieve the goal of cleaning river water, several pollution control actions had been enforced by
Project Year: 2015
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "Development and application of carbon and Pb isotopes analysis technology in fine particles"
Project Subject: "The objective of this study is to investigate the potential pollution sources of PM2.5 in Kaohsiung
Project Year: 2020
Organizer: "Department of Environmental Monitoring & Information Management"

Project Title: "The 2019 Project of Chemical Speciation Monitoring and Analysis of Fine Particulate Matter (PM2.5)"
Project Subject: "This study proceeded with regular collections of PM2.5 (aerodynamic diameters equal to or smaller t
Project Year: 2019
Organizer: "Department of Environmental Monitoring & Information Management"

行政院環境保護署 的其他資料集

建檔公廁明細-宜蘭縣

不定期更新更新,162

賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:08

行政院環境保護署

公告應回收廢物品及容器回收量

每1月更新,63

顏先生 | 02-23117722#2109 | 2023-07-30 01:00:53

行政院環境保護署

柴油新車審驗資料-合格證明函

不定期更新更新,42

李小姐 | 02-2311-7722#6311 | 2023-08-09 01:04:47

行政院環境保護署

桃園市水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,45

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:41

行政院環境保護署

會計事務處理注意事項

不定期更新更新,34

林小姐 | 02-2311-7722#2173 | 2023-08-09 01:05:47

行政院環境保護署

空氣污染防制區範圍圖

不定期更新更新,36

周小姐 | 02-23117722#6102 | 2023-07-27 01:06:03

行政院環境保護署

環評會議公告

每2月更新,110

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:22

行政院環境保護署

廢家具修繕DIY

不定期更新更新,38

林小姐 | 04-22521718#53511 | 2023-08-09 01:04:04

行政院環境保護署

使用中機動車輛噪音資料-汽油車

不定期更新更新,97

林先生 | 02-23712121-6403 | 2022-01-14 01:18:53

行政院環境保護署

大甲媽祖遶境即時空品監測成果(E-motor)

不定期更新更新,136

陳先生 | 02-2311-7722#2341 | 2022-01-14 01:02:39

行政院環境保護署

空氣品質小時值_花蓮縣_花蓮站

每小時更新更新,96

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:36

行政院環境保護署

空氣品質小時值_高雄市_美濃站

每1時更新,132

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:44

行政院環境保護署

廢棄物罰鍰次數

每年更新更新,82

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:30

行政院環境保護署

交通事業廢棄物再利用機構資料

每1年更新,68

李小姐 | 02-2311-7722#2626 | 2023-07-27 00:59:36

行政院環境保護署

科學工業事業廢棄物再利用機構資料

每1年更新,72

李小姐 | 02-2311-7722#2626 | 2023-07-27 00:59:34

行政院環境保護署

環境教育機構認證申請書

不定期更新更新,57

盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:26

行政院環境保護署

應回收廢棄物稽核認證行程

每1年更新,117

廖小姐 | 02-2370-5888#3103 | 2023-07-27 01:00:00

行政院環境保護署

二氧化碳-小時值-每小時

每1時更新,222

陳先生 | 02-2311-7722#2386 | 2023-08-07 00:58:21

行政院環境保護署

緊急防制辦法空品狀況

每小時更新更新,96

謝小姐 | 02-23117722轉2386 | 2022-01-14 01:05:55

行政院環境保護署

廢棄物質最終處置資訊網相關新聞

每月更新更新,45

許先生 | 02-2311-7722#2641 | 2022-01-14 01:24:14

行政院環境保護署

大眾捷運系統之開發類別環境影響說明書

每2月更新,43

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:14

行政院環境保護署

環保署裁罰處分

每季更新更新,90

張先生 | 02-2311-7722#2716 | 2022-01-15 01:10:12

行政院環境保護署

補助地方設置巨大廢棄物回收再利用廠一覽

不定期更新更新,42

林小姐 | 04-22521718#53511 | 2023-08-07 00:59:54

行政院環境保護署

應回收廢棄物受補貼機構(處理業)

每1年更新,140

廖小姐 | 02-2370-5888#3103 | 2023-07-27 01:00:04

行政院環境保護署

全國公廁建檔資料

每1日更新,124

賴先生 | 04-2252-1718#53686 | 2023-08-05 00:59:29

行政院環境保護署

環訓所年度年報彙編

每年更新更新,47

湯小姐 | 03-4020789#544 | 2022-01-15 01:10:11

行政院環境保護署

核能四廠環評監督委員會會議紀錄

不定期更新更新,36

陳先生 | 04-2252-1718#51207 | 2023-08-09 01:04:33

行政院環境保護署

環境影響評估報告書環境敏感區位調查表

每2月更新,101

黃先生 | 02-23117722#2748 | 2023-08-05 01:00:55

行政院環境保護署

環評監督追蹤之作業架構

不定期更新更新,38

陳先生 | 04-22521718#51207 | 2022-01-15 01:13:26

行政院環境保護署

行政院環境保護署前瞻基礎建設計畫特別預算會計月報

每1月更新,49

鄭小姐 | 02-23117722#2156 | 2023-08-09 01:05:39

行政院環境保護署