"2017 Project of “Image rebuilding of recycling at tourist attra
「"2017 Project of “Image rebuilding of recycling at tourist attra」於資料集「EPQSummary_WasteManagement」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:53。 欄位Project Title的內容是"2017 Project of “Image rebuilding of recycling at tourist attractions and recycling dream taking off of remote area in Chiayi County”" , 欄位Project Subject的內容是"This project was initiated to rebuild the image of the recycling at the tourist attractions by increasing the recycling facilities with local features and improving the environment cleaning in addition to the existing recycling settings at those sightseeing spots. Meanwhile, the recycling dream taking off activities were introduced in the elementary schools at remote area to leverage the power of the students to promote and implement the recycling actions in the remote area; There were some rewards provided for promotions and creations of recycling activities to support the schools to prepare the required teaching and sport equipments for students and even help the students to have their graduate trips. Also, daily supplements were provided in the local grocery stores as the recycling exchange rewards for citizens to enhance the recycle of glass wares, agricultural chemical containers and dry batteries etc. Besides, the recycling exchange rewards for the beach area were implemented to reinforce the garbage classifications at beach area and kept the ocean away from the wastes pollution; and a shopping street with dining services and gifts was planned to attract the tourists to stay longer in the sightseeing spots with a positive recycling image since all the merchants on the shopping street were well trained to do recycling actively. According to the requirements in the contract, all the manpower and equipment were ready to execute the project on 1st May, 2017 (Please refer to Environmental Protection Bureau, Chiayi County (abbreviated as EPB) Doc. No. EPB E1060011581 issued on 12th May, 2017 for inspection) and completed by 30th November, 2017. The project period was lasting for 7 months with everything on track; the key achievements were summarized as the following,I. Facilitate the image rebuilding of recycling at the tourist attractions of the rural and beach area.The working items included coaching the merchants in those areas to set the recycling equipments with local features, investigating the production and flow of the kitchen wastes and assessing the feasibility of reducing the kitchen wastes from the sources. There were 5 featured recycling facilities set in the Danyana, Taiping Cloud Ladder, Meishan Park, Nuputzu Grass and Julu Communities with the support of the Project; all the results and performances were great with 2,355 kg of the monthly average recycled quantity. After coaching, 10 merchants had set the recycling equipments with 755 kg of the monthly average recycled quantity at Budai Town. The the production and flow of the kitchen wastes were investigated at 22 restaurants of the Project covered region, including 20 big restaurants producing 8,620kg of cooked food wastes and 120 kg of raw kitchen wastes per month; however, all the wastes were well managed by qualified companies but the feasibility of reducing the kitchen wastes was considered and provided to EPB for further assessment. II. Recycling dream is taking off.The working item was focusing on the theme of “Recycling dream taking off” to help the children to make their dreams come true. The children in aboriginal communities could facilitate the recycling activities in their communities and share the good results in the press conferences. The Project allowed the children from 46 elementary schools of remote or mountain area to raise the requests of “Recycling dream taking off” with the designed form. 7 schools completed the applications with proposals by 5th June and 6 of them provided their achievement reports. An evaluation and selection meeting was conducted on 6th October, the first ranked was Houshanmei school, the second was Meibei school and the third went to Meijun school. Also, some other rewards went to Siding school for recycling creativity, Liming school for recycling contributions and Guanghwa school for recycling special award et..." , 欄位Project Year的內容是2017 , 欄位Organizer的內容是"Environmental Protection Bureau, Chiayi County" , 欄位Executive Unit的內容是"綠信環境科技股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=153549 , 欄位Publish Date的內容是20180201 。
Project Title
"2017 Project of “Image rebuilding of recycling at tourist attractions and recycling dream taking off of remote area in Chiayi County”"
Project Subject
"This project was initiated to rebuild the image of the recycling at the tourist attractions by increasing the recycling facilities with local features and improving the environment cleaning in addition to the existing recycling settings at those sightseeing spots. Meanwhile, the recycling dream taking off activities were introduced in the elementary schools at remote area to leverage the power of the students to promote and implement the recycling actions in the remote area; There were some rewards provided for promotions and creations of recycling activities to support the schools to prepare the required teaching and sport equipments for students and even help the students to have their graduate trips. Also, daily supplements were provided in the local grocery stores as the recycling exchange rewards for citizens to enhance the recycle of glass wares, agricultural chemical containers and dry batteries etc. Besides, the recycling exchange rewards for the beach area were implemented to reinforce the garbage classifications at beach area and kept the ocean away from the wastes pollution; and a shopping street with dining services and gifts was planned to attract the tourists to stay longer in the sightseeing spots with a positive recycling image since all the merchants on the shopping street were well trained to do recycling actively. According to the requirements in the contract, all the manpower and equipment were ready to execute the project on 1st May, 2017 (Please refer to Environmental Protection Bureau, Chiayi County (abbreviated as EPB) Doc. No. EPB E1060011581 issued on 12th May, 2017 for inspection) and completed by 30th November, 2017. The project period was lasting for 7 months with everything on track; the key achievements were summarized as the following,I. Facilitate the image rebuilding of recycling at the tourist attractions of the rural and beach area.The working items included coaching the merchants in those areas to set the recycling equipments with local features, investigating the production and flow of the kitchen wastes and assessing the feasibility of reducing the kitchen wastes from the sources. There were 5 featured recycling facilities set in the Danyana, Taiping Cloud Ladder, Meishan Park, Nuputzu Grass and Julu Communities with the support of the Project; all the results and performances were great with 2,355 kg of the monthly average recycled quantity. After coaching, 10 merchants had set the recycling equipments with 755 kg of the monthly average recycled quantity at Budai Town. The the production and flow of the kitchen wastes were investigated at 22 restaurants of the Project covered region, including 20 big restaurants producing 8,620kg of cooked food wastes and 120 kg of raw kitchen wastes per month; however, all the wastes were well managed by qualified companies but the feasibility of reducing the kitchen wastes was considered and provided to EPB for further assessment. II. Recycling dream is taking off.The working item was focusing on the theme of “Recycling dream taking off” to help the children to make their dreams come true. The children in aboriginal communities could facilitate the recycling activities in their communities and share the good results in the press conferences. The Project allowed the children from 46 elementary schools of remote or mountain area to raise the requests of “Recycling dream taking off” with the designed form. 7 schools completed the applications with proposals by 5th June and 6 of them provided their achievement reports. An evaluation and selection meeting was conducted on 6th October, the first ranked was Houshanmei school, the second was Meibei school and the third went to Meijun school. Also, some other rewards went to Siding school for recycling creativity, Liming school for recycling contributions and Guanghwa school for recycling special award et..."
Project Year
2017
Organizer
"Environmental Protection Bureau, Chiayi County"
Executive Unit
"綠信環境科技股份有限公司"
Reporting download URL
Publish Date
20180201
「"2017 Project of “Image rebuilding of recycling at tourist attra」所屬的資料集:「EPQSummary_WasteManagement」的其他資料
Project Title:
"Improvement Plan on Management and Guidance for recycle and treatment business enterprises and subs
Project Subject:
"The main aspect in this project was to assist the Environmental Protection Administration in the re
Project Year:
2019
Organizer:
"Recycling Fund Management Board"
Project Title:
""
Project Subject:
"There are 9.5-month period of the plan execution, since 104 years March 16 to December 31 104 years
Project Year:
2015
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"2019 Improvement of Tracking Dumping Cases and Supervision of Industrial Waste Treatment in The Sci
Project Subject:
"The project comprises five parts, including analyzing the recycling status of aluminum dross (alumi
Project Year:
2019
Organizer:
"Bureau of Environmental Inspection"
Project Title:
"Project of management with domestic waste sorting, cleaning and filing"
Project Subject:
"This project followed the strategy of “promoting circular economy- waste recycling”from EPA(Environ
Project Year:
2018
Organizer:
"Department of Waste Management"
Project Title:
"103 Taichung City bottom slag commissioned re-use supervision plan final report"
Project Subject:
"Assist in the management of bottom slag recycling and quality assurance system operations"
Project Year:
2014
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"Waste Treating and Technical personnel of waste disposal Management in Public and Private Waste Cle
Project Subject:
"This project carried out from February 26th, 2015 to December 31st, 2015. The main job included rev
Project Year:
2015
Organizer:
"Department of Waste Management"
Project Title:
"Purification of rare resources recovered from regulated recyclable waste by supported liquid membra
Project Subject:
"The LED lighting optoelectronic industry of supply chain integrity in Taiwan. The yield and product
Project Year:
2015
Organizer:
"Recycling Fund Management Board"
Project Title:
"6R Policy Promotion Project"
Project Subject:
"The annual campaign strategy and creative marketing plan for the Project is based on waste manageme
Project Year:
2015
Organizer:
"Department of Waste Management"
Project Title:
"2016 National Recycling Improvement Project Plan"
Project Subject:
"This plan was being executed between October , 2016 and late September, 2017. The main goal was to
Project Year:
2016
Organizer:
"Recycling Fund Management Board"
Project Title:
"The Reduction Planning and Promoting Project for Plastic Shopping Bags, Disposable Tableware, Takea
Project Subject:
"The project was executed between March 11th and December 31st, 2019. Among its key objectives were
Project Year:
2019
Organizer:
"Department of Waste Management"
Project Title:
"Greenhouse gas inventory of waste treatment facilities and carbon reduction enhancements"
Project Subject:
"The project mainly collected the policies and measures related to greenhouse gas (GHG) reduction of
Project Year:
2016
Organizer:
"Department of Environmental Sanitation & Toxic Substance Management"
Project Title:
"無"
Project Subject:
"The tasks to be implemented in this project include the following: (1) sponsor sustainability indic
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Green Design and Establishment of Resource Recycling Assessment System Project – Workplan"
Project Subject:
"The main work items of the project were as follows: (I) Collating and analyzing data on industries
Project Year:
2018
Organizer:
"Department of Waste Management"
Project Title:
"2016 Department of Environmental Protention Taipei City Government「Inspect and Ban Recycling indust
Project Subject:
"2016 Department of Environmental Protention Taipei City Government「Inspect and Ban Recycling indust
Project Year:
2016
Organizer:
"Department of Environmental Protection, Taipei City Government"
Project Title:
"Improvement and recycled of derivative wastes after classification and treatment plan, 2018"
Project Subject:
"Several incinerator plants in Taiwan are being renovated. Therefore, the government has the need to
Project Year:
2018
Organizer:
"Recycling Fund Management Board"
Project Title:
"Application research of waste panel glass reused in humidity control materials"
Project Subject:
"Due to the raising amount of end-of-life panel displays, the recycling of waste panels has become a
Project Year:
2019
Organizer:
"Recycling Fund Management Board"
Project Title:
"Preliminary assessment plan of WEEE Management system and Treatment technology export"
Project Subject:
"Waste management in Taiwan has developed very unique waste disposal process and recycling system by
Project Year:
2014
Organizer:
"Department of Waste Management"
Project Title:
"The Auditing and Certification Project of the Regulated Recyclable Waste (Non-Plastics Waste Contai
Project Subject:
"According to the results of non-plastic waste containers auditing and certification from Jan 01, 20
Project Year:
2017
Organizer:
"Recycling Fund Management Board"
Project Title:
"Application research on adding recycled materials to lables of packaging industry"
Project Subject:
"One of the problems faced by the resource recycling industry in Taiwan over the years has been that
Project Year:
2020
Organizer:
"Recycling Fund Management Board"
Project Title:
"The Third-party Inspection and Certification on Waste Information Technology Appliances and Electri
Project Subject:
"From January 1, 2013 to December 31 , 2014, the totally certificated amount of waste Electronic and
Project Year:
2013
Organizer:
"Recycling Fund Management Board"
Project Title:
"2019 Regulation of Industrial Waste and Water pollution Abatement Project"
Project Subject:
"This project is mainly to examine restricted industries and guide them to reduce their industrial w
Project Year:
2019
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Levy of Containers Recycling Fee and Waste Containers Management of Recycling"
Project Subject:
"The implementations were summarized as the following:To develop an appropriate levy rates for respo
Project Year:
2016
Organizer:
"Recycling Fund Management Board"
Project Title:
"Tin recovery from e-waste using an pilot-scale and eco-friendly tin stripping process"
Project Subject:
"Based on the Environmental Protection Agency's sustainable development of innovative technology res
Project Year:
2017
Organizer:
"Recycling Fund Management Board"
Project Title:
"The project for review of Sustainable Materials Management (SMM) indicator, development of environm
Project Subject:
"This project carried out from April 26th to December 31st, 2016. The main job include establishing
Project Year:
2016
Organizer:
"Department of Waste Management"
Project Title:
"Non-industrial Waste Management Review Project"
Project Subject:
"The work of this project mainly includes the collection and analysis of the status of agricultural,
Project Year:
2016
Organizer:
"Department of Waste Management"
Project Title:
"The evaluation project of the planning and financial analysis for the construction project of the i
Project Subject:
"The content of this report is mainly to evaluate the operation planning and financial analysis of t
Project Year:
2019
Organizer:
"Bureau of Environmental Inspection"
Project Title:
"106 Annual Chiayi County Waste Incineration Project Baseline Information and Declaration Flow and W
Project Subject:
"Project Name: Chiayi County, the construction of the baseline business waste information and report
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Chiayi County"
Project Title:
"The Inspection and Certification Third Party on Due Recycled Waste(waste batteries and waste lamps)
Project Subject:
"The project period was from January 1st, 2017 to December 31st, 2018 whereas below data was collect
Project Year:
2017
Organizer:
"Recycling Fund Management Board"
Project Title:
"Project of promoting the renewal of low-carbon refuse trucks and optimization for clearance, 2021"
Project Subject:
"The implementation period of this project was from January 1, 110 to December 10, 110. The results
Project Year:
2021
Organizer:
"Bureau of Environmental Inspection"
Project Title:
"Enhance the application technology of construction use and ensure that recycled aggregates from bot
Project Subject:
"This project aims at improving the management of bottom ash recycling, conducting relevant works of
Project Year:
2018
Organizer:
"Department of Waste Management"
行政院環境保護署 的其他資料集
南投縣重要環保統計資料
每1月更新,217顏先生 | 02-23117722#2109 | 2023-08-07 01:00:08
行政院環境保護署空氣品質小時值_新北市_永和站
每1時更新,186陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:27
行政院環境保護署地下水污染物監測及管制標準
不定期更新更新,114陳小姐 | 02-2383-2389#8207 | 2022-01-14 01:20:11
行政院環境保護署歷年土壤調查環保署農地調查計畫中部地區污染調查計畫
不定期更新更新,164謝先生 | (02)23832389*8302 | 2022-01-14 01:20:28
行政院環境保護署空氣品質小時值_臺中市_忠明站
每1時更新,269陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:58
行政院環境保護署
環保署工程施工查核小組、問答集
不定期更新更新,37蔡先生 | 04-22521718#51205 | 2023-08-09 01:05:14
行政院環境保護署環保署裁罰處分
每季更新更新,106張先生 | 02-2311-7722#2716 | 2022-01-15 01:10:12
行政院環境保護署環保署環境影響評估審查委員會會議紀錄
不定期更新更新,44劉先生 | 02-23117722#2743 | 2022-01-15 01:12:43
行政院環境保護署區域性地下水水質監測資料
每3月更新,151郭先生 | 2311-7722#2399 | 2023-08-07 01:02:05
行政院環境保護署日空氣品質指標(AQI)
每日更新更新,150謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:38
行政院環境保護署
EPQSummary_RegionalEnvironmentalManagement
不定期更新更新,98陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:44
行政院環境保護署經過飲用水水源水質保護區之環境影響說明書件
每2月更新,57黃先生 | 02-23117722#2748 | 2023-08-05 01:01:04
行政院環境保護署空氣品質監測站位置圖
不定期更新更新,51謝小姐 | 02-2311-7722#2386 | 2022-01-15 01:16:06
行政院環境保護署行政院環境保護署環境保護基金附屬單位預算案
每年更新更新,47郭小姐 | 02-2311-7722#2164 | 2022-01-15 01:09:42
行政院環境保護署環保專責(技術)人員合格證書申請表
不定期更新更新,46魏小姐 | 03-402-0789#605 | 2022-01-15 01:10:45
行政院環境保護署
行政院環境保護署環境檢驗所會計月報
每1月更新,44鍾小姐 | 03-4915818#3004 | 2023-08-09 01:05:46
行政院環境保護署交通噪音監測站位置圖
不定期更新更新,47章小姐 | 02-23712121#6407 | 2023-07-27 01:06:02
行政院環境保護署縣市清運機具統計資料
每半年更新更新,41陳小姐 | (04)2252-1718#53406 | 2022-01-14 01:22:13
行政院環境保護署河川水質測點基本資料(含地理圖資)
不定期更新更新,189謝小姐 | 02-23117722#2386 | 2022-01-14 01:23:16
行政院環境保護署水污染源許可及申報資料
每半年更新更新,98陳先生 | 02-2311-7722#2827 | 2022-01-15 01:12:30
行政院環境保護署
噪音罰鍰次數
每年更新更新,67謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:42
行政院環境保護署督察檢測環境介質數據
每1月更新,120陳小姐 | 04-2252-1718#51310 | 2023-08-07 01:00:38
行政院環境保護署環保專案摘要資料_毒物管理
不定期更新更新,151郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:39
行政院環境保護署空氣品質小時值_高雄市_楠梓站
每1時更新,331陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:40
行政院環境保護署空氣品質監測即時影像資料(發布)
每10分更新,37陳先生 | 02-2311-7722#2386 | 2023-08-09 01:05:51
行政院環境保護署
科技計畫清單
每1年更新,51賀先生 | 23117722#2981 | 2023-08-09 01:04:27
行政院環境保護署大型垃圾焚化廠操作營運情形
每月更新更新,124謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:17
行政院環境保護署水庫水質月監測資料
不定期更新更新,126謝小姐 | 02-23117722#2386 | 2022-01-14 01:23:22
行政院環境保護署空氣品質小時值_臺北市_士林站
每1時更新,195陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:14
行政院環境保護署環境用藥微生物製劑常見菌種特性資料
不定期更新更新,191薛先生 | 02-2325-7399#55413 | 2023-07-27 01:02:59
行政院環境保護署