"National soil quality properties investigation and management r
「"National soil quality properties investigation and management r」於資料集「EPQSummary_SoilAndGroundwater」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:52。 欄位Project Title的內容是"National soil quality properties investigation and management research program." , 欄位Project Subject的內容是"In order to establish the suitable soil pollution control standards, relevant information and regulations have been collected and analyzed. The risk based assessment has been taken into consideration while propose the soil pollution control standards amendment. The framework of the soil pollution control standards has been suggest as well the risk management objectives, risk assessment of exposure scenarios and exposure pathways, parameters of risk assessment. The priority works of soil pollution standards amendment include dioxin standard modifying and proposing soil pollution standards of source water protection area. National soil quality and property investigation has been planned. Soil quality and property of 26 soil standard monoliths in Taoyuan, Changhua and Tainan are investigated. To integrate relevant soil quality information and develop soil information sharing platform, this project planed the national soil quality database system and tried to develop soil quality assessment methods and indicators by scientific methods. Three potential pollution areas of emerging contaminants have been investigated. The result shows that agricultural soil concentrations of indium and molybdenum along the Xiaoli River are higher than the background levels. The soil concentrations of emerging organic contaminants are found below the detection level mostly." , 欄位Project Year的內容是2013 , 欄位Organizer的內容是"Soil and Groundwater Remediation Fund Management Board" , 欄位Executive Unit的內容是"瑞昶科技股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=83242 , 欄位Publish Date的內容是20150301 。
Project Title
"National soil quality properties investigation and management research program."
Project Subject
"In order to establish the suitable soil pollution control standards, relevant information and regulations have been collected and analyzed. The risk based assessment has been taken into consideration while propose the soil pollution control standards amendment. The framework of the soil pollution control standards has been suggest as well the risk management objectives, risk assessment of exposure scenarios and exposure pathways, parameters of risk assessment. The priority works of soil pollution standards amendment include dioxin standard modifying and proposing soil pollution standards of source water protection area. National soil quality and property investigation has been planned. Soil quality and property of 26 soil standard monoliths in Taoyuan, Changhua and Tainan are investigated. To integrate relevant soil quality information and develop soil information sharing platform, this project planed the national soil quality database system and tried to develop soil quality assessment methods and indicators by scientific methods. Three potential pollution areas of emerging contaminants have been investigated. The result shows that agricultural soil concentrations of indium and molybdenum along the Xiaoli River are higher than the background levels. The soil concentrations of emerging organic contaminants are found below the detection level mostly."
Project Year
2013
Organizer
"Soil and Groundwater Remediation Fund Management Board"
Executive Unit
"瑞昶科技股份有限公司"
Reporting download URL
Publish Date
20150301
「"National soil quality properties investigation and management r」所屬的資料集:「EPQSummary_SoilAndGroundwater」的其他資料
Project Title:
""
Project Subject:
"Taiwan and Korea signed the Memorandum of Understanding (MOU) on technical cooperation in soil and
Project Year:
2015
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Promotion of Soil and Groundwater Pollution Site Remediation and Project Management Plan"
Project Subject:
"1. Drafting Site Management PlanIn order to effectively utilize the Soil Pollution Fund, this proje
Project Year:
2018
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Soil and Groundwater Contamination Investigation Project in 2016 Environmental Protection Bureau, N
Project Subject:
"This project starts from February 25rd, 2016 to December 20st, 2016, which it is mainly to assist E
Project Year:
2016
Organizer:
"Nantou County Environmental Protection Bureau"
Project Title:
"Development of Environmental Forensic Techniques in Soil and Groundwater Contamination and Validati
Project Subject:
"To effectively determine the fate of spilled fuel in the subsurface environment and successfully id
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Hsinchu City 104 years of soil and groundwater pollution investigation and verification work progra
Project Subject:
"The program is scheduled for December 12, 104 to December 20, As of December 2004, the work team ha
Project Year:
2015
Organizer:
"Bureau of Environmental Protection Hsin-Chu"
Project Title:
"Contamination Source Investigation and Mitigation Plan for Industrial Park of High Contamination Po
Project Subject:
" In order to assess soil and groundwater qualities in the industrial parks, the Environmental Prote
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Source Identification Development Plan for Soil and Groundwater Oil Contamination"
Project Subject:
"There are three parts in this project. Firstly, we collected 27 fresh gasoline and 40 blending stoc
Project Year:
2018
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"The Pollution Improvement Project by Soil Excavation Method with Clean Backfilled Farmland Pollutio
Project Subject:
"The project aims to improve soil pollution control farmland of Taoyuan County. To get rid of the l
Project Year:
2015
Organizer:
"Taoyuan County Government Environment Protection Bureau"
Project Title:
"Management of Contaminated Soil and Groundwater Remediation Strategies"
Project Subject:
"The implementation period of this plan has been from January 20, 2020 to July 19, 2021. The summary
Project Year:
2020
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Remediation of Emerging Industry Special Metal"
Project Subject:
"This project will be carried out to improve energy crops Sunflower Research and Analysis of heavy m
Project Year:
2015
Organizer:
"Office of Sustainable Development"
Project Title:
"Investigation and Verification of Soil and Groundwater Pollution of Taipei City in 2012"
Project Subject:
"In order to confidently groundwater and soil quality the plan was to test and ensure the quality wi
Project Year:
2012
Organizer:
"Department of Environmental Protection, Taipei City Government"
Project Title:
"FY 2015 Control and Tracking of the Off-site Treatment to the Polluted Soils."
Project Subject:
"This project was designed to follow the policy of off-site soil treatment management system, which
Project Year:
2015
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
" Research and Analysis of Soil Dioxin Contamination Investigation and Management in Taiwan Region"
Project Subject:
"Dioxin is easily to accumulate in the environment and be intaked by human being through the food c
Project Year:
2013
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"In the 107th year, Pingtung County promoted the prevention and control of soil and groundwater poll
Project Subject:
"The project work includes sampling and analysis of underground well water quality, simple tap water
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"The Survey of the Soil and Groundwater Contamination in Yunlin County in 2013"
Project Subject:
"For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year:
2013
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Hsinchu City 105 years of soil and groundwater pollution investigation and verification work progra
Project Subject:
"The overall progress of the project is 98.9% (due to the current situation of emergency response fu
Project Year:
2016
Organizer:
"Bureau of Environmental Protection Hsin-Chu"
"-"2014"-"
Project Title:
"-"
Project Subject:
"-"
Project Year:
2014
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Investigation and Verification of Soil and Groundwater Pollution in Taitung County in 108."
Project Subject:
"The Soil and Groundwater Pollution Investigation and Verification Work Plan of Taitung County Envir
Project Year:
2019
Organizer:
"Taitung County Environment Protection Bureau"
Project Title:
"The Project(2017)of Establishing A Management Strategy for Soil and Groundwater Contamination Base
Project Subject:
"In recent years, Taiwan EPA has completed drafting guidance and protocols for carrying out risk ass
Project Year:
2017
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Hsinchu City 101 annual soil and groundwater pollution investigation and verification work program"
Project Subject:
"Hsinchu City is located in the northwest of Taiwan, Taiwan is the northern region, between Taipei a
Project Year:
2012
Organizer:
"Bureau of Environmental Protection Hsin-Chu"
Project Title:
"The Survey of the Soil and Groundwater Contamination in Yunlin County in 2012"
Project Subject:
"I. Soil pollution investigation in high pollution potential zone This work was to investigate the s
Project Year:
2012
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"The Survey of the Soil and Groundwater Contamination in Chang-hua County in 2017"
Project Subject:
"For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year:
2017
Organizer:
"Environmental Protection Bureau Changhua County"
Project Title:
"Emergency Measures for RCA Former Taoyuan Plant Groundwater Remediation Site"
Project Subject:
"TCETVT (hereinafter referred to as RCA) former Taoyuan plant was announced as Groundwater Pollution
Project Year:
2013
Organizer:
"Taoyuan County Government Environment Protection Bureau"
Project Title:
"Audit and Evaluation of Control and Management of Soil and Groundwater Pollution Remediation Fund A
Project Subject:
"The duration of this project was from March 31st, 2014 to March 30th, 2015. This project included 3
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Study on inhalation exposure parameters for assessing health risk of concerned pollutants in soil a
Project Subject:
"Harmful substances in groundwater could cause adverse health effects when entering into human body
Project Year:
2020
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"The 2019 Promotion Project for Soil and Groundwater Pollution Affairs"
Project Subject:
"People have been getting increasingly aware of environmental protection over the years. Yet, there
Project Year:
2019
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Management Project for Pollution Prevention in Farmland"
Project Subject:
"The agricultural development was considered as a solid foundation for the industrial transformation
Project Year:
2018
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Contamination Source Investigation and Mitigation Plan for Industrial Park of High Contamination Po
Project Subject:
"In order to assess soil and groundwater qualities in the industrial parks, the Environmental Protec
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"The 2015 Technical Experience Exchange for the Working Group on Remediation for Soil and Groundwate
Project Subject:
"The major items of this project included: (1) 2015 Taiwan-Korea Forum on Remediation of Soil and Gr
Project Year:
2015
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Aboveground storage tank systems pilot project-pollution prevention management and investigation"
Project Subject:
"The Environmental Protection Administration (EPA) implemented the project to understand the interna
Project Year:
2019
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
行政院環境保護署 的其他資料集
環境教育活動數
每季更新更新,55李小姐 | 02-23117722#2724 | 2022-01-15 01:10:44
行政院環境保護署環保署書面之公共工程及採購契約
不定期更新,42許小姐 | (02)23117722#2483 | 2022-01-15 01:10:14
行政院環境保護署建檔公廁明細-屏東縣
不定期更新更新,169賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:06
行政院環境保護署光化測站(朴子)小時值資料
每月更新更新,190謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:29
行政院環境保護署旅館或觀光旅館之興建或擴建類別環境影響說明書
每2月更新,60黃先生 | 02-23117722#2748 | 2023-08-05 01:01:08
行政院環境保護署
空氣品質小時值_高雄市_前鎮站
每1時更新,135陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:38
行政院環境保護署綠色商店基本資料
每季更新更新,95邱小姐 | 02-23117722#2924 | 2022-01-15 01:16:43
行政院環境保護署環境教育活動人時
每3月更新,77李小姐 | 02-23117722#2724 | 2023-08-07 01:01:27
行政院環境保護署機車排氣定期檢驗資料
不定期更新更新,132謝小姐 | 02-2371-2121#6310 | 2022-01-14 01:18:28
行政院環境保護署環保標章驗證機構資料
每1月更新,43盧小姐 | 02-23117722#2943 | 2023-07-28 11:36:20
行政院環境保護署
環保署補、捐(獎)助團體及個人情形表
每3月更新,123蘇小姐 | 02-2311-7722#2155 | 2023-07-27 01:04:57
行政院環境保護署水污染罰鍰次數
每年更新更新,134謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:27
行政院環境保護署環境教育(教學)人員(專長)認證申請書
不定期更新更新,42盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:28
行政院環境保護署全國場址新增列管及解列統計表
不定期更新更新,120賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:12
行政院環境保護署公民營廢棄物清除機構資料
每月更新更新,147何先生 | 02-2311-7722#2653 | 2022-01-14 01:26:25
行政院環境保護署
廠商獲頒產品數統計(第二類)
每季更新更新,50孫小姐 | 02-23117722#2926 | 2022-01-14 01:17:49
行政院環境保護署連江縣水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,60程先生 | 02-2311-7722#2833 | 2023-08-09 01:04:05
行政院環境保護署空氣品質小時值_彰化縣_彰化站
每1時更新,128陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:56
行政院環境保護署縣市(新竹市)小時值-每小時
每小時更新更新,166謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:48
行政院環境保護署環保署工程施工查核小組、問答集
不定期更新更新,35蔡先生 | 04-22521718#51205 | 2023-08-09 01:05:14
行政院環境保護署
區域性地下水水質測站位置圖
不定期更新更新,53陳先生 | 02-2311-7722#2386 | 2023-08-07 01:04:32
行政院環境保護署環保專案摘要資料_環境衛生
不定期更新更新,109陳先生 | 02-2311-7722#2386 | 2023-07-30 01:02:02
行政院環境保護署縣市(基隆市)小時值-每小時
每1時更新,244陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:57
行政院環境保護署重點事業廢棄物-一般污泥之產出及清理流向
每月更新更新,148陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:16
行政院環境保護署主要水庫優養指數
每1年更新,33顏先生 | 02-23117722#2109 | 2023-07-30 01:01:02
行政院環境保護署
MajorEnvironmentalPolicies
每3月更新,168陳小姐 | (02)23117722#2753,(02)23117722#2756 | 2023-07-30 01:03:45
行政院環境保護署歷年毒性化學物質環境流布調查成果手冊
每年更新更新,35陳小姐 | 23257399#55337 | 2022-01-14 01:22:52
行政院環境保護署廢家具修繕DIY
不定期更新更新,43林小姐 | 04-22521718#53511 | 2023-08-09 01:04:04
行政院環境保護署環境影響說明書附表五:施工階段
每2月更新,115黃先生 | 02-23117722#2748 | 2023-08-05 01:00:54
行政院環境保護署補助地方設置巨大廢棄物回收再利用廠一覽
不定期更新更新,44林小姐 | 04-22521718#53511 | 2023-08-07 00:59:54
行政院環境保護署