「"Investigation and Verification of Soil and Groundwater Pollutio」於資料集「EPQSummary_SoilAndGroundwater」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:52。 欄位Project Title的內容是"Investigation and Verification of Soil and Groundwater Pollution in Pingtung County in 106 Years" , 欄位Project Subject的內容是"This project begins from January 12 and ends at December 31, 2017, the completed work items include soil and groundwater testing data related to the previous years. The first monitoring well maintenance work was completed from February to May, and the second monitoring well maintenance work was completed from July to September. After maintenance, the monitoring well conditions remained good. In May, 18 sampling operations were completed during the dry season. One monitoring well (No.1799, Pu-Qiang-Lun paragraph, well number T00216) was sampled due to no water in the dry season until June. During September, six sampling operations were completed .Water quality test results did not exceed the regulatory standards. However, the survey results of underground water quality in the upper and lower half of YanPu area show that the area with the highest level of 1,1-Dichloroethene is still limited to T00414 and T00415, with the exception of T00415-1, which exceeds the recommended reference value . The newly-established TaJen University monitoring well did not detect the 1,1-Dichloroethene concentration after the analysis. It was initially determined that the pollutants did not spread to the downstream. The other on May 19 to complete the sampling and testing company's QA/QC(Quality Assurance/Quality Control) inspection operations, the overall quality assurance content reviewed and amended by the Commission according to the implementation. In addition, the soil regular testing was completed in May. The results showed that the concentration of heavy metal mercury exceeded the monitoring standard of agricultural crops for food crops. The result was N.D(Non-Detection) of the two groups of crops (min bean and chili).A total of 8 verifications were completed, including soil quality of No. 900 in Zhong-shan paragraph of Chaozhou town, soil quality of No. 33 in Yong-long paragraph of Yanpu village, groundwater quality of No. 556 in XinXing paragraph of Pingtung city, groundwater quality of public wells in Shinkairyo site.Soil and Groundwater Quality of No. 364, 370, 373, 374 and No. Soil and surrounding quality of WanDan township SirAn paragraph. Soil and groundwater quality of Jing-Mao enterprise and Kun-Sheng hardware, soil quality verification operation of FuJu Solar Co., Ltd., of the simple well groundwater heavy metal lead exceeded the regulatory standards, the rest did not exceed the regulatory standards; the team recommended follow-up can be set to a standard monitor wells Jing-Mao enterprises to confirm the situation overweight. The verification operation completed the No. 325 (No. 2) of XingYang segment of XinYuan Township and MingGuang metal factory Co., Ltd. The verification results have been reduced below the standard of improvement, and the PingTung county EPB has released the information according to the verification results.Emergency response part of the operation is carried out in 7 games, respectively, KanDing township, DingXian paragraph No.322 and No. 329 around the ground, BiaoLiao township, ZhongShan paragraph No. 221 surrounding soil and groundwater, WanDan township, TianCuo paragraph No.1019 around the groundwater, XinYuan township, Xing-Yang paragraph No.391 around the groundwater, ChangZhi township, BaoZiLiao paragraph No.1069 of the ground around the groundwater, LiGang township, TuKu paragraph No.287-58 soil and around groundwater, BiaoLiao township, Dar-Xiang-Ying paragraph two short paragraphs No.12,12 -1, 12-2, 13, 14 around soil and groundwater (each 1 episode), among BiaoLiao township, ZhongShan paragraph No. 221, WanDan township, Tian-cuo paragraph No.1019, XinYuan township, XingYang paragraph No.391 Department of public opinion on the ground stacked slag, after confirmation of the three surrounding soil and groundwater have not been subject to pollution.For the gas station this year's network application r..." , 欄位Project Year的內容是2017 , 欄位Organizer的內容是"Environmental Protection Bureau, Pingtung County" , 欄位Executive Unit的內容是"裕山環境工程股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=154448 , 欄位Publish Date的內容是20180112 。
Project Title
"Investigation and Verification of Soil and Groundwater Pollution in Pingtung County in 106 Years"
Project Subject
"This project begins from January 12 and ends at December 31, 2017, the completed work items include soil and groundwater testing data related to the previous years. The first monitoring well maintenance work was completed from February to May, and the second monitoring well maintenance work was completed from July to September. After maintenance, the monitoring well conditions remained good. In May, 18 sampling operations were completed during the dry season. One monitoring well (No.1799, Pu-Qiang-Lun paragraph, well number T00216) was sampled due to no water in the dry season until June. During September, six sampling operations were completed .Water quality test results did not exceed the regulatory standards. However, the survey results of underground water quality in the upper and lower half of YanPu area show that the area with the highest level of 1,1-Dichloroethene is still limited to T00414 and T00415, with the exception of T00415-1, which exceeds the recommended reference value . The newly-established TaJen University monitoring well did not detect the 1,1-Dichloroethene concentration after the analysis. It was initially determined that the pollutants did not spread to the downstream. The other on May 19 to complete the sampling and testing company's QA/QC(Quality Assurance/Quality Control) inspection operations, the overall quality assurance content reviewed and amended by the Commission according to the implementation. In addition, the soil regular testing was completed in May. The results showed that the concentration of heavy metal mercury exceeded the monitoring standard of agricultural crops for food crops. The result was N.D(Non-Detection) of the two groups of crops (min bean and chili).A total of 8 verifications were completed, including soil quality of No. 900 in Zhong-shan paragraph of Chaozhou town, soil quality of No. 33 in Yong-long paragraph of Yanpu village, groundwater quality of No. 556 in XinXing paragraph of Pingtung city, groundwater quality of public wells in Shinkairyo site.Soil and Groundwater Quality of No. 364, 370, 373, 374 and No. Soil and surrounding quality of WanDan township SirAn paragraph. Soil and groundwater quality of Jing-Mao enterprise and Kun-Sheng hardware, soil quality verification operation of FuJu Solar Co., Ltd., of the simple well groundwater heavy metal lead exceeded the regulatory standards, the rest did not exceed the regulatory standards; the team recommended follow-up can be set to a standard monitor wells Jing-Mao enterprises to confirm the situation overweight. The verification operation completed the No. 325 (No. 2) of XingYang segment of XinYuan Township and MingGuang metal factory Co., Ltd. The verification results have been reduced below the standard of improvement, and the PingTung county EPB has released the information according to the verification results.Emergency response part of the operation is carried out in 7 games, respectively, KanDing township, DingXian paragraph No.322 and No. 329 around the ground, BiaoLiao township, ZhongShan paragraph No. 221 surrounding soil and groundwater, WanDan township, TianCuo paragraph No.1019 around the groundwater, XinYuan township, Xing-Yang paragraph No.391 around the groundwater, ChangZhi township, BaoZiLiao paragraph No.1069 of the ground around the groundwater, LiGang township, TuKu paragraph No.287-58 soil and around groundwater, BiaoLiao township, Dar-Xiang-Ying paragraph two short paragraphs No.12,12 -1, 12-2, 13, 14 around soil and groundwater (each 1 episode), among BiaoLiao township, ZhongShan paragraph No. 221, WanDan township, Tian-cuo paragraph No.1019, XinYuan township, XingYang paragraph No.391 Department of public opinion on the ground stacked slag, after confirmation of the three surrounding soil and groundwater have not been subject to pollution.For the gas station this year's network application r..."
Project Year
2017
Organizer
"Environmental Protection Bureau, Pingtung County"
Executive Unit
"裕山環境工程股份有限公司"
Reporting download URL
Publish Date
20180112
「"Investigation and Verification of Soil and Groundwater Pollutio」所屬的資料集:「EPQSummary_SoilAndGroundwater」的其他資料
Project Title:
" 107 Soil and Groundwater Pollution Survey and Verification Work Plan - Keelung City"
Project Subject:
"The overall progress of the project from the date of performance (February 14, 2007) to November 15
Project Year:
2018
Organizer:
"Bureau of Environmental Protection, Keelung City"
Project Title:
" Soil and Groundwater Contamination Investigation Project in 2016 Environmental Protection Bureau,
Project Subject:
"This project starts from March 25rd, 2017 to December 20st, 2017, which it is mainly to assist Envi
Project Year:
2017
Organizer:
"Nantou County Environmental Protection Bureau"
Project Title:
"Taipei District’s Soil and Groundwater Pollution Investigation and Verification Project"
Project Subject:
"In order to prevent soil and groundwater from contamination, the local competent authority must reg
Project Year:
2019
Organizer:
"Department of Environmental Protection, Taipei City Government"
Project Title:
"The audition and review plan on evaluation, investigation and testing results reports of potential
Project Subject:
"The purpose of this project was to assist local environmental protection bureaus on reviewing and a
Project Year:
2015
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"2013 working plan on soil and groundwater investigation of Hualien County"
Project Subject:
"1. Monitoring Well Management and Groundwater Investigation2. Manage the site management3. Manageme
Project Year:
2013
Organizer:
"Environmental Protection Bureau, Hualien County"
Project Title:
"Investigation, Inspection, and Technical Support for the Soil and Groundwater Project (2015)"
Project Subject:
"In 2015, the major tasks of this two-year’s project were to establish a response team that assisted
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Strategic Plan for the Soil and Groundwater Pollution Remediation Fund"
Project Subject:
"Currently, the Soil and Groundwater Pollution Remediation Fund has 8 sources of income. Among them
Project Year:
2015
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Research and Pilot Study Project Management for 2015"
Project Subject:
"In order to promote and enhance the research and development task for soil, groundwater and sedimen
Project Year:
2015
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Investigation of Contaminated Farmland Adjacent to Changhua’s East-West Second and Third Irrigation
Project Subject:
"The “2nd Control and Investigation Project for National Agricultural Land with High Potential for H
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Control and Investigation Project for National Agricultural Land with High Potential of Heavy Metal
Project Subject:
"The “Control and Investigation Project for National Agricultural Land with High Potential for Heavy
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Changhua County Farmland Soil Pollution Control Site Appropriate Measures Improvement Plan-Irrigati
Project Subject:
"The project goal is to conduct the soil investigation on heavy metal-contaminated farmlands near th
Project Year:
2017
Organizer:
"Environmental Protection Bureau Changhua County"
Project Title:
"107 Soil and Groundwater Pollution Survey and Verification Project - New Taipei City"
Project Subject:
"Since its inception in 1993, the New North City Environmental Protection Bureau has implemented rel
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Taipei County"
Project Title:
"Soil and groundwater, pollution investigation, verification"
Project Subject:
"This project continues work in “Soil and Groundwater Investigation and Verification Project” of Tai
Project Year:
2017
Organizer:
"Taitung County Environment Protection Bureau"
Project Title:
"Investigation and Verification of Soil and Groundwater Pollution of Kaohsiung City in 2017"
Project Subject:
" This project was contracted by the Environmental Protection Bureau of Kaohsiung City Government (K
Project Year:
2017
Organizer:
"Environmental Protection Bureau Kauhsiung City Government"
Project Title:
"Project of Soil and Groundwater Pollution Survey and Investigation in HsinChu Country,2014"
Project Subject:
"AbstractThis project has been completed all works with the contract (see table 摘-1). And the result
Project Year:
2014
Organizer:
"HsinChu County Environment Protection Bureau"
Project Title:
"2017 Filing for and Verification of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject:
"To remediate the soil and groundwater pollution in Taiwan, the Environmental Protection Administrat
Project Year:
2017
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Taipei City Soil and Groundwater Pollution Investigation and Verification Program in 106"
Project Subject:
" In order to confidently groundwater and soil quality the plan was to test and ensure the quality w
Project Year:
2017
Organizer:
"Department of Environmental Protection, Taipei City Government"
Project Title:
"Separation and purification of Europium and Yttrium from fluorescent powder of spent fluorescent li
Project Subject:
"The purpose of this study was to apply the supported liquid membranes with strip dispersion ((SLM-S
Project Year:
2014
Organizer:
"Office of Sustainable Development"
Project Title:
""
Project Subject:
"The Soil and Groundwater Pollution Remediation Act (SGPRA) included the concept of risk assessment
Project Year:
2013
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Investigation Program for Pollution of Agricultural Land in Dong-xi-2nd ditches & Dong-xi-3rd ditch
Project Subject:
"The “2nd Control and Investigation Project for National Agricultural Land with High Potential for H
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"The Investigation of Soil and Groundwater Contamination of Lienchiang County in 2017"
Project Subject:
" For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contam
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Lienchiang County"
Project Title:
"Project of Providing Services on Law Amendment and Legal Consultation relating to the Soil and Grou
Project Subject:
"The Soil and Groundwater Remediation Act (hereinafter referred to as SGRA) was promulgated and enac
Project Year:
2019
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Investigation, Inspection and Technical Support for the Soil and Groundwater Contamination Project"
Project Subject:
"In 2013, the major tasks of this two-year’s project were to establish a response team that assisted
Project Year:
2013
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"2017 soil and groundwater pollution investigation and audition project"
Project Subject:
"Environmental Protection Bureau, Chiayi City (referred to CYC EPB) carried out the soil and groundw
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"the plan specification for investigating and verifying the soil and groundwater contamination in Ki
Project Subject:
" "
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Kinmen County"
Project Title:
"2019 Investigation and Verification of Soil and Groundwater Contamination in Yilan County"
Project Subject:
"In order to prevent soil and groundwater from contamination, the local competent authority must reg
Project Year:
2019
Organizer:
"Environmental Protection Bureau of Yi-Lan County"
Project Title:
"Potential polluting factory investigation, Maintenance of monitoring well, farmland sites sampled f
Project Subject:
"For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year:
2015
Organizer:
"Environmental Protection Bureau Changhua County"
Project Title:
"Investigation and Verification of Soil and Groundwater Pollution of Kaohsiung City in 2016"
Project Subject:
"This project was contracted by the Environmental Protection Bureau of Kaohsiung City (Kaohsiung EPB
Project Year:
2016
Organizer:
"Environmental Protection Bureau Kauhsiung City Government"
Project Title:
"The 2016 Experience Exchange for Contaminated Site Investigation and Remediation Technologies betwe
Project Subject:
"Taiwan and Korea signed the Memorandum of Understanding (MOU) on technical cooperation in soil and
Project Year:
2017
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Land Quality Media Campaigns and Promotion Project"
Project Subject:
"“Soil and ground water” preservation is an issue that has long been neglected yet poses a profound
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
行政院環境保護署 的其他資料集
國際環保新聞週報
不更新更新,109楊先生 | (02)23117722#2217,(02)23117722#2216 | 2022-01-14 01:18:04
行政院環境保護署行政院環境保護署補助地方政府自行車道路線資料
不定期更新更新,48詹小姐 | 02-23117722#6401 | 2023-08-09 01:05:50
行政院環境保護署使用中機動車輛噪音資料-機車
不定期更新更新,220謝先生 | 02-23712121#6403 | 2023-07-30 01:03:30
行政院環境保護署重點事業廢棄物-一般污泥之處理方式
每月更新更新,121陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:13
行政院環境保護署管制事業下水道系統環工技師專責人員證號資料資訊平台
不定期更新更新,57葉先生 | 02-2311-7722#2821 | 2023-08-09 01:05:18
行政院環境保護署
應回收廢棄物回收量資料
每年更新更新,38廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:23:55
行政院環境保護署特殊性工業區即時監測值資料檔 (氣象監測項目)
每小時更新更新,108丁先生 | 02-2371-2121#6101 | 2022-01-14 01:04:58
行政院環境保護署環保署書面之公共工程及採購契約
不定期更新,41許小姐 | (02)23117722#2483 | 2022-01-15 01:10:14
行政院環境保護署公告事業廢棄物清運機具資料
每月更新更新,220陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:05
行政院環境保護署日累積雨量(每月更新)
每1月更新,121陳先生 | 02-2311-7722#2386 | 2023-08-03 01:05:26
行政院環境保護署
應回收廢棄物處理業者資料
每1年更新,118廖小姐 | 02-2370-5888#3103 | 2023-07-27 00:59:29
行政院環境保護署環保專案摘要資料_環境教育
不定期更新更新,230陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:58
行政院環境保護署中科后里環境監測資料
不定期更新更新,47陳先生 | 04-22521718#51207 | 2023-08-09 01:05:06
行政院環境保護署高雄市重要環保統計資料
每月更新更新,90謝小姐 | 02-23117722#2103 | 2022-01-14 01:20:39
行政院環境保護署水庫水質監測站位置圖
不定期更新更新,51陳先生 | 02-2311-7722#2386 | 2023-08-07 01:04:22
行政院環境保護署
新化學物質及既有化學物質資料登錄辦法英文版
不定期更新更新,50蔡小姐 | 23257399#55723 | 2022-01-15 01:13:23
行政院環境保護署事業廢棄物委託或共同處理申報量統計
每月更新更新,138陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:34
行政院環境保護署重點事業廢棄物-有害性集塵灰之處理方式
每月更新更新,144陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:12
行政院環境保護署主要水庫優養指數
每1年更新,32顏先生 | 02-23117722#2109 | 2023-07-30 01:01:02
行政院環境保護署空氣品質小時值_基隆市_基隆站
每1時更新,163陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:28
行政院環境保護署
高雄市水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,33程先生 | 02-2311-7722#2833 | 2023-08-09 01:04:09
行政院環境保護署國內已制訂之碳足跡產品類別規則文件清單
不定期更新更新,35陳先生 | 02-23117722#2932 | 2023-08-09 01:05:36
行政院環境保護署各年度環境檢測標準方法研訂資訊表
每1年更新,44楊先生 | (03)491-5818轉2103 | 2023-08-09 01:04:47
行政院環境保護署環境音量監測不合格時段數
每月更新更新,159謝小姐 | 02-23117722#2103 | 2022-01-14 01:20:55
行政院環境保護署全國場址目前改善與整治進度
不定期更新更新,56賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:11
行政院環境保護署
事業廢棄物輸出/輸入申報量統計
每1月更新,87林先生 | 02-2311-7722#2671 | 2023-08-07 01:01:49
行政院環境保護署環境影響差異分析報告專案小組審查會議紀錄
每2月更新,79黃先生 | 02-23117722#2748 | 2023-08-06 01:02:18
行政院環境保護署空氣品質監測小時值資料(一般污染物,每日更新)
每日更新更新,106謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:20
行政院環境保護署空氣品質小時值_高雄市_大寮站
每小時更新更新,83謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:21
行政院環境保護署光化測站(臺西)小時值資料
每1月更新,99陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:36
行政院環境保護署