time1: 0 time2: 0 time3: 0 time4: 0 total: 0 "2019 Investigation and Verification of Soil and Groundwater Con
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

"2019 Investigation and Verification of Soil and Groundwater Con

"2019 Investigation and Verification of Soil and Groundwater Con」於資料集「EPQSummary_SoilAndGroundwater」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:52。 欄位Project Title的內容是"2019 Investigation and Verification of Soil and Groundwater Contamination in Yilan County" , 欄位Project Subject的內容是"In order to prevent soil and groundwater from contamination, the local competent authority must regularly investigate and exam the quality of soil and groundwater in its own jurisdiction and deal with the petitions. Therefore, Yilan Environmental Protection Bureau (EPB) has been continuously monitoring the potential sites of contaminated soil and groundwater in the region, including industrial complex in Loung Te and Letzer, as well as other underground storage tanks (UST). Additionally, the inspection, verification and control measures has been implemented over restricted contaminated area. The Yilan EPB has commissioned Pro. Vision Environmental Engineering Corporation (the “PVEEC”) to be the chief executive of the “2019 Investigation and Verification of Soil and Groundwater Contamination in Yilan County” project (the “project”). All scopes of work in the project has been accomplished and every assignment was flawlessly on schedule. Hereby the final report is submitted to the EPB following its inspection over the work.1. Soil Reguler AnalysisThis year, a total of 13 sites, where the contamination in soil exceeds the monitoring standard, were investigated. The result shows that the concentration of heavy metals were found to exceed monitoring standards in 8 sites, where some of area that the lands fertilized using animal manure and groundwater full of arsenic. In addition 1 site be analyzed the concentration of heavy metals were found to exceed control standards.2. Contamination Potential Area SurveyThe total of 18 factories were Phase I surveyed and conducted soil and groundwater contamination verification of 8 of these factories were sampled. The results showed for soil and groundwater, none of these 8 factories exceeded the control standards. However, one of them are exceeded the monitoring standards, who regular monitoring is needed in the future.3. Sediment Analysis of Industrial AreaThis year, PVEEC has completed sediments analysis around the potentially-contaminated factories, a total of 4 factories in Loung Te and Letzer industrial area. Results showed that the many of heavy metals in the sediment exceeded the “Sediment Lower Limit”, even exceeded the “Sediment Upper Limit”. There is an increasing trend with downstream of the regional drainage.4. Groundwater AnalysisSampling work of all 19 wells has been done in May, 2019, and no results exceeded the control standards, and 6 of them reached the monitoring standards, mainly ammonia nitrogen.As for the monitoring of the landfill site, no groundwater exceed the control standards. It is common that all landfills detected ammonia nitrogen and total dissolved solids(TDS), exceeding monitoring standards. For raw water, Wujie, Su-Ao and Samxing Landfill all detected ammonia nitrogen, exceeding the discharge water standard. 5. Wells Maintenance and CheckingThe team had completed, as contracted, a total of 2 times of quarterly work of the checks and maintenance of regional and on-site monitoring wells, according to the results, 5 of them went through the external maintenance after the assessment, and 1 of it was stopped monitoring. In addition, for the condition assessment on 11 monitoring wells; according to the results, 5 of them went through the internal maintenance after the assessment, and 6 of them went through the well development again followed by camera shooting inside the well to assure of tidiness.6. Restrained Sites Management and VerificationThe PVEEC has completed 32 site-related written reviews and 10 soil and groundwater legal-related written review; also assisted in 8 review meetings and 1 On-site checking.The PVEEC has carried out the monthly inspection over restrained sites for the progress of improvement and the latest condition in hand and evaluate the predicted effects for the site where the remediation plan has been accomplished..." , 欄位Project Year的內容是2019 , 欄位Organizer的內容是"Environmental Protection Bureau of Yi-Lan County" , 欄位Executive Unit的內容是"傑美工程顧問股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=217285 , 欄位Publish Date的內容是20200221

Project Title

"2019 Investigation and Verification of Soil and Groundwater Contamination in Yilan County"

Project Subject

"In order to prevent soil and groundwater from contamination, the local competent authority must regularly investigate and exam the quality of soil and groundwater in its own jurisdiction and deal with the petitions. Therefore, Yilan Environmental Protection Bureau (EPB) has been continuously monitoring the potential sites of contaminated soil and groundwater in the region, including industrial complex in Loung Te and Letzer, as well as other underground storage tanks (UST). Additionally, the inspection, verification and control measures has been implemented over restricted contaminated area. The Yilan EPB has commissioned Pro. Vision Environmental Engineering Corporation (the “PVEEC”) to be the chief executive of the “2019 Investigation and Verification of Soil and Groundwater Contamination in Yilan County” project (the “project”). All scopes of work in the project has been accomplished and every assignment was flawlessly on schedule. Hereby the final report is submitted to the EPB following its inspection over the work.1. Soil Reguler AnalysisThis year, a total of 13 sites, where the contamination in soil exceeds the monitoring standard, were investigated. The result shows that the concentration of heavy metals were found to exceed monitoring standards in 8 sites, where some of area that the lands fertilized using animal manure and groundwater full of arsenic. In addition 1 site be analyzed the concentration of heavy metals were found to exceed control standards.2. Contamination Potential Area SurveyThe total of 18 factories were Phase I surveyed and conducted soil and groundwater contamination verification of 8 of these factories were sampled. The results showed for soil and groundwater, none of these 8 factories exceeded the control standards. However, one of them are exceeded the monitoring standards, who regular monitoring is needed in the future.3. Sediment Analysis of Industrial AreaThis year, PVEEC has completed sediments analysis around the potentially-contaminated factories, a total of 4 factories in Loung Te and Letzer industrial area. Results showed that the many of heavy metals in the sediment exceeded the “Sediment Lower Limit”, even exceeded the “Sediment Upper Limit”. There is an increasing trend with downstream of the regional drainage.4. Groundwater AnalysisSampling work of all 19 wells has been done in May, 2019, and no results exceeded the control standards, and 6 of them reached the monitoring standards, mainly ammonia nitrogen.As for the monitoring of the landfill site, no groundwater exceed the control standards. It is common that all landfills detected ammonia nitrogen and total dissolved solids(TDS), exceeding monitoring standards. For raw water, Wujie, Su-Ao and Samxing Landfill all detected ammonia nitrogen, exceeding the discharge water standard. 5. Wells Maintenance and CheckingThe team had completed, as contracted, a total of 2 times of quarterly work of the checks and maintenance of regional and on-site monitoring wells, according to the results, 5 of them went through the external maintenance after the assessment, and 1 of it was stopped monitoring. In addition, for the condition assessment on 11 monitoring wells; according to the results, 5 of them went through the internal maintenance after the assessment, and 6 of them went through the well development again followed by camera shooting inside the well to assure of tidiness.6. Restrained Sites Management and VerificationThe PVEEC has completed 32 site-related written reviews and 10 soil and groundwater legal-related written review; also assisted in 8 review meetings and 1 On-site checking.The PVEEC has carried out the monthly inspection over restrained sites for the progress of improvement and the latest condition in hand and evaluate the predicted effects for the site where the remediation plan has been accomplished..."

Project Year

2019

Organizer

"Environmental Protection Bureau of Yi-Lan County"

Executive Unit

"傑美工程顧問股份有限公司"

Publish Date

20200221

「"2019 Investigation and Verification of Soil and Groundwater Con」所屬的資料集:「EPQSummary_SoilAndGroundwater」的其他資料

Project Title: "Anticipatory Improvement Project of Sites with No Polluter - Phase Ⅰ (A Groundwater Contamination S
Project Subject: "This project is a non-polluter site remediation plan that is a demonstration plan for the Environme
Project Year: 2017
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: ""
Project Subject: "As at mid-term report (November 30, 2014), the contents of the project were completed as follows:1.
Project Year: 2014
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "Investigation of Hazardous Substances Transformation in Groundwater and Amending Water Pollution Co
Project Subject: "This project is to investigate the groundwater contamination potential of hazardous materials from
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Application of geophysical prospecting to investigation ,verification and evaluation of soil and gr
Project Subject: "This project is in the second period of the project. With the tests in three waste and landfill sit
Project Year: 2016
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Project of review and adjustment on the soil and groundwater pollution remediation fees systems"
Project Subject: "This project attempts to deliver specific and feasible suggestions for the amendment on the soil an
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Investigation of Contaminated Farmland Adjacent to Changhua’s East-West Second and Third Irrigation
Project Subject: "The “2nd Control and Investigation Project for National Agricultural Land with High Potential for H
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "FY 2016 Control and Tracking of the Off-site Treatment to the Polluted Soils."
Project Subject: "This project designed to follow the Waste Disposal Act on reporting and management policy of contam
Project Year: 2017
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "International Cooperation on Soil and Groundwater Remediation 2019"
Project Subject: "The project “2019 International Exchange of Technical Experiences on Remediation for Soil and Groun
Project Year: 2019
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The Investigation of Soil and Groundwater Contamination of Lienchiang County in 2015"
Project Subject: "For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year: 2015
Organizer: "Environmental Protection Bureau, Lienchiang County"

Project Title: ""
Project Subject: "“Soil and Groundwater Pollution Remediation Act”(hereunder referred to as “the Act”) was promulgate
Project Year: 2013
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: " 107 Soil and Groundwater Pollution Survey and Verification Work Plan - Keelung City"
Project Subject: "The overall progress of the project from the date of performance (February 14, 2007) to November 15
Project Year: 2018
Organizer: "Bureau of Environmental Protection, Keelung City"

Project Title: "Soil and Groundwater Investigation and Verification Project"
Project Subject: "(A) the intended goalThe project mainly implements the monitoring and verification of soil and grou
Project Year: 2013
Organizer: "Environmental Protection Bureau, Taipei County"

Project Title: "River and reservoir sediment characterization and assessment of environmental damages"
Project Subject: "The objectives of the project are to development and enhance the sediment transport model by applyi
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "2016 working plan on soil and groundwater investigation of Hualien County"
Project Subject: "1. Monitoring Well Management and Groundwater Investigation2. Manage the site management3. Manageme
Project Year: 2016
Organizer: "Environmental Protection Bureau, Hualien County"

Project Title: "Experiment and development of agriculture soil and groundwater arsenic removal technology in natura
Project Subject: "The project conducted the domestic and international phytoremediation lietratures collection. Consi
Project Year: 2017
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The Survey of the Soil and Groundwater Contamination in Chang-hua County in 2018"
Project Subject: "For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year: 2018
Organizer: "Environmental Protection Bureau Changhua County"

Project Title: "The Survey of the Soil and Groundwater Contamination in Chang-hua County in 2017"
Project Subject: "For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year: 2017
Organizer: "Environmental Protection Bureau Changhua County"

Project Title: "Project of Publicizing Soil and Groundwater Pollution Prevention"
Project Subject: "The Environmental Protection Administration, Executive Yuan, promulgated the Soil and Groundwater P
Project Year: 2020
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The Survey of the Soil and Groundwater Contamination in Yunlin County in 2018"
Project Subject: "The program has been operated for the follows: The groundwater from the 2 monitoring well was samp
Project Year: 2018
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "Project of investigation and management of green sustainable remediation pilot site in Dapinding Sp
Project Subject: "The objective of this project is to build up a preliminary action plan for the green sustainable re
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: ""
Project Subject: "The Soil and Groundwater Pollution Remediation Act (SGPRA) included the concept of risk assessment
Project Year: 2013
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Project for Promoting Soil Pollution Assessment Investigation and Detection System and Check Auditi
Project Subject: "The objective of this project was to assist the Environmental Protection Administration (EPA) to pr
Project Year: 2017
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The survey of pesticides,polycyclic aromatic hydrocarbons,phenols,phthalates,and organotins in soil
Project Subject: "Pesticides, phenols, phthalates, and organotins were heavily used and polycyclic aromatic hydrocarb
Project Year: 2014
Organizer: "Environmental Analysis Laboratory"

Project Title: "Preparation of Using and Planning about Soil and Groundwater Remediation Fund"
Project Subject: "1.Draft financial management and strategy of the Soil and Groundwater Pollution Remediation Fund:Th
Project Year: 2017
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: ""
Project Subject: "The main tasks of this project were included supervising, verification and technical support. In su
Project Year: 2012
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: "Project of Developing Analytical Modeling of Subsurface Contaminated sites"
Project Subject: "Subsurface simulation models play key roles in the management and remediation of pollution sites. G
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The sustainable development perspective and assessment of the Economic and Trade Core Zone in Kaohs
Project Subject: "Kaohsiung was once dominated by heavy industries. There are 91 remediation sites in Kaohsiung so fa
Project Year: 2015
Organizer: "Environmental Protection Bureau Kauhsiung City Government"

Project Title: "Promotion of Contaminated Site Management with the Integration of Risk Analysis Platform"
Project Subject: "To continue strengthening risk map tool and promoting contaminated site management, this project wa
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The survey, evaluation and application of key exposure factors for health and ecological risk asses
Project Subject: "Risk assessment is done by compiling and evaluating various parameters regarding environment and re
Project Year: 2016
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Strategic Management Implementation Plan for Groundwater Pollution Source"
Project Subject: "This project collects European and American case studies of well head protection, watershed managem
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

行政院環境保護署 的其他資料集

空氣品質小時值_臺北市_大同站

每1時更新,112

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:10

行政院環境保護署

環境教育人員認證展延 【常見問答】

不定期更新,42

蘇小姐 | (03)4020789分機669 | 2022-01-15 01:11:10

行政院環境保護署

嘉義市重要環保統計資料

每1月更新,127

顏先生 | 02-23117722#2109 | 2023-08-07 00:59:58

行政院環境保護署

空氣品質監測小時值資料(一般污染物,每日更新)

每日更新更新,106

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:20

行政院環境保護署

縣市(雲林縣)小時值-每小時

每1時更新,98

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:48

行政院環境保護署

年度環境保護人員訓練計畫

每1年更新,44

湯小姐 | 03-4020789#544 | 2023-08-07 01:01:30

行政院環境保護署

EPQSummary_EnvironmentalHealth

不定期更新更新,122

陳先生 | 02-2311-7722#2386 | 2023-08-01 01:01:21

行政院環境保護署

公民營廢棄物甲級清除機構許可資料

每1月更新,165

盧小姐 | 02-2311-7722#2651 | 2023-07-27 01:03:17

行政院環境保護署

行政院環境保護署「資料開放諮詢小組」委員名單

不定期更新更新,47

林小姐 | 02-2311-7722#2365 | 2022-01-15 01:12:45

行政院環境保護署

公告飲用水水質處理藥劑

不定期更新更新,40

黃先生 | 02-23117722-2881 | 2023-08-09 01:05:33

行政院環境保護署

碳粉匣對應型號

每1月更新,105

黃小姐 | 02-23117722#2932 | 2023-07-30 01:01:22

行政院環境保護署

0800資源回收免費專線-查詢廢輪胎、鉛蓄電池統計

每年更新更新,53

莊先生 | 02-23705888#3108 | 2022-01-14 01:24:27

行政院環境保護署

行政院環境保護署單位決算

每1年更新,34

何先生 | 02-23117722#2158 | 2023-08-09 01:04:28

行政院環境保護署

空氣品質小時值_桃園市_平鎮站

每小時更新更新,187

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:51

行政院環境保護署

PM2.5化學成分監測數據

每1月更新,161

蘇先生 | (03)491-5818#2204 | 2023-07-27 01:03:08

行政院環境保護署

焚化廠空污監測資料

每月更新更新,122

吳先生 | 04-22521718#53526 | 2022-01-15 01:15:31

行政院環境保護署

環境影響評估技術顧問機構評鑑成果

2年更新,41

劉先生 | 02-23117722#2743 | 2022-01-15 01:12:19

行政院環境保護署

噪音陳情案件數(依音源)

不定期更新更新,48

謝先生 | 02-23712121-6403 | 2023-07-27 01:03:47

行政院環境保護署

0800資源回收免費專線-一般件問題查詢廢容器統計

每1年更新,56

莊先生 | 02-23705888#3108 | 2023-07-27 00:59:59

行政院環境保護署

空氣品質小時值_臺北市_松山站

每1時更新,111

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:11

行政院環境保護署

公告毒性化學物質及其毒性分類

不定期更新更新,36

陳小姐 | 23257399#55337 | 2022-01-14 01:22:53

行政院環境保護署

開發單位公開說明會訊息公聽會訊息

每2月更新,107

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:33

行政院環境保護署

環境音量監測不合格時段數

每月更新更新,159

謝小姐 | 02-23117722#2103 | 2022-01-14 01:20:55

行政院環境保護署

持久性有機污染物斯德哥爾摩公約國家實施計畫成果報告

每年更新更新,37

劉小姐 | 23257399#55531 | 2022-01-15 01:10:06

行政院環境保護署

新化學物質及既有化學物質資料登錄辦法英文版

不定期更新更新,50

蔡小姐 | 23257399#55723 | 2022-01-15 01:13:23

行政院環境保護署

鹿林山測站小時值資料

每1時更新,98

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:25

行政院環境保護署

固定污染源CEMS監測數據紀錄值資料集(15分鐘紀錄值)

每15分更新,254

洪小姐 | 02-23117722#6221 | 2023-08-02 00:58:29

行政院環境保護署

因應對策專案小組初審會議紀錄

不定期更新更新,43

劉先生 | 02-23117722#2743 | 2022-01-15 01:12:39

行政院環境保護署

雲林縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,47

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:47

行政院環境保護署

建檔公廁明細-新竹市

不定期更新更新,183

曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:15:00

行政院環境保護署