time1: 0 time2: 0 time3: 0 time4: 0 total: 0 "The project of soil and groundwater pollution investigation and verification"
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

"The project of soil and groundwater pollution investigation and verification"

"The project of soil and groundwater pollution investigation and verification"」於資料集「EPQSummary_SoilAndGroundwater」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:52。 欄位Project Title的內容是"The project of soil and groundwater pollution investigation and verification" , 欄位Project Subject的內容是"Environmental Protection Bureau, Chiayi City (referred to CYC EPB) carried out the project of soil and groundwater pollution investigation and verification since 2003. In 2016, CYC EPB still upheld the concept of “Prevention Is Better than Cure” to implement the same project.The results of final report were described as below:1. The monitoring well in Jin-Chung elementary school has been installed on 2016/5/14, then carried out GPS measuring and slug test. Taken groundwater sample on 2016/8/4 and then to analyze. The test data displayed the concentration of Mn, Fe in groundwater exceeded the pollution monitoring standards.2. Regular monitored groundwater quality: According to the data of groundwater samples of 20 monitoring wells displayed, ammonium nitrate, Fe and Mn exceeded the groundwater pollution monitoring standards, the remaining items were lower than the groundwater pollution monitoring standard.3. Management and maintenance of monitoring wells: Each well carried out exterior inspection, repairing, interior maintenance. The work of maintenance kept the functions of wells workable.4.Assesment the condition of monitoring wells: Used compressed air to purge well, it would clean away sediments, and then used video camera to record interior of well.5. Regular monitored soil in farmland: There were 5 blocks of farmland which the concentration of As exceeded the soil pollution monitoring standards. According to the regulation, these blocks should be monitored next year. Another monitoring work was to investigate the quality of irrigation water in this area, the results of the concentration of As in water exceeded the standard of irrigation water quality.6. Management gasoline stations: Included to review the data via on-line applied and site audit of gas stations, which 21 stations audit on-site have been accomplished before mid-term. The major fault was the difference between document and situation of actual site, such fault would inform to owner, and ask them to correct the fault in specified duration, then would follow up for improvement.7. Propaganda and promotion: A propaganda meeting of The Soil and Groundwater Pollution Remediation Act held on 2016/4/29 at CPC Chia-yi branch, participants made more understanding about Soil and Groundwater Pollution Remediation Acts through this meeting.8. Regular inspection of pollution controlled sites: There were 10 pollution controlled sites, 1 gasoline station of Article 7, paragraph 5 and 1 abandon factory required to patrol monthly. Abnormal condition and illegal behavior did not happen during the duration of project.9. Emergent Plan and Execution: there was none of emergency event to carry out.Forward to next year, CYC EPB still uphold the spirit of environmental protection to keep the environmental quality always clean and fresh." , 欄位Project Year的內容是2016 , 欄位Organizer的內容是"Environmental Protection Bureau, Chiayi City" , 欄位Executive Unit的內容是"恆逸工程股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=128160 , 欄位Publish Date的內容是20170201

Project Title

"The project of soil and groundwater pollution investigation and verification"

Project Subject

"Environmental Protection Bureau, Chiayi City (referred to CYC EPB) carried out the project of soil and groundwater pollution investigation and verification since 2003. In 2016, CYC EPB still upheld the concept of “Prevention Is Better than Cure” to implement the same project.The results of final report were described as below:1. The monitoring well in Jin-Chung elementary school has been installed on 2016/5/14, then carried out GPS measuring and slug test. Taken groundwater sample on 2016/8/4 and then to analyze. The test data displayed the concentration of Mn, Fe in groundwater exceeded the pollution monitoring standards.2. Regular monitored groundwater quality: According to the data of groundwater samples of 20 monitoring wells displayed, ammonium nitrate, Fe and Mn exceeded the groundwater pollution monitoring standards, the remaining items were lower than the groundwater pollution monitoring standard.3. Management and maintenance of monitoring wells: Each well carried out exterior inspection, repairing, interior maintenance. The work of maintenance kept the functions of wells workable.4.Assesment the condition of monitoring wells: Used compressed air to purge well, it would clean away sediments, and then used video camera to record interior of well.5. Regular monitored soil in farmland: There were 5 blocks of farmland which the concentration of As exceeded the soil pollution monitoring standards. According to the regulation, these blocks should be monitored next year. Another monitoring work was to investigate the quality of irrigation water in this area, the results of the concentration of As in water exceeded the standard of irrigation water quality.6. Management gasoline stations: Included to review the data via on-line applied and site audit of gas stations, which 21 stations audit on-site have been accomplished before mid-term. The major fault was the difference between document and situation of actual site, such fault would inform to owner, and ask them to correct the fault in specified duration, then would follow up for improvement.7. Propaganda and promotion: A propaganda meeting of The Soil and Groundwater Pollution Remediation Act held on 2016/4/29 at CPC Chia-yi branch, participants made more understanding about Soil and Groundwater Pollution Remediation Acts through this meeting.8. Regular inspection of pollution controlled sites: There were 10 pollution controlled sites, 1 gasoline station of Article 7, paragraph 5 and 1 abandon factory required to patrol monthly. Abnormal condition and illegal behavior did not happen during the duration of project.9. Emergent Plan and Execution: there was none of emergency event to carry out.Forward to next year, CYC EPB still uphold the spirit of environmental protection to keep the environmental quality always clean and fresh."

Project Year

2016

Organizer

"Environmental Protection Bureau, Chiayi City"

Executive Unit

"恆逸工程股份有限公司"

Publish Date

20170201

「"The project of soil and groundwater pollution investigation and verification"」所屬的資料集:「EPQSummary_SoilAndGroundwater」的其他資料

Project Title: "Changhua Agricultural Land Pollution Control Site Proper Measures to Improve Project-The East-west
Project Subject: "The main tasks of this project include supervising, verification and providing technical support fo
Project Year: 2016
Organizer: "Environmental Protection Bureau Changhua County"

Project Title: "The Survey of the Soil and Groundwater Contamination in Chang-hua County in 2016"
Project Subject: "For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year: 2016
Organizer: "Environmental Protection Bureau Changhua County"

Project Title: "2014 AD to 2015 AD Project on the Research & Revision of Law, the Consultation of Legal Ambiguities
Project Subject: "The main achievements of this project include: (1) providing 10 legal opinions on the legal issues
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The development of LA-ICP-MS method for determining the chemical transformation and translocation o
Project Subject: "This three-year project aimed at the development of LA-ICP-MS method in conjunction with X-ray fluo
Project Year: 2018
Organizer: "Environmental Analysis Laboratory"

Project Title: "Soil and Groundwater Pollution in HsinChu Country,2019"
Project Subject: "The total cost of this project is NT $ 9,500,000, and the overall working period ended on December
Project Year: 2019
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The International Cooperation Project on Soil and Groundwater Pollution Remediation"
Project Subject: "The project “International Cooperation Project on Soil and Groundwater Pollution Remediation” has b
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: ""
Project Subject: "The Soil and Groundwater Pollution Remediation Act (SGPRA) included the concept of risk assessment
Project Year: 2013
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Promote the Framework of Environmental Liability Insurance Policy and Program of Strategy for Cont
Project Subject: "Based on the policy framework established by “2014 Study on Identification and Transfer of Environm
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Bioaccessibility of heavy metals in soils of contaminated sites and its application on health risk
Project Subject: "Harmful substances in soil and dust may enter into human body through direct inhalation, digestion,
Project Year: 2017
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Land Quality Media Campaigns and Promotion Project"
Project Subject: "“Soil and ground water” preservation is an issue that has long been neglected yet poses a profound
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: ""
Project Subject: "For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year: 2014
Organizer: "Environmental Protection Bureau, Lienchiang County"

Project Title: "Program for Managing Contaminated Sediments in Taiwan 2016"
Project Subject: "Sediment could provide habits and food for aquatic wildlife and plays a crucial role in the cycles
Project Year: 2016
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The Survey of the Soil and Groundwater Contamination in Yunlin County in 2019"
Project Subject: "The program of “The Survey of Soil and Groundwater Contamination in Yunlin county in 2019” has been
Project Year: 2019
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "Plan of auditing and guiding of potential polluted soil evaluation, investigation and testing "
Project Subject: "The purpose of this project was to assist local environmental protection bureaus on reviewing and a
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Strategic Management Implementation Plan for Groundwater Pollution Source"
Project Subject: "This project collects European and American case studies of well head protection, watershed managem
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Pollution improvement project (II)t for farmland soil pollution control sites at Tao-yuan County(A)
Project Subject: "The project was to confirm the degree of heavy metal pollution and to take remediation measures on
Project Year: 2014
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: ""
Project Subject: "The Project this year continues principles of previous similar Projects, and outcomes of final repo
Project Year: 2014
Organizer: "Environmental Protection Bureau, Chiayi City"

Project Title: "the project of contaminated soil off-site treatment, final disposal, reuse and audting for 2013"
Project Subject: "This project designed to follow the Waste Disposal Act on reporting and management policy of contam
Project Year: 2013
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Soil and Groundwater Investigation and Verification Project"
Project Subject: "This project continues work in “Soil and Groundwater Investigation and Verification Project” of New
Project Year: 2016
Organizer: "Environmental Protection Bureau, Taipei County"

Project Title: "FY 2016 Control and Tracking of the Off-site Treatment to the Polluted Soils."
Project Subject: "This project designed to follow the Waste Disposal Act on reporting and management policy of contam
Project Year: 2017
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "2019 Investigation and Verification of Soil and Groundwater Contamination in Yilan County"
Project Subject: "In order to prevent soil and groundwater from contamination, the local competent authority must reg
Project Year: 2019
Organizer: "Environmental Protection Bureau of Yi-Lan County"

Project Title: "FY 2015 Control and Tracking of the Off-site Treatment to the Polluted Soils."
Project Subject: "This project was designed to follow the policy of off-site soil treatment management system, which
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Program for Managing Contaminated Sediments in Taiwan from 2017"
Project Subject: "Sediment could provide habits and food for aquatic wildlife and plays a crucial role in the cycles
Project Year: 2017
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: ""
Project Subject: "According to the plan specification of investigation and verification of the soil and groundwater c
Project Year: 2013
Organizer: "Environmental Protection Bureau, Lienchiang County"

Project Title: "FY 2020 Supervision and Inspection Plan for the Quality Assurance of Projects Relevant to Soil and
Project Subject: "The 2020 “Supervision and Inspection Plan for the Quality Assurance of Projects Relevant to Soil an
Project Year: 2020
Organizer: "Environmental Analysis Laboratory"

Project Title: "soil and groundwater"
Project Subject: "1. Monitoring Well Management and Groundwater Investigation 2. Manage the site management 3. Manage
Project Year: 2019
Organizer: "Environmental Protection Bureau, Hualien County"

Project Title: "2018 Taichung city soil and groundwater contaminate investigation and contingency measure project"
Project Subject: "The “Soil and groundwater contaminate investigation and contingency measure project” of Taichung Ci
Project Year: 2018
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "2015 Filing for and Verification of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject: ""
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: ""
Project Subject: "「Soil and Groundwater affect each other, People and Environment depend each other」, the new proverb
Project Year: 2015
Organizer: "Environmental Protection Bureau, Chiayi City"

Project Title: "2018 Reexamination of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject: "The main purpose of this project is to improve the management of payers of soil and groundwater pol
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

行政院環境保護署 的其他資料集

噪音罰鍰次數

每年更新更新,63

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:42

行政院環境保護署

空氣品質小時值_臺中市_豐原站

每1時更新,192

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:00

行政院環境保護署

環境空氣戴奧辛監測資料

每6月更新,128

戴先生 | 02-2371-2121#6210 | 2023-08-07 01:03:23

行政院環境保護署

水污染稽查次數

每年更新更新,129

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:26

行政院環境保護署

列管事業污染源裁處資料

每1月更新,111

陳小姐 | 04-2252-1718#51310 | 2023-08-07 01:02:41

行政院環境保護署

空氣品質小時值_新北市_萬里站

每1時更新,123

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:21

行政院環境保護署

機車新車審驗資料

每月更新更新,116

邱小姐 | 02-23712121#6309 | 2022-01-14 01:18:31

行政院環境保護署

道路交通音量監測結果統計(依管制區分)

每季更新更新,150

林先生 | 02-23712121#6403 | 2022-01-14 01:18:41

行政院環境保護署

環境影響說明書環境敏感區位調查表

每2月更新,131

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:02

行政院環境保護署

焚化廠營運年報

每1年更新,112

莊先生 | 04-22521718#53523 | 2023-08-07 01:02:34

行政院環境保護署

新化學物質少量登錄表單

不定期更新更新,53

蔡先生 | 02-23257399#55723 | 2023-08-09 01:04:24

行政院環境保護署

臺中雲林農地作物含重金屬鎘污染成因調查及查證計畫

不更新更新,46

吳小姐 | 02-2383-2389#8303 | 2022-01-15 01:12:21

行政院環境保護署

環保新聞

每3日更新,269

陳小姐 | 02-2311-7722#2343 | 2023-07-30 00:59:20

行政院環境保護署

交通空氣品質監測站基本資料

不定期更新更新,58

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:52

行政院環境保護署

苗栗縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,39

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:44

行政院環境保護署

歷年公共建設計畫執行情形

不定期更新更新,46

陳小姐 | 02-2311-7722#2913 | 2022-01-15 01:10:17

行政院環境保護署

歷年環保署農地全國重金屬污染潛勢管制及調查計畫2期

不定期更新更新,115

謝先生 | (02)23832389*8302 | 2022-01-14 01:20:26

行政院環境保護署

宜蘭縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,53

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:52

行政院環境保護署

環保署工程施工查核小組、問答集

不定期更新更新,35

蔡先生 | 04-22521718#51205 | 2023-08-09 01:05:14

行政院環境保護署

空氣品質指標(AQI)概況

每月更新更新,142

謝小姐 | 02-23117722#2103 | 2022-01-14 01:20:51

行政院環境保護署

公民營廢棄物甲級清除機構許可資料

每1月更新,181

盧小姐 | 02-2311-7722#2651 | 2023-07-27 01:03:17

行政院環境保護署

廢家具修繕DIY

不定期更新更新,44

林小姐 | 04-22521718#53511 | 2023-08-09 01:04:04

行政院環境保護署

環保署環境影響評估審查委員會會議紀錄

不定期更新更新,43

劉先生 | 02-23117722#2743 | 2022-01-15 01:12:43

行政院環境保護署

空氣污染排放量推估結果

不定期更新更新,109

柏小姐 | 02-23712121#6106 | 2022-01-14 01:04:24

行政院環境保護署

各級環保單位歲出決算

每月更新更新,96

謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:35

行政院環境保護署

空氣品質小時值_臺東縣_關山站

每小時更新更新,221

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:50

行政院環境保護署

毒化物運作紀錄申報總量

每6月更新,160

許先生 | 02-23257399#55328 | 2023-07-27 01:03:31

行政院環境保護署

事業排放廢(污)水於土壤或地面水體所含有害健康物質之種類

不定期更新更新,41

郭先生 | 02-2311-7722#2829 | 2023-08-09 01:04:16

行政院環境保護署

登錄證明文件繳費通知單

不定期更新更新,39

沈小姐 | 02-23491031 | 2022-01-14 01:22:59

行政院環境保護署

環保證照訓練近期開班訊息

每月更新更新,124

魏小姐 | 03-4020789#603 | 2022-01-15 01:11:05

行政院環境保護署