soils and groundwater2011[Project goals] The goal of this projec」於資料集「EPQSummary_EnvironmentalImpactAssessment」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:43。 欄位Project Title的內容是soils and groundwater , 欄位Project Subject的內容是[Project goals] The goal of this project is to establish environmental background data of the farmland soil, fish farm sediment, river and drainage sediment and groundwater in Mai-liao, Tai-si, Sih-hu, Lun-bei, and Dong-shih Township near the No. 6 Naphtha Cracker Complex. Until December 28, 2012, we had completed the works according to the contract. Various environmental media sampling work was completed from April 16 to May 3 and September 6. The measured content includes eight heavy metals, poly-aromatic hydrocarbons (PAHs) and total petroleum hydrocarbon (TPH). Besides, the investigation item of the farmland soil and groundwater had additional measurement of dioxin and total phenols. Furthermore, for the operating characteristics of The No. 6 Naphtha Cracker Complex, we build a frequently used chemical material safety data sheet (MSDS), and achieved 4 emergency cases with the Environmental Protection Bureau (EPB). [Survey results] 1, The first work of this project is to collect relevant reports about the No. 6 Naphtha Cracker Complex. The environmental media sampling plan and the subsequent analysis of the reference data were based on the contents of report. 2, According to the results of this project, the detected anomalies were found in some locations: (1) From the 50 groups of the farmland soil measured data display all the detected values have no significant abnormal situations. The dioxin detected values compared with the other survey areas of the Yunlin County showed none of the significantly higher value of farmland soil. That means heavy metals may not yet be as indicative of pollutants. 3 TPH samples were detected in the concentration of certain content (higher than 100 mg/kg) and belong to the substance of the diesel class (heavy oil). It is suggested to clarifying what the reason of high TPH values are come from the air pollutants of The No. 6 Naphtha Cracker Complex air or nearby steam oil pollution. (2) From the 30 samples of the fish-farm sediment, among 16 samples showed the content of heavy metal (such as As, Cu, Zn, Hg) had exceeded the lower limit of the sediment quality guidelines. Among there, there are 3 samples detected and found the content of heavy metal such as As, Cu had exceeded the upper limit of the sediment quality guidelines. The high As content might caused by pumping groundwater and thus accumulated at the bottom of fish farms. The high content of Cu, Zn may be caused by the owners’ using algaecide with copper sulfate component, feeding containing Cu, Zn and other substances in the feed or fish ponds foreign soil (pollution foreign soil). 3 TPH samples were detected and found in the concentration of certain content (higher than 100 mg/kg) and which belongs to the substance of the diesel class (heavy oil). About the abnormal oil content, we conclude preliminarily it may be caused by fishery machinery oil leaking or backfilling polluted soil. (3) The measured results of 8 samples of river and drainage sediment showed the content of heavy metals such as Ni, As, Cu, Zn had exceeded the lower limit of the sediment quality guidelines. Hou-An Bridge (R03 point) was also found that the concentration of Cu, Zn had exceeded the upper limit of the sediment quality guidelines. It is estimated that the content of heavy metal As, Cu, Zn in the sediment were come from polluted substance of upstream, such as agricultural –recycle water, or the wastewater from animal excreta and factories. 3 TPH samples were detected to be higher than the concentration of 100 mg/kg, and the TPH concentration of Hou-An Bridge (R03 point) was 4,830 mg/kg. The oil pollution may be caused by the dumping of waste oil. (4) The measured results of groundwater showed that it were detected As, Fe content exceeds groundwater pollution monitoring standards in some locations. It is generally believed that should be related to the releas... , 欄位Project Year的內容是2011 , 欄位Organizer的內容是Environmental Protection Bureau Yunlin County , 欄位Executive Unit的內容是澳新科技股份有限公司 , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=216646&proj_id=1005238456&doc_kind=1 , 欄位Publish Date的內容是20200215

Project Title

soils and groundwater

Project Subject

[Project goals] The goal of this project is to establish environmental background data of the farmland soil, fish farm sediment, river and drainage sediment and groundwater in Mai-liao, Tai-si, Sih-hu, Lun-bei, and Dong-shih Township near the No. 6 Naphtha Cracker Complex. Until December 28, 2012, we had completed the works according to the contract. Various environmental media sampling work was completed from April 16 to May 3 and September 6. The measured content includes eight heavy metals, poly-aromatic hydrocarbons (PAHs) and total petroleum hydrocarbon (TPH). Besides, the investigation item of the farmland soil and groundwater had additional measurement of dioxin and total phenols. Furthermore, for the operating characteristics of The No. 6 Naphtha Cracker Complex, we build a frequently used chemical material safety data sheet (MSDS), and achieved 4 emergency cases with the Environmental Protection Bureau (EPB). [Survey results] 1, The first work of this project is to collect relevant reports about the No. 6 Naphtha Cracker Complex. The environmental media sampling plan and the subsequent analysis of the reference data were based on the contents of report. 2, According to the results of this project, the detected anomalies were found in some locations: (1) From the 50 groups of the farmland soil measured data display all the detected values have no significant abnormal situations. The dioxin detected values compared with the other survey areas of the Yunlin County showed none of the significantly higher value of farmland soil. That means heavy metals may not yet be as indicative of pollutants. 3 TPH samples were detected in the concentration of certain content (higher than 100 mg/kg) and belong to the substance of the diesel class (heavy oil). It is suggested to clarifying what the reason of high TPH values are come from the air pollutants of The No. 6 Naphtha Cracker Complex air or nearby steam oil pollution. (2) From the 30 samples of the fish-farm sediment, among 16 samples showed the content of heavy metal (such as As, Cu, Zn, Hg) had exceeded the lower limit of the sediment quality guidelines. Among there, there are 3 samples detected and found the content of heavy metal such as As, Cu had exceeded the upper limit of the sediment quality guidelines. The high As content might caused by pumping groundwater and thus accumulated at the bottom of fish farms. The high content of Cu, Zn may be caused by the owners’ using algaecide with copper sulfate component, feeding containing Cu, Zn and other substances in the feed or fish ponds foreign soil (pollution foreign soil). 3 TPH samples were detected and found in the concentration of certain content (higher than 100 mg/kg) and which belongs to the substance of the diesel class (heavy oil). About the abnormal oil content, we conclude preliminarily it may be caused by fishery machinery oil leaking or backfilling polluted soil. (3) The measured results of 8 samples of river and drainage sediment showed the content of heavy metals such as Ni, As, Cu, Zn had exceeded the lower limit of the sediment quality guidelines. Hou-An Bridge (R03 point) was also found that the concentration of Cu, Zn had exceeded the upper limit of the sediment quality guidelines. It is estimated that the content of heavy metal As, Cu, Zn in the sediment were come from polluted substance of upstream, such as agricultural –recycle water, or the wastewater from animal excreta and factories. 3 TPH samples were detected to be higher than the concentration of 100 mg/kg, and the TPH concentration of Hou-An Bridge (R03 point) was 4,830 mg/kg. The oil pollution may be caused by the dumping of waste oil. (4) The measured results of groundwater showed that it were detected As, Fe content exceeds groundwater pollution monitoring standards in some locations. It is generally believed that should be related to the releas...

Project Year

2011

Organizer

Environmental Protection Bureau Yunlin County

Executive Unit

澳新科技股份有限公司

Publish Date

20200215

「soils and groundwater2011[Project goals] The goal of this projec」所屬的資料集:「EPQSummary_EnvironmentalImpactAssessment」的其他資料

Project Title: Review And Correction about Scoping and Policy Evaluation in Development activity of Environmental I
Project Subject: Recently, more and more development activities are obliged or volunteer to undergo the second stage
Project Year: 2014
Organizer: Department of Comprehensive Planning

Project Title: Project for Assistance on Holding EIA Review Meetings in 2016, Evaluation of EIA Technical Consultin
Project Subject: The main objective of this project is to improve the efficiency and quality of the Environmental Imp
Project Year: 2016
Organizer: Department of Comprehensive Planning

Project Title: The evaluation of Technical Consulting Firms Compiling Environmental Impact Assessment Reports for
Project Subject: The Environmental Protection Administration (EPA) has initiated “The evaluation of Technical Consult
Project Year: 2010
Organizer: Department of Comprehensive Planning

Project Title: Analysis of Environmental Impact Assessment and decision-making supporting project in 2018
Project Subject: The 2018 Analysis of Environmental Impact Assessment and decision support project was contracted to
Project Year: 2018
Organizer: Department of Comprehensive Planning

Project Title: "Project for Assistance on Holding Environmental Impact Assessment Review Meetings in 2015"
Project Subject: "To improve the efficiency and quality of the Environmental Impact Assessment (EIA) review, document
Project Year: 2014
Organizer: "Department of Comprehensive Planning"

Project Title: Project for Assistance on Environmental Impact Assessment Review and Making Comments on the EIA Docu
Project Subject: To improve the efficiency and quality of the Environmental Impact Assessment (EIA) review, a panel o
Project Year: 2015
Organizer: Department of Comprehensive Planning

Project Title: 101 Environmental Impact Assessment Inquiry Application System data collection and maintenance proje
Project Subject: This project had developed many results this year in the Environmental Impact Assessment inquiry app
Project Year: 2012
Organizer: Department of Comprehensive Planning

Project Title: Environmental Impact Assessment Inquiry Application System Management and Maintenance Project
Project Subject: This project had developed many results this year in the Environmental Impact Assessment inquiry app
Project Year: 2020
Organizer: Department of Comprehensive Planning

Project Title: "Environmental Impact Assessment Inquiry Application System Management and Maintenance Project"
Project Subject: "This project had developed many results this year in the Environmental Impact Assessment inquiry ap
Project Year: 2014
Organizer: "Department of Comprehensive Planning"

Project Title: The Promotion of Taiwan Nanotechnology EHS Database and the integration of knowledge
Project Subject: The goal of this project is to maintain the website of Taiwan nanotechnology EHS database(http://ehs
Project Year: 2017
Organizer: Office of Sustainable Development

Project Title: A study on the establishment of technology and methods of SEA
Project Subject: Environmental Impact Assessment (EIA) has been implemented in many countries in the world for many y
Project Year: 2002
Organizer: Department of Comprehensive Planning

Project Title: "Study on Revising Regulations for Reviewing of Environmental Impact Assessment and Directions "
Project Subject: "Environmental Impact Assessment (EIA) Act has been enforced since 1994. The purpose of the EIA syst
Project Year: 2014
Organizer: "Department of Comprehensive Planning"

Project Title: Environmental impact assessment review operations Project after the Implementation of the Geology Ac
Project Subject: Geology Act is promulgated by the Ministry of Economic Affairs on December 1st 2011. “Geologically s
Project Year: 2017
Organizer: Department of Comprehensive Planning

Project Title: A Study of the Application of Technical Guidelines for Social Impact Assessment in Environmental Imp
Project Subject: The aim of environmental impact assessment (EIA) is to make the potential impacts of development pro
Project Year: 2016
Organizer: Department of Comprehensive Planning

Project Title: The Supervision Project for Environmental Impact Assessment
Project Subject: The scope of the project was the review and supervision the approved environmental impact assessment
Project Year: 2016
Organizer: Bureau of Environmental Inspection

Project Title: Case Study and Analysis of Environmental Impact Assessment in the United States of America and Formu
Project Subject: Case Study and Analysis of Environmental Impact Assessment in the United States of America and Formu
Project Year: 2012
Organizer: Department of Comprehensive Planning

Project Title: Study on International Low-Carbon and Resilient city building mechanism Project
Project Subject: The main goal of this project is to develop an instruction to help decision makers of the city to di
Project Year: 2015
Organizer: Department of Environmental Sanitation & Toxic Substance Management

Project Title: Environmental Impact Assessment Inquiry Application System Management and Maintenance Project
Project Subject: This project had developed many results this year in the Environmental Impact Assessment inquiry app
Project Year: 2014
Organizer: Department of Comprehensive Planning

Project Title: The Suggestions for the Amendments of the Environmental Impact Assessment Act and the Environment
Project Subject: The main executive content of the Research Team includes four major parts: (1) doing research on leg
Project Year: 2010
Organizer: Department of Comprehensive Planning

Project Title: "Work Plan to optimize the Reporting System of Environmental Impact Assessment Commitment Statements
Project Subject: "The previous version of Reporting System of Environmental Impact Assessment Commitment Statements w
Project Year: 2019
Organizer: "Bureau of Environmental Inspection"

Project Title: The Supervision Project for Environmental Impact Assessment
Project Subject: This annual project reviewed and supervised the approved environmental impact assessment (EIA) repor
Project Year: 2012
Organizer: Bureau of Environmental Inspection

Project Title: Technical Protocol for Estuarine and Marine Ecological Evaluation Using in Environmental Impact Asse
Project Subject: The establishment of this technical protocol is to provide guidance for marine ecological evaluation
Project Year: 2003
Organizer: Department of Comprehensive Planning

Project Title: The Supervision Project for Environmental Impact Assessment
Project Subject: The scope of the project was the review and supervision the approved environmental impact assessment
Project Year: 2018
Organizer: Bureau of Environmental Inspection

Project Title: "Environmental impact assessment review operations Project after the Implementation of the Geology A
Project Subject: " Geology Act is promulgated by the Ministry of Economic Affairs on December 1st 2011. “Geologically
Project Year: 2017
Organizer: "Department of Comprehensive Planning"

Project Title: Special Project for a Workshop in Environmental Impact Assessment Practice
Project Subject: The Foundation on Resources and Environmental Protection Service (FREEPS) was entrusted by the Envir
Project Year: 2005
Organizer: Department of Comprehensive Planning

Project Title: Enhanced Environmental Impact Assessment Supervisory and law Enforcement Project 2021.
Project Subject: The scope of the project was the reviewed and supervised the approved environmental impact assessmen
Project Year: 2021
Organizer: Bureau of Environmental Inspection

Project Title: "The Supervision Project for Environmental Impact Assessment"
Project Subject: " The scope of the project was the review and supervision the approved environmental impact assessme
Project Year: 2017
Organizer: "Bureau of Environmental Inspection"

Project Title: Evaluation of Technical Consulting Firms on Environmental Impact Assessment and Feasibility Study fo
Project Subject: The Environment Protection Administration (EPA) has initiated “The evaluation of Technical Consultin
Project Year: 2012
Organizer: Department of Comprehensive Planning

Project Title: Research and Analysis of Environmental Impact Assessment Act 8 Judgement Guideline Project Work Plan
Project Subject: This project aims at exploring how to apply Environmental Impact Assessment Act Article 8, especiall
Project Year: 2014
Organizer: Department of Comprehensive Planning

Project Title: Investigation of Light Pollution Impacts on Human Perception and Related Metrics and Countermeasures
Project Subject: This research project is based on domestic characteristics in Taiwan to investigate and analyze the
Project Year: 2016
Organizer: Department of Air Quality Protection & Noise Control

行政院環境保護署 的其他資料集

苗栗縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,44

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:44

行政院環境保護署

環境教育人員(訓練)認證申請書

不定期更新更新,49

盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:27

行政院環境保護署

道路交通音量監測結果統計(依管制區分)

每季更新更新,197

林先生 | 02-23712121#6403 | 2022-01-14 01:18:41

行政院環境保護署

重點事業廢棄物-有機廢液之處理方式

每月更新更新,214

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:08

行政院環境保護署

水污染防治各項許可申請收費標準

不定期更新更新,47

王先生 | 02-2311-7722#2832 | 2022-01-14 01:23:05

行政院環境保護署

空氣品質監測站基本資料

不定期更新更新,165

陳先生 | 02-2311-7722#2386 | 2023-08-07 01:01:47

行政院環境保護署

環評主管機關受理審查之環境影響說明書

每2月更新,139

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:32

行政院環境保護署

嘉義縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,60

程先生 | 02-2311-7722#2833 | 2023-08-09 01:04:10

行政院環境保護署

行政院環境保護署環境教育設施場所認證展延申請書

不定期更新,69

蘇小姐 | (03)4020789分機669 | 2022-01-15 01:11:08

行政院環境保護署

縣市(直轄市)小時值-每小時

每小時更新更新,180

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:23

行政院環境保護署

大甲媽祖遶境即時空品監測成果(感測器#3)

不定期更新更新,286

陳先生 | 02-2311-7722#2341 | 2022-01-14 01:02:38

行政院環境保護署

鹿林山測站基本資料

不定期更新更新,45

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:02

行政院環境保護署

行政院環境保護署補助地方政府自行車道路線資料

不定期更新更新,57

詹小姐 | 02-23117722#6401 | 2023-08-09 01:05:50

行政院環境保護署

登錄證明文件繳費通知單

不定期更新更新,47

沈小姐 | 02-23491031 | 2022-01-14 01:22:59

行政院環境保護署

環境教育人員認證資料

每1月更新,70

盧小姐 | 03-4020789#606 | 2023-07-27 01:04:48

行政院環境保護署

行政院環保署及地方政府「水區、水體分類」公告說明表

不定期更新,48

簡小姐 | 02-23117722#2818 | 2022-01-15 01:13:07

行政院環境保護署

特殊性工業區品保品管後監測值資料檔(氣象監測項目)

每年更新更新,163

丁先生 | 02-2371-2121#6101 | 2022-01-15 01:07:02

行政院環境保護署

交通噪音監測站位置圖

不定期更新更新,52

章小姐 | 02-23712121#6407 | 2023-07-27 01:06:02

行政院環境保護署

0800資源回收免費專線-一般件問題查詢廢電子電器統計

每1年更新,51

莊先生 | 02-23705888#3108 | 2023-07-27 01:00:02

行政院環境保護署

環境教育設施場所認證資料

每月更新更新,160

蘇小姐 | 03-4020789#628 | 2022-01-15 01:11:14

行政院環境保護署

空氣品質小時值_臺北市_古亭站

每1時更新,146

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:11

行政院環境保護署

日空氣品質指標(AQI)

每日更新更新,170

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:38

行政院環境保護署

毒性化學物質許可及申報資料

每3月更新,300

許先生 | 02-23117722#2865 | 2023-07-30 01:03:49

行政院環境保護署

環保署補助地方政府設置完成之現地處理設施

不定期更新,58

黃先生 | 02-2311-7722#2839 | 2022-01-14 01:22:19

行政院環境保護署

各事業廢棄物代碼申報流向統計

每月更新更新,133

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:23:53

行政院環境保護署

營建署事業廢棄物再利用機構資料

不定期更新更新,107

李小姐 | 02-2311-7722#2633 | 2022-01-14 01:26:14

行政院環境保護署

環境用藥製造業地理資料

不定期更新更新,52

王小姐 | 02-2325-7399#55413 | 2022-01-15 01:10:37

行政院環境保護署

行政院環境保護署環境檢驗所會計月報

每1月更新,50

鍾小姐 | 03-4915818#3004 | 2023-08-09 01:05:46

行政院環境保護署

已公告之飲用水取水口一定距離一覽表

不定期更新更新,128

黃先生 | 02-23117722#2881 | 2023-07-27 01:02:59

行政院環境保護署

水庫水質監測站位置圖

不定期更新更新,63

陳先生 | 02-2311-7722#2386 | 2023-08-07 01:04:22

行政院環境保護署