"Construction Engineering"2012"The content of the final report o
「"Construction Engineering"2012"The content of the final report o」於資料集「EPQSummary_Air」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:50。 欄位Project Title的內容是"Construction Engineering" , 欄位Project Subject的內容是"The content of the final report of the pollution control plan for the construction project of Hsinchu City in the year of 101, the commissioned unit Kangting Engineering Consulting Enterprise Co., Ltd. assisted in the implementation of the inspection and control of construction projects in Hsinchu City, the inspection of management methods, the construction of air pollution charges, and the declaration Guide work and other work, all work items are completed according to the planning progress, detailed work execution methods and results are described in chapters.
Based on the concept of improving the quality of service for the people, the declaration of the air pollution fee for the construction project was changed from the declaration orientation to the satisfaction of the public's satisfaction with the quality of the application. The overall collection operation focused on the overall service performance and quality of the project, and in enriching the air pollution fund. During the project period, a total of 12,480,654 yuan was built for air pollution. It also cooperated with telephone notifications and issuing documents to increase the reporting rate of air pollution charges, and on-site inspection of engineering changes, so that the construction of air pollution charges will be put on the track.
As far as the control surface is concerned, according to the regulations on the management of air pollution control facilities for construction projects, the action plan such as grade inspection, color list control, persuasion notice and site on-site counseling will be promoted to promote the site to actively carry out pollution prevention and road adoption. In addition to the work, he also invested in manpower to gradually inspect the first and second-level construction sites within the jurisdiction. During the project period, a total of 3,278 site inspections were completed, and the missing projects were also strengthened through the special control of the Guanpu Re-zone. In promoting the adoption and cleaning of roads on the construction site, a total of 26 people participated in road cleaning operations to help maintain the environment and reduce street dust. The maintenance and repair mileage of the construction project totaled 7,884.2 kilometers, and the number of cleaning mileage was nearly three. The TSP reduction was 108.8 metric tons.
The project inspection control is mainly based on the top 100 monthly pollution, and the patrol emission ratio is over 80%. In addition, it assists in the implementation of 430 cases of public nuisance cases to deal with public grievances. In the implementation of the publicity work, through the statute briefing session, the site on-site counseling symposium, the promotion of the text and the promotion of electronic media, and the promotion of the effectiveness of the promotion by diversified propaganda, the manufacturers are familiar with the requirements of the law, and by environmental protection The exposure of the news has increased public satisfaction.
Overall, the TSP emissions from construction projects in 2001 were 1,785.8 metric tons, an increase of 12.6% over the same period of the previous year. The reduction rate of particulate TSP pollution was 57.4%. In the case of a significant increase in pollution, the reduction rate was higher than that in the same period of 100 years. 6%." , 欄位Project Year的內容是2012 , 欄位Organizer的內容是"Bureau of Environmental Protection Hsin-Chu" , 欄位Executive Unit的內容是"康廷工程顧問企業有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=200333 , 欄位Publish Date的內容是20190904 。
Project Title
"Construction Engineering"
Project Subject
"The content of the final report of the pollution control plan for the construction project of Hsinchu City in the year of 101, the commissioned unit Kangting Engineering Consulting Enterprise Co., Ltd. assisted in the implementation of the inspection and control of construction projects in Hsinchu City, the inspection of management methods, the construction of air pollution charges, and the declaration Guide work and other work, all work items are completed according to the planning progress, detailed work execution methods and results are described in chapters. Based on the concept of improving the quality of service for the people, the declaration of the air pollution fee for the construction project was changed from the declaration orientation to the satisfaction of the public's satisfaction with the quality of the application. The overall collection operation focused on the overall service performance and quality of the project, and in enriching the air pollution fund. During the project period, a total of 12,480,654 yuan was built for air pollution. It also cooperated with telephone notifications and issuing documents to increase the reporting rate of air pollution charges, and on-site inspection of engineering changes, so that the construction of air pollution charges will be put on the track. As far as the control surface is concerned, according to the regulations on the management of air pollution control facilities for construction projects, the action plan such as grade inspection, color list control, persuasion notice and site on-site counseling will be promoted to promote the site to actively carry out pollution prevention and road adoption. In addition to the work, he also invested in manpower to gradually inspect the first and second-level construction sites within the jurisdiction. During the project period, a total of 3,278 site inspections were completed, and the missing projects were also strengthened through the special control of the Guanpu Re-zone. In promoting the adoption and cleaning of roads on the construction site, a total of 26 people participated in road cleaning operations to help maintain the environment and reduce street dust. The maintenance and repair mileage of the construction project totaled 7,884.2 kilometers, and the number of cleaning mileage was nearly three. The TSP reduction was 108.8 metric tons. The project inspection control is mainly based on the top 100 monthly pollution, and the patrol emission ratio is over 80%. In addition, it assists in the implementation of 430 cases of public nuisance cases to deal with public grievances. In the implementation of the publicity work, through the statute briefing session, the site on-site counseling symposium, the promotion of the text and the promotion of electronic media, and the promotion of the effectiveness of the promotion by diversified propaganda, the manufacturers are familiar with the requirements of the law, and by environmental protection The exposure of the news has increased public satisfaction. Overall, the TSP emissions from construction projects in 2001 were 1,785.8 metric tons, an increase of 12.6% over the same period of the previous year. The reduction rate of particulate TSP pollution was 57.4%. In the case of a significant increase in pollution, the reduction rate was higher than that in the same period of 100 years. 6%."
Project Year
2012
Organizer
"Bureau of Environmental Protection Hsin-Chu"
Executive Unit
"康廷工程顧問企業有限公司"
Reporting download URL
Publish Date
20190904
「"Construction Engineering"2012"The content of the final report o」所屬的資料集:「EPQSummary_Air」的其他資料
Project Title:
"Ambient odor air monitoring around Taoyuan CPC oil refinery area during 2014"
Project Subject:
"A combination of work in monitoring, modeling, and flare flow rates from Taiwan CPC Tao-Yuan Oil Re
Project Year:
2014
Organizer:
"Taoyuan County Government Environment Protection Bureau"
Project Title:
" "
Project Subject:
"Summary of Implementation Results
This project's implementation period extended from August 18,
201
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Taipei County"
Project Title:
"Composition Analysis of PM2.5 and Air Quality Forecasting for Taichung City in 2018"
Project Subject:
"This study analyzes the chemical composition of PM2.5 with samples collected from the ambient envir
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
""
Project Subject:
"The scope of this project includes: 1) Establishing and updating of the emission inventory; 2) Moni
Project Year:
2015
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"2017 Inspection Plan of Diesel Vehicle Dynamometer in Smoke Exhaust Detection Station"
Project Subject:
"With regarding to diesel vehicle contamination control, in order to improve the air quality and pro
Project Year:
2017
Organizer:
"HsinChu County Environment Protection Bureau"
Project Title:
"Evaluating Regional Energy Conservation and Carbon Reduction Project for International Cooperation
Project Subject:
"If the model provides the possible effects of policy programs, decision makers can more quickly sel
Project Year:
2015
Organizer:
"Solution integration office"
Project Title:
"The project of enhancing street fugitive dust washing and sweeping program for Yunlin County in 201
Project Subject:
"The project, has completed the following main events, and the results are described below:1. The st
Project Year:
2013
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Chiayi City folk activities, catering and open burning of the Air Pollution Control plan"
Project Subject:
"The results of the implementation report are summarized below:A. The Investigation of air pollution
Project Year:
2015
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
" 107 Enhanced Street Dust Cleaning and Planning Management Planning - Planning and Management"
Project Subject:
"The project has been implemented since May 2, 2007. All work items have been completed as of April
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"Development of Continuous Monitoring Technology for Odorous Compounds in Ambient Air"
Project Subject:
"The major objective of this project was to develop the sampling and analysis technology of ambient
Project Year:
2014
Organizer:
"Environmental Analysis Laboratory"
Project Title:
"The main pollution source inspection control and poor air quality improvement process project in Ta
Project Subject:
"Status analysis of air quality
(1) According to the Air Quality Index (AQI), analyzed the AQI>100 r
Project Year:
2018
Organizer:
"Environmental Protection Bureau of Tainan City"
Project Title:
"A Project of Greenhouse Gases Voluntary Reduction Scheme and GHG Emission Performance Standard (EPS
Project Subject:
"Taiwan Environment Protection Administration has obligations to promote the Greenhouse Gases Volunt
Project Year:
2016
Organizer:
"Department of Environmental Sanitation & Toxic Substance Management"
Project Title:
""
Project Subject:
"The main work items of Stationary air pollution source control project are as follows: (1) Database
Project Year:
2014
Organizer:
"Environmental Protection Bureau of Tainan City"
Project Title:
"Penhu County Mobile Sources Audition and Control Project, 2016"
Project Subject:
"On motorbike pollution control, according to the data on EPA moter vehicles emission regular test i
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Penghu County"
Project Title:
"The Chiayi City Air Quality Assessment and Management Scheme,2018"
Project Subject:
"In order to actively and effectively use air pollution control costs to improve the city's air qual
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Promotion of eco-driving and green-transportation, and vehicle carbon dioxide reduction technology
Project Subject:
"Since 2015, the EPA has implemented the CO2 emission standards for passenger vehicles this project
Project Year:
2015
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"2018 Hualien City Mobile Pollution Source control and Parking idling flameout management Project"
Project Subject:
"From the date of completion of the contract signing, in order to make the project smoothly promoted
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Hualien County"
Project Title:
""
Project Subject:
"From February 26, 2015 to December 15, 2015, the results of the work are summarized as follows:I. I
Project Year:
2015
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Control to promotion of River Fugitive Dust Management Plan"
Project Subject:
"Due to water resource allocation, watershed management, and river development, some rivers have exh
Project Year:
2017
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"Air Pollution Exposure Assessment of Houli, Situn, Daya, Dadu, Cingshuei, Shalu, Wuci, Longjing Dis
Project Subject:
"The purpose of this project is to evaluate the relationship between the health status of the reside
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
""
Project Subject:
"To address the impact on the quality of the environment by mobile sources, the inspectors banned ur
Project Year:
2013
Organizer:
"Taitung County Environment Protection Bureau"
Project Title:
"The Implementaion Plan to Improve Air Quality in the air basin"
Project Subject:
"The amendment of Clean Air Act in 1999 has adapted the graded Control Region system, from which eac
Project Year:
2018
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"107 annual Taitung County low carbon and sustainable homeland operation system and implementation
Project Subject:
"Low-carbon city"
Project Year:
2018
Organizer:
"Taitung County Environment Protection Bureau"
Project Title:
"The annual audits of the analyzers at the motorcycle inspection stations."
Project Subject:
"Taiwan’s Environmental Protection Administration has conducted annual inspections of motorcycles si
Project Year:
2014
Organizer:
"Environmental Analysis Laboratory"
Project Title:
"The Effectiveness Assessments in Air Quality Management and Improvement Strategies."
Project Subject:
"The project analyzed air quality data recorded and offered weekly/monthly reports to EPA. 12 monthl
Project Year:
2017
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"Low Carbon sustainable home operation system with the implementation of the evaluation plan"
Project Subject:
"In recent years, global warming, climate change and greenhouse gas control issues, has become the f
Project Year:
2017
Organizer:
"Nantou County Environmental Protection Bureau"
Project Title:
" The project of poor air quality during Cho-Shui-Hsi coastal strengthens street dust control for 10
Project Subject:
"This project aims to clean the major roads in YunlinCounty via street cleaning operations. This ope
Project Year:
2013
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Permit, Air Pollution Fees and Inspection for Stationary Pollution Sources with Air Quality Mainten
Project Subject:
"This Plan includes: planning of air quality control issues, permit management, air pollution fees r
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"Emission Estimation and Concentration Monitoring of PM2.5 in Keelung Port"
Project Subject:
"-"
Project Year:
2016
Organizer:
"Bureau of Environmental Protection, Keelung City"
Project Title:
"105 years of volatile organic matter and continuous automatic monitoring of pollution sources inves
Project Subject:
"Taoyuan City, the number of fixed sources of pollution 2,545, which are based on the Environmental
Project Year:
2016
Organizer:
"Taoyuan County Government Environment Protection Bureau"
行政院環境保護署 的其他資料集
列管公廁個數
每年更新更新,163謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:36
行政院環境保護署行政院環境保護署「資料開放諮詢小組」會議紀錄
每半年更新更新,45林小姐 | 02-2311-7722#2365 | 2022-01-15 01:12:46
行政院環境保護署通過逐車審驗運送車輛
每月更新更新,148林先生 | 02-2325-7399#55232 | 2022-01-14 01:25:47
行政院環境保護署全國各縣市之責任業者列管家數統計
每1年更新,74廖小姐 | 02-2370-5888#3103 | 2023-07-27 00:59:42
行政院環境保護署大型垃圾焚化廠操作營運情形
每月更新更新,127謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:17
行政院環境保護署
南科樹谷環境監測資料
不定期更新更新,44陳先生 | 04-22521718#51207 | 2022-01-14 01:22:03
行政院環境保護署光化測站(林園)小時值資料
不定期更新更新,159陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:28
行政院環境保護署全國各縣市清潔隊資料
每1年更新,44廖小姐 | 02-2370-5888#3103 | 2023-07-30 00:59:23
行政院環境保護署環境教育終身學習護照註冊人數
每季更新更新,45李小姐 | 02-23117722#2724 | 2022-01-15 01:10:49
行政院環境保護署公文統計資料
不定期更新更新,64賴先生 | 02-2311-7722#2347 | 2022-01-14 01:22:15
行政院環境保護署
縣市(雲林縣)小時值-每小時
每1時更新,159陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:48
行政院環境保護署歷年環保署農地_全國重金屬污染潛勢之管制及調查計畫
不定期更新更新,102謝先生 | (02)23832389*8302 | 2022-01-14 01:20:23
行政院環境保護署建檔公廁明細-桃園市
不定期更新更新,193曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:14:45
行政院環境保護署包裝及盛裝飲用水水源水質抽驗結果
每季更新更新,128黃先生 | 02-23117722#2881 | 2022-01-15 01:10:25
行政院環境保護署環境影響說明書附表五:空氣
每2月更新,108黃先生 | 02-23117722#2748 | 2023-08-06 01:04:01
行政院環境保護署
已公告之飲用水取水口一定距離一覽表
不定期更新更新,122黃先生 | 02-23117722#2881 | 2023-07-27 01:02:59
行政院環境保護署縣市清運機具統計資料
每半年更新更新,43陳小姐 | (04)2252-1718#53406 | 2022-01-14 01:22:13
行政院環境保護署病媒防治業地理資料
不定期更新更新,38薛先生 | 02-2325-7399#55413 | 2023-07-27 01:02:56
行政院環境保護署應回收廢棄物(廢鉛蓄電池類)回收量資料
每年更新更新,47廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:36
行政院環境保護署0800資源回收免費專線-一般件問題查詢活動統計
每年更新更新,56莊先生 | 02-23705888#3108 | 2022-01-14 01:24:29
行政院環境保護署
補助地方設置巨大廢棄物回收再利用廠一覽
不定期更新更新,47林小姐 | 04-22521718#53511 | 2023-08-07 00:59:54
行政院環境保護署光化測站(土城)小時值資料
每月更新更新,273謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:25
行政院環境保護署歷年公共建設計畫執行情形
不定期更新更新,51陳小姐 | 02-2311-7722#2913 | 2022-01-15 01:10:17
行政院環境保護署環境科技論壇論文集
每1年更新,43賀先生 | 23117722#2981 | 2023-08-06 01:06:11
行政院環境保護署固定污染源設備元件揮發性有機物洩漏檢測申報資料
每3月更新,334戴先生 | 02-2311-7722#6208 | 2023-08-07 01:02:40
行政院環境保護署
廢棄物罰鍰次數
每年更新更新,94謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:30
行政院環境保護署符合噪音管制標準車輛-國產汽油引擎車
不定期更新更新,326章小姐 | 02-23712121#6406 | 2023-07-28 11:37:57
行政院環境保護署經過山坡地之環境影響說明書件
每2月更新,241黃先生 | 02-23117722#2748 | 2023-08-05 01:01:01
行政院環境保護署應回收廢棄物回收業者資料
不定期更新更新,209廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:26:22
行政院環境保護署環境空氣戴奧辛監測資料
每6月更新,130戴先生 | 02-2371-2121#6210 | 2023-08-07 01:03:23
行政院環境保護署