time1: 0 time2: 0 time3: 0 time4: 0 total: 0 2009 Air Quality Operating and Maintaining Stations, Visibility
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

2009 Air Quality Operating and Maintaining Stations, Visibility

2009 Air Quality Operating and Maintaining Stations, Visibility 」於資料集「EPQSummary_NoiseAndVibration」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:50。 欄位Project Title的內容是2009 Air Quality Operating and Maintaining Stations, Visibility Investigation and Indoor Air Quality Management Project , 欄位Project Subject的內容是This project is executed from March 20, 2009 to March 19, 2010 and was budgeted 7,930 thousand New Taiwan Dollars. It accomplished the all assignments and duties, including the sampling with analysis and maintenance of both human and auto inspection stations in air quality, software and hardware devices updating, electrical signboard installation, visibility investigation, indoor air quality announcement and non-atomic ionized radiation monitoring, that Environmental Protection Bureau (EPB) authorized. For the human inspection stations in air quality, Xin Yi elementary school, Cheng Gong elementary school, Wen Shan elementary school, Bei Shin junior high school, Xi Yuan junior high school and Taiwan Railways terminal were sampling and analysis monthly for dust fall. Besides, The TSP sampling with analysis and maintenance were executed twice a month. The fluid correction of single point and multiple points were executed once a month and once a season separately. For the auto inspection stations, every monitoring items of station operated normally according to the weekly and seasonally maintenance of the project. Therefore, the data availability ratio could be over 85%. In addition, the software and hardware devices were also updating such as data management software, air conditioners, atmospheric pressure meters, railings and ladders. The monitoring data show that the air quality in 2009 was worse than it in 2008. Nevertheless, the disqualified rate of urban air quality in 2009 was 2.70% and the index pollutant was O3 as majority. For Situn station, it has 11 days, 4 days and 7 days for disqualification of air quality, index pollutant PM10 and O3 separately. For Jhonming station, it has 9 days, 3 days and 6 days for disqualification of air quality, index pollutant PM10 and O3 separately. For the Wunshan station, the disqualified rate of urban air quality in 2009 was 2.47% and it has 4 days and 5 days for the index pollutant PM10 and O3 separately. The disqualified rate of counties and cities of air quality in central Taiwan were in turn as Nantou County (3.42%), Taichung City (2.70%) and Changhua County (1.23%). For the non-atomic ionized radiation monitoring, the 10 cases of electromagnetic wave monitoring were accomplished. 6 high frequency cases and 4 low frequency cases of electromagnetic wave were measured to fill the bill of environmental suggestions. For the indoor air quality management, 2 educated announcements and statements have been already held. At the same time, 20 public places also participated in the independent managements of indoor air quality and CO2 investigations. Consequently, the results of CO2 investigation filled the bill of environmental suggestions to Environmental Protection Administration (EPA). The results of indoor air quality show that the disqualified rates of fungi were 60% as the most unqualified item. Nevertheless, the 9 examination items of CO2, CO, HCHO, TVOC, PM10, PM2.5, O3, bacteria and temperatures were fill the bill as 100% qualified rate. Besides, West distric office and Beitun district office were awarded excellent organization of indoor air quality according to indoor air quality judgments. They were also the best demonstrated places for indoor air quality in Taichung city. For the visibility investigation, this project discussed the results of particles monitoring and particles analysis of PM10 and PM2.5 for long term visibility monitoring of Taichung Weather Station of Central Weather Bureau (CWB) and rebuilt the PM10 concentration of Taichung urban area in the last 40 years. Also, it compared to the differences of visibility between Taichung City and previous data of central Taiwan area. Therefore, it built the classified index of visibility for Taichung City. In the event, both the best model of optional scenarios and the cost effective policies of pollutant reducing an... , 欄位Project Year的內容是2009 , 欄位Organizer的內容是Environmental Protection Bureau, Taichung City , 欄位Executive Unit的內容是祥威環境科技有限公司 , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=16709&proj_id=0988041263&doc_kind=1 , 欄位Publish Date的內容是20110301

Project Title

2009 Air Quality Operating and Maintaining Stations, Visibility Investigation and Indoor Air Quality Management Project

Project Subject

This project is executed from March 20, 2009 to March 19, 2010 and was budgeted 7,930 thousand New Taiwan Dollars. It accomplished the all assignments and duties, including the sampling with analysis and maintenance of both human and auto inspection stations in air quality, software and hardware devices updating, electrical signboard installation, visibility investigation, indoor air quality announcement and non-atomic ionized radiation monitoring, that Environmental Protection Bureau (EPB) authorized. For the human inspection stations in air quality, Xin Yi elementary school, Cheng Gong elementary school, Wen Shan elementary school, Bei Shin junior high school, Xi Yuan junior high school and Taiwan Railways terminal were sampling and analysis monthly for dust fall. Besides, The TSP sampling with analysis and maintenance were executed twice a month. The fluid correction of single point and multiple points were executed once a month and once a season separately. For the auto inspection stations, every monitoring items of station operated normally according to the weekly and seasonally maintenance of the project. Therefore, the data availability ratio could be over 85%. In addition, the software and hardware devices were also updating such as data management software, air conditioners, atmospheric pressure meters, railings and ladders. The monitoring data show that the air quality in 2009 was worse than it in 2008. Nevertheless, the disqualified rate of urban air quality in 2009 was 2.70% and the index pollutant was O3 as majority. For Situn station, it has 11 days, 4 days and 7 days for disqualification of air quality, index pollutant PM10 and O3 separately. For Jhonming station, it has 9 days, 3 days and 6 days for disqualification of air quality, index pollutant PM10 and O3 separately. For the Wunshan station, the disqualified rate of urban air quality in 2009 was 2.47% and it has 4 days and 5 days for the index pollutant PM10 and O3 separately. The disqualified rate of counties and cities of air quality in central Taiwan were in turn as Nantou County (3.42%), Taichung City (2.70%) and Changhua County (1.23%). For the non-atomic ionized radiation monitoring, the 10 cases of electromagnetic wave monitoring were accomplished. 6 high frequency cases and 4 low frequency cases of electromagnetic wave were measured to fill the bill of environmental suggestions. For the indoor air quality management, 2 educated announcements and statements have been already held. At the same time, 20 public places also participated in the independent managements of indoor air quality and CO2 investigations. Consequently, the results of CO2 investigation filled the bill of environmental suggestions to Environmental Protection Administration (EPA). The results of indoor air quality show that the disqualified rates of fungi were 60% as the most unqualified item. Nevertheless, the 9 examination items of CO2, CO, HCHO, TVOC, PM10, PM2.5, O3, bacteria and temperatures were fill the bill as 100% qualified rate. Besides, West distric office and Beitun district office were awarded excellent organization of indoor air quality according to indoor air quality judgments. They were also the best demonstrated places for indoor air quality in Taichung city. For the visibility investigation, this project discussed the results of particles monitoring and particles analysis of PM10 and PM2.5 for long term visibility monitoring of Taichung Weather Station of Central Weather Bureau (CWB) and rebuilt the PM10 concentration of Taichung urban area in the last 40 years. Also, it compared to the differences of visibility between Taichung City and previous data of central Taiwan area. Therefore, it built the classified index of visibility for Taichung City. In the event, both the best model of optional scenarios and the cost effective policies of pollutant reducing an...

Project Year

2009

Organizer

Environmental Protection Bureau, Taichung City

Executive Unit

祥威環境科技有限公司

Publish Date

20110301

「2009 Air Quality Operating and Maintaining Stations, Visibility 」所屬的資料集:「EPQSummary_NoiseAndVibration」的其他資料

Project Title: Implement of the new vehicle type approval with regard to noise and diesel vehicle and quality consi
Project Subject: This project aims to assist EPA in examination of noise and diesel vehicle certificates for new vehi
Project Year: 2018
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Research on Noise Control and Assessment with Detection Camera System Applied to In-use Motor Vehicl
Project Subject: Among the petitions submitted in recent years, many have been complaining against the big noise made
Project Year: 2018
Organizer: Department of Air Quality Protection & Noise Control

Project Title: New physical public nuisance survey and study
Project Subject: The light pollution phenomenon becomes more obvious due to the increasing of installed lighting faci
Project Year: 2011
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Kuan-Yin ELV Shredding Plant Operation Monitoring and ELV Recycling System Reviewing Project
Project Subject: The purpose of this project is to assist and monitor the contracted operation of Kuan-Yin Auto Shred
Project Year: 2004
Organizer: Recycling Fund Management Board

Project Title: 101 year and 102 year diesel car power station maintenance management plan
Project Subject: Kaohsiung diesel power station maintenance and management plans were an operation and maintenance of
Project Year: 2012
Organizer: Environmental Protection Bureau Kauhsiung City Government

Project Title: The project for analyzing noise monitoring data and noise control plan.
Project Subject: This plan analyzed the noise complaint cases in recent years, and compared social and economic facto
Project Year: 2019
Organizer: Department of Air Quality Protection & Noise Control

Project Title: The project of strengthen repeatedly noise cases complaint inspection and low frequency noise contro
Project Subject: The noise is one of the major cases environmental pollutions. The number of noise complaint were app
Project Year: 2018
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Control measures for in-using motor vehicle’s noise and for prone to noise emission facilities
Project Subject: This project assisted the EPA to operate and maintain the in-use vehicles noise reporting website sy
Project Year: 2014
Organizer: Department of Air Quality Protection & Noise Control

Project Title: The Control Measure of In-use Vehicle Noise
Project Subject: This project assisted the EPA to operate and maintain the in-use vehicles noise reporting website sy
Project Year: 2013
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Traffic Noise and Aircraft Noise Control Project
Project Subject: Our company has completed various work contents of this project in conformity with the contractual r
Project Year: 2020
Organizer: Department of Air Quality Protection & Noise Control

Project Title: "Investigation of environmental low-frequency noise and vibration and research projet for improvemen
Project Subject: "The number of people affected by noise and vibration are increased by the days, and the quality of
Project Year: 2015
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: Chiayi City Diesel Vehicle Air Pollution Control and Idling Motor Vehicle Park and Stop audit plan i
Project Subject: As diesel engine has high output horsepower, it consumes relatively less fuel comparing with petrol
Project Year: 2021
Organizer: Environmental Protection Bureau, Chiayi City

Project Title: The project for inspection、reporting and control of vehicle noise
Project Subject: This project assisted the EPA to operate and maintain the in-use vehicles noise reporting website sy
Project Year: 2018
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Hualien electric locomotive promotion and installation plan in 110
Project Subject: The 110 Hualien County Electric Locomotive Promotion and Installation Plan will be implemented from
Project Year: 2021
Organizer: Environmental Protection Bureau, Hualien County

Project Title: 2013 Penghu County Mobile Pollution Source Control and Turn off Idling Engines Promotion Project
Project Subject: Project name: 2013 Penghu County Mobile Pollution Source Control and Turn off Idling Engines Promoti
Project Year: 2013
Organizer: Environmental Protection Bureau, Penghu County

Project Title: "Aviation Noise Control Project"
Project Subject: "Defects are commonly seen in the operation of the aviation noise monitoring stations and control (m
Project Year: 2016
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: Ambient Air Quality Monitoring Plan in year 2013
Project Subject: The program starts from 3/8/2013. The planned contents of tasks include maintaining the normal opera
Project Year: 2013
Organizer: Environmental Protection Bureau Yunlin County

Project Title: Control measures for in-using motor vehicle’s noise and for prone to noise emission facilities
Project Subject: This project assisted the EPA to operate and update the in-use vehicles noise reporting website for
Project Year: 2011
Organizer: Department of Air Quality Protection & Noise Control

Project Title: ""
Project Subject: "This project aims to: 1. Monitor the mobile environment and traffic noise in Tainan City; 2. Assist
Project Year: 2014
Organizer: "Environmental Protection Bureau of Tainan City"

Project Title: Construction of regional non-ionizing radiation monitoring data and information management project
Project Subject: In order to achieve a more comprehensive investigation of the distribution of environmental electrom
Project Year: 2018
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Ambient Air Quality Monitoring Plan in year 2016
Project Subject: This project has been started on August 26, 2016. The project scope included operation, maintenance
Project Year: 2016
Organizer: Environmental Protection Bureau Yunlin County

Project Title: 2022 Research and Management Program on Noise Control Technologies for Air and Ground Transportation
Project Subject: 一、 Air and ground transportation In terms of aircraft noise, completed suggestion and revision of re
Project Year: 2022
Organizer: Department of Air Quality Protection & Noise Control

Project Title: The Noise Control Management Information System and Noise Control Information Web Update and Mainten
Project Subject: The goals of this project included system maintenance and data collection of “The Noise Control Mana
Project Year: 2012
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Motor vehicles emission testing institutions checking project of 2018
Project Subject: The project was in accordance with「Regulations Governing Motor Vehicle Air Pollutant and Noise Emiss
Project Year: 2018
Organizer:

Project Title: "Research on Noise Control and Assessment with Detection Camera System Applied to In-use Motor Vehic
Project Subject: "Among the petitions submitted in recent years, many have been complaining against the big noise mad
Project Year: 2018
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: The project for joint inspection、exhaust pipe certification and control of vehicle noise.
Project Subject: This project assisted the EPA in operating the in-use vehicles noise reporting website system, and t
Project Year: 2019
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Noise Pollution Inspection on Public sentiment and Control Plan for 2019
Project Subject: This project has been executed since Jan.,2019, including motor vehicle noise control, traffic noise
Project Year: 2019
Organizer: Environmental Protection Bureau, Taichung City

Project Title: "Research on Non-ionizing Radiation Management and Environmental Monitoring Empirical Technology"
Project Subject: "This project completed the measurement and evaluation of electromagnetic field levels in specific a
Project Year: 2020
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: "A project for traffic noise control"
Project Subject: "Because of the urban development, traffic are getting more congested. And in order to mitigate the
Project Year: 2015
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title:
Project Subject: This project focused on the noise pollution and was principally categorized into eight parts: 1) com
Project Year: 2015
Organizer: Environmental Protection Bureau of Tainan City

行政院環境保護署 的其他資料集

經過水庫集水區之環境影響說明書件

每2月更新,72

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:03

行政院環境保護署

環境影響評估技術顧問機構評鑑成果

2年更新,46

劉先生 | 02-23117722#2743 | 2022-01-15 01:12:19

行政院環境保護署

空氣污染排放量推估結果

不定期更新更新,113

柏小姐 | 02-23712121#6106 | 2022-01-14 01:04:24

行政院環境保護署

光化測站(橋頭)小時值資料

不定期更新更新,169

陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:34

行政院環境保護署

環保人員數

每月更新更新,110

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:43

行政院環境保護署

縣市(澎湖縣)小時值-每小時

每小時更新更新,81

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:01:03

行政院環境保護署

符合噪音管制標準車輛-國產柴油引擎車

不定期更新更新,220

林先生 | 02-23712121-6403 | 2022-01-14 01:18:57

行政院環境保護署

空氣污染防制區範圍圖

不定期更新更新,41

周小姐 | 02-23117722#6102 | 2023-07-27 01:06:03

行政院環境保護署

行政院環境保護署環境保護產品驗證機構管理要點

每季更新更新,44

孫小姐 | 02-23117722#2926 | 2022-01-15 01:13:11

行政院環境保護署

空氣品質小時值_臺中市_西屯站

每1時更新,214

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:57

行政院環境保護署

機車排氣定檢站資料

每月更新更新,205

謝小姐 | 02-2371-2121#6310 | 2022-01-14 01:18:35

行政院環境保護署

歷年土壤調查_環保署土壤重金屬含量調查(319公頃)

不定期更新更新,103

謝先生 | (02)23832389*8302 | 2022-01-14 01:20:19

行政院環境保護署

環保署遊說法辦理情形

不定期更新更新,46

包先生 | 02-23117722 #2223 | 2022-01-15 01:13:30

行政院環境保護署

移動污染源空氣污染防制費收費統計

每1月更新,132

周小姐 | 02-2311-7722#6304 | 2023-07-28 11:35:52

行政院環境保護署

固定污染源設備元件揮發性有機物洩漏檢測申報資料

每3月更新,279

戴先生 | 02-2311-7722#6208 | 2023-08-07 01:02:40

行政院環境保護署

事業廢棄物共同清除、處理機構許可資料

不定期更新更新,162

何先生 | 02-2311-7722#2653 | 2022-01-14 01:26:04

行政院環境保護署

高雄市重要環保統計資料

每月更新更新,184

謝小姐 | 02-23117722#2103 | 2022-01-14 01:20:39

行政院環境保護署

總碳氫化合物(THC)監測小時值(每小時提供)

每小時更新更新,110

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:09

行政院環境保護署

澎湖縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,48

程先生 | 02-2311-7722#2833 | 2023-08-09 01:04:06

行政院環境保護署

彰化縣重要環保統計資料

每1月更新,143

陳先生 | 02-23117722#2108 | 2023-08-07 01:00:11

行政院環境保護署

環境教育活動數

每季更新更新,59

李小姐 | 02-23117722#2724 | 2022-01-15 01:10:44

行政院環境保護署

二仁溪污染整治小組及再生願景聯繫會報

不定期更新,31

黃先生 | 02-2311-7722#2508 | 2022-01-15 01:12:47

行政院環境保護署

各公告類別申報事業廢棄物流向統計

每1年更新,114

林先生 | 02-2311-7722#2671 | 2023-08-07 01:02:02

行政院環境保護署

位於野生動物保護或棲息區之環境影響說明書件

每2月更新,79

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:08

行政院環境保護署

EPQSummary_SoilAndGroundwater

不定期更新更新,238

郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:52

行政院環境保護署

推薦機關(薦舉)環境教育人員認證申請書

不定期更新更新,40

盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:27

行政院環境保護署

道路之開發類別環境影響說明書

每2月更新,91

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:14

行政院環境保護署

建檔公廁明細-宜蘭縣

不定期更新更新,185

賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:08

行政院環境保護署

土壤及地下水污染管制區公告資料

每月更新更新,130

賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:32

行政院環境保護署

環境教育及訓練電子報

不定期更新更新,39

葉小姐 | 03-4020789#607 | 2022-01-15 01:13:29

行政院環境保護署