time1: 0 time2: 0 time3: 0 time4: 0 total: 0 2009 Air Quality Operating and Maintaining Stations, Visibility
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

2009 Air Quality Operating and Maintaining Stations, Visibility

2009 Air Quality Operating and Maintaining Stations, Visibility 」於資料集「EPQSummary_NoiseAndVibration」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:50。 欄位Project Title的內容是2009 Air Quality Operating and Maintaining Stations, Visibility Investigation and Indoor Air Quality Management Project , 欄位Project Subject的內容是This project is executed from March 20, 2009 to March 19, 2010 and was budgeted 7,930 thousand New Taiwan Dollars. It accomplished the all assignments and duties, including the sampling with analysis and maintenance of both human and auto inspection stations in air quality, software and hardware devices updating, electrical signboard installation, visibility investigation, indoor air quality announcement and non-atomic ionized radiation monitoring, that Environmental Protection Bureau (EPB) authorized. For the human inspection stations in air quality, Xin Yi elementary school, Cheng Gong elementary school, Wen Shan elementary school, Bei Shin junior high school, Xi Yuan junior high school and Taiwan Railways terminal were sampling and analysis monthly for dust fall. Besides, The TSP sampling with analysis and maintenance were executed twice a month. The fluid correction of single point and multiple points were executed once a month and once a season separately. For the auto inspection stations, every monitoring items of station operated normally according to the weekly and seasonally maintenance of the project. Therefore, the data availability ratio could be over 85%. In addition, the software and hardware devices were also updating such as data management software, air conditioners, atmospheric pressure meters, railings and ladders. The monitoring data show that the air quality in 2009 was worse than it in 2008. Nevertheless, the disqualified rate of urban air quality in 2009 was 2.70% and the index pollutant was O3 as majority. For Situn station, it has 11 days, 4 days and 7 days for disqualification of air quality, index pollutant PM10 and O3 separately. For Jhonming station, it has 9 days, 3 days and 6 days for disqualification of air quality, index pollutant PM10 and O3 separately. For the Wunshan station, the disqualified rate of urban air quality in 2009 was 2.47% and it has 4 days and 5 days for the index pollutant PM10 and O3 separately. The disqualified rate of counties and cities of air quality in central Taiwan were in turn as Nantou County (3.42%), Taichung City (2.70%) and Changhua County (1.23%). For the non-atomic ionized radiation monitoring, the 10 cases of electromagnetic wave monitoring were accomplished. 6 high frequency cases and 4 low frequency cases of electromagnetic wave were measured to fill the bill of environmental suggestions. For the indoor air quality management, 2 educated announcements and statements have been already held. At the same time, 20 public places also participated in the independent managements of indoor air quality and CO2 investigations. Consequently, the results of CO2 investigation filled the bill of environmental suggestions to Environmental Protection Administration (EPA). The results of indoor air quality show that the disqualified rates of fungi were 60% as the most unqualified item. Nevertheless, the 9 examination items of CO2, CO, HCHO, TVOC, PM10, PM2.5, O3, bacteria and temperatures were fill the bill as 100% qualified rate. Besides, West distric office and Beitun district office were awarded excellent organization of indoor air quality according to indoor air quality judgments. They were also the best demonstrated places for indoor air quality in Taichung city. For the visibility investigation, this project discussed the results of particles monitoring and particles analysis of PM10 and PM2.5 for long term visibility monitoring of Taichung Weather Station of Central Weather Bureau (CWB) and rebuilt the PM10 concentration of Taichung urban area in the last 40 years. Also, it compared to the differences of visibility between Taichung City and previous data of central Taiwan area. Therefore, it built the classified index of visibility for Taichung City. In the event, both the best model of optional scenarios and the cost effective policies of pollutant reducing an... , 欄位Project Year的內容是2009 , 欄位Organizer的內容是Environmental Protection Bureau, Taichung City , 欄位Executive Unit的內容是祥威環境科技有限公司 , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=16709&proj_id=0988041263&doc_kind=1 , 欄位Publish Date的內容是20110301

Project Title

2009 Air Quality Operating and Maintaining Stations, Visibility Investigation and Indoor Air Quality Management Project

Project Subject

This project is executed from March 20, 2009 to March 19, 2010 and was budgeted 7,930 thousand New Taiwan Dollars. It accomplished the all assignments and duties, including the sampling with analysis and maintenance of both human and auto inspection stations in air quality, software and hardware devices updating, electrical signboard installation, visibility investigation, indoor air quality announcement and non-atomic ionized radiation monitoring, that Environmental Protection Bureau (EPB) authorized. For the human inspection stations in air quality, Xin Yi elementary school, Cheng Gong elementary school, Wen Shan elementary school, Bei Shin junior high school, Xi Yuan junior high school and Taiwan Railways terminal were sampling and analysis monthly for dust fall. Besides, The TSP sampling with analysis and maintenance were executed twice a month. The fluid correction of single point and multiple points were executed once a month and once a season separately. For the auto inspection stations, every monitoring items of station operated normally according to the weekly and seasonally maintenance of the project. Therefore, the data availability ratio could be over 85%. In addition, the software and hardware devices were also updating such as data management software, air conditioners, atmospheric pressure meters, railings and ladders. The monitoring data show that the air quality in 2009 was worse than it in 2008. Nevertheless, the disqualified rate of urban air quality in 2009 was 2.70% and the index pollutant was O3 as majority. For Situn station, it has 11 days, 4 days and 7 days for disqualification of air quality, index pollutant PM10 and O3 separately. For Jhonming station, it has 9 days, 3 days and 6 days for disqualification of air quality, index pollutant PM10 and O3 separately. For the Wunshan station, the disqualified rate of urban air quality in 2009 was 2.47% and it has 4 days and 5 days for the index pollutant PM10 and O3 separately. The disqualified rate of counties and cities of air quality in central Taiwan were in turn as Nantou County (3.42%), Taichung City (2.70%) and Changhua County (1.23%). For the non-atomic ionized radiation monitoring, the 10 cases of electromagnetic wave monitoring were accomplished. 6 high frequency cases and 4 low frequency cases of electromagnetic wave were measured to fill the bill of environmental suggestions. For the indoor air quality management, 2 educated announcements and statements have been already held. At the same time, 20 public places also participated in the independent managements of indoor air quality and CO2 investigations. Consequently, the results of CO2 investigation filled the bill of environmental suggestions to Environmental Protection Administration (EPA). The results of indoor air quality show that the disqualified rates of fungi were 60% as the most unqualified item. Nevertheless, the 9 examination items of CO2, CO, HCHO, TVOC, PM10, PM2.5, O3, bacteria and temperatures were fill the bill as 100% qualified rate. Besides, West distric office and Beitun district office were awarded excellent organization of indoor air quality according to indoor air quality judgments. They were also the best demonstrated places for indoor air quality in Taichung city. For the visibility investigation, this project discussed the results of particles monitoring and particles analysis of PM10 and PM2.5 for long term visibility monitoring of Taichung Weather Station of Central Weather Bureau (CWB) and rebuilt the PM10 concentration of Taichung urban area in the last 40 years. Also, it compared to the differences of visibility between Taichung City and previous data of central Taiwan area. Therefore, it built the classified index of visibility for Taichung City. In the event, both the best model of optional scenarios and the cost effective policies of pollutant reducing an...

Project Year

2009

Organizer

Environmental Protection Bureau, Taichung City

Executive Unit

祥威環境科技有限公司

Publish Date

20110301

「2009 Air Quality Operating and Maintaining Stations, Visibility 」所屬的資料集:「EPQSummary_NoiseAndVibration」的其他資料

Project Title: 2019 Taipei City Noise Control Project
Project Subject: Due to thee high population and building density, heavy traffic flow and the residential-commercial
Project Year: 2019
Organizer: Department of Environmental Protection, Taipei City Government

Project Title: Taichung City: Noise Pollution Inspection on Public sentiment and Control Plan for 2020
Project Subject: This project has been executed since Jan., 2020 , including motor vehicle noise control, traffic noi
Project Year: 2020
Organizer: Environmental Protection Bureau, Taichung City

Project Title: "The control measure of noise reporting、inspection and performance"
Project Subject: "This project assisted the EPA to operate and maintain the in-use vehicles noise reporting website s
Project Year: 2016
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: The control measure of noise reporting、inspection and performance.
Project Subject: This project assisted the EPA to operate and maintain the in-use vehicles noise reporting website sy
Project Year: 2017
Organizer: Department of Air Quality Protection & Noise Control

Project Title:
Project Subject: Diesel engines are extensively used in passenger and cargo transportation vehicles and military and
Project Year: 2015
Organizer: Environmental Protection Bureau, Chiayi City

Project Title: "Efficiency Evaluation Plan on the Reduction of Air Pollution, Carbon, and Noise by Applying Modifie
Project Subject: "1.Research and analysis of the current situation of applying solar panels to acoustic barriers for
Project Year: 2019
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: "The Study of Characteristics and Control of Environmental Vibration Source "
Project Subject: "In order to fulfill the environment protection affairs, to establish the background information, an
Project Year: 2017
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: Smart Noise System Applied to Environmental Sensing IoT
Project Subject: An EU Environmental Noise Directive has defined the “quiet zone” and required EU member states to im
Project Year: 2020
Organizer: Department of Air Quality Protection & Noise Control

Project Title: The Study of Facilities and Regulations of Sound Insulation in Buildings of Nearby Transportation Sy
Project Subject: (一)Collection and analysis for facilities (include openings of exterior wall in buildings ) and regu
Project Year: 2013
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Research and Analysis of Public Nuisance Dispute Problem for Noise &Vibration of Mass Transportatio
Project Subject: This is a two-year research project which is sponsored by Environmental Protection Administration, d
Project Year: 2007
Organizer: Department of Supervision Evaluation & Dispute Resolution

Project Title: The project for noise control of in-use vehicle and construction and improve the quality management
Project Subject: This project assists the EPA in controlling noise from vehicles in use, Including the inspection and
Project Year: 2022
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Investigation of Environment Low-frequency Noise and Vibration and Research Project for Improvement
Project Subject: The environmental vibration is a part of environmental protection goal in Taiwan. The EPA put in man
Project Year: 2016
Organizer: Department of Air Quality Protection & Noise Control

Project Title: "Control measures for in-using motor vehicle’s noise and for prone to noise emission facilities"
Project Subject: "This project assisted the EPA to operate and maintain the in-use vehicles noise reporting website s
Project Year: 2014
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: " Smart Noise System Applied to Environmental Sensing IoT"
Project Subject: "An EU Environmental Noise Directive has defined the “quiet zone” and required EU member states to i
Project Year: 2020
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title:
Project Subject: This plan intended to accomplish operation of noise mobile environment and traffic sounds monitoring
Project Year: 2012
Organizer: Environmental Protection Bureau of Tainan City

Project Title: "Development of underwater noise investigation technology for offshore wind power facilities."
Project Subject: "In recent years, the government has been dedicated to the development of green industry (including
Project Year: 2018
Organizer: "Environmental Analysis Laboratory"

Project Title: 110 Hualien County Construction Projects and Noise Inspection and Control Plan
Project Subject: According to the contract to standardize the work items and content, and in line with the requiremen
Project Year: 2021
Organizer: Environmental Protection Bureau, Hualien County

Project Title: 2013 Penghu County Mobile Pollution Source Control and Turn off Idling Engines Promotion Project
Project Subject: Project name: 2013 Penghu County Mobile Pollution Source Control and Turn off Idling Engines Promoti
Project Year: 2013
Organizer: Environmental Protection Bureau, Penghu County

Project Title: Implement of the new vehicle type approval with regard to diesel vehicle and noise and quality consi
Project Subject: This project implements motor vehicle noise and diesel vehicle emission inspection and management po
Project Year: 2020
Organizer: Department of Air Quality Protection & Noise Control

Project Title: The control strategy of the in-use vehicle noise
Project Subject: This project assisted the EPA to operate and maintain the in-use vehicle noise reporting website sys
Project Year: 2015
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Noise Monitoring and Noise Recognition and Control of Motor Vehicles Exhaust Pipes in Tainan City, 2
Project Subject: 1. Project Title: Noise Monitoring and Noise Recognition and Control of Motor Vehicles Exhaust Pipes
Project Year: 2021
Organizer: Environmental Protection Bureau of Tainan City

Project Title: Motor vehicles emission testing institutions checking project of 2018
Project Subject: The project was in accordance with「Regulations Governing Motor Vehicle Air Pollutant and Noise Emiss
Project Year: 2018
Organizer:

Project Title: "The project for reporting、joint inspection and control exhaust pipe certification of vehicle noise.
Project Subject: "This project was mainly to assist the EPA to grasp the results of vehicle noise inspections in vari
Project Year: 2020
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: "Implement of the new vehicle type approval with regard to noise and diesel vehicle and quality cons
Project Subject: "This project aims to assist EPA in examination of noise and diesel vehicle certificates for new veh
Project Year: 2018
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: "Research Project on Operating Procedures for Indoor Noise Monitoring and Verification of Measuremen
Project Subject: "In order to promote the enhancement of indoor acoustic quality in public places, the Environmental
Project Year: 2017
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: "Stationary pollution sources, Chiayi County 101 year continuous emission monitoring systems (CEMS)
Project Subject: "1. Continuously the automatic monitor facility laws and regulations degree of conformity and the fu
Project Year: 2012
Organizer: "Environmental Protection Bureau, Chiayi County"

Project Title: "The study of environmental noise quality analysis "
Project Subject: "1. To collect the framework information of foreign long-term noise monitoring system.2. To propose
Project Year: 2014
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: A Study on Soundproof Efficiency and Regulations of Buildings Adjacent to Transportation Systems
Project Subject: Soundproof efficiency and regulations of façade openings on buildings adjacent to transportation sys
Project Year: 2014
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Noise Monitoring and Management 2020 in Tainan City
Project Subject: Project Results Summary of Environmental Protection Bureau, Tainan City Government 1. Project Title
Project Year: 2020
Organizer: Environmental Protection Bureau of Tainan City

Project Title: Implement of the new vehicle type approval with regard to noise and diesel vehicle and quality consi
Project Subject: This project aims to assist EPA in examination of noise and diesel vehicle certificates for new vehi
Project Year: 2018
Organizer: Department of Air Quality Protection & Noise Control

行政院環境保護署 的其他資料集

大型垃圾焚化廠操作營運情形

每月更新更新,142

謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:17

行政院環境保護署

執行機關一般廢棄物產生量

每1月更新,175

顏先生 | 02-23117722#2109 | 2023-07-27 01:01:23

行政院環境保護署

環境教育人員認證得採計之專業領域課程(ODT)

不定期更新更新,47

盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:24

行政院環境保護署

核能四廠環評監督委員會會議紀錄

不定期更新更新,48

陳先生 | 04-2252-1718#51207 | 2023-08-09 01:04:33

行政院環境保護署

縣市(臺東縣)小時值-每小時

每1時更新,302

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:38

行政院環境保護署

汽車新車審驗資料

每月更新更新,197

王先生 | 02-23712121#6306 | 2022-01-14 01:18:29

行政院環境保護署

細懸浮微粒資料(PM2.5)

每1時更新,106

陳先生 | 02-2311-7722#2386 | 2023-08-08 00:58:48

行政院環境保護署

廢棄物質最終處置資訊網相關新聞

每月更新更新,75

許先生 | 02-2311-7722#2641 | 2022-01-14 01:24:14

行政院環境保護署

屏東縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,56

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:51

行政院環境保護署

經過山坡地之環境影響說明書件

每2月更新,272

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:01

行政院環境保護署

行政院環境保護署單位決算

每1年更新,43

何先生 | 02-23117722#2158 | 2023-08-09 01:04:28

行政院環境保護署

空氣品質小時值_雲林縣_崙背站

每1時更新,320

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:52

行政院環境保護署

空氣污染實收罰鍰

每年更新更新,157

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:40

行政院環境保護署

核能一廠、二廠相關計畫環評監督委員會會議紀錄

不定期更新更新,37

陳先生 | 04-22521718#51207 | 2023-08-09 01:05:12

行政院環境保護署

自來水水質抽驗結果(依項目)

每月提供6個月前資料更新,154

黃先生 | 02-23117722#2881 | 2022-01-15 01:10:24

行政院環境保護署

行政院環境保護署毒物及化學物質局單位決算

不定期更新,49

魏小姐 | 02-23257399#55432 | 2022-01-15 01:09:57

行政院環境保護署

歷年毒性化學物質環境流布調查成果手冊

每年更新更新,44

陳小姐 | 23257399#55337 | 2022-01-14 01:22:52

行政院環境保護署

環評主管機關受理審查之環境影響調查報告

每2月更新,97

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:16

行政院環境保護署

廢(污)水產生量及排放量

每1年更新,145

顏先生 | 02-23117722#2109 | 2023-07-30 01:01:05

行政院環境保護署

河川水質季監測資料

每3月更新,188

郭先生 | 2311-7722#2399 | 2023-08-07 01:02:03

行政院環境保護署

環保署職員官等性別統計資料

每3月更新,60

嚴小姐 | 02-23117722#2133 | 2023-07-30 01:02:14

行政院環境保護署

縣市(新北市)小時值-每小時

每小時更新更新,155

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:40

行政院環境保護署

光化測站(林園)小時值資料

不定期更新更新,175

陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:28

行政院環境保護署

應設置資源回收設施之電子電器販賣業者資料

每1年更新,127

廖小姐 | 02-2370-5888#3103 | 2023-07-27 00:59:44

行政院環境保護署

EPQSummary_EnvironmentalImpactAssessment

不定期更新更新,171

陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:43

行政院環境保護署

公告事業廢棄物清運機具資料

每月更新更新,243

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:05

行政院環境保護署

環境教育機構認證申請書

不定期更新更新,65

盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:26

行政院環境保護署

環保署毒物及化學物質局補、捐(獎)助團體及個人情形表

每季更新更新,61

陳小姐 | 02-23257399#55434,02-23257399#55432 | 2022-01-15 01:09:58

行政院環境保護署

各月份場址更新率統計報表

不定期更新更新,165

賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:17

行政院環境保護署

使用中機動車輛噪音檢驗之場所表

不定期更新更新,46

謝先生 | 02-23712121#6403 | 2023-08-07 01:02:18

行政院環境保護署