time1: 0 time2: 0 time3: 0 time4: 0 total: 0 "Develope and evaluate the characteristic index of particulate matter source "
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

"Develope and evaluate the characteristic index of particulate matter source "

"Develope and evaluate the characteristic index of particulate matter source "」於資料集「EPQSummary_Air」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:50。 欄位Project Title的內容是"Develope and evaluate the characteristic index of particulate matter source " , 欄位Project Subject的內容是"The purpose of this study is to establish the source profiles and fingerprinters of particulate matters (PM) emitted from various major stationary pollution sources in Taiwan, including power plant, steel manufacturing, cement mill/clinker and petroleum refining. To achieve this goal, PM of aerodynamic diameter less than 100 m (total particulate matter, TSP) emitted from 13 eligible plants were collected isokinetically using an in-stack sampling device. The ambient TSP in the surrounding air of these plants was also simultaneously measured in order to estimate the fugitive emissions. The target metals in all aerosol samples were analyzed by ICP-MS. The result shows that the major elements such as Al, Fe, Na, Mg, K and Ca emitted from all the stacks were very similar; however, abundance of Ca, Fe, K were, respectively, found in cement mills/clinkers, steel arc and steel sintering. It is also found that some trace metals such as As, Se and Ge (coal power plant), K, Fe, Mn, Pb, Zn, Cr and Sn (steel plant), Ca, Sr, Ti, Tl and Cs (cement mill), Co, Ni, V, Sb, La and P (heavy oil burning) along with La, Nd and Ce (petroleum refining) could be regarded as tracers for the specific sources. High enrichment factor (EF) values for Se, Tl, Ga, As, Pb, Zn, Cd, Sn, Sb and Ge in all sources indicate that these elements were profoundly from anthropogenic origins. Furthermore, we constructed some fingerprinting ratios in different sources: (1)As/Se and Se/Ti for power plants; (2)Fe/Al, Mn/Ti, Cu/Ba, Zn/Cu, Cr/Ti along with Cr/Ni for steel arc; (3)Rb/K in steel sintering; (4) Tl/Ca, Tl/Se, Tl/As, Tl/Ga and Rb/Cs for cement plant; (5) Co/Ti, Ni/Ti and Cu/Sb for heavy oil combustion; (6)La/Ce and La/Nd for petroleum refining. The specific ratio will be a powerful tool to qualitatively identify the pollution sources of atmospheric PM. The result for emission factor reflects that the emissions of PM from stack were much higher than those from fugitive process in all stationary sources. Finally, the source profiles were employed to assess the source apportionments of atmospheric primary PM at Taoyuan and Zhudong sampling sites. At Taoyuan sampling sites, soil dust (28 %) was the predominant source of primary PM, followed by traffic emissions (22 %), power plant (17 %), steel manufacturing (13 %), cement mills (10 %) and petroleum refining (10 %). For Zhudong sites, soil dust (40 %) contributes largest fractions of airborne primary PM, followed by vehicle fleets (34 %), cement mills (16 %), petroleum refinery (6 %) and steel plants (4 %)." , 欄位Project Year的內容是2014 , 欄位Organizer的內容是"Environmental Analysis Laboratory" , 欄位Executive Unit的內容是"中央研究院環境變遷研究中心" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=73168 , 欄位Publish Date的內容是20150201

Project Title

"Develope and evaluate the characteristic index of particulate matter source "

Project Subject

"The purpose of this study is to establish the source profiles and fingerprinters of particulate matters (PM) emitted from various major stationary pollution sources in Taiwan, including power plant, steel manufacturing, cement mill/clinker and petroleum refining. To achieve this goal, PM of aerodynamic diameter less than 100 m (total particulate matter, TSP) emitted from 13 eligible plants were collected isokinetically using an in-stack sampling device. The ambient TSP in the surrounding air of these plants was also simultaneously measured in order to estimate the fugitive emissions. The target metals in all aerosol samples were analyzed by ICP-MS. The result shows that the major elements such as Al, Fe, Na, Mg, K and Ca emitted from all the stacks were very similar; however, abundance of Ca, Fe, K were, respectively, found in cement mills/clinkers, steel arc and steel sintering. It is also found that some trace metals such as As, Se and Ge (coal power plant), K, Fe, Mn, Pb, Zn, Cr and Sn (steel plant), Ca, Sr, Ti, Tl and Cs (cement mill), Co, Ni, V, Sb, La and P (heavy oil burning) along with La, Nd and Ce (petroleum refining) could be regarded as tracers for the specific sources. High enrichment factor (EF) values for Se, Tl, Ga, As, Pb, Zn, Cd, Sn, Sb and Ge in all sources indicate that these elements were profoundly from anthropogenic origins. Furthermore, we constructed some fingerprinting ratios in different sources: (1)As/Se and Se/Ti for power plants; (2)Fe/Al, Mn/Ti, Cu/Ba, Zn/Cu, Cr/Ti along with Cr/Ni for steel arc; (3)Rb/K in steel sintering; (4) Tl/Ca, Tl/Se, Tl/As, Tl/Ga and Rb/Cs for cement plant; (5) Co/Ti, Ni/Ti and Cu/Sb for heavy oil combustion; (6)La/Ce and La/Nd for petroleum refining. The specific ratio will be a powerful tool to qualitatively identify the pollution sources of atmospheric PM. The result for emission factor reflects that the emissions of PM from stack were much higher than those from fugitive process in all stationary sources. Finally, the source profiles were employed to assess the source apportionments of atmospheric primary PM at Taoyuan and Zhudong sampling sites. At Taoyuan sampling sites, soil dust (28 %) was the predominant source of primary PM, followed by traffic emissions (22 %), power plant (17 %), steel manufacturing (13 %), cement mills (10 %) and petroleum refining (10 %). For Zhudong sites, soil dust (40 %) contributes largest fractions of airborne primary PM, followed by vehicle fleets (34 %), cement mills (16 %), petroleum refinery (6 %) and steel plants (4 %)."

Project Year

2014

Organizer

"Environmental Analysis Laboratory"

Executive Unit

"中央研究院環境變遷研究中心"

Publish Date

20150201

「"Develope and evaluate the characteristic index of particulate matter source "」所屬的資料集:「EPQSummary_Air」的其他資料

Project Title: "2017 「Tainan City Air Quality Assessment & Management Plan」"
Project Subject: "(1)Environmental Loading and Trend The amount of population in Tainan City is 1.885 million, and th
Project Year: 2017
Organizer: "Environmental Protection Bureau of Tainan City"

Project Title: "Early warning, publicity and improvement of the river dust in Hualien County in 107"
Project Subject: "Běn jì huà zì héyuē qiānyuē rì 107 nián 10 yuè 22 rì zhíxíng, jiézhì 108 nián 10 yuè 21 rì zhǐ, jì
Project Year: 2018
Organizer: "Environmental Protection Bureau, Hualien County"

Project Title: "2017 Mobile Pollution Source Control Plan"
Project Subject: "1. Control of vehicle in serviceIn order to control the vehicle in service of the county, this plan
Project Year: 2017
Organizer: "HsinChu County Environment Protection Bureau"

Project Title: "Yilan County 103 annual diesel exhaust pollution control and power meter operation detection plan"
Project Subject: "Fourth, carry out the achievement Relevant environmental pollution that may cause in order to stren
Project Year: 2014
Organizer: "Environmental Protection Bureau of Yi-Lan County"

Project Title: "105 year degrees Hsinchu City high risk potential pollutant and PM2.5 investigation and management
Project Subject: "First, the high risk potential industry inspection control.Second, environmental monitoring.Third,
Project Year: 2016
Organizer: "Bureau of Environmental Protection Hsin-Chu"

Project Title: "Prevention and promotion to improve river dust programs of Jhuoshuei River in 2013."
Project Subject: "This plan was from April 11, 2013 to April 10, 2014, all the works has been completed within schedu
Project Year: 2013
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "Taitung fixed contamination inspection control plan"
Project Subject: "The main work items of Tainan stationary air pollution source control project areas follows: (1) Im
Project Year: 2014
Organizer: "Taitung County Environment Protection Bureau"

Project Title: "The 2014 Project on Indoor Air Quality Inspection and Management for Pingtung County"
Project Subject: "The project has accomplished eighty six for new registered premises and one hundred and fifty nine
Project Year: 2014
Organizer: "Environmental Protection Bureau, Pingtung County"

Project Title: "The 102 annual project of mobile pollution inspection and management in Taoyuan County"
Project Subject: ""
Project Year: 2013
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: "Penghu 『2016 The air quality management development plan』"
Project Subject: "In this year our project goal is collect and analysis over the years environmental background in Pe
Project Year: 2016
Organizer: "Environmental Protection Bureau, Penghu County"

Project Title: "2015 Atmospheric Fine Particulates Monitoring and Analysis Project in Kinmen County"
Project Subject: "The project implemented from April 1, 2015 to March 31, 2016. Major completed works include manual
Project Year: 2015
Organizer: "Environmental Protection Bureau, Kinmen County"

Project Title: "2012 Offshore Island Industrial Zone for Inspection of Continuous Emission Monitoring System Projec
Project Subject: "Implementing checking thoroughly the process’s discharge pipes of Offshore Industrial Zone of the i
Project Year: 2012
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "Completion of subsidy verification for low-pollution vehicle"
Project Subject: " The major target of the project was to check and review the subsidy application of purchase on el
Project Year: 2014
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: "2016 Yilan County stationary pollution permits, inspection control and CEMs facilities function che
Project Subject: " "
Project Year: 2016
Organizer: "Environmental Protection Bureau of Yi-Lan County"

Project Title: "2016 Kinmen County Low-Carbon Sustainable Homeland Operation and Performance Assessment Program"
Project Subject: "1. Assist in Implementation and Evaluation of the Low-carbon Island ProgramPromote the 2016 local l
Project Year: 2016
Organizer: "Environmental Protection Bureau, Kinmen County"

Project Title: "107 years of Wuhu County fixed pollution source inspection control plan"
Project Subject: "In addition, Penghu County, under the guidance of its chief executive, worked hard to achieve its q
Project Year: 2018
Organizer: "Environmental Protection Bureau, Penghu County"

Project Title: "Air Pollution Control Information Integration Project in the Offshore Industrial Park in 2017."
Project Subject: "This project was carried out from August 16th, 2017 to November 13th, 2018. All work contents were
Project Year: 2017
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "none"
Project Subject: "none"
Project Year: 2018
Organizer: "Environmental Protection Bureau, Pingtung County"

Project Title: "-"
Project Subject: "-"
Project Year: 2015
Organizer: "Nantou County Environmental Protection Bureau"

Project Title: "The dust suppression program of Beinan River in 2016"
Project Subject: "For the past few years, Taitung had been influenced by severe Windblown dust crisis because of the
Project Year: 2016
Organizer: "Taitung County Environment Protection Bureau"

Project Title: "The project of evaluating the inspected procedures of the motor-exhaust inspecting stations"
Project Subject: "The project was implemented from April 28, 2018 to December 31, 2018. The project was evaluated the
Project Year: 2018
Organizer: "Department of Environmental Protection, Taipei City Government"

Project Title: "2013 Offshore Island Industrial Zone for Inspection of Continuous Emission Monitoring System Projec
Project Subject: "In this project implementations of monitoring facilities added and replaced that assisted the Envir
Project Year: 2013
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "2011 Offshore Island Industrial Zone Total Air Pollution Examination and Permit Control"
Project Subject: "This plan has a 11-month execution period from Apr 1, 2011 to Feb 29, 2012 and includes the main ta
Project Year: 2012
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "-"
Project Subject: "-"
Project Year: 2013
Organizer: "Environmental Protection Bureau, Pingtung County"

Project Title: "2016 Inspection Plan of Diesel Vehicle Dynamometer in Smoke Exhaust Detection Station"
Project Subject: "With regarding to diesel vehicle contamination control, in order to improve the air quality and pro
Project Year: 2016
Organizer: "HsinChu County Environment Protection Bureau"

Project Title: "2014 Air quality management development plan"
Project Subject: ""
Project Year: 2014
Organizer: "Environmental Protection Bureau, Penghu County"

Project Title: "107 Hsinchu City Air Quality Integrated Management Plan"
Project Subject: "As of December 31, 2018, the overall progress of the implementation of this project reached 100%. T
Project Year: 2018
Organizer: "Bureau of Environmental Protection Hsin-Chu"

Project Title: "105年度花蓮縣空氣污染等陳情案件快速查處管制計畫"
Project Subject: "(1) quickly investigate and deal with casesIn this year, the number of case cases was 2,695, of whi
Project Year: 2016
Organizer: "Environmental Protection Bureau, Hualien County"

Project Title: "The Mobile Source Inspection and Management Project in 103th"
Project Subject: "Yunlin County’s mobile pollution source control plan investigates if motors within its administrati
Project Year: 2014
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "2017 Environmental Quality Monitoring Station(including Mobile Monitoring Vehicle) Operation And Ma
Project Subject: "This project was implemented from Feb. 3, 2017 to Dec. 31, 2017. All tasks defined in the Environme
Project Year: 2017
Organizer: "Environmental Protection Bureau, Taichung City"

行政院環境保護署 的其他資料集

建檔公廁明細-桃園市

不定期更新更新,179

曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:14:45

行政院環境保護署

EPQSummary_NoiseAndVibration

不定期更新更新,125

陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:50

行政院環境保護署

事業廢棄物共同清除、處理機構許可資料

不定期更新更新,152

何先生 | 02-2311-7722#2653 | 2022-01-14 01:26:04

行政院環境保護署

行政院環境保護署環境保護基金附屬單位法定預算

每1年更新,43

郭小姐 | 02-2311-7722#2164 | 2023-08-09 01:05:43

行政院環境保護署

重點事業廢棄物-一般污泥之處理方式

每月更新更新,136

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:13

行政院環境保護署

環境影響差異分析報告專案小組審查會議紀錄

每2月更新,105

黃先生 | 02-23117722#2748 | 2023-08-06 01:02:18

行政院環境保護署

空氣品質監測小時值資料(一般污染物,每日更新)

每日更新更新,133

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:20

行政院環境保護署

柴油新車審驗資料-合格證明函

不定期更新更新,45

李小姐 | 02-2311-7722#6311 | 2023-08-09 01:04:47

行政院環境保護署

苗栗縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,39

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:44

行政院環境保護署

噪音稽查次數

每年更新更新,80

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:41

行政院環境保護署

土壤及地下水污染場址位置圖

不定期更新更新,45

賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:16:34

行政院環境保護署

列管事業污染源裁處資料

每1月更新,102

陳小姐 | 04-2252-1718#51310 | 2023-08-07 01:02:41

行政院環境保護署

水污染罰鍰次數

每年更新更新,135

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:27

行政院環境保護署

EPQSummary_PublicNuisanceDispute

不定期更新更新,120

陳先生 | 02-2311-7722#2386 | 2023-07-27 01:02:16

行政院環境保護署

空氣品質小時值_臺北市_大同站

每1時更新,123

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:10

行政院環境保護署

列管廢棄物棄置場址

每1月更新,39

黃小姐 | 04-22521718*53606 | 2023-08-09 01:04:05

行政院環境保護署

環境影響說明書附表五:空氣

每2月更新,92

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:01

行政院環境保護署

空氣污染防制區範圍圖

不定期更新更新,38

周小姐 | 02-23117722#6102 | 2023-07-27 01:06:03

行政院環境保護署

光化測站(萬華)小時值資料

不定期更新更新,116

陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:37

行政院環境保護署

經過飲用水水源水質保護區之環境影響評估報告書

每2月更新,55

黃先生 | 02-23117722#2748 | 2023-08-05 01:00:58

行政院環境保護署

建檔公廁明細-新竹市

不定期更新更新,185

曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:15:00

行政院環境保護署

大甲媽祖遶境即時空品監測成果(E-motor)

不定期更新更新,162

陳先生 | 02-2311-7722#2341 | 2022-01-14 01:02:39

行政院環境保護署

土壤污染物監測及管制標準

不定期更新更新,67

王先生 | 02-23832389#8307 | 2022-01-14 01:20:21

行政院環境保護署

各公告類別事業廢棄物委託或共同處理申報量統計

每月更新更新,182

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:25:40

行政院環境保護署

毒性化學物質許可及申報資料

每3月更新,274

許先生 | 02-23117722#2865 | 2023-07-30 01:03:49

行政院環境保護署

機車排氣定期檢驗資料

不定期更新更新,132

謝小姐 | 02-2371-2121#6310 | 2022-01-14 01:18:28

行政院環境保護署

大眾捷運系統之開發類別環境影響說明書

每2月更新,52

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:14

行政院環境保護署

彰化縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,49

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:46

行政院環境保護署

監測車、河川揚塵監測站基本資料

每1日更新,75

陳先生 | 02-2311-7722#2386 | 2023-08-03 01:02:48

行政院環境保護署

空氣品質小時值_彰化縣_二林站

每1時更新,121

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:55

行政院環境保護署