Total Load Control Plan for Environmental Impact Assessment in S
「Total Load Control Plan for Environmental Impact Assessment in S」於資料集「EPQSummary_EnvironmentalImpactAssessment」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:43。 欄位Project Title的內容是Total Load Control Plan for Environmental Impact Assessment in Slope-Land and Coast Areas , 欄位Project Subject的內容是According to the environmental carrying capacity, total load control aimed to develop and use environmental resources under the acceptable capacity, reducing the impacts and hazards of unsuitable developments and uses. Meanwhile, total load control focuses on the individual environmental characteristics and carrying capacity to determine the standards of total load based on the capacities of water, air, land, soil, transportation, and so on.
The approaches of this study are as follows. First, we collected and analyzed all related projects commissioned by EPA in the past, and then compared and assessed the different methods, content, and conclusions of those projects. According the compared results, we set up the operation processes of environmental sensitive area delimitation, total load control analysis, total load control standards and control strategies making and environmental geographic information system framework. After that, we apply the operation processes to a case study, the Hsin-Chu Area. The results of this project entirely included relative projects. After the case study and setting up townscape total load control and control standards of environmental sensitivity area, air quality, water quality, water source, soil quality, transportation, land use and waste, we build up geographic information system framework of total load control in environmental impact assessment. All study data were collected into this GIS framework. , 欄位Project Year的內容是2004 , 欄位Organizer的內容是Department of Comprehensive Planning , 欄位Executive Unit的內容是中國文化大學數位地球研究中心 , 欄位Reporting download URL的內容是https://epq.epa.gov.tw , 欄位Publish Date的內容是20050301 。
Project Title
Total Load Control Plan for Environmental Impact Assessment in Slope-Land and Coast Areas
Project Subject
According to the environmental carrying capacity, total load control aimed to develop and use environmental resources under the acceptable capacity, reducing the impacts and hazards of unsuitable developments and uses. Meanwhile, total load control focuses on the individual environmental characteristics and carrying capacity to determine the standards of total load based on the capacities of water, air, land, soil, transportation, and so on. The approaches of this study are as follows. First, we collected and analyzed all related projects commissioned by EPA in the past, and then compared and assessed the different methods, content, and conclusions of those projects. According the compared results, we set up the operation processes of environmental sensitive area delimitation, total load control analysis, total load control standards and control strategies making and environmental geographic information system framework. After that, we apply the operation processes to a case study, the Hsin-Chu Area. The results of this project entirely included relative projects. After the case study and setting up townscape total load control and control standards of environmental sensitivity area, air quality, water quality, water source, soil quality, transportation, land use and waste, we build up geographic information system framework of total load control in environmental impact assessment. All study data were collected into this GIS framework.
Project Year
2004
Organizer
Department of Comprehensive Planning
Executive Unit
中國文化大學數位地球研究中心
Reporting download URL
Publish Date
20050301
「Total Load Control Plan for Environmental Impact Assessment in S」所屬的資料集:「EPQSummary_EnvironmentalImpactAssessment」的其他資料
-2019-
Project Title:
-
Project Subject:
-
Project Year:
2019
Organizer:
Environmental Protection Bureau, Taichung City
Project Title:
Dataset Builds up and Renews of Total Load Control Plan for Environmental Impact Assessment
Project Subject:
Objective of this project is to set up data set for EIA and total load control in Dasuie river water
Project Year:
2005
Organizer:
Department of Comprehensive Planning
Project Title:
Design of biodiversity offsets technical guidance and construction of GIS databases in EIA
Project Subject:
Ecosystem services and biodiversity are the foundation to human sustainable development and are supp
Project Year:
2012
Organizer:
Department of Comprehensive Planning
Project Title:
Construction of regional non-ionizing radiation monitoring data and information management project
Project Subject:
In order to achieve a more comprehensive investigation of the distribution of environmental electrom
Project Year:
2018
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
"The Supervision Project for Environmental Impact Assessment"
Project Subject:
"The scope of the project was the review and supervision the approved environmental impact assessmen
Project Year:
2016
Organizer:
"Bureau of Environmental Inspection"
Project Title:
"Analysis of Environmental Impact Assessment and decision-making supporting project in 2018"
Project Subject:
"The 2018 Analysis of Environmental Impact Assessment and decision support project was contracted to
Project Year:
2018
Organizer:
"Department of Comprehensive Planning"
Project Title:
Reviewal and amendment for the institution and regulations of Strategic Environmental Assessment
Project Subject:
The administration continuously carried out the tasks of Strategic Environmental Assessment (SEA) on
Project Year:
2011
Organizer:
Department of Comprehensive Planning
Project Title:
Project for Revision of Operational Rules of Environmental Evaluation for Development
Project Subject:
Environmental evaluation is the core for national development. And every country has its own law and
Project Year:
2011
Organizer:
Department of Comprehensive Planning
Project Title:
Environmental Impact Assessment Inquiry Application System Management and Maintenance Project
Project Subject:
This project had developed many results this year in the Environmental Impact Assessment inquiry app
Project Year:
2020
Organizer:
Department of Comprehensive Planning
Project Title:
Project Subject:
As our government plans to establish the Ministry of Environment and Resources under the policy of t
Project Year:
2012
Organizer:
Department of Comprehensive Planning
Project Title:
Plan of technical support on environmental impact assessment for river water quality
Project Subject:
This project is aimed to provide a technical support for examining environmental impact assessment (
Project Year:
2012
Organizer:
Department of Comprehensive Planning
Project Title:
Environmental Impact Assessment Inquiry System – to Expand the EIA Review Data
Project Subject:
This project had developed many results this year in the Environmental Impact Assessment inquiry app
Project Year:
2009
Organizer:
Department of Comprehensive Planning
Project Title:
The evaluation of Technical Consulting Firms Compiling Environmental Impact Assessment Reports for
Project Subject:
The Environmental Protection Administration (EPA) has initiated “The evaluation of Technical Consult
Project Year:
2010
Organizer:
Department of Comprehensive Planning
Project Title:
Enhanced Environmental Impact Assessment Supervisory and law Enforcement Project 2021.
Project Subject:
The scope of the project was the reviewed and supervised the approved environmental impact assessmen
Project Year:
2021
Organizer:
Bureau of Environmental Inspection
Project Title:
Total Load Control Plan for Environmental Impact Assessment in Slope-Land Areas-Case Study on Miao-L
Project Subject:
According to the environmental carrying capacity, total load control aimed to develop and use enviro
Project Year:
2002
Organizer:
Department of Comprehensive Planning
Project Title:
""
Project Subject:
"This plan deals with the 2016 “New Taipei City EIA Supervision and Control and Sustainable Developm
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Taipei County"
Project Title:
Research and Analysis of Environmental Impact Assessment Review Benefit and Judicial Decisions Proje
Project Subject:
There are two objectives of this project. One is to evaluate the benefits gained from the local Envi
Project Year:
2015
Organizer:
Department of Comprehensive Planning
Project Title:
Study on Cumulative Environmental Impacts Assessment Standard and Integrate to Geographic Informatio
Project Subject:
This study continues the project of ”Study on Cumulative Environmental Impacts Assessment Standard a
Project Year:
2003
Organizer:
Department of Comprehensive Planning
Project Title:
Strategic Environmental Assessment on Changes in Scope of the Drinking Water Source
Project Subject:
It had been delineated and issued eighty-six of the drinking water source quality protection area an
Project Year:
2012
Organizer:
Department of Environmental Sanitation & Toxic Substance Management
Project Title:
"Environmental Impact Assessment Supervision and Inspection of Listed Cases Involving Air Pollutant
Project Subject:
"The main purpose of this project is to assist the Environmental Protection Agency in supervising an
Project Year:
2021
Organizer:
"Bureau of Environmental Inspection"
Project Title:
Evaluation of Technical Consulting Firms on Environmental Impact Assessment in Fiscal Year 91
Project Subject:
The Environmental Protection Administration (EPA) has started the work of “Technical Consulting Firm
Project Year:
2002
Organizer:
Department of Comprehensive Planning
Project Title:
Evaluation of Technical Consulting Firms on Environmental Impact Assessment and Feasibility Study fo
Project Subject:
The Environment Protection Administration (EPA) has initiated “The evaluation of Technical Consultin
Project Year:
2012
Organizer:
Department of Comprehensive Planning
Project Title:
Study on Revising Regulations for Reviewing of Environmental Impact Assessment and Directions
Project Subject:
Environmental Impact Assessment (EIA) Act has been enforced since 1994. The purpose of the EIA syste
Project Year:
2014
Organizer:
Department of Comprehensive Planning
Project Title:
Inclusion Criteria for Construction Works Required for EIA of transmission line
Project Subject:
According to Taiwan’s “Inclusion Criteria for Construction Works Required for Environmental Impact A
Project Year:
2002
Organizer:
Department of Comprehensive Planning
Project Title:
The Supervision Project for Environmental Impact Assessment
Project Subject:
This annual project reviewed and supervised the approved environmental impact assessment (EIA) repor
Project Year:
2013
Organizer:
Bureau of Environmental Inspection
Project Title:
"Research and Analysis of Environmental Impact Assessment Act 8 Judgement Guideline Project Work Pla
Project Subject:
" This project aims at exploring how to apply Environmental Impact Assessment Act Article 8, especi
Project Year:
2014
Organizer:
"Department of Comprehensive Planning"
Project Title:
Project for Assistance on Holding EIA Review Meetings in 2022,Evaluation of EIA Technical Consulting
Project Subject:
The main objective of this project is to improve theefficiency and qualityof the Environmental Impac
Project Year:
2022
Organizer:
Department of Comprehensive Planning
Project Title:
"Project for Assistance on Holding Environmental Impact Assessment Review Meetings in 2015"
Project Subject:
"To improve the efficiency and quality of the Environmental Impact Assessment (EIA) review, document
Project Year:
2014
Organizer:
"Department of Comprehensive Planning"
Project Title:
EIA background data and monitor environment impact data query system (1)
Project Subject:
This project collect the weather and air quality data and caculate the summary data for the AIR poll
Project Year:
2002
Organizer:
Department of Comprehensive Planning
Project Title:
Evaluation of EIA Technical Consulting Organizations, Certification of Evaluators and Conferences
Project Subject:
The Environment Protection Administration (EPA) has been annually undertaking the Evaluation of Envi
Project Year:
2013
Organizer:
Department of Comprehensive Planning
行政院環境保護署 的其他資料集
苗栗縣水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,44許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:44
行政院環境保護署面源網格空氣污染排放量(TWD97)
每2年更新,143劉小姐 | 02-23117722#6111 | 2023-07-30 01:04:44
行政院環境保護署環境教育設施場所手冊
不定期更新更新,74蘇小姐 | (03)4020789分機669 | 2022-01-15 01:11:06
行政院環境保護署自備飲料杯優惠店家資料
不定期更新更新,195林先生 | 02-2311-7722#2614 | 2022-01-14 01:24:10
行政院環境保護署環保署裁罰處分
每季更新更新,130張先生 | 02-2311-7722#2716 | 2022-01-15 01:10:12
行政院環境保護署
光化測站小時值資料
每1月更新,119陳先生 | 02-2311-7722#2386 | 2023-08-03 00:59:17
行政院環境保護署苗栗縣重要環保統計資料
每1月更新,157顏先生 | 02-23117722#2109 | 2023-08-07 01:00:15
行政院環境保護署道路交通音量監測結果統計(依時段分)
每季更新更新,120林先生 | 02-23712121#6403 | 2022-01-14 01:18:42
行政院環境保護署環保新聞
每3日更新,287陳小姐 | 02-2311-7722#2343 | 2023-07-30 00:59:20
行政院環境保護署經過飲用水水源水質保護區之環境影響評估報告書
每2月更新,63黃先生 | 02-23117722#2748 | 2023-08-05 01:00:58
行政院環境保護署
行政院環境保護署毒物及化學物質局會計月報
每1月更新,55陳小姐 | 02-23257399#55433 | 2023-08-09 01:05:41
行政院環境保護署經過活動斷層範圍環境影響說明書
每2月更新,96黃先生 | 02-23117722#2748 | 2023-08-05 01:01:11
行政院環境保護署行政院環境保護署毒物及化學物質局單位決算
不定期更新,47魏小姐 | 02-23257399#55432 | 2022-01-15 01:09:57
行政院環境保護署縣市(臺北市)小時值-每小時
每1時更新,199陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:56
行政院環境保護署綠色消費暨環境保護產品推動使用作業要點
每季更新更新,49孫小姐 | 02-23117722#2926 | 2022-01-15 01:13:09
行政院環境保護署
環保標章產品審查通過及有效數資料(第一類)
每季更新更新,150孫小姐 | 02-23117722#2926 | 2022-01-14 01:17:21
行政院環境保護署建檔公廁明細-宜蘭縣
不定期更新更新,211賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:08
行政院環境保護署環保署工程施工查核小組、問答集
不定期更新更新,42蔡先生 | 04-22521718#51205 | 2023-08-09 01:05:14
行政院環境保護署公告應回收項目之責任業者列管資料
每年更新更新,58廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:26:07
行政院環境保護署不法利得宣導資料
不定期更新更新,80全先生 | (04)2252-1718#337 | 2023-08-09 01:04:30
行政院環境保護署
環境影響說明書附表五:施工階段
每2月更新,143黃先生 | 02-23117722#2748 | 2023-08-05 01:00:54
行政院環境保護署自來水水質抽驗結果(依件數)
不定期更新更新,229黃先生 | 02-23117722#2881 | 2023-07-27 01:04:53
行政院環境保護署環保專責(技術)人員訓練簡章
不定期更新更新,92劉小姐 | 03-402-0789#604 | 2023-08-05 00:59:47
行政院環境保護署沼液沼渣農地肥分使用計畫
不定期更新更新,50吳小姐 | 02-2311-7722#2842 | 2023-08-09 01:05:34
行政院環境保護署環境影響差異分析報告專案小組審查會議紀錄
每2月更新,116黃先生 | 02-23117722#2748 | 2023-08-06 01:02:18
行政院環境保護署
新竹市水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,52許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:43
行政院環境保護署廢棄物稽查次數
每1年更新,200顏先生 | 02-23117722#2109 | 2023-07-27 01:00:46
行政院環境保護署列管毒性化學物質毒理資料
每年更新更新,157劉先生 | 02-23257399#55427 | 2022-01-14 01:22:55
行政院環境保護署持久性有機污染物斯德哥爾摩公約國家實施計畫成果報告
每年更新更新,47劉小姐 | 23257399#55531 | 2022-01-15 01:10:06
行政院環境保護署空氣品質小時值_新北市_富貴角站
每1時更新,363陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:11
行政院環境保護署