"2017 Survey and Promotion of Biogas Fermentation Residue as Fer
「"2017 Survey and Promotion of Biogas Fermentation Residue as Fer」於資料集「EPQSummary_WaterQualityProtection」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:47。 欄位Project Title的內容是"2017 Survey and Promotion of Biogas Fermentation Residue as Fertilizer for Animal Husbandry in Yunlin County" , 欄位Project Subject的內容是"The project aims at surveying animal husbandry in Yunlin County. The content of survey includes the distribution of animal husbandry, the percentage of pollution contributed, the relative locations of key survey stations, and so on. The survey objects are focused on the animal husbandry business which owners have registration certificates for breeding livestock or poultry, and the survey areas are mainly at Beigang, Xinhuwei, Zhuoshui River basin, and Dayilun, Bajiaoting, Shicuoliao, Youcailiao, Magongcuo, as well as Niutiaowan Drain. The survey areas also include Tuku, Yunjia, Guanguang, Haifeng and Feng Bridge.
Based on the distribution of animal husbandry and pollution load condition, the project comes up with a suggestion list of 98 livestock farms which could be counseled for using biogas fermentation residue as fertilizer. Project developers visit those livestock farms to check whether the facilities are qualified, to understand current conditions of waste water treatment facilities in farms, days of anaerobic fermentation, conditions of biogas collection and utilization, farm lands which can be used for biogas fermentation residue irrigation, and also to introduce farm owners the application procedures for biogas fermentation residue as fertilizer, as well as related water pollution regulation.
In order to raise farm owners’ interest in using biogas fermentation residue as fertilizer, project developers have printed 2,000 guidance brochures and hand them out during on-site counseling and promotional meetings. It is estimated that 10 promotional meetings will be held in the duration of the project, and by 30 November there were already 8 meetings held, 894 participants joining, and 222 willingness questionnaires collected. There were 38 farm owners who already have anaerobic pools and biogas bags on their farms showing interest in applying for the project. Among the farm lands of these owners, there were 29 self-owned farm lands. Project developers also counsel these 29 farm lands on site. There were a demonstrative observation tour held on 26 April with 52 participants, excluding staffs from the Environmental Protection Bureau and other staff members.
Meanwhile, in order to counsel large livestock farms in Yunlin County to use biogas fermentation residue as fertilizer, and to check whether some small to medium farms are still operating, project developers conduct waste water facilities operation and waste water discharge inspection on farms in which less than 3,000 pigs are fed and on those which often receive people’s statements. The inspected amount of farms reached 528 by 30 November. nineteen of them were temporarily suspended, and eighteen of them were visited with no owners around. None of the inspected farms were inspected with bypass discharge. For the farms in which more than 3,000 pigs are fed, those which often receive people’s statements or unwilling to use biogas fermentation residue as fertilizer, water sampling is conducted. 171 farms were inspected by 30 November, and among the 171 effective reports, 68 of them are under qualified. The under-qualification rate is 39.8%. There are 20 farms which fail at qualifying BOD and SS, 11 farms fail at reaching BOD standard, and 37 farms fail at reaching SS standard. During the water sampling process, there were 23 farms which owners are willing to use biogas fermentation residue as fertilizer, with project developers conducting counseling afterwards. So far, six of them are assisted by the project to apply for the biogas fermentation fertilizer.
As to 8 performance tracking in demonstrative areas in year 2016, 8 dry and wet season groundwater table monitoring and soil monitoring were accomplished. The monitoring results will be compared and contrasted with the background value first proposed in year 2016 in order to understand the influence to groundwater system and..." , 欄位Project Year的內容是2017 , 欄位Organizer的內容是"Environmental Protection Bureau Yunlin County" , 欄位Executive Unit的內容是"元科科技股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=216843 , 欄位Publish Date的內容是20200218 。
Project Title
"2017 Survey and Promotion of Biogas Fermentation Residue as Fertilizer for Animal Husbandry in Yunlin County"
Project Subject
"The project aims at surveying animal husbandry in Yunlin County. The content of survey includes the distribution of animal husbandry, the percentage of pollution contributed, the relative locations of key survey stations, and so on. The survey objects are focused on the animal husbandry business which owners have registration certificates for breeding livestock or poultry, and the survey areas are mainly at Beigang, Xinhuwei, Zhuoshui River basin, and Dayilun, Bajiaoting, Shicuoliao, Youcailiao, Magongcuo, as well as Niutiaowan Drain. The survey areas also include Tuku, Yunjia, Guanguang, Haifeng and Feng Bridge. Based on the distribution of animal husbandry and pollution load condition, the project comes up with a suggestion list of 98 livestock farms which could be counseled for using biogas fermentation residue as fertilizer. Project developers visit those livestock farms to check whether the facilities are qualified, to understand current conditions of waste water treatment facilities in farms, days of anaerobic fermentation, conditions of biogas collection and utilization, farm lands which can be used for biogas fermentation residue irrigation, and also to introduce farm owners the application procedures for biogas fermentation residue as fertilizer, as well as related water pollution regulation. In order to raise farm owners’ interest in using biogas fermentation residue as fertilizer, project developers have printed 2,000 guidance brochures and hand them out during on-site counseling and promotional meetings. It is estimated that 10 promotional meetings will be held in the duration of the project, and by 30 November there were already 8 meetings held, 894 participants joining, and 222 willingness questionnaires collected. There were 38 farm owners who already have anaerobic pools and biogas bags on their farms showing interest in applying for the project. Among the farm lands of these owners, there were 29 self-owned farm lands. Project developers also counsel these 29 farm lands on site. There were a demonstrative observation tour held on 26 April with 52 participants, excluding staffs from the Environmental Protection Bureau and other staff members. Meanwhile, in order to counsel large livestock farms in Yunlin County to use biogas fermentation residue as fertilizer, and to check whether some small to medium farms are still operating, project developers conduct waste water facilities operation and waste water discharge inspection on farms in which less than 3,000 pigs are fed and on those which often receive people’s statements. The inspected amount of farms reached 528 by 30 November. nineteen of them were temporarily suspended, and eighteen of them were visited with no owners around. None of the inspected farms were inspected with bypass discharge. For the farms in which more than 3,000 pigs are fed, those which often receive people’s statements or unwilling to use biogas fermentation residue as fertilizer, water sampling is conducted. 171 farms were inspected by 30 November, and among the 171 effective reports, 68 of them are under qualified. The under-qualification rate is 39.8%. There are 20 farms which fail at qualifying BOD and SS, 11 farms fail at reaching BOD standard, and 37 farms fail at reaching SS standard. During the water sampling process, there were 23 farms which owners are willing to use biogas fermentation residue as fertilizer, with project developers conducting counseling afterwards. So far, six of them are assisted by the project to apply for the biogas fermentation fertilizer. As to 8 performance tracking in demonstrative areas in year 2016, 8 dry and wet season groundwater table monitoring and soil monitoring were accomplished. The monitoring results will be compared and contrasted with the background value first proposed in year 2016 in order to understand the influence to groundwater system and..."
Project Year
2017
Organizer
"Environmental Protection Bureau Yunlin County"
Executive Unit
"元科科技股份有限公司"
Reporting download URL
Publish Date
20200218
「"2017 Survey and Promotion of Biogas Fermentation Residue as Fer」所屬的資料集:「EPQSummary_WaterQualityProtection」的其他資料
Project Title:
"Supervise and Examination Project for Water Pollution Control Fee Collection Operation"
Project Subject:
"Among the 11,325 between 11,379 firms from which fees were collected in 2020, 5,420 had enterprise
Project Year:
2020
Organizer:
"Department of Water Quality Protection"
Project Title:
"Forward-looking River Water Qual i ty & Envi ronment Management Plan for 2020 (Central Region)"
Project Subject:
"This program is commissioned by the Environmental Protection Administration (EPA) of the Executive
Project Year:
2020
Organizer:
"Department of Water Quality Protection"
Project Title:
"Water quality sensing IoT, contextual use and data display applications"
Project Subject:
"Due to rapid development of economy in Taiwan, industrialization and urbanization have brought grea
Project Year:
2020
Organizer:
"Department of Environmental Monitoring & Information Management"
Project Title:
"Assessing the impact of climate change on drinking water quality and coping strategies 2020"
Project Subject:
"The aim of this project is to review the topics of reinforcing drinking-water regulation and policy
Project Year:
2020
Organizer:
"Department of Water Quality Protection"
Project Title:
"106 Nantou County Water Pollution Source Scientific Inspection Control and River Watch Operation Pl
Project Subject:
"1. In-depth review of water pollution causes: The number of contracts was 150. During the implement
Project Year:
2017
Organizer:
"Nantou County Environmental Protection Bureau"
Project Title:
"Water Pollution Sources Inspection and Water Pollution Control Fee Collection and Piggery Waste an
Project Subject:
"AbstractsThe main work of the project can be divided into two sub-projects, namely : (1) Water Poll
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"2018 Yunlin County water pollution source inspection control and application permit data management
Project Subject:
"Yunlin County has a large number of registered businesses. In order to effectively carry out releva
Project Year:
2018
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Spreading Simulation for Marine Pollution Emergency Response"
Project Subject:
"The plan of year 2017 is to run the oil spill and chemical dispersion simulation modeling software,
Project Year:
2017
Organizer:
"Department of Water Quality Protection"
Project Title:
"The Project of Optimizing Water Pollution Sources Management System (the Second Year)"
Project Subject:
"Since 2018, Water Pollution Sources Management System has been reviewed about its function, process
Project Year:
2021
Organizer:
"Department of Water Quality Protection"
Project Title:
" The Management Plan for Water Qulity Control of the Middle District Reservoirs in 2020"
Project Subject:
" The key reservoirs in the middle area of Taiwan in this project include Techi Reservoir, Wushoh R
Project Year:
2020
Organizer:
"Department of Water Quality Protection"
Project Title:
"Industrial wastewater pollution control and analysis of characteristics of the proposed project"
Project Subject:
"Taiwan’s Environmental Protection Administration (EPA) has set the strategy behind Article 14-1 in
Project Year:
2017
Organizer:
"Department of Water Quality Protection"
Project Title:
"The Project of Water Pollution Source Inspection and Water Pollution Fee Examination in Chiayi Coun
Project Subject:
" The execution duration of The Project of Water Pollution Source Inspection and Water Pollution Fee
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Chiayi County"
Project Title:
"The Project of Yun-lin Marine Pollution Response /Environmental Monitoring and Central District Wat
Project Subject:
"The project aims to enforce the Central District Water Pollution Incident Emergency Response to the
Project Year:
2015
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Test plan for forward-looking treatment technology of car wash wastewater"
Project Subject:
" In recent years, Taiwan's environmental awareness has risen and environmental issues have recei
Project Year:
2020
Organizer:
"Department of Water Quality Protection"
Project Title:
" Forward-Looking Plan for River Water Quality Management in Southern Taiwan,2019"
Project Subject:
"The purpose of this project is to assistantly execute the “Forward-Looking Infrastructure Developme
Project Year:
2020
Organizer:
"Department of Water Quality Protection"
Project Title:
"Piggery Waste and Digestate Carrying to Irrigation Pre-preparation And Evaluation of the Operation
Project Subject:
"1.Research the specifications about tank trucks and tanksResearch materials and specifications abou
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"Water pollution source inspection and control plan in Nantou County 2013"
Project Subject:
"This project was mainly to assist the Environmental Protection Bureau (Nantou EPB) of the Nantou Co
Project Year:
2013
Organizer:
"Nantou County Environmental Protection Bureau"
Project Title:
"Assessment of Healthy Watersheds Management in Taiwan"
Project Subject:
"In this research work, the successful lessons of management plans from the USA, the European Union,
Project Year:
2014
Organizer:
"Department of Water Quality Protection"
Project Title:
"Maintenance and Response Resource Integration Program for Marine Pollution Control and Management S
Project Subject:
" The goal of this program for this year was to improve the system’s management performance for resp
Project Year:
2015
Organizer:
"Department of Water Quality Protection"
Project Title:
"A plan of the technical support on environmental impact assessment for surface water quality modeli
Project Subject:
"The purpose of this study is to assist Taiwan EPA in reviewing the report of environmental impact a
Project Year:
2016
Organizer:
"Department of Water Quality Protection"
Project Title:
"Forward-looking River Water Quality & Environment Management Plan for 2019 (Central Region)"
Project Subject:
"The Forward-looking River Water Quality & Environment Management Plan (Central Region) is an entrus
Project Year:
2019
Organizer:
"Department of Water Quality Protection"
Project Title:
"The Study of Pollutant Characteristics of Industrial Wastewater and Pollution Control Measures"
Project Subject:
"Since 2010, based on a series of surveys on industrial wastewater characteristics, Taiwan’s Environ
Project Year:
2015
Organizer:
"Department of Water Quality Protection"
Project Title:
"Water quality sensing IoT, contextual use and data display applications"
Project Subject:
"Due to rapid development of economy in Taiwan, industrialization and urbanization have brought grea
Project Year:
2019
Organizer:
"Department of Environmental Monitoring & Information Management"
Project Title:
"2017 Tainan City Water Pollution Sources Scientific Inspection and Water Pollution Fee Imposition C
Project Subject:
"In recent years, river improvement-related measures promoted in Tainan City include: reduction and
Project Year:
2017
Organizer:
"Environmental Protection Bureau of Tainan City"
Project Title:
"A Survey of Drinking Water for Certain Specific Analytes in the Water Quality Standards"
Project Subject:
" The purpose of this project was to examine the water quality of the pre-chosen 362 drinking water
Project Year:
2015
Organizer:
"Department of Environmental Sanitation & Toxic Substance Management"
Project Title:
"107 TMDL of Key Water Quality Monitoring Stations in Beigang River and Xinhuwei River of Yunlin Cou
Project Subject:
"The aim of this project is to check the legitimacy and rationality of permits for enterprises and s
Project Year:
2018
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Unpresendanted Piggery Waste Resource and Rivive Approach"
Project Subject:
"Piggery waste and digestate may be considered as resources, after anaerobic fermentation the pigger
Project Year:
2015
Organizer:
"Department of Water Quality Protection"
Project Title:
"The Project of Livestock Manure Resource Utilization Promoting and Managing, 2019."
Project Subject:
"Managing include: 774 livestock farms nationwide have agreed to use treated digestates from livesto
Project Year:
2019
Organizer:
"Department of Water Quality Protection"
Project Title:
"the Plan of Private Enterprises Joint Action to Emergency Response of Water Pollution Incident in S
Project Subject:
"The plan is divided into two parts, namely, the Plan of Private Enterprises Joint Action to Emergen
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Project of Ocean pollution control inspection for Yunlin county"
Project Subject:
"This project was carried out from Feb. 26th, 2016 to the end of Nov. 30th, 2016. To help Yunlin cou
Project Year:
2016
Organizer:
"Environmental Protection Bureau Yunlin County"
行政院環境保護署 的其他資料集
點源網格空氣污染排放量(TWD97)
每2年更新,709劉小姐 | 02-23117722#6111 | 2023-07-30 01:04:45
行政院環境保護署重點事業廢棄物-生物醫療廢棄物之處理方式
每月更新更新,136陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:07
行政院環境保護署新北市重要環保統計資料
每1月更新,90顏先生 | 02-23117722#2109 | 2023-08-03 01:01:17
行政院環境保護署環保專責(技術)人員合格證書申請表
不定期更新更新,41魏小姐 | 03-402-0789#605 | 2022-01-15 01:10:45
行政院環境保護署緊急防制辦法空品狀況
每小時更新更新,96謝小姐 | 02-23117722轉2386 | 2022-01-14 01:05:55
行政院環境保護署
應回收廢棄物(廢電子電器及廢資訊物品類)回收量資料
每年更新更新,50廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:38
行政院環境保護署經過水庫集水區之環境影響說明書件
每2月更新,65黃先生 | 02-23117722#2748 | 2023-08-05 01:01:03
行政院環境保護署環境督察總隊對污染源裁處資訊
每1月更新,164蘇先生 | 04-2252-1718#51305 | 2023-04-15 01:01:35
行政院環境保護署環境教育人員認證得採計之專業領域課程(ODS)
不定期更新更新,36盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:24
行政院環境保護署空氣品質小時值_新北市_菜寮站
每1時更新,161陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:16
行政院環境保護署
公民營廢棄物乙級處理機構許可資料
每1月更新,123盧小姐 | 02-2311-7722#2651 | 2023-07-28 11:35:17
行政院環境保護署空氣污染防制區劃分結果
2年更新,132柏小姐 | 02-23712121#6106 | 2022-01-14 01:05:04
行政院環境保護署應回收廢棄物處理業者(廢乾電池類)最大處理量資料
每年更新更新,43廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:03
行政院環境保護署公民營廢棄物乙級清除機構許可資料
每月更新更新,102何先生 | 02-2311-7722#2653 | 2022-01-14 01:25:57
行政院環境保護署應回收廢棄物處理業者(廢鉛蓄電池類)最大處理量資料
每年更新更新,36廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:23:59
行政院環境保護署
公害陳情案件數
每1月更新,126顏先生 | 02-23117722#2109 | 2023-07-27 01:01:15
行政院環境保護署自備飲料杯優惠店家資料
不定期更新更新,164林先生 | 02-2311-7722#2614 | 2022-01-14 01:24:10
行政院環境保護署空氣品質小時值_臺中市_西屯站
每1時更新,92陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:57
行政院環境保護署花蓮縣重要環保統計資料
每1月更新,124顏先生 | 02-23117722#2109 | 2023-08-07 01:00:00
行政院環境保護署固定污染源CEMS監測數據紀錄值資料集(1小時紀錄值)
每1時更新,148洪小姐 | 02-23117722#6221 | 2023-08-02 00:58:28
行政院環境保護署
環境教育機構認證資料
每1月更新,38盧小姐 | 03-4020789#606 | 2023-07-27 01:02:47
行政院環境保護署環境保護許可管理系統(暨解除列管)對象基本資料
每日更新更新,212陳先生 | 02-2311-7722#2682 | 2022-01-15 01:12:25
行政院環境保護署管制事業下水道系統環工技師專責人員證號資料資訊平台
不定期更新更新,57葉先生 | 02-2311-7722#2821 | 2023-08-09 01:05:18
行政院環境保護署科技計畫清單
每1年更新,42賀先生 | 23117722#2981 | 2023-08-09 01:04:27
行政院環境保護署環保署考核直轄市及縣(市)政府環境保護績效作業要點
不定期更新更新,35陳先生 | (02)2311-7722分機2971 | 2023-08-07 01:03:24
行政院環境保護署
河川揚塵監測資料
每1時更新,140陳先生 | 02-2311-7722#2386 | 2023-08-02 00:59:03
行政院環境保護署符合噪音管制標準車輛-進口機車
不定期更新更新,128林先生 | 02-23712121-6403 | 2022-01-14 01:18:59
行政院環境保護署機車排氣定檢站資料
每月更新更新,179謝小姐 | 02-2371-2121#6310 | 2022-01-14 01:18:35
行政院環境保護署預鑄式建築物污水處理設施審定登記認可設施一覽表
不定期更新更新,46洪先生 | 02-23117722分機2833 | 2023-08-09 01:04:31
行政院環境保護署空氣品質小時值_高雄市_前鎮站
每1時更新,107陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:38
行政院環境保護署