"The demonstrative project of investigating and analyzing the mu
「"The demonstrative project of investigating and analyzing the mu」於資料集「EPQSummary_SoilAndGroundwater」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:52。 欄位Project Title的內容是"The demonstrative project of investigating and analyzing the mud core in Sun-Moon Lake" , 欄位Project Subject的內容是"This project completed first the works of sonar seismic scan before coring. Then two sites were chosen for getting cores in Sun-Moon Lake based on the seismic results, and 5 sediment cores which have a total recovered length over 825 cm have succeeded to be taken in accordance with the project’s objects. After, sediment descriptions, photos, non-destructive analysis of Multi-Sensor Core Logging, Color Reflectance Spectrum and X-ray Fluorescence scanning were carried out for each core. Besides, 55 samples were chosen for radioactive age dating according to the EPA's demand.The obtained results including radioactive age dating pointed out that all the cores cover the age interval from present back to older than AD 1934 which the dam began to be constructed. Age dating results also indicate that the sediments from Sun Lake provide better age controlled data than that of the Moon Lake. The estimated sedimentation rate showed that the site Sun 2 was three times faster than that of the site Moon 1. The result reveals that the main sediment transportation path is from northeastern side of Sun Lake toward the Moon Lake. Physical property parameters, such as the -ray density, porosity, magnetic susceptibility etc., all show very different patterns before and after the dam construction. The trend reflects that the organic material content in the lake sediments dramatically decreased after the reservoir running. Results of X-ray Fluorescence scanning present that the variations in composition of heavy elements may be also due to sediment source changes. High Ni content before AD 1934 may represent the sediment source from the in-situ basin. Thus, the contents of Pb, Zn, Cr increased and the content of Ca started rising and fluctuating after the dam been constructed might conduct the sediment source from faraway after AD 1934. Increasing Pb, Zn, Cr and Ca may imply the pollutions derived from Zhuoshui River or surrounding area, which is worth to be paid attention on it in the future. Besides, extra high sedimentation rate found in our cores most recently may be due to the destructions of 1999 Chi-Chi earthquake and much heavy rainfall brought by several later typhoons passed through. Therefore, the rapid sediment accumulation in the reservoir may be another important issue to be paid attention on. " , 欄位Project Year的內容是2015 , 欄位Organizer的內容是"Soil and Groundwater Remediation Fund Management Board" , 欄位Executive Unit的內容是"社團法人中華民國地質學會" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=127659 , 欄位Publish Date的內容是20170201 。
Project Title
"The demonstrative project of investigating and analyzing the mud core in Sun-Moon Lake"
Project Subject
"This project completed first the works of sonar seismic scan before coring. Then two sites were chosen for getting cores in Sun-Moon Lake based on the seismic results, and 5 sediment cores which have a total recovered length over 825 cm have succeeded to be taken in accordance with the project’s objects. After, sediment descriptions, photos, non-destructive analysis of Multi-Sensor Core Logging, Color Reflectance Spectrum and X-ray Fluorescence scanning were carried out for each core. Besides, 55 samples were chosen for radioactive age dating according to the EPA's demand.The obtained results including radioactive age dating pointed out that all the cores cover the age interval from present back to older than AD 1934 which the dam began to be constructed. Age dating results also indicate that the sediments from Sun Lake provide better age controlled data than that of the Moon Lake. The estimated sedimentation rate showed that the site Sun 2 was three times faster than that of the site Moon 1. The result reveals that the main sediment transportation path is from northeastern side of Sun Lake toward the Moon Lake. Physical property parameters, such as the -ray density, porosity, magnetic susceptibility etc., all show very different patterns before and after the dam construction. The trend reflects that the organic material content in the lake sediments dramatically decreased after the reservoir running. Results of X-ray Fluorescence scanning present that the variations in composition of heavy elements may be also due to sediment source changes. High Ni content before AD 1934 may represent the sediment source from the in-situ basin. Thus, the contents of Pb, Zn, Cr increased and the content of Ca started rising and fluctuating after the dam been constructed might conduct the sediment source from faraway after AD 1934. Increasing Pb, Zn, Cr and Ca may imply the pollutions derived from Zhuoshui River or surrounding area, which is worth to be paid attention on it in the future. Besides, extra high sedimentation rate found in our cores most recently may be due to the destructions of 1999 Chi-Chi earthquake and much heavy rainfall brought by several later typhoons passed through. Therefore, the rapid sediment accumulation in the reservoir may be another important issue to be paid attention on. "
Project Year
2015
Organizer
"Soil and Groundwater Remediation Fund Management Board"
Executive Unit
"社團法人中華民國地質學會"
Reporting download URL
Publish Date
20170201
「"The demonstrative project of investigating and analyzing the mu」所屬的資料集:「EPQSummary_SoilAndGroundwater」的其他資料
Project Title:
"Soil and Groundwater monitoring and investigating in Taoyuan area for 2015"
Project Subject:
"This project follows last year work in “Soil and Groundwater Investigation and Verification Project
Project Year:
2015
Organizer:
"Taoyuan County Government Environment Protection Bureau"
Project Title:
"Investigation, Inspection, and Technical Support for the Soil and Groundwater Project (2016) "
Project Subject:
"In 2016, the major tasks of this two-year’s project were to establish a response team that assisted
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Source Identification Development Plan for Soil and Groundwater Oil Contamination"
Project Subject:
"There are three parts in this project. Firstly, we collected 27 fresh gasoline and 40 blending stoc
Project Year:
2018
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"FY 2020 Supervision and Inspection Plan for the Quality Assurance of Projects Relevant to Soil and
Project Subject:
"The 2020 “Supervision and Inspection Plan for the Quality Assurance of Projects Relevant to Soil an
Project Year:
2020
Organizer:
"Environmental Analysis Laboratory"
Project Title:
"2017 soil and groundwater pollution investigation and audition project"
Project Subject:
"Environmental Protection Bureau, Chiayi City (referred to CYC EPB) carried out the soil and groundw
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Apply Phase II Environmental Site Assessment Process to execute Soil and Groundwater Pollution Pote
Project Subject:
"To keep abreast of the soil and groundwater quality in each location with high potential environmen
Project Year:
2017
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
""
Project Subject:
"The aim of the “Arsenic and mercury pollution investigation of agricultural land and management str
Project Year:
2013
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Soil and Groundwater Quality Management of National Industrial land"
Project Subject:
"Industrial production often leads to soil and groundwater pollution, and thus the Taiwan EPA amende
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Special Report on Completion and Validation Child-Specific Exposure Factor in Taiwan"
Project Subject:
"Harmful substances in soil and dust may enter into human body through direct inhalation, digestion,
Project Year:
2015
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"2017 AD to 2018 AD Project on the Research & Revision of Law, the Consultation of Legal Ambiguities
Project Subject:
"The Soil and Groundwater Remediation Act was promulgated and enacted on February 2, 2000. Despite a
Project Year:
2017
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Plan of 2014 on auditing and guiding of potential polluted soil evaluation,investigation and testin
Project Subject:
"The purpose of this project was to assist local environmental protection bureaus on reviewing and a
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Project on collection and utilization of the soil and groundwater pollution remediation fees"
Project Subject:
"The modified Regulations Governing Collection of Soil and Groundwater Pollution Remediation Fees ha
Project Year:
2018
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
""
Project Subject:
"Taiwan and Korea signed the Memorandum of Understanding (MOU) on technical cooperation in soil and
Project Year:
2015
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Prospect of Soil and Underground Water and Excellent Mindset Cultivation Plan"
Project Subject:
"In response to large-scale human development and the environmental problems of the over-exploitatio
Project Year:
2020
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Soil and Groundwater Investigation and Verification Project"
Project Subject:
"The project mainly implements the monitoring and verification of soil and groundwater pollution inv
Project Year:
2012
Organizer:
"Environmental Protection Bureau, Taipei County"
Project Title:
"Soil and Groundwater Contamination Investigation Project in 2019 Environmental Protection Bureau, M
Project Subject:
"The project has conducted the following items:
1.Groundwater Monitoring Wells: (1)218 wells had bee
Project Year:
2019
Organizer:
"Environmental Protection Bureau Miaoli County Government"
Project Title:
"soil and groundwater pollution, Taitung"
Project Subject:
"none"
Project Year:
2016
Organizer:
"Taitung County Environment Protection Bureau"
Project Title:
"11:07 張耀文 貼圖 11:26 張耀文 Changhua County Agricultural Land Pollution Control Site Appropriate Measure
Project Subject:
"The main purpose of this project was to perform detailed soil surveys and improve the project of C
Project Year:
2016
Organizer:
"Environmental Protection Bureau Changhua County"
Project Title:
"The International Cooperation Project on Soil and Groundwater Pollution Remediation"
Project Subject:
"The project “International Cooperation Project on Soil and Groundwater Pollution Remediation” has b
Project Year:
2018
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"The inspection, consultation and auditing of declaration reports for underground storage tanks proj
Project Subject:
"Taiwan EPA has promoted UST investigation and pollution prevention over the past decade. In order t
Project Year:
2015
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Site Assessment and Investigation for Soil and Groundwater Potential Contamination of Abandoned Fac
Project Subject:
"The project, “Site Assessment and Investigation for Soil and Groundwater Potential Contamination of
Project Year:
2015
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Green and Sustainable Remediation Demonstration and Consultation Project"
Project Subject:
"Based on the GSR framework, executive flowchart and toolbox developed by the previous project, the
Project Year:
2013
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Aboveground storage tank systems pilot project-pollution prevention management and investigation"
Project Subject:
"The Environmental Protection Administration (EPA) implemented the project to understand the interna
Project Year:
2019
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Apply Environmental Forensic Techniques to Establish Commercial Diesel Fingerprint Investigation Pl
Project Subject:
"The final report is divided into the following parts: In this project, fourteen papers relevant
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Development of Soil and Groundwater Pollution Liability Insurance for Gas Stations"
Project Subject:
"The scope of work of this project contained compilation of gas station contamination data, risk ide
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Investigation plan of area of groundwater contamination for Northern area of Anding Section, Anding
Project Subject:
"Despite of the MIP survey, groundwater investigation of temporary wells, groundwater investigation
Project Year:
2015
Organizer:
"Environmental Protection Bureau of Tainan City"
Project Title:
"Project of investigation and management of green sustainable remediation pilot site in Dapinding Sp
Project Subject:
"The objective of this project is to build up a preliminary action plan for the green sustainable re
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"The Survey of the Soil and Groundwater Contamination in Chang-hua County in 2017"
Project Subject:
"For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year:
2017
Organizer:
"Environmental Protection Bureau Changhua County"
Project Title:
"Project of Soil and Groundwater Pollution Survey and Investigation in HsinChu Country,2016 "
Project Subject:
"AbstractThe total cost of this project is NT $ 10,000,000, and the overall working period ended on
Project Year:
2016
Organizer:
"HsinChu County Environment Protection Bureau"
Project Title:
" Soil and Groundwater Quality Management of National Industrial Parks (phase 3 project)"
Project Subject:
"This project is the third phase of the master plan of the action program of promoting soil and grou
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
行政院環境保護署 的其他資料集
應回收廢棄物處理業者資料
每1年更新,118廖小姐 | 02-2370-5888#3103 | 2023-07-27 00:59:29
行政院環境保護署行政院環境保護署環境保護產品管理作業規範
每季更新更新,39孫小姐 | 02-23117722#2926 | 2022-01-15 01:13:10
行政院環境保護署建檔公廁明細-嘉義縣
不定期更新更新,174曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:15:04
行政院環境保護署園區之興建或擴建類別環境影響說明書
每2月更新,41黃先生 | 02-23117722#2748 | 2023-08-06 01:04:23
行政院環境保護署環境音量監測不合格時段數
每月更新更新,159謝小姐 | 02-23117722#2103 | 2022-01-14 01:20:55
行政院環境保護署
環境防蟲用天然物質資料
每3月更新,72薛先生 | 02-2325-7399#55413 | 2023-07-27 01:02:57
行政院環境保護署空氣品質小時值_新北市_土城站
每1時更新,205陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:19
行政院環境保護署公告應回收項目之責任業者列管家數統計
每1年更新,35廖小姐 | 02-2370-5888#3103 | 2023-07-27 00:59:42
行政院環境保護署新北市重要環保統計資料
每1月更新,90顏先生 | 02-23117722#2109 | 2023-08-03 01:01:17
行政院環境保護署預鑄式建築物污水處理設施審定登記認可設施一覽表
不定期更新更新,46洪先生 | 02-23117722分機2833 | 2023-08-09 01:04:31
行政院環境保護署
0800資源回收免費專線-查詢非公告應回收廢棄物類統計
每年更新更新,44莊先生 | 02-23705888#3108 | 2022-01-14 01:24:29
行政院環境保護署應回收廢棄物處理業者(廢輪胎類)最大處理量資料
每年更新更新,46廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:00
行政院環境保護署環境影響說明書專案小組初審會議紀錄
不定期更新更新,57劉先生 | 02-2311-7722#2743 | 2022-01-15 01:12:35
行政院環境保護署台灣地區垃圾處理場(廠)互惠緊急支援要點
不定期更新,32蔡先生 | 04-2252-1718#53508 | 2022-01-15 01:13:13
行政院環境保護署行政院環保署及地方政府「水區、水體分類」公告說明表
不定期更新,38簡小姐 | 02-23117722#2818 | 2022-01-15 01:13:07
行政院環境保護署
交通噪音監測站位置圖
不定期更新更新,38章小姐 | 02-23712121#6407 | 2023-07-27 01:06:02
行政院環境保護署空氣品質小時值_新北市_永和站
每1時更新,118陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:27
行政院環境保護署經過海岸保護區之環境影響評估報告書件
每2月更新,47黃先生 | 02-23117722#2748 | 2023-08-06 01:04:05
行政院環境保護署新化學物質標準登錄表單
不定期更新更新,58金先生 | 23257399#55315 | 2022-01-14 01:22:59
行政院環境保護署再生粒料毒性特性溶出試驗結果
不定期更新更新,45許先生 | 02-2311-7722#2641 | 2022-01-14 01:18:39
行政院環境保護署
環境用藥微生物製劑常見菌種特性資料
不定期更新更新,160薛先生 | 02-2325-7399#55413 | 2023-07-27 01:02:59
行政院環境保護署紫外線即時監測資料
每1時更新,243陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:05
行政院環境保護署行政院環境保護署會計月報
每月更新更新,44陳小姐 | 02-2311-7722#2159 | 2022-01-14 01:22:16
行政院環境保護署國際環保新聞週報
不更新更新,109楊先生 | (02)23117722#2217,(02)23117722#2216 | 2022-01-14 01:18:04
行政院環境保護署使用中機動車輛噪音資料-汽油車
不定期更新更新,97林先生 | 02-23712121-6403 | 2022-01-14 01:18:53
行政院環境保護署
土壤及地下水污染管制區公告資料
每月更新更新,112賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:32
行政院環境保護署EPQSummary_WasteManagement
不定期更新更新,115郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:53
行政院環境保護署公民營廢棄物甲級清除機構許可資料
每1月更新,165盧小姐 | 02-2311-7722#2651 | 2023-07-27 01:03:17
行政院環境保護署機車排氣定檢站資料
每月更新更新,179謝小姐 | 02-2371-2121#6310 | 2022-01-14 01:18:35
行政院環境保護署國內已制訂之碳足跡產品類別規則文件清單
不定期更新更新,35陳先生 | 02-23117722#2932 | 2023-08-09 01:05:36
行政院環境保護署