The Review and the Evaluation of the Effectiveness for the Colle
「The Review and the Evaluation of the Effectiveness for the Colle」於資料集「EPQSummary_ChemicalSubstanceManagement」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:48。 欄位Project Title的內容是The Review and the Evaluation of the Effectiveness for the Collection Systems of Waste Batteries and Waste lamps , 欄位Project Subject的內容是(1)Many different types of waste battery collection and recycling subsidy rates had been reduced since EPA post the revised subsidy rates in November, 2006. The collection and recycling costs for many different types of waste batteries dropped off after the subsidy rates adjustment. This is resulting in the low purchasing prices of waste batteries offered by recycling industries in the collection market. For primary Li battery, secondary Li battery and Ni-Cd battery, the collection and recycling costs of recycling industries are close to the subsidy rates after the adjustment. The subsidy rates of primary Li battery and secondary Li battery are slightly below the average collection and recycling costs of recycling industries. The subsidy rate of Ni-Cd battery is slightly above the average collection and recycling costs of recycling industries. For Mn-Zn alkaline battery and Ni-MH battery, the subsidy rates are slightly below the collection and recycling costs of recycling industries after the adjustment. For button Li battery, button alkaline battery, Ag-oxide battery, Hg-oxide battery and Zn-air battery, the subsidy rates are above the collection and recycling costs of recycling industries.
(2)The comparing results of suggested waste battery subsidy rates calculated based on the reflecting cost and annual balance principles and EPA subsidy rates , the suggested subsidy rates based on annual balance principles are higher than the ones’ based on the reflecting cost because the recycling fund will be in debt if the suggested subsidy rates calculated based on the reflecting cost. Although the values of suggested subsidy rates have slightly differences, the results of comparing with EPA subsidy rates are the same. The battery types which the suggested subsidy rates of collection and recycling are below the EPA subsidy rates are Mn-Zn alkaline battery, secondary Li battery, button Li battery, button alkaline battery, Ag-oxide battery, Hg-oxide battery, Zn-air battery and Ni-MH battery. The battery types which the suggested subsidy rates of collection and recycling are above the EPA subsidy rates are primary Li battery and Ni-Cd battery.
(3)The domestic waste battery recycling corporation started in October, 2007. according to the current data, the recycling costs of Mn-Zn alkaline battery in domestic are lower than the recycling costs abroad. The recycling costs of secondary Li battery and Ni-MH battery in domestic are higher than the recycling costs abroad.
(4)Based on the data collection and calculation, the collection and recycling costs of fluorescent lamps are around 11.33~17.20 NT dollars/kg in 2006. The average value is around 13.42 NT dollars/kg. And the unit effectiveness for resources is -2.42 NT dollars/kg.
(5)According to the comparing results of suggested waste fluorescent lamp subsidy rates calculated based on the reflecting cost and annual balance principles and EPA subsidy rates, the suggested subsidy rates based on annual balance principles are lower than the ones’ based on the reflecting cost because the recycling fund will be in debt or surplus if the suggested subsidy rates calculated based on the reflecting cost. Although the values of suggested subsidy rates have slightly differences, the results of comparing with EPA subsidy rates are the same. The suggested subsidy rates of collection and recycling are below the EPA subsidy rates.
(6)Because non-linear tube lamps had been regulated to collect since July, 2007, all the recycling factories don’t have the data of collection costs, recycling costs and collection volumes. Thus, the evaluation should be run after cumulating enough data.
(7)We can build up the trusting life-cycle data of products based on the perspectives of domestic production, consumption and wasting, and provide the costs of management processes and data collections. Only restraining in the ... , 欄位Project Year的內容是2007 , 欄位Organizer的內容是Recycling Fund Management Board , 欄位Executive Unit的內容是財團法人台灣產業服務基金會 , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=1031&proj_id=PNFSDZRTGJ&doc_kind=1 , 欄位Publish Date的內容是20080401 。
Project Title
The Review and the Evaluation of the Effectiveness for the Collection Systems of Waste Batteries and Waste lamps
Project Subject
(1)Many different types of waste battery collection and recycling subsidy rates had been reduced since EPA post the revised subsidy rates in November, 2006. The collection and recycling costs for many different types of waste batteries dropped off after the subsidy rates adjustment. This is resulting in the low purchasing prices of waste batteries offered by recycling industries in the collection market. For primary Li battery, secondary Li battery and Ni-Cd battery, the collection and recycling costs of recycling industries are close to the subsidy rates after the adjustment. The subsidy rates of primary Li battery and secondary Li battery are slightly below the average collection and recycling costs of recycling industries. The subsidy rate of Ni-Cd battery is slightly above the average collection and recycling costs of recycling industries. For Mn-Zn alkaline battery and Ni-MH battery, the subsidy rates are slightly below the collection and recycling costs of recycling industries after the adjustment. For button Li battery, button alkaline battery, Ag-oxide battery, Hg-oxide battery and Zn-air battery, the subsidy rates are above the collection and recycling costs of recycling industries. (2)The comparing results of suggested waste battery subsidy rates calculated based on the reflecting cost and annual balance principles and EPA subsidy rates , the suggested subsidy rates based on annual balance principles are higher than the ones’ based on the reflecting cost because the recycling fund will be in debt if the suggested subsidy rates calculated based on the reflecting cost. Although the values of suggested subsidy rates have slightly differences, the results of comparing with EPA subsidy rates are the same. The battery types which the suggested subsidy rates of collection and recycling are below the EPA subsidy rates are Mn-Zn alkaline battery, secondary Li battery, button Li battery, button alkaline battery, Ag-oxide battery, Hg-oxide battery, Zn-air battery and Ni-MH battery. The battery types which the suggested subsidy rates of collection and recycling are above the EPA subsidy rates are primary Li battery and Ni-Cd battery. (3)The domestic waste battery recycling corporation started in October, 2007. according to the current data, the recycling costs of Mn-Zn alkaline battery in domestic are lower than the recycling costs abroad. The recycling costs of secondary Li battery and Ni-MH battery in domestic are higher than the recycling costs abroad. (4)Based on the data collection and calculation, the collection and recycling costs of fluorescent lamps are around 11.33~17.20 NT dollars/kg in 2006. The average value is around 13.42 NT dollars/kg. And the unit effectiveness for resources is -2.42 NT dollars/kg. (5)According to the comparing results of suggested waste fluorescent lamp subsidy rates calculated based on the reflecting cost and annual balance principles and EPA subsidy rates, the suggested subsidy rates based on annual balance principles are lower than the ones’ based on the reflecting cost because the recycling fund will be in debt or surplus if the suggested subsidy rates calculated based on the reflecting cost. Although the values of suggested subsidy rates have slightly differences, the results of comparing with EPA subsidy rates are the same. The suggested subsidy rates of collection and recycling are below the EPA subsidy rates. (6)Because non-linear tube lamps had been regulated to collect since July, 2007, all the recycling factories don’t have the data of collection costs, recycling costs and collection volumes. Thus, the evaluation should be run after cumulating enough data. (7)We can build up the trusting life-cycle data of products based on the perspectives of domestic production, consumption and wasting, and provide the costs of management processes and data collections. Only restraining in the ...
Project Year
2007
Organizer
Recycling Fund Management Board
Executive Unit
財團法人台灣產業服務基金會
Reporting download URL
https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=1031&proj_id=PNFSDZRTGJ&doc_kind=1
Publish Date
20080401
「The Review and the Evaluation of the Effectiveness for the Colle」所屬的資料集:「EPQSummary_ChemicalSubstanceManagement」的其他資料
Project Title:
The Management of Persistent Organic Pollutants and Promotion of Toxic Substance Release Calculation
Project Subject:
The achievements made in this project are summarized as follows: 1) The latest information on the St
Project Year:
2017
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
The project of reyclable waste recycle effort estimating model
Project Subject:
Our estimate of the recyclable waste amount is smaller than the past amount estimated by “depreciati
Project Year:
2005
Organizer:
Recycling Fund Management Board
Project Title:
Performance of vehicle noise type approval, conformity of product and vehicle noise control
Project Subject:
This project includes three major tasks: (1) Inspecting new model certification, and performing samp
Project Year:
2010
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
The formation, transportation and effect of photochemical pollution on Taiwan
Project Subject:
Hourly data from 3 photochemical assessment monitoring stations (PAMS) located in central Taiwan wer
Project Year:
2003
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
The Project of Evaluating Analytical Capability and Supporting Sample Testing for Toxic and Concerne
Project Subject:
There is a growing need for chemical analysis of toxic chemical substances in order to support the a
Project Year:
2020
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
Evaluation of the uptake rate of major air pollutants by common tree plants in Taiwan
Project Subject:
The purpose of this project is to evaluate the uptake rate of major air pollutants by common tree pl
Project Year:
2008
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
2004 Pingtung County’s discard branches and leaves of fruit trees, which is handled of substitute pr
Project Subject:
Pingtung County’s Environment Protection Bureau take the job about improving to burn the agriculture
Project Year:
2004
Organizer:
Environmental Protection Bureau, Pingtung County
Project Title:
Advance Stationary Air Pollution Control Strategy and the Certification for Auditor Program
Project Subject:
In order to strengthen and put the stationary sources management into effect, this project divided i
Project Year:
2013
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
Monitoring the Gasoline and Diesel Fuel Quality and Auditing the Air Pollution Control Fee
Project Subject:
The auditing of air pollution fee collected from gasoline/diesel during Jan. to Nov. 2005 were compl
Project Year:
2005
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
2002 Polluting vehicles appeal cases management system
Project Subject:
To accomplish the lottery event for the people who appealed the polluting vehicles year 2002. The va
Project Year:
2002
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
2017 The Program of Environmental Agent s Management System Operation and Proficiency.
Project Subject:
This year’s project is divided into four parts, which includes the review of environmental agent pro
Project Year:
2017
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
Analysis and Promotion Plan for Chemical Risk Management and Communication
Project Subject:
The chemical risk management and analysis report for Taiwan in 2030 is prepared by sorting out a con
Project Year:
2018
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
The project for background investigation of environmental distribution of chemical substances and an
Project Subject:
The major aims of this project were to (1) investigate distribution of concerned chemicals in fiftee
Project Year:
2019
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
"Surveying and inspecting project for post-market chemicals, 2019"
Project Subject:
"This project concentrates on (A) surveying and inspecting for post-market chemicals, (B) inspecting
Project Year:
2019
Organizer:
"Toxic and Chemical Substances Bureau"
Project Title:
111 Year Miaoli County Toxic and Concerned Chemical Substances Source Management Plan
Project Subject:
This plan ended on October 31, 2011, and all work was completed in accordance with the plan and cont
Project Year:
2022
Organizer:
Environmental Protection Bureau Miaoli County Government
Project Title:
The analysis of effects of Local EPB s SIPs in2003
Project Subject:
The objects of this project are: to analyze the effects of the State Implementation Plans (SIPs) exe
Project Year:
2003
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
Surveying and inspecting project for post-market chemicals, 2019
Project Subject:
This project concentrates on (A) surveying and inspecting for post-market chemicals, (B) inspecting
Project Year:
2019
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
The Inspection and Certification Third Party on Due Recycled Waste (Waste Motor Vehicles-north Regio
Project Subject:
行政院環境保護署96年度委辦計畫英文摘要
Project of inspection and certification on the recycling waste vehicle (Norther
Project Year:
2007
Organizer:
Recycling Fund Management Board
Project Title:
The project of examining distribution, fee rates and collection rate of waste container.
Project Subject:
The project focuses on three issues: “The investigation and analysis of waste containers distributio
Project Year:
2011
Organizer:
Recycling Fund Management Board
Project Title:
Project of auditing, tracking and administrating the resources recycling procedures.(2005)
Project Subject:
Based on Waste Disposal Act (Oct. 24, 2001), The Recycling Management Fund(RMF)of Environmental Prot
Project Year:
2005
Organizer:
Recycling Fund Management Board
Project Title:
Polllution analysis of Dioxion exhausted by vehicle
Project Subject:
ntries of the world, this study researches the reason for dioxin in diesel car exhaust. We analyzed
Project Year:
2002
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
The Legislation Procedure for Amending the Relating Regulations of Noise Control Act
Project Subject:
In order to match to the implementation of administrative process, Noise Control Law has been revise
Project Year:
2003
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
Project of inspection and certification fair body on the collection, clearance, disposal of the gene
Project Subject:
A. In accordance with relevant regulations, EPA, through open selection procedure, evaluates and sel
Project Year:
2006
Organizer:
Recycling Fund Management Board
Project Title:
Project for constructing a safe and comfortable homeland : The plan for the setup of southern enviro
Project Subject:
This project aimed to set up southern environmental incidents specialist teams with one team each in
Project Year:
2017
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
Project on Improvement of Dioxin Emission for Non-restrain Source, and Investigation of Heavy Metal
Project Subject:
In this Project, we implemented the on-site survey and consultation of the improvement of dioxin emi
Project Year:
2004
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
To promote eco-friendly commercial design of containers and promotes the waste containers recovery p
Project Subject:
1.To promote eco-friendly commercial design of containers with an integrated study of international
Project Year:
2010
Organizer:
Recycling Fund Management Board
Project Title:
Promotes the recycling processing efficiency of the waste electronic electric appliance and the wast
Project Subject:
The purpose of this project is to examine and then propose improvement suggestions on the operation
Project Year:
2007
Organizer:
Recycling Fund Management Board
Project Title:
Project for Expansion of Chemical Substances Registration System and Promotion of Relevant Affairs (
Project Subject:
The project period dates from 10th March to 31st December, 2020. The main tasks include maintenance
Project Year:
2020
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
The impact of Electromagnetic Field (EMF) on the environment Project
Project Subject:
Objectives: This project is intended to explore the impact of Electromagnetic Field (EMF) on the env
Project Year:
2008
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
The minus effects to our environment with vibration
Project Subject:
In corresponding to the minus effects to our environment with vibration, Environmental Protection Ad
Project Year:
2002
Organizer:
Department of Air Quality Protection & Noise Control
行政院環境保護署 的其他資料集
訴願決定書
每6月更新,44李先生 | 02-2311-7722#2962 | 2023-07-30 01:05:32
行政院環境保護署環境影響說明書完成審查件數
每年更新更新,90謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:24
行政院環境保護署環保專案摘要資料_環境監測及檢測
不定期更新更新,139郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:42
行政院環境保護署環境教育人員認證得採計之專業領域課程(ODS)
不定期更新更新,43盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:24
行政院環境保護署空氣品質小時值_新竹縣_竹東站
每1時更新,316陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:04
行政院環境保護署
廢(污)水產生量及排放量
每1年更新,115顏先生 | 02-23117722#2109 | 2023-07-30 01:01:05
行政院環境保護署臺中雲林農地作物含重金屬鎘污染成因調查及查證計畫
不更新更新,50吳小姐 | 02-2383-2389#8303 | 2022-01-15 01:12:21
行政院環境保護署園區之興建或擴建類別環境影響說明書
每2月更新,43黃先生 | 02-23117722#2748 | 2023-08-06 01:04:23
行政院環境保護署噪音稽查次數
每年更新更新,87謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:41
行政院環境保護署EPQSummary_Air
不定期更新更新,322郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:50
行政院環境保護署
縣市(連江縣)小時值-每小時
每小時更新更新,83謝小姐 | 02-2311-7722#2386 | 2022-01-15 01:02:40
行政院環境保護署環保署補、捐(獎)助地方政府情形表
每季更新更新,123蘇小姐 | 02-2311-7722#2155 | 2022-01-15 01:09:29
行政院環境保護署公民營廢棄物乙級處理機構許可資料
每1月更新,143盧小姐 | 02-2311-7722#2651 | 2023-07-28 11:35:17
行政院環境保護署空氣品質小時值_雲林縣_臺西站
每1時更新,240陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:49
行政院環境保護署0800資源回收免費專線-整體話務達成狀況統計
每年更新更新,50莊先生 | 02-23705888#3108 | 2022-01-14 01:24:32
行政院環境保護署
病媒防治業地理資料
不定期更新更新,36薛先生 | 02-2325-7399#55413 | 2023-07-27 01:02:56
行政院環境保護署環境教育(教學、行政)人員(學歷)認證申請書
不定期更新,48蘇小姐 | (03)4020789分機669 | 2022-01-15 01:10:53
行政院環境保護署環境影響說明書附表五:空氣
每2月更新,101黃先生 | 02-23117722#2748 | 2023-08-06 01:04:01
行政院環境保護署病媒防治業許可執照資料
每3月更新,115薛先生 | 02-2325-7399#55413 | 2023-07-27 01:02:57
行政院環境保護署新化學物質少量登錄表單
不定期更新更新,55蔡先生 | 02-23257399#55723 | 2023-08-09 01:04:24
行政院環境保護署
行政院環境保護署環境教育設施場所認證展延申請書
不定期更新,63蘇小姐 | (03)4020789分機669 | 2022-01-15 01:11:08
行政院環境保護署機車新車審驗資料
每月更新更新,124邱小姐 | 02-23712121#6309 | 2022-01-14 01:18:31
行政院環境保護署應回收廢棄物處理業者(廢照明光源類)最大處理量資料
每年更新更新,52廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:02
行政院環境保護署光化測站小時值資料
每1月更新,93陳先生 | 02-2311-7722#2386 | 2023-08-03 00:59:17
行政院環境保護署環境用藥販賣業許可執照資料
每3月更新,161薛先生 | 02-2325-7399#55413 | 2023-07-27 01:02:58
行政院環境保護署
生物源網格空氣污染排放量(TWD97)
不定期更新更新,173柏小姐 | 02-23712121#6106 | 2022-01-14 01:05:47
行政院環境保護署空氣品質小時值_金門縣_金門站
每1時更新,331陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:23
行政院環境保護署碳粉匣對應型號
每1月更新,139黃小姐 | 02-23117722#2932 | 2023-07-30 01:01:22
行政院環境保護署行政院環境保護署環境教育人員認證展延研習開課申請書
不定期更新更新,53盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:21
行政院環境保護署應回收廢棄物(廢照明光源類)回收量資料
每年更新更新,55廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:39
行政院環境保護署