"Plan of technical support on environmental impact assessment fo
「"Plan of technical support on environmental impact assessment fo」於資料集「EPQSummary_EnvironmentalImpactAssessment」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:43。 欄位Project Title的內容是"Plan of technical support on environmental impact assessment for river water quality " , 欄位Project Subject的內容是"The purpose of this study is to assist Taiwan EPA in reviewing the report of environmental impact assessment (EIA) on the section of receiving water quality modeling. Four main tasks are conducted to provide technological support in examining the results of Water Quality Modeling which is used in the assessment of surface water quality. The tasks include: (a) reviewing at least 19 EIA reports, (b) evaluating the performance of the four models (HSPF/BASINS, SWMM, WASP, and Qual2k) which were applied in EIA cases, (c) holding a workshop to discuss Water Quality Modeling, and (d) providing suggestions for revising the guideline of Water Quality Modeling. In 2014, all of the water quality models (e.g. HSPF/BASINS, SWMM, WASP, Qual2k, and mass balance method) which listed in guideline of Water Quality Modeling are used in project development as EIA report process. Five EIA cases assessed by the complex models (HSPF/BASINS, SWMM, WASP and Qual2k), ten EIA cases used mass balance method and four cases assessed by water quality effluent standard. The five water quality models (HSPF/BASINS, SWMM, WASP, Qual2k and mass balance method) are evaluated for their capability and applicability to the application of EIA cases. The results indicate that simulation of the four models can obtain comparable results under well fit of the process of calibration and confirmation. The location of water quality data collection also affects the result by using the mass balance method. Finally, several suggestions might help in the future. This study recommends that government agencies should work with institute (e.g. WERC, Water Environment Research Centre) to revise the modeling guideline or implement models for EIA case applications. Moreover, the institute could play critical role in archiving models and data, maintaining and upgrading them for future applications. The modeling workshop should place frequently to emphasis on modeler education; guideline for model assessment should be developed." , 欄位Project Year的內容是2014 , 欄位Organizer的內容是"Department of Comprehensive Planning" , 欄位Executive Unit的內容是"國立臺北科技大學" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=72129 , 欄位Publish Date的內容是20150201 。
Project Title
"Plan of technical support on environmental impact assessment for river water quality "
Project Subject
"The purpose of this study is to assist Taiwan EPA in reviewing the report of environmental impact assessment (EIA) on the section of receiving water quality modeling. Four main tasks are conducted to provide technological support in examining the results of Water Quality Modeling which is used in the assessment of surface water quality. The tasks include: (a) reviewing at least 19 EIA reports, (b) evaluating the performance of the four models (HSPF/BASINS, SWMM, WASP, and Qual2k) which were applied in EIA cases, (c) holding a workshop to discuss Water Quality Modeling, and (d) providing suggestions for revising the guideline of Water Quality Modeling. In 2014, all of the water quality models (e.g. HSPF/BASINS, SWMM, WASP, Qual2k, and mass balance method) which listed in guideline of Water Quality Modeling are used in project development as EIA report process. Five EIA cases assessed by the complex models (HSPF/BASINS, SWMM, WASP and Qual2k), ten EIA cases used mass balance method and four cases assessed by water quality effluent standard. The five water quality models (HSPF/BASINS, SWMM, WASP, Qual2k and mass balance method) are evaluated for their capability and applicability to the application of EIA cases. The results indicate that simulation of the four models can obtain comparable results under well fit of the process of calibration and confirmation. The location of water quality data collection also affects the result by using the mass balance method. Finally, several suggestions might help in the future. This study recommends that government agencies should work with institute (e.g. WERC, Water Environment Research Centre) to revise the modeling guideline or implement models for EIA case applications. Moreover, the institute could play critical role in archiving models and data, maintaining and upgrading them for future applications. The modeling workshop should place frequently to emphasis on modeler education; guideline for model assessment should be developed."
Project Year
2014
Organizer
"Department of Comprehensive Planning"
Executive Unit
"國立臺北科技大學"
Reporting download URL
Publish Date
20150201
「"Plan of technical support on environmental impact assessment fo」所屬的資料集:「EPQSummary_EnvironmentalImpactAssessment」的其他資料
Project Title:
"Environmental impact assessment review operations Project after the Implementation of the Geology A
Project Subject:
"Geology Act is promulgated by the Ministry of Economic Affairs on December 1st 2011. “Geologically
Project Year:
2018
Organizer:
"Department of Comprehensive Planning"
Project Title:
"Evaluation of EIA Technical Consulting Organizations, Certification of Evaluators and Conferences
Project Subject:
"The Environment Protection Administration (EPA) has been annually undertaking the Evaluation of Env
Project Year:
2013
Organizer:
"Department of Comprehensive Planning"
Project Title:
"Investigation of Light Pollution Impacts on Human Perception and Related Metrics and Countermeasure
Project Subject:
"This research project is based on domestic characteristics in Taiwan to investigate and analyze the
Project Year:
2016
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
Strategic Environmental Assessment on Changes in Scope of the Drinking Water Source Quality Protecti
Project Subject:
Taiwan has announced the delineation of 86 drinking water source and quality protection areas and 49
Project Year:
2015
Organizer:
Department of Environmental Sanitation & Toxic Substance Management
Project Title:
Project for Revision of Operational Rules of Environmental Evaluation for Development
Project Subject:
Environmental evaluation is the core for national development. And every country has its own law and
Project Year:
2011
Organizer:
Department of Comprehensive Planning
Project Title:
An Examination and Application of the Social Cost-benefit Analysis in Environmental Impact Assessmen
Project Subject:
This study has accomplished three major tasks. First, we investigate the application of cost and ben
Project Year:
2012
Organizer:
Department of Comprehensive Planning
Project Title:
The Supervision Project for Environmental Impact Assessment
Project Subject:
The scope of the project was the review and supervision the approved environmental impact assessment
Project Year:
2019
Organizer:
Bureau of Environmental Inspection
Project Title:
"The Supervision Project for Environmental Impact Assessment"
Project Subject:
"The scope of the project was the review and supervision the approved environmental impact assessmen
Project Year:
2018
Organizer:
"Bureau of Environmental Inspection"
Project Title:
Project for Assistance on Holding EIA Review Meetings in 2022,Evaluation of EIA Technical Consulting
Project Subject:
The main objective of this project is to improve theefficiency and qualityof the Environmental Impac
Project Year:
2022
Organizer:
Department of Comprehensive Planning
Project Title:
The Supervision Project for Environmental Impact Assessment
Project Subject:
This annual project reviewed and supervised the approved environmental impact assessment (EIA) repor
Project Year:
2012
Organizer:
Bureau of Environmental Inspection
Project Title:
EIA Documents Data Processing (II)
Project Subject:
In order to improve accuracy and prompt data processing and data transporting in Environmental Impa
Project Year:
2002
Organizer:
Department of Comprehensive Planning
Project Title:
"Environmental Impact Assessment Inquiry Application System Management and Maintenance Project"
Project Subject:
"This project had developed many results this year in the Environmental Impact Assessment inquiry ap
Project Year:
2019
Organizer:
"Department of Comprehensive Planning"
Project Title:
Total Load Control Plan for Environmental Impact Assessment in Slope-Land and Coast Areas
Project Subject:
According to the environmental carrying capacity, total load control aimed to develop and use enviro
Project Year:
2004
Organizer:
Department of Comprehensive Planning
Project Title:
"The Supervision Project for Environmental Impact Assessment"
Project Subject:
"This annual project reviewed and supervised the approved environmental impact assessment (EIA) repo
Project Year:
2013
Organizer:
"Bureau of Environmental Inspection"
Project Title:
"Analysis of Environmental Impact Assessment and decision-making supporting project in 2020"
Project Subject:
" The IER was entrusted with the 2020 Analysis of Environmental Impact Assessment and Decision-makin
Project Year:
2020
Organizer:
"Department of Comprehensive Planning"
Project Title:
"Plan of technical support on environmental impact assessment for river water quality"
Project Subject:
" The purpose of this study is to assist Taiwan EPA in reviewing the report of environmental impact
Project Year:
2015
Organizer:
"Department of Comprehensive Planning"
Project Title:
Study the Amendment for Environmental Impact Assessment Act
Project Subject:
The Foundation on Resources and Environmental Protection Service (FREPS) was entrusted by the Enviro
Project Year:
2003
Organizer:
Department of Comprehensive Planning
Project Title:
soils and groundwater
Project Subject:
[Project goals]
The goal of this project is to establish environmental background data of the farmla
Project Year:
2011
Organizer:
Environmental Protection Bureau Yunlin County
"-"2019"-"
Project Title:
"-"
Project Subject:
"-"
Project Year:
2019
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
The Design and Implementation of Greenhouse Gases Voluntary Reduction Project Review Mechanism and D
Project Subject:
There are five main work items in this project; the results achieved for each item are summarized as
Project Year:
2021
Organizer:
Department of Environmental Sanitation & Toxic Substance Management
Project Title:
"Project for Assistance on Holding EIA Review Meetings in 2020, Evaluation of EIA Technical Consulti
Project Subject:
"The main objective of this project is to improve the efficiency and quality of the Environmental Im
Project Year:
2020
Organizer:
"Department of Comprehensive Planning"
Project Title:
Evaluation of Technical Consulting Firms on Environmental Impact Assessment in Fiscal Year 95.
Project Subject:
The Environmental Protection Administration (EPA) has started the work of “Technical Consulting Firm
Project Year:
2006
Organizer:
Department of Comprehensive Planning
Project Title:
The Standard Operating Procedure and the model establishment of the Environmental Impact Assessment
Project Subject:
The main content of the project is coordinating ways to the public opinion investigation of all sort
Project Year:
2005
Organizer:
Department of Comprehensive Planning
Project Title:
The Supervision Project for Environmental Impact Assessment
Project Subject:
This Plan is directed toward six developing plans which had through environmental effect appraisal e
Project Year:
2009
Organizer:
Department of Comprehensive Planning
Project Title:
Reviewal and amendment for the institution and regulations of Strategic Environmental Assessment
Project Subject:
The administration continuously carried out the tasks of Strategic Environmental Assessment (SEA) on
Project Year:
2011
Organizer:
Department of Comprehensive Planning
Project Title:
"A Project of the Technical Support on Environmental Impact Assessment"
Project Subject:
"In order to improve the efficiency and quality of the environmental impact assessment (EIA) review,
Project Year:
2017
Organizer:
"Department of Comprehensive Planning"
Project Title:
Environmental impact assessment review operations Project after the Implementation of the Geology Ac
Project Subject:
Geology Act is promulgated by the Ministry of Economic Affairs on December 1st 2011. “Geologically s
Project Year:
2018
Organizer:
Department of Comprehensive Planning
Project Title:
"Analysis of Environmental Impact Assessment and decision-making supporting project in 2018"
Project Subject:
"The 2018 Analysis of Environmental Impact Assessment and decision support project was contracted to
Project Year:
2018
Organizer:
"Department of Comprehensive Planning"
Project Title:
"Review Operations of Environmental Impact Assessment after Geology Act comes into force"
Project Subject:
"In order to establish a base of geological surveys and geological safety assessment review mechanis
Project Year:
2014
Organizer:
"Department of Comprehensive Planning"
Project Title:
Carbon footprint saving route planning for garbage truck in TaoYuan County
Project Subject:
By following the government carbon footprint saving policy, this project completed the GPS installat
Project Year:
2009
Organizer:
Taoyuan County Government Environment Protection Bureau
行政院環境保護署 的其他資料集
督察檢測環境介質數據
每1月更新,139陳小姐 | 04-2252-1718#51310 | 2023-08-07 01:00:38
行政院環境保護署教育部事業廢棄物再利用機構資料
每年更新更新,41李小姐 | 02-2311-7722#2633 | 2022-01-14 01:26:13
行政院環境保護署歷年公共建設計畫執行情形
不定期更新更新,53陳小姐 | 02-2311-7722#2913 | 2022-01-15 01:10:17
行政院環境保護署全國公廁建檔資料
每1日更新,162賴先生 | 04-2252-1718#53686 | 2023-08-05 00:59:29
行政院環境保護署行政院環境保護署環境教育人員認證展延研習開課申請書
不定期更新更新,59盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:21
行政院環境保護署
公害陳情案件分佈位置圖
不定期更新更新,49許小姐 | 04-22521718#58709 | 2022-01-15 01:16:11
行政院環境保護署環保人員數
每月更新更新,131謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:43
行政院環境保護署環保專案摘要資料_環境資訊系統
不定期更新更新,113郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:42
行政院環境保護署每月自來水水質抽驗資料
每1月更新,187黃先生 | 02-23117722-2881 | 2023-07-27 01:04:49
行政院環境保護署基隆市水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,48許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:38
行政院環境保護署
地下水污染物監測及管制標準
不定期更新更新,122陳小姐 | 02-2383-2389#8207 | 2022-01-14 01:20:11
行政院環境保護署空氣品質小時值_宜蘭縣_宜蘭站
每1時更新,284陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:31
行政院環境保護署縣市(連江縣)小時值-每小時
每小時更新更新,100謝小姐 | 02-2311-7722#2386 | 2022-01-15 01:02:40
行政院環境保護署斯德哥爾摩公約出國報告
每年更新更新,47劉小姐 | 23257399#55531 | 2022-01-15 01:10:07
行政院環境保護署事業廢棄物再利用申報量統計
每1月更新,109林先生 | 02-2311-7722#2671 | 2023-08-07 01:02:11
行政院環境保護署
重點事業廢棄物-有害性集塵灰之產出及清理流向
每1月更新,233林先生 | 02-2311-7722#2671 | 2023-08-07 01:01:56
行政院環境保護署空氣品質小時值_新竹市_新竹站
每1時更新,244陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:04
行政院環境保護署0800資源回收免費專線-查詢廢乾電池、照明光源統計
每年更新更新,54莊先生 | 02-23705888#3108 | 2022-01-14 01:24:28
行政院環境保護署行政院環境保護署環境保護產品證書規費收費標準
每季更新更新,59孫小姐 | 02-23117722#2926 | 2022-01-15 01:13:08
行政院環境保護署獎勵民眾檢舉違反水污染防治法案件指導原則
不定期更新,44簡小姐 | 02-2311-7722#2818 | 2022-01-15 01:13:07
行政院環境保護署
環境影響說明書專案小組初審會議紀錄
不定期更新更新,66劉先生 | 02-2311-7722#2743 | 2022-01-15 01:12:35
行政院環境保護署水污染源許可及申報資料
每半年更新更新,117陳先生 | 02-2311-7722#2827 | 2022-01-15 01:12:30
行政院環境保護署環保署環境影響評估審查委員會會議資料
每2月更新,82黃先生 | 02-23117722#2748 | 2023-08-05 01:00:47
行政院環境保護署環保專案摘要資料_廢棄物管理
不定期更新更新,209郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:38
行政院環境保護署特殊性工業區即時監測值資料檔 (一般空氣污染物)
每小時更新更新,178丁先生 | 02-2371-2121#6101 | 2022-01-14 01:04:59
行政院環境保護署
清潔隊員節慶祝活動
每年更新更新,50蔡先生 | (04)2252-1718#53606 | 2022-01-14 01:18:06
行政院環境保護署環境教育(教學)人員(專長)認證申請書
不定期更新更新,52盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:28
行政院環境保護署EPQSummary_EnvironmentalEducation
不定期更新更新,265郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:14:02
行政院環境保護署連江縣水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,68程先生 | 02-2311-7722#2833 | 2023-08-09 01:04:05
行政院環境保護署全國場址新增列管及解列統計表
不定期更新更新,132賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:12
行政院環境保護署