Industrial Park Wastewater Controls to Be Tightenedwater1999
「Industrial Park Wastewater Controls to Be Tightenedwater1999」於資料集「Environmental Policy Monthly」由單位「行政院環境保護署」的楊先生所提供,聯繫電話是(02)23117722#2217,(02)23117722#2216,最近更新時間為:2022-01-15 01:13:03。 欄位編號的內容是293 , 欄位標題的內容是Industrial Park Wastewater Controls to Be Tightened , 欄位摘要的內容是The EPA is drafting six major strategies to broadly strengthen controls on effluent emitted from factories in industrial parks. These strategies include confirming the capacity and capability of unified wastewater treatment plants strengthening and raising the industrial wastewater connection rates, implementing a discharge permit review system and periodic monitoring and reporting, actively promoting pre-discharge treatment controls, and conducting industrial park assistance and unified auditing.
Taiwan currently has 95 industrial parks with 50 more in the development or planning stages. The government has until now actively promoted wastewater management in industrial parks by treating wastewater in unified wastewater treatment plants. These plants are the responsibility of industrial park management centers.
As one often hears of wastewater incidents in Taiwan’s industrial parks, the EPA recently proposed six major strategies to simultaneously strengthen controls on the hardware and software of current management systems. On December 9 of last year, the EPA discussed the strategies with representatives of local environmental authorities and related agencies and asked local authorities to support implementation timeframes.
Strategies 1 and 2 primarily address confirming the capacity and capability of unified wastewater treatment plants. Taiwan currently has 40 industrial parks with unified wastewater treatment plants. To accommodate industrial park growth and to meet 1998 emission standards, the MOEA's Industrial Development Bureau (IDB) in 1995 allotted NT$2.88 billion to upgrade and expand wastewater treatment plants. Expansion projects at eight parks are underway and are scheduled for completion in June of next year. Upgrading projects which began in July of 1987, include adding mixing and precipitation tanks, aeration and sedimentation tanks, concentration ponds, and sludge water extraction capabilities to another twelve plants. Projects at all but two of the industrial parks were completed at the end of last year. The remaining two projects at industrial parks in Tawulun and Hsining are scheduled for completion by the end of April.
Apart from requiring that current status reports on these projects be submitted, the EPA is also asking that industrial parks without a project plan submit a wastewater plant capacity estimate report confirming wastewater usage volume, wastewater generation volume, and treatment equipment capacity. The report must also address forecast growth of wastewater and estimate whether or not the wastewater treatment capacity of the industrial park will be sufficient over the next ten years.
In terms of surveying wastewater treatment plant capability, the EPA is asking that industrial parks submit information regarding wastewater discharge water quality, alternative plans to prevent water contamination during the project period, and sludge generation volume during normal operation, according to their wastewater discharge water quality. Compilation of the above information must be completed by the end of May.
Strategy 3 addresses strengthening wastewater connection and raising wastewater connection rates in industrial parks. The EPA in recent years has actively promoted wastewater connection in industrial parks. In 1993, the overall wastewater connection rate in industrial parks was only 49%. By the end of March last year, this rate had risen to 88% with approximately 380,000 tons of wastewater treated each day.
To increase the connection rate, the EPA began a six-month project in January to strengthen the auditing of companies that are not connected the treatment system. Companies not connected (those that have no discharge permit or are discharging at unapproved discharge points) will have one week in which to become connected. After that period, companies that still have not complied will be fined on a per inspection basis until they become connected or they obtain a discharge permit.
Strategy 4 addresses implementing permitting review systems and periodic monitoring and reporting. In the future, approval of discharge permits will be based not only on discharge from a factory’s wastewater treatment plant, but will also consider the pre-discharge treatment of wastewater.
A major focus of revising the Water Pollution Control Act is to bring pre-discharge wastewater treatment under control. Prior to completion of the revised act, the EPA is relying on discharge permit approval and asking that industrial park management centers control pre-discharge treatment in good faith and to the best of their ability. When unified wastewater treatment plants in industrial parks apply for a permit, the EPA will also require that pre-discharge treatment information from relevant sites be attached to the application. This information will also be required when unified wastewater treatment plants apply for a modification or an extension.
To implement wastewater pre-discharge treatment controls, apart from the discharge permit requirement, Strategy 5 addresses promoting codes regarding the abnormal treatment of water entering industrial park wastewater treatment plants. These codes have been jointly drafted by sewer competent authorities and industrial park management centers.
The addition of this measure mainly addresses the current inflexibility of wastewater connection cutoffs. If a company exceeds the standards by even a small amount, its connection may be cut off. This kind of punitive measure gives companies little incentive to improve contamination prevention and actually leads to more companies discharging illegally. The codes mentioned above are expected to provide a more graduated and flexible framework for punitive measures. The EPA suggested that connection cutoff standards be changed from a single standard to inter-regional ones. After the wastewater discharge of a company exceeds a certain standard concentration, the company will be fined at different degrees of severity.
As drafting and enforcement of the Special Treatment Codes are not part of its duties, the EPA is actively consulting with relevant provincial government agencies and industrial park management centers to accelerate drafting of these codes.
Strategy 6 addresses promoting assisting and unifying auditing in industrial parks. Prior to June of last year, the EPA had completed 560 diagnosis and assistance cases in industrial parks. In July of last year, screening continued on 130 companies with a poor pre-discharge treatment record to determine their prevention technology and to assist and track them. Companies were selected from dyeing, chemical, electroplating, leather, petrochemical and paper industries in major industrial parks.
To accommodate the simultaneous execution of assistance and auditing work, the EPA asked industrial park management centers to submit a unified auditing control plan prior to December 31 of last year that addresses companies that are not connected or that have a poor pre-discharge treatment record. This plan is to be executed after being agreed to by environmental authorities. , 欄位全文的內容是The EPA is drafting six major strategies to broadly strengthen controls on effluent emitted from factories in industrial parks. These strategies include confirming the capacity and capability of unified wastewater treatment plants strengthening and raising the industrial wastewater connection rates, implementing a discharge permit review system and periodic monitoring and reporting, actively promoting pre-discharge treatment controls, and conducting industrial park assistance and unified auditing.
Taiwan currently has 95 industrial parks with 50 more in the development or planning stages. The government has until now actively promoted wastewater management in industrial parks by treating wastewater in unified wastewater treatment plants. These plants are the responsibility of industrial park management centers.
As one often hears of wastewater incidents in Taiwan’s industrial parks, the EPA recently proposed six major strategies to simultaneously strengthen controls on the hardware and software of current management systems. On December 9 of last year, the EPA discussed the strategies with representatives of local environmental authorities and related agencies and asked local authorities to support implementation timeframes.
Strategies 1 and 2 primarily address confirming the capacity and capability of unified wastewater treatment plants. Taiwan currently has 40 industrial parks with unified wastewater treatment plants. To accommodate industrial park growth and to meet 1998 emission standards, the MOEA's Industrial Development Bureau (IDB) in 1995 allotted NT$2.88 billion to upgrade and expand wastewater treatment plants. Expansion projects at eight parks are underway and are scheduled for completion in June of next year. Upgrading projects which began in July of 1987, include adding mixing and precipitation tanks, aeration and sedimentation tanks, concentration ponds, and sludge water extraction capabilities to another twelve plants. Projects at all but two of the industrial parks were completed at the end of last year. The remaining two projects at industrial parks in Tawulun and Hsining are scheduled for completion by the end of April.
Apart from requiring that current status reports on these projects be submitted, the EPA is also asking that industrial parks without a project plan submit a wastewater plant capacity estimate report confirming wastewater usage volume, wastewater generation volume, and treatment equipment capacity. The report must also address forecast growth of wastewater and estimate whether or not the wastewater treatment capacity of the industrial park will be sufficient over the next ten years.
In terms of surveying wastewater treatment plant capability, the EPA is asking that industrial parks submit information regarding wastewater discharge water quality, alternative plans to prevent water contamination during the project period, and sludge generation volume during normal operation, according to their wastewater discharge water quality. Compilation of the above information must be completed by the end of May.
Strategy 3 addresses strengthening wastewater connection and raising wastewater connection rates in industrial parks. The EPA in recent years has actively promoted wastewater connection in industrial parks. In 1993, the overall wastewater connection rate in industrial parks was only 49%. By the end of March last year, this rate had risen to 88% with approximately 380,000 tons of wastewater treated each day.
To increase the connection rate, the EPA began a six-month project in January to strengthen the auditing of companies that are not connected the treatment system. Companies not connected (those that have no discharge permit or are discharging at unapproved discharge points) will have one week in which to become connected. After that period, companies that still have not complied will be fined on a per inspection basis until they become connected or they obtain a discharge permit.
Strategy 4 addresses implementing permitting review systems and periodic monitoring and reporting. In the future, approval of discharge permits will be based not only on discharge from a factory’s wastewater treatment plant, but will also consider the pre-discharge treatment of wastewater.
A major focus of revising the Water Pollution Control Act is to bring pre-discharge wastewater treatment under control. Prior to completion of the revised act, the EPA is relying on discharge permit approval and asking that industrial park management centers control pre-discharge treatment in good faith and to the best of their ability. When unified wastewater treatment plants in industrial parks apply for a permit, the EPA will also require that pre-discharge treatment information from relevant sites be attached to the application. This information will also be required when unified wastewater treatment plants apply for a modification or an extension.
To implement wastewater pre-discharge treatment controls, apart from the discharge permit requirement, Strategy 5 addresses promoting codes regarding the abnormal treatment of water entering industrial park wastewater treatment plants. These codes have been jointly drafted by sewer competent authorities and industrial park management centers.
The addition of this measure mainly addresses the current inflexibility of wastewater connection cutoffs. If a company exceeds the standards by even a small amount, its connection may be cut off. This kind of punitive measure gives companies little incentive to improve contamination prevention and actually leads to more companies discharging illegally. The codes mentioned above are expected to provide a more graduated and flexible framework for punitive measures. The EPA suggested that connection cutoff standards be changed from a single standard to inter-regional ones. After the wastewater discharge of a company exceeds a certain standard concentration, the company will be fined at different degrees of severity.
As drafting and enforcement of the Special Treatment Codes are not part of its duties, the EPA is actively consulting with relevant provincial government agencies and industrial park management centers to accelerate drafting of these codes.
Strategy 6 addresses promoting assisting and unifying auditing in industrial parks. Prior to June of last year, the EPA had completed 560 diagnosis and assistance cases in industrial parks. In July of last year, screening continued on 130 companies with a poor pre-discharge treatment record to determine their prevention technology and to assist and track them. Companies were selected from dyeing, chemical, electroplating, leather, petrochemical and paper industries in major industrial parks.
To accommodate the simultaneous execution of assistance and auditing work, the EPA asked industrial park management centers to submit a unified auditing control plan prior to December 31 of last year that addresses companies that are not connected or that have a poor pre-discharge treatment record. This plan is to be executed after being agreed to by environmental authorities. , 欄位年度的內容是1999 , 欄位月份的內容是2 , 欄位卷的內容是2 , 欄位期的內容是8 , 欄位順序的內容是1 , 欄位倒序的內容是2 , 欄位分類的內容是water , 欄位標題2的內容是Industrial Park Wastewater Controls to Be Tightened , 欄位檔案位置的內容是print/V2/V2-08 。
編號
293
標題
Industrial Park Wastewater Controls to Be Tightened
摘要
The EPA is drafting six major strategies to broadly strengthen controls on effluent emitted from factories in industrial parks. These strategies include confirming the capacity and capability of unified wastewater treatment plants strengthening and raising the industrial wastewater connection rates, implementing a discharge permit review system and periodic monitoring and reporting, actively promoting pre-discharge treatment controls, and conducting industrial park assistance and unified auditing. Taiwan currently has 95 industrial parks with 50 more in the development or planning stages. The government has until now actively promoted wastewater management in industrial parks by treating wastewater in unified wastewater treatment plants. These plants are the responsibility of industrial park management centers. As one often hears of wastewater incidents in Taiwan’s industrial parks, the EPA recently proposed six major strategies to simultaneously strengthen controls on the hardware and software of current management systems. On December 9 of last year, the EPA discussed the strategies with representatives of local environmental authorities and related agencies and asked local authorities to support implementation timeframes. Strategies 1 and 2 primarily address confirming the capacity and capability of unified wastewater treatment plants. Taiwan currently has 40 industrial parks with unified wastewater treatment plants. To accommodate industrial park growth and to meet 1998 emission standards, the MOEA's Industrial Development Bureau (IDB) in 1995 allotted NT$2.88 billion to upgrade and expand wastewater treatment plants. Expansion projects at eight parks are underway and are scheduled for completion in June of next year. Upgrading projects which began in July of 1987, include adding mixing and precipitation tanks, aeration and sedimentation tanks, concentration ponds, and sludge water extraction capabilities to another twelve plants. Projects at all but two of the industrial parks were completed at the end of last year. The remaining two projects at industrial parks in Tawulun and Hsining are scheduled for completion by the end of April. Apart from requiring that current status reports on these projects be submitted, the EPA is also asking that industrial parks without a project plan submit a wastewater plant capacity estimate report confirming wastewater usage volume, wastewater generation volume, and treatment equipment capacity. The report must also address forecast growth of wastewater and estimate whether or not the wastewater treatment capacity of the industrial park will be sufficient over the next ten years. In terms of surveying wastewater treatment plant capability, the EPA is asking that industrial parks submit information regarding wastewater discharge water quality, alternative plans to prevent water contamination during the project period, and sludge generation volume during normal operation, according to their wastewater discharge water quality. Compilation of the above information must be completed by the end of May. Strategy 3 addresses strengthening wastewater connection and raising wastewater connection rates in industrial parks. The EPA in recent years has actively promoted wastewater connection in industrial parks. In 1993, the overall wastewater connection rate in industrial parks was only 49%. By the end of March last year, this rate had risen to 88% with approximately 380,000 tons of wastewater treated each day. To increase the connection rate, the EPA began a six-month project in January to strengthen the auditing of companies that are not connected the treatment system. Companies not connected (those that have no discharge permit or are discharging at unapproved discharge points) will have one week in which to become connected. After that period, companies that still have not complied will be fined on a per inspection basis until they become connected or they obtain a discharge permit. Strategy 4 addresses implementing permitting review systems and periodic monitoring and reporting. In the future, approval of discharge permits will be based not only on discharge from a factory’s wastewater treatment plant, but will also consider the pre-discharge treatment of wastewater. A major focus of revising the Water Pollution Control Act is to bring pre-discharge wastewater treatment under control. Prior to completion of the revised act, the EPA is relying on discharge permit approval and asking that industrial park management centers control pre-discharge treatment in good faith and to the best of their ability. When unified wastewater treatment plants in industrial parks apply for a permit, the EPA will also require that pre-discharge treatment information from relevant sites be attached to the application. This information will also be required when unified wastewater treatment plants apply for a modification or an extension. To implement wastewater pre-discharge treatment controls, apart from the discharge permit requirement, Strategy 5 addresses promoting codes regarding the abnormal treatment of water entering industrial park wastewater treatment plants. These codes have been jointly drafted by sewer competent authorities and industrial park management centers. The addition of this measure mainly addresses the current inflexibility of wastewater connection cutoffs. If a company exceeds the standards by even a small amount, its connection may be cut off. This kind of punitive measure gives companies little incentive to improve contamination prevention and actually leads to more companies discharging illegally. The codes mentioned above are expected to provide a more graduated and flexible framework for punitive measures. The EPA suggested that connection cutoff standards be changed from a single standard to inter-regional ones. After the wastewater discharge of a company exceeds a certain standard concentration, the company will be fined at different degrees of severity. As drafting and enforcement of the Special Treatment Codes are not part of its duties, the EPA is actively consulting with relevant provincial government agencies and industrial park management centers to accelerate drafting of these codes. Strategy 6 addresses promoting assisting and unifying auditing in industrial parks. Prior to June of last year, the EPA had completed 560 diagnosis and assistance cases in industrial parks. In July of last year, screening continued on 130 companies with a poor pre-discharge treatment record to determine their prevention technology and to assist and track them. Companies were selected from dyeing, chemical, electroplating, leather, petrochemical and paper industries in major industrial parks. To accommodate the simultaneous execution of assistance and auditing work, the EPA asked industrial park management centers to submit a unified auditing control plan prior to December 31 of last year that addresses companies that are not connected or that have a poor pre-discharge treatment record. This plan is to be executed after being agreed to by environmental authorities.
全文
The EPA is drafting six major strategies to broadly strengthen controls on effluent emitted from factories in industrial parks. These strategies include confirming the capacity and capability of unified wastewater treatment plants strengthening and raising the industrial wastewater connection rates, implementing a discharge permit review system and periodic monitoring and reporting, actively promoting pre-discharge treatment controls, and conducting industrial park assistance and unified auditing. Taiwan currently has 95 industrial parks with 50 more in the development or planning stages. The government has until now actively promoted wastewater management in industrial parks by treating wastewater in unified wastewater treatment plants. These plants are the responsibility of industrial park management centers. As one often hears of wastewater incidents in Taiwan’s industrial parks, the EPA recently proposed six major strategies to simultaneously strengthen controls on the hardware and software of current management systems. On December 9 of last year, the EPA discussed the strategies with representatives of local environmental authorities and related agencies and asked local authorities to support implementation timeframes. Strategies 1 and 2 primarily address confirming the capacity and capability of unified wastewater treatment plants. Taiwan currently has 40 industrial parks with unified wastewater treatment plants. To accommodate industrial park growth and to meet 1998 emission standards, the MOEA's Industrial Development Bureau (IDB) in 1995 allotted NT$2.88 billion to upgrade and expand wastewater treatment plants. Expansion projects at eight parks are underway and are scheduled for completion in June of next year. Upgrading projects which began in July of 1987, include adding mixing and precipitation tanks, aeration and sedimentation tanks, concentration ponds, and sludge water extraction capabilities to another twelve plants. Projects at all but two of the industrial parks were completed at the end of last year. The remaining two projects at industrial parks in Tawulun and Hsining are scheduled for completion by the end of April. Apart from requiring that current status reports on these projects be submitted, the EPA is also asking that industrial parks without a project plan submit a wastewater plant capacity estimate report confirming wastewater usage volume, wastewater generation volume, and treatment equipment capacity. The report must also address forecast growth of wastewater and estimate whether or not the wastewater treatment capacity of the industrial park will be sufficient over the next ten years. In terms of surveying wastewater treatment plant capability, the EPA is asking that industrial parks submit information regarding wastewater discharge water quality, alternative plans to prevent water contamination during the project period, and sludge generation volume during normal operation, according to their wastewater discharge water quality. Compilation of the above information must be completed by the end of May. Strategy 3 addresses strengthening wastewater connection and raising wastewater connection rates in industrial parks. The EPA in recent years has actively promoted wastewater connection in industrial parks. In 1993, the overall wastewater connection rate in industrial parks was only 49%. By the end of March last year, this rate had risen to 88% with approximately 380,000 tons of wastewater treated each day. To increase the connection rate, the EPA began a six-month project in January to strengthen the auditing of companies that are not connected the treatment system. Companies not connected (those that have no discharge permit or are discharging at unapproved discharge points) will have one week in which to become connected. After that period, companies that still have not complied will be fined on a per inspection basis until they become connected or they obtain a discharge permit. Strategy 4 addresses implementing permitting review systems and periodic monitoring and reporting. In the future, approval of discharge permits will be based not only on discharge from a factory’s wastewater treatment plant, but will also consider the pre-discharge treatment of wastewater. A major focus of revising the Water Pollution Control Act is to bring pre-discharge wastewater treatment under control. Prior to completion of the revised act, the EPA is relying on discharge permit approval and asking that industrial park management centers control pre-discharge treatment in good faith and to the best of their ability. When unified wastewater treatment plants in industrial parks apply for a permit, the EPA will also require that pre-discharge treatment information from relevant sites be attached to the application. This information will also be required when unified wastewater treatment plants apply for a modification or an extension. To implement wastewater pre-discharge treatment controls, apart from the discharge permit requirement, Strategy 5 addresses promoting codes regarding the abnormal treatment of water entering industrial park wastewater treatment plants. These codes have been jointly drafted by sewer competent authorities and industrial park management centers. The addition of this measure mainly addresses the current inflexibility of wastewater connection cutoffs. If a company exceeds the standards by even a small amount, its connection may be cut off. This kind of punitive measure gives companies little incentive to improve contamination prevention and actually leads to more companies discharging illegally. The codes mentioned above are expected to provide a more graduated and flexible framework for punitive measures. The EPA suggested that connection cutoff standards be changed from a single standard to inter-regional ones. After the wastewater discharge of a company exceeds a certain standard concentration, the company will be fined at different degrees of severity. As drafting and enforcement of the Special Treatment Codes are not part of its duties, the EPA is actively consulting with relevant provincial government agencies and industrial park management centers to accelerate drafting of these codes. Strategy 6 addresses promoting assisting and unifying auditing in industrial parks. Prior to June of last year, the EPA had completed 560 diagnosis and assistance cases in industrial parks. In July of last year, screening continued on 130 companies with a poor pre-discharge treatment record to determine their prevention technology and to assist and track them. Companies were selected from dyeing, chemical, electroplating, leather, petrochemical and paper industries in major industrial parks. To accommodate the simultaneous execution of assistance and auditing work, the EPA asked industrial park management centers to submit a unified auditing control plan prior to December 31 of last year that addresses companies that are not connected or that have a poor pre-discharge treatment record. This plan is to be executed after being agreed to by environmental authorities.
年度
1999
月份
2
卷
2
期
8
順序
1
倒序
2
分類
water
標題2
Industrial Park Wastewater Controls to Be Tightened
檔案位置
print/V2/V2-08
「Industrial Park Wastewater Controls to Be Tightenedwater1999」所屬的資料集:「Environmental Policy Monthly」的其他資料
編號:
961
標題:
Revised Air Pollution Control Act Simplifies Permit Procedures
摘要:
The revised Air Pollution Control Act passed by the Legislative Yuan on May 21, authorizes the EPA t
全文:
The revised Air Pollution Control Act passed by the Legislative Yuan on May 21, authorizes the EPA t
編號:
484
標題:
Standards for Automotive Diesel Fuel Constituents and Properties Announced
摘要:
To respond to the liberalization of the Taiwan petroleum market on December 15 the EPA officially an
全文:
To respond to the liberalization of the Taiwan petroleum market on December 15 the EPA officially an
編號:
470
標題:
Dioxin Standards for Small Incinerators On the Way
摘要:
The Environmental Quality Protection Foundation (EQPF) has brought allegations of high risk from dio
全文:
The Environmental Quality Protection Foundation (EQPF) has brought allegations of high risk from dio
編號:
860
標題:
Environmental Excellence Awards for Construction Sites
摘要:
The EPA held the 2001 National Construction Site Environmental Excellence Awards Ceremony at the EPA
全文:
The EPA held the 2001 National Construction Site Environmental Excellence Awards Ceremony at the EPA
編號:
455
標題:
Draft of Toxic Substance Use Regulations Completed
摘要:
Toxic substance In order to unify toxic substance management models the EPA recently proposed a draf
全文:
In order to unify toxic substance management models the EPA recently proposed a draft of the Regulat
編號:
423
標題:
EPA to Go All Out Against Underground Electroplaters
摘要:
To solve pollution problems caused by electroplating in Taiwan the EPA has drafted a preliminary pla
全文:
To solve pollution problems caused by electroplating in Taiwan the EPA has drafted a preliminary pla
編號:
274
標題:
Evaluation Process for EIA Consulting Firms Systematized
摘要:
In amending the EIA Act Enforcement Rules the EPA added stipulations regarding EIA consultant evalua
全文:
In amending the EIA Act Enforcement Rules the EPA added stipulations regarding EIA consultant evalua
編號:
650
標題:
30 Types of General Industrial Waste OK for Direct Reuse
摘要:
After obtaining a consensus with industries and related government departments the EPA has expanded
全文:
After obtaining a consensus with industries and related government departments the EPA has expanded
編號:
634
標題:
80 Uses for Toxic Chemical Substances Eliminated
摘要:
The EPA currently has listed 252 substances as toxic chemicals (161 categories) and promulgated rest
全文:
The EPA currently has listed 252 substances as toxic chemicals (161 categories) and promulgated rest
編號:
344
標題:
NOx Emission Standards to be Significantly Tightened
摘要:
The EPA plans to tighten up the currently loose nitrogen oxide (NOx) emission standards and set limi
全文:
The EPA plans to tighten up the currently loose nitrogen oxide (NOx) emission standards and set limi
編號:
807
標題:
Toxic Chemical Detection and Warning Equipment Guidelines Revised
摘要:
The EPA has announced revisions to the Toxic Chemical Substances Detection and Warning Equipment Ins
全文:
The EPA has announced revisions to the Toxic Chemical Substances Detection and Warning Equipment Ins
編號:
869
標題:
Old Motorbike Replacement Subsidies Aim to Reduce Air Pollution
摘要:
The EPA as part of its efforts to reduce air pollution, announced the most up-to-date Old Motorbike
全文:
The EPA as part of its efforts to reduce air pollution, announced the most up-to-date Old Motorbike
編號:
852
標題:
Tracking Industrial Waste Flows in Real-time Using GPS
摘要:
The EPA plans to start using global positioning system (GPS) technology next year to perform the rea
全文:
The EPA plans to start using global positioning system (GPS) technology next year to perform the rea
編號:
882
標題:
Ban on Water Polluting Behavior Announced
摘要:
In accordance with Article 28-5 of the Water Pollution Control Act (水污染防治法) the EPA announced on Jan
全文:
In accordance with Article 28-5 of the Water Pollution Control Act (水污染防治法) the EPA announced on Jan
編號:
501
標題:
Amendments to Effluent Standards Rolled Out
摘要:
The EPA recently announced the implementation of amended effluent standards. Because the paper indus
全文:
The EPA recently announced the implementation of amended effluent standards. Because the paper indus
編號:
761
標題:
Construction Site Runoff Water Placed Under Regulation
摘要:
The EPA will begin introducing a series of regulations aimed at enterprises that are frequently the
全文:
The EPA will begin introducing a series of regulations aimed at enterprises that are frequently the
編號:
403
標題:
Emergency Measures for Industrial Waste Management Underway
摘要:
Industrial waste control regulations have been tightened but because of insufficient treatment capac
全文:
Industrial waste control regulations have been tightened but because of insufficient treatment capac
編號:
137
標題:
Water Pollution Fee to be Postponed
摘要:
Water Quality According to EPA Administrator Hsung-Hsiung Tsai public opinion following announcemen
全文:
Water Quality According to EPA Administrator Hsung-Hsiung Tsai public opinion following announcemen
編號:
213
標題:
EPA Steps Up Groundwater Remediation Efforts
摘要:
In response to the public’s increasing concern over groundwater contamination the EPA has accelerate
全文:
In response to the public’s increasing concern over groundwater contamination the EPA has accelerate
編號:
592
標題:
EPA To Set Recycling Guidelines for Fast Food Industry
摘要:
The pollution problems arising from fast food consumption are receiving greater attention. Because f
全文:
The pollution problems arising from fast food consumption are receiving greater attention. Because f
編號:
889
標題:
New Policies for a New Year
摘要:
The EPM presents an overview of some of the major policies being pursued within the EPA this year in
全文:
The EPM presents an overview of some of the major policies being pursued within the EPA this year in
編號:
236
標題:
Pingtung County Listed as Low Sulfur Oil Control Area
摘要:
On August 19 the EPA formally announced Pingtung Countys listing as a low sulfur oil control area. O
全文:
On August 19 the EPA formally announced Pingtung Countys listing as a low sulfur oil control area. O
編號:
300
標題:
Collection Rate of Quantity-based Air Pollution Fee Hits 90%
摘要:
Nearly 5000 firms have already paid the FY1999 first quarter (quantity-based) air pollution fee, and
全文:
Nearly 5000 firms have already paid the FY1999 first quarter (quantity-based) air pollution fee, and
編號:
854
標題:
Automotive Fuel Control Standards Tightened
摘要:
Prompted by changes in objective conditions (such as improvements in the quality of widely-available
全文:
Prompted by changes in objective conditions (such as improvements in the quality of widely-available
編號:
496
標題:
Mandatory Recycling of Fluorescent Lightbulbs On the Way
摘要:
Because discarded fluorescent lightbulbs contain mercury they have a significant impact on the envir
全文:
Because discarded fluorescent lightbulbs contain mercury they have a significant impact on the envir
編號:
493
標題:
Feature Article: Toxic Chemical Management: Past Achievements and Future Policy
摘要:
The EPA has already listed 199 types of toxic chemicals to guard against the many dangers posed by t
全文:
The EPA has already listed 199 types of toxic chemicals to guard against the many dangers posed by t
編號:
408
標題:
Glass Shards to be Cleared for Reuse in Public Construction Projects
摘要:
To further the recycling of glass the EPA on August 6 invited relevant units to discuss opening the
全文:
To further the recycling of glass the EPA on August 6 invited relevant units to discuss opening the
編號:
18
標題:
IDE Offers APEC Cleaner Production Training
摘要:
Others The pollution control industry ranks among Taiwan's top ten new industries. Limitations of t
全文:
Others The pollution control industry ranks among Taiwan's top ten new industries. Limitations of t
編號:
113
標題:
Environmental Services Sector to be APEC Target for Liberalization
摘要:
International Affairs Early voluntary liberalization was one of the most actively promoted APEC pol
全文:
International Affairs Early voluntary liberalization was one of the most actively promoted APEC pol
編號:
845
標題:
EPA Subsidy for Replacement of Diesel Buses
摘要:
To sharply improve urban air quality and give city residents a cleaner living environment the EPA is
全文:
To sharply improve urban air quality and give city residents a cleaner living environment the EPA is
行政院環境保護署 的其他資料集
空氣品質小時值_南投縣_竹山站
每1時更新,117陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:28
行政院環境保護署行政院環境保護署單位決算
每1年更新,34何先生 | 02-23117722#2158 | 2023-08-09 01:04:28
行政院環境保護署新化學物質及既有化學物質資料登錄工具說明
不定期更新更新,42蔡先生 | 02-23257399#55723 | 2023-08-09 01:05:35
行政院環境保護署空氣品質小時值_新北市_新莊站
每小時更新更新,102謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:24
行政院環境保護署應回收廢棄物處理業者(廢家電資訊類)最大處理量資料
每年更新更新,46廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:01
行政院環境保護署
公民營廢棄物乙級清除機構許可資料
每月更新更新,93何先生 | 02-2311-7722#2653 | 2022-01-14 01:25:57
行政院環境保護署環保標章產品審查通過及有效數資料(第一類)
每季更新更新,104孫小姐 | 02-23117722#2926 | 2022-01-14 01:17:21
行政院環境保護署補助地方設置巨大廢棄物回收再利用廠一覽
不定期更新更新,42林小姐 | 04-22521718#53511 | 2023-08-07 00:59:54
行政院環境保護署應回收廢棄物處理業者(廢機動車輛類)最大處理量資料
每1年更新,59廖小姐 | 02-2370-5888#3103 | 2023-08-03 00:59:54
行政院環境保護署環保署書面之公共工程及採購契約
不定期更新,41許小姐 | (02)23117722#2483 | 2022-01-15 01:10:14
行政院環境保護署
建檔公廁明細-新竹縣
不定期更新更新,116賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:00
行政院環境保護署焚化廠飛灰穩定化檢測資料
每月更新更新,112吳先生 | 04-22521718#53526 | 2022-01-15 01:15:34
行政院環境保護署列管公廁個數
每年更新更新,112謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:36
行政院環境保護署環保署環境影響評估審查委員會會議資料
每2月更新,70黃先生 | 02-23117722#2748 | 2023-08-05 01:00:47
行政院環境保護署建檔公廁明細-南投縣
不定期更新更新,107賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:06
行政院環境保護署
環境影響評估案件概況
每1年更新,136顏先生 | 02-23117722#2109 | 2023-07-30 01:00:47
行政院環境保護署空氣品質指標(AQI)
每小時更新更新,66謝小姐 | 02-2311-7722#2386 | 2022-01-12 01:04:49
行政院環境保護署重要河川污染情形
每月更新更新,141謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:02
行政院環境保護署歷年公共建設計畫執行情形
不定期更新更新,44陳小姐 | 02-2311-7722#2913 | 2022-01-15 01:10:17
行政院環境保護署六輕相關計畫環境監測資料
每季更新更新,42陳先生 | 04-22521718#51207 | 2022-01-15 01:14:25
行政院環境保護署
公告事業廢棄物清運機具資料
每月更新更新,220陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:05
行政院環境保護署應回收廢棄物受補貼機構(回收業)
每年更新更新,127廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:23:57
行政院環境保護署環訓所年度年報彙編
每年更新更新,47湯小姐 | 03-4020789#544 | 2022-01-15 01:10:11
行政院環境保護署交通事業廢棄物再利用機構資料
每1年更新,68李小姐 | 02-2311-7722#2626 | 2023-07-27 00:59:36
行政院環境保護署應回收廢棄物處理業者資料
每1年更新,118廖小姐 | 02-2370-5888#3103 | 2023-07-27 00:59:29
行政院環境保護署
自來水水質抽驗檢驗結果
每1月更新,97顏先生 | 02-23117722#2109 | 2023-07-27 01:01:26
行政院環境保護署公害陳情上半年度統計分析報告
每8月更新,45許小姐 | 04-22521718#58709 | 2023-08-09 01:04:44
行政院環境保護署空氣品質小時值_雲林縣_斗六站
每1時更新,103陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:53
行政院環境保護署環評主管機關受理審查之因應對策
每2月更新,39黃先生 | 02-23117722#2748 | 2023-08-05 01:01:17
行政院環境保護署公民營製造業、用水、電力及燃氣供應業污染防治支出
每1年更新,44顏先生 | 02-23117722#2109 | 2023-07-30 01:00:38
行政院環境保護署