"The 2014 Project of VOC inspection in offshore industrial zones, Yunlin County"
「"The 2014 Project of VOC inspection in offshore industrial zones, Yunlin County"」於資料集「EPQSummary_Air」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:50。 欄位Project Title的內容是"The 2014 Project of VOC inspection in offshore industrial zones, Yunlin County" , 欄位Project Subject的內容是"The main work of the project plan for the project and tube industrial area of the county Islands volatile organic pollution control business. Indeed supervision Islands Industrial Zone volatile organic sources of pollution, and volatile organic pollution checking, testing operations and follow-up control operations, to achieve pollution reduction goals. So far the implementation of this project , work items are following the original method of planning and execution of the operation , the main results are as follows :1. An improvement in the combustion exhaust emissions norm tower : a total of 44 islands industrial gas flaring tower , has completed 24 improvements , a total of 102 completed seven improvements were units of ARO-1 Plant No. AE01 burning towers, and Taiwan ARO-2 plant number AP01, ARO-3 plant number AE01 and light oil plant AR01 ~ AR04, the remaining 20 will be 103 years before the end of June .2. fixed roof storage tank regulatory compliance audit of 312 degrees , regulatory compliance conditions are 168 , of which 17.85% ( 30 ) control equipment not yet comply with regulatory requirements , 25% ( 42 ) record with tank claims data are missing , 0.59% ( 1 ) found that the slot is not clear reporting and record checks .3. loading operation facilities of checking 139 for permit applications and the EIA reported total vapor pressure of the different loading operation facilities , investigate the actual situation of the factory has been requested , and check application data , for licensing transactions.4. Equipment components inspectors to detect a plasticized wheat plant ( light oil plant ) for the maximum number of leaks , leaks proportion accounted last year for the 21:00 and 9:00 this year , second only to the latter sets of Haifeng factory (ARO3 plant ) , last year 6:00 and 8:00 this year , so please fix two plants more positive self- detection equipment components and increase the frequency of sampling tests planned equipment components from 99 to 102 years with an average leak rate 0.18% 99 to 102 years of independent factories average leak detection rate of 0.32% , comparing the two sampling tests found the leak rate of less than factory independent testing.5. Wastewater field in addition to checking the current situation in Changchun stamped artificial plants and acetic acid plant in Taiwan completed stamped connectivity to external control equipment at the end of this year , the plants are handled extension , extension of the light oil plant has not yet submitted a letter of exhibition is expected to be extended 103/09/30 , been extended to the rest of the plant are 103/10/31 ." , 欄位Project Year的內容是2014 , 欄位Organizer的內容是"Environmental Protection Bureau Yunlin County" , 欄位Executive Unit的內容是"台灣曼寧工程顧問股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=103447 , 欄位Publish Date的內容是20160201 。
Project Title
"The 2014 Project of VOC inspection in offshore industrial zones, Yunlin County"
Project Subject
"The main work of the project plan for the project and tube industrial area of the county Islands volatile organic pollution control business. Indeed supervision Islands Industrial Zone volatile organic sources of pollution, and volatile organic pollution checking, testing operations and follow-up control operations, to achieve pollution reduction goals. So far the implementation of this project , work items are following the original method of planning and execution of the operation , the main results are as follows :1. An improvement in the combustion exhaust emissions norm tower : a total of 44 islands industrial gas flaring tower , has completed 24 improvements , a total of 102 completed seven improvements were units of ARO-1 Plant No. AE01 burning towers, and Taiwan ARO-2 plant number AP01, ARO-3 plant number AE01 and light oil plant AR01 ~ AR04, the remaining 20 will be 103 years before the end of June .2. fixed roof storage tank regulatory compliance audit of 312 degrees , regulatory compliance conditions are 168 , of which 17.85% ( 30 ) control equipment not yet comply with regulatory requirements , 25% ( 42 ) record with tank claims data are missing , 0.59% ( 1 ) found that the slot is not clear reporting and record checks .3. loading operation facilities of checking 139 for permit applications and the EIA reported total vapor pressure of the different loading operation facilities , investigate the actual situation of the factory has been requested , and check application data , for licensing transactions.4. Equipment components inspectors to detect a plasticized wheat plant ( light oil plant ) for the maximum number of leaks , leaks proportion accounted last year for the 21:00 and 9:00 this year , second only to the latter sets of Haifeng factory (ARO3 plant ) , last year 6:00 and 8:00 this year , so please fix two plants more positive self- detection equipment components and increase the frequency of sampling tests planned equipment components from 99 to 102 years with an average leak rate 0.18% 99 to 102 years of independent factories average leak detection rate of 0.32% , comparing the two sampling tests found the leak rate of less than factory independent testing.5. Wastewater field in addition to checking the current situation in Changchun stamped artificial plants and acetic acid plant in Taiwan completed stamped connectivity to external control equipment at the end of this year , the plants are handled extension , extension of the light oil plant has not yet submitted a letter of exhibition is expected to be extended 103/09/30 , been extended to the rest of the plant are 103/10/31 ."
Project Year
2014
Organizer
"Environmental Protection Bureau Yunlin County"
Executive Unit
"台灣曼寧工程顧問股份有限公司"
Reporting download URL
Publish Date
20160201
「"The 2014 Project of VOC inspection in offshore industrial zones, Yunlin County"」所屬的資料集:「EPQSummary_Air」的其他資料
Project Title:
"105 years of migration pollution sources"
Project Subject:
"In order to solve the pollution caused by mobile pollution sources, the banning and propaganda work
Project Year:
2016
Organizer:
"Taitung County Environment Protection Bureau"
Project Title:
"Stationary Sources Permit and Air pollution Fee project"
Project Subject:
"The main work items of Stationary Sources Permit and Air pollution Fee project are: (1) Stationary
Project Year:
2009
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"Construct and promote systematic working mechanisms for national greenhouse gas inventory"
Project Subject:
"Since the UNFCCC has made significant progress in guidelines and review guideline of national repor
Project Year:
2014
Organizer:
"Office of Greenhouse Gases Reduction Management"
Project Title:
"Pingtung County gravel pits cum escape pollution control plan"
Project Subject:
"Abstract1. Checking and Governing Pingtung County governs 63 sand and gravel processing plants, whe
Project Year:
2009
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"The 2015 Project of VOC inspection in of fshore indus tr ial zones, Yunl in County"
Project Subject:
"The main work of this project is to manage the volatile organic compound pollution sources of the C
Project Year:
2015
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
" The 107th year of air pollution inspection and control scheme for folklore activities, catering i
Project Subject:
"The main content of this project included:air pollution emissions investigation at temples and alta
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Chiayi City"
"NO"2016"NO"
Project Title:
"NO"
Project Subject:
"NO"
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"Motorcycle Emissions Control and Exhaust Inspection Station Quality Management Plan"
Project Subject:
"The regular motorcycle exhaust inspection system has been implemented for 21 years since started in
Project Year:
2017
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"none"
Project Subject:
"none"
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"Cross-Strait Communication and Cooperation on Air Quality Protection"
Project Subject:
" Taiwan and China are both facing air pollution problems relating to particulate matters and pho
Project Year:
2014
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
""
Project Subject:
"From March 4, 2016 to December 15, 2016, the results of the work are summarized as follows:(一) Prom
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"2011 Street Dust Reduction Performance Assessment and Clean Air Zone Management Project"
Project Subject:
"The final report of Taoyuan County’s “2011 Street Dust Reduction Performance Assessment and Clean A
Project Year:
2011
Organizer:
"Taoyuan County Government Environment Protection Bureau"
Project Title:
""
Project Subject:
"Fourth, carry out the achievement Relevant environmental pollution that may cause in order to stren
Project Year:
2015
Organizer:
"Environmental Protection Bureau of Yi-Lan County"
""2014"etc"
Project Title:
""
Project Subject:
"etc"
Project Year:
2014
Organizer:
"Environmental Protection Bureau, Taichung City"
"-"2015"-"
Project Title:
"-"
Project Subject:
"-"
Project Year:
2015
Organizer:
"Nantou County Environmental Protection Bureau"
Project Title:
"The Integration Plan of Air Quality to Manintain, Improve and scheme"
Project Subject:
"The scope of this project includes: 1) analysis of air quality monitoring data; 2)
analysis and res
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Taipei County"
Project Title:
"107 annual Taitung County low carbon and sustainable homeland operation system and implementation
Project Subject:
"Low-carbon city"
Project Year:
2018
Organizer:
"Taitung County Environment Protection Bureau"
Project Title:
"Statistics and Updates of Environment-Related National Greenhouse Gas Inventory"
Project Subject:
"All parties included in Annex I to the Convention are obligated to prepared their National Inventor
Project Year:
2015
Organizer:
"Office of Greenhouse Gases Reduction Management"
Project Title:
"Plan for Audit Air Pollutants Emissions from Stationary Sources and Consumer Products VOCs Control
Project Subject:
"The tasks of this project are including three parts: to prepare the instrument of HAP control of st
Project Year:
2016
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"Health risk assessment in nearby of the industrial park Health risk assessment in nearby of the ind
Project Subject:
"This is the first progress report of health risk assessment in nearby of the industrial park. The
Project Year:
2015
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"The Project of PM2.5 Control and Local Sources Profile Establishment of Chiayi City in 2016"
Project Subject:
"This project aims to the following seven main parts: Reference reviewes, setup local PM2.5 fingerpr
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Sampling Analysis of Fine Particulate Matter(PM2.5) of Taichung City in 2016"
Project Subject:
"This study is mainly based on sampling analysis, including PM2.5 sampling of the perimeters, in-sta
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"106 years of migration pollution sources"
Project Subject:
"In order to solve the pollution caused by mobile pollution sources to the environment, it is urgent
Project Year:
2017
Organizer:
"Taitung County Environment Protection Bureau"
Project Title:
"Established in use diesel vehicles pollutant improvement and examination system plan "
Project Subject:
"Mobile pollution source is one of the main causes that generated air quality deterioration in metro
Project Year:
2013
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"2016 PingTung Air Quality Management Plan"
Project Subject:
"The main task of the project is to assist Environmental Protection Bureau Ping Tung County (PTEPB)
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"105 years Penghu County fugitive pollution source inspection and control of low-carbon island dust
Project Subject:
"105 years escape Penghu Island and the carbon pollution control inspection suppress fugitive dust d
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Penghu County"
Project Title:
"Completion of subsidy verification for low-pollution vehicle"
Project Subject:
"The major target of the project was to check and review the subsidy application of purchase on elec
Project Year:
2015
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"The Chiayi City Air Quality Assessment and Management Scheme,2018"
Project Subject:
"In order to actively and effectively use air pollution control costs to improve the city's air qual
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"The 2016 Taichung low-emission vehicle and idling-stop control project"
Project Subject:
"This project will run from its original signing date of March 8, 2016 to December 31, 2016. We have
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"Implement of new model conformity of production inspection, the in-used vehicle recall investigativ
Project Subject:
"As to the task of implementation of new vehicle emissions control measures: in 2018, there were 1,2
Project Year:
2018
Organizer:
"Department of Air Quality Protection & Noise Control"
行政院環境保護署 的其他資料集
廢家具修繕DIY
不定期更新更新,43林小姐 | 04-22521718#53511 | 2023-08-09 01:04:04
行政院環境保護署新竹市重要環保統計資料
每1月更新,178顏先生 | 02-23117722#2109 | 2023-08-07 00:59:59
行政院環境保護署推薦機關(薦舉)環境教育人員認證申請書
不定期更新更新,38盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:27
行政院環境保護署符合噪音管制標準車輛-進口汽油引擎車
不定期更新更新,177林先生 | 02-23712121-6403 | 2022-01-14 01:18:56
行政院環境保護署EPQSummary_Other
不定期更新更新,68郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:14:18
行政院環境保護署
新竹市水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,45許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:43
行政院環境保護署EPQSummary_NoiseAndVibration
不定期更新更新,124陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:50
行政院環境保護署公民營製造業、用水、電力及燃氣供應業污染防治支出
每1年更新,47顏先生 | 02-23117722#2109 | 2023-07-30 01:00:38
行政院環境保護署非甲烷碳氫化合物(NMHC)監測小時值
每1日更新,137陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:33
行政院環境保護署地方環保局環保罰鍰金額
每1月更新,141顏先生 | 02-23117722#2109 | 2023-07-27 01:01:11
行政院環境保護署
營建署事業廢棄物再利用機構資料
不定期更新更新,74李小姐 | 02-2311-7722#2633 | 2022-01-14 01:26:14
行政院環境保護署空氣品質小時值_桃園市_平鎮站
每小時更新更新,189謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:51
行政院環境保護署應回收廢棄物受補貼機構(處理業)
每1年更新,143廖小姐 | 02-2370-5888#3103 | 2023-07-27 01:00:04
行政院環境保護署光化測站(林園)小時值資料
不定期更新更新,153陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:28
行政院環境保護署各月份場址更新率統計報表
不定期更新更新,126賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:17
行政院環境保護署
經過活動斷層範圍環境影響說明書
每2月更新,86黃先生 | 02-23117722#2748 | 2023-08-05 01:01:11
行政院環境保護署貨品通關事前聲明確認作業指引簡報
不定期更新,51金先生 | 23257399#55315 | 2022-01-14 01:22:22
行政院環境保護署縣市(臺南市)小時值-每小時
每1時更新,139陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:44
行政院環境保護署縣市(宜蘭縣)小時值-每小時
每1時更新,122陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:37
行政院環境保護署區域性地下水水質測站位置圖
不定期更新更新,53陳先生 | 02-2311-7722#2386 | 2023-08-07 01:04:32
行政院環境保護署
資源回收業(站、點)資料
不定期更新,113范小姐 | 02-23117722#2622 | 2022-01-14 01:26:05
行政院環境保護署環保專案摘要資料_噪音振動
不定期更新更新,104陳先生 | 02-2311-7722#2386 | 2023-07-30 01:02:05
行政院環境保護署歷年土壤調查_環保署土壤重金屬含量調查(25公頃)
不定期更新更新,114謝小姐 | (02)23832389*8302 | 2022-01-14 01:20:17
行政院環境保護署空氣品質小時值_雲林縣_斗六站
每1時更新,114陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:53
行政院環境保護署環保專案摘要資料_其他
不定期更新更新,152陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:54
行政院環境保護署
重點事業廢棄物-有機廢液之處理方式
每月更新更新,200陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:08
行政院環境保護署行政院環境保護署環境檢驗所單位決算
每年更新更新,32洪小姐 | 03-4915818#3001 | 2022-01-15 01:09:40
行政院環境保護署環保專案摘要資料_環境影響評估
不定期更新更新,116陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:55
行政院環境保護署全國場址更新率統計報表
不定期更新更新,159賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:16
行政院環境保護署臺北市水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,46吳小姐 | 02-2383-2389#8303 | 2022-01-18 01:24:38
行政院環境保護署