time1: 0 time2: 0 time3: 0 time4: 0 total: 0 Construction Site Air Pollution Control Criteria DevelopedAir
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

Construction Site Air Pollution Control Criteria DevelopedAir

Construction Site Air Pollution Control Criteria DevelopedAir」於資料集「Environmental Policy Monthly」由單位「行政院環境保護署」的楊先生所提供,聯繫電話是(02)23117722#2217,(02)23117722#2216,最近更新時間為:2022-01-15 01:13:03。 欄位編號的內容是242 , 欄位標題的內容是Construction Site Air Pollution Control Criteria Developed , 欄位摘要的內容是In line with this year’s Street Cleanup Plan the EPA is accelerating development of the Construction Project Air Pollution Control Regulations. The general principles of the regulations will be set first, followed by the regulatory criteria and detailed rules for each construction project category. Targets to be brought under control are to be “major projects” of a specific scale based on the surface area of a given construction activity. Building materials and particulate waste matter will also be brought under control and builders will be required to maintain the condition of routes within a specific distance of construction sites used by construction vehicles. A preliminary draft is nearing completion and the final draft will be formally announced at the end of the year. To improve air quality in urban areas, EPA Administrator Hsung-Hsiung Tsai made airborne particulate matter reduction a major administrative goal for this year. Enforcement authorities discovered however that routes used by construction vehicles to enter and exit construction sites were not subject to air pollution controls. As this prevents the Street Cleanup Plan from being fully implemented, the EPA decided to accelerate development of the Construction Project Air Pollution Control Regulations. , 欄位全文的內容是In line with this year’s Street Cleanup Plan the EPA is accelerating development of the Construction Project Air Pollution Control Regulations. The general principles of the regulations will be set first, followed by the regulatory criteria and detailed rules for each construction project category. Targets to be brought under control are to be “major projects” of a specific scale based on the surface area of a given construction activity. Building materials and particulate waste matter will also be brought under control and builders will be required to maintain the condition of routes within a specific distance of construction sites used by construction vehicles. A preliminary draft is nearing completion and the final draft will be formally announced at the end of the year. To improve air quality in urban areas, EPA Administrator Hsung-Hsiung Tsai made airborne particulate matter reduction a major administrative goal for this year. Enforcement authorities discovered however that routes used by construction vehicles to enter and exit construction sites were not subject to air pollution controls. As this prevents the Street Cleanup Plan from being fully implemented, the EPA decided to accelerate development of the Construction Project Air Pollution Control Regulations. Construction project air pollution control is difficult because the classification of projects is too complicated and project conditions of the controlled projects are too varied. The EPA is therefore working on a set of principles that will be used to develop the criteria of detailed rules for each construction project category. The EPA has not yet decided to first create a set of articles and then define and announce in rounds the regulatory criteria of individual projects, or to set and announce regulatory criteria and standards according to the circumstances of each project category. An important principle of the draft stipulates that only construction projects classified as “major projects” will be targeted. The land area required by a given structure will be used to define project criteria. The EPA will select an appropriate percentage of projects based on the comparative distribution of construction activities and the structural total floor area. The EPA will discuss this calculation method with concerned parties once related information has been prepared. To control air pollution generated by construction activity, current control methods target construction sites as a unit. In the future, however, controls will require contractors to be responsible for the air pollution generation by construction related transportation activities. The draft articles stipulate that construction vehicles must be fitted with sealed anti-dust equipment and that construction vehicles and equipment must be cleaned before they leave the construction site. In addition, contractors will be responsible for cleaning transport routes within a short distance of construction sites used by construction vehicles and equipment. Transport routes must be washed and swept regularly so no obvious dust or grime remains. Other materials to be brought under control including stones and gravel cannot be left outside the construction site. It is important to note that local governments will have some discretion in setting air pollution controls on construction projects. After the Construction Project Air Pollution Control Regulations are implemented, local competent authorities may still set tougher controls for specific areas based on air quality control needs. On September 23, the EPA discussed the above items with relevant parties. A preliminary draft will be completed in two to three weeks. Assuming that technical problems can be overcome, allowing the draft to be formally announced at the end of the year, the EPA estimates that construction project criteria can be finalized before the end of 1999. , 欄位年度的內容是1999 , 欄位月份的內容是2 , 欄位卷的內容是2 , 欄位期的內容是5 , 欄位順序的內容是1 , 欄位倒序的內容是2 , 欄位分類的內容是Air , 欄位標題2的內容是Construction Site Air Pollution Control Criteria Developed , 欄位檔案位置的內容是print/V2/V2-05

編號

242

標題

Construction Site Air Pollution Control Criteria Developed

摘要

In line with this year’s Street Cleanup Plan the EPA is accelerating development of the Construction Project Air Pollution Control Regulations. The general principles of the regulations will be set first, followed by the regulatory criteria and detailed rules for each construction project category. Targets to be brought under control are to be “major projects” of a specific scale based on the surface area of a given construction activity. Building materials and particulate waste matter will also be brought under control and builders will be required to maintain the condition of routes within a specific distance of construction sites used by construction vehicles. A preliminary draft is nearing completion and the final draft will be formally announced at the end of the year. To improve air quality in urban areas, EPA Administrator Hsung-Hsiung Tsai made airborne particulate matter reduction a major administrative goal for this year. Enforcement authorities discovered however that routes used by construction vehicles to enter and exit construction sites were not subject to air pollution controls. As this prevents the Street Cleanup Plan from being fully implemented, the EPA decided to accelerate development of the Construction Project Air Pollution Control Regulations.

全文

In line with this year’s Street Cleanup Plan the EPA is accelerating development of the Construction Project Air Pollution Control Regulations. The general principles of the regulations will be set first, followed by the regulatory criteria and detailed rules for each construction project category. Targets to be brought under control are to be “major projects” of a specific scale based on the surface area of a given construction activity. Building materials and particulate waste matter will also be brought under control and builders will be required to maintain the condition of routes within a specific distance of construction sites used by construction vehicles. A preliminary draft is nearing completion and the final draft will be formally announced at the end of the year. To improve air quality in urban areas, EPA Administrator Hsung-Hsiung Tsai made airborne particulate matter reduction a major administrative goal for this year. Enforcement authorities discovered however that routes used by construction vehicles to enter and exit construction sites were not subject to air pollution controls. As this prevents the Street Cleanup Plan from being fully implemented, the EPA decided to accelerate development of the Construction Project Air Pollution Control Regulations. Construction project air pollution control is difficult because the classification of projects is too complicated and project conditions of the controlled projects are too varied. The EPA is therefore working on a set of principles that will be used to develop the criteria of detailed rules for each construction project category. The EPA has not yet decided to first create a set of articles and then define and announce in rounds the regulatory criteria of individual projects, or to set and announce regulatory criteria and standards according to the circumstances of each project category. An important principle of the draft stipulates that only construction projects classified as “major projects” will be targeted. The land area required by a given structure will be used to define project criteria. The EPA will select an appropriate percentage of projects based on the comparative distribution of construction activities and the structural total floor area. The EPA will discuss this calculation method with concerned parties once related information has been prepared. To control air pollution generated by construction activity, current control methods target construction sites as a unit. In the future, however, controls will require contractors to be responsible for the air pollution generation by construction related transportation activities. The draft articles stipulate that construction vehicles must be fitted with sealed anti-dust equipment and that construction vehicles and equipment must be cleaned before they leave the construction site. In addition, contractors will be responsible for cleaning transport routes within a short distance of construction sites used by construction vehicles and equipment. Transport routes must be washed and swept regularly so no obvious dust or grime remains. Other materials to be brought under control including stones and gravel cannot be left outside the construction site. It is important to note that local governments will have some discretion in setting air pollution controls on construction projects. After the Construction Project Air Pollution Control Regulations are implemented, local competent authorities may still set tougher controls for specific areas based on air quality control needs. On September 23, the EPA discussed the above items with relevant parties. A preliminary draft will be completed in two to three weeks. Assuming that technical problems can be overcome, allowing the draft to be formally announced at the end of the year, the EPA estimates that construction project criteria can be finalized before the end of 1999.

年度

1999

月份

2

2

5

順序

1

倒序

2

分類

Air

標題2

Construction Site Air Pollution Control Criteria Developed

檔案位置

print/V2/V2-05

「Construction Site Air Pollution Control Criteria DevelopedAir」所屬的資料集:「Environmental Policy Monthly」的其他資料

編號: 203
標題: A Look Inside the EPA The Bureau of Water Quality Protection
摘要: According to the Environmental Protection Administration Organization Statutes the EPAs Bureau of Wa
全文: According to the Environmental Protection Administration Organization Statutes the EPAs Bureau of Wa

編號: 187
標題: Study Recommends Strengthening EMS Incentives
摘要: In addition to implementing research and discussion on EMS related policies the EPA has contracted
全文: In addition to implementing research and discussion on EMS related policies the EPA has contracted

編號: 58
標題: New List of Industries Required to Obtain Air Pollution Control Permits Announced
摘要: Air Quality  The EPA has announced the 7th round of industries with stationary pollution sources whi
全文: Air Quality  The EPA has announced the 7th round of industries with stationary pollution sources whi

編號: 216
標題: Government Policy EIA Targets Formally Announced
摘要: On August 3 the EPA formally announced the Items for Assessing the Environmental Impact of Governmen
全文: On August 3 the EPA formally announced the Items for Assessing the Environmental Impact of Governmen

編號: 164
標題: Initial Structure of Publicly Operated Recycling Fund Confirmed
摘要: The EPA drafted the Regulations Governing the Collection Safekeeping and Use of the Resource Recycli
全文: The EPA drafted the Regulations Governing the Collection Safekeeping and Use of the Resource Recycli

編號: 315
標題: EPA Announces Requirements for Toxic Substance Liability Insurance
摘要: Rules requiring third party liability insurance for the handling of toxic substances were completed
全文: Rules requiring third party liability insurance for the handling of toxic substances were completed

編號: 833
標題: Special Demonstration Zone for Recycling to be Established
摘要: The EPA as part of its efforts to further the development of a recycling-conscious society, has draw
全文: The EPA as part of its efforts to further the development of a recycling-conscious society, has draw

編號: 258
標題: EPA Announces Consolidation of General Waste Recycling Categories
摘要: On October 23 an amendment to the Guidelines for the Selection of General Waste Recycling and Dispos
全文: On October 23 an amendment to the Guidelines for the Selection of General Waste Recycling and Dispos

編號: 525
標題: EPA Promotes Management of Community Sewage Infrastructure
摘要: On February 29 the EPA announced the results of an analysis of the community wastewater system in th
全文: On February 29 the EPA announced the results of an analysis of the community wastewater system in th

編號: 615
標題: River Inspections to be Strengthened Through Aerial Surveillance
摘要: In order to overcome current limitations on inspecting river pollution the EPA will cooperate with t
全文: In order to overcome current limitations on inspecting river pollution the EPA will cooperate with t

編號: 142
標題: EPA Drafts Tougher Motorcycle Emission Standards
摘要: Air Quality Following numerous discussions with industry the EPA finally completed a draft of the
全文: Air Quality Following numerous discussions with industry the EPA finally completed a draft of the

編號: 323
標題: Investigation of Groundwater Beneath Waste Dumps Begun
摘要: The EPA recently launched an investigation of groundwater contamination around Taiwan's 140 identifi
全文: The EPA recently launched an investigation of groundwater contamination around Taiwan's 140 identifi

編號: 729
標題: Emergency Response Plan for Severe Marine Oil Spills Approved
摘要: On April 10 the Executive Yuan approved the Emergency Response Plan for Severe Marine Oil Pollution.
全文: On April 10 the Executive Yuan approved the Emergency Response Plan for Severe Marine Oil Pollution.

編號: 734
標題: No Change in Policy for Gas Pump Vapor Recapturing Equipment
摘要: Through three years of EPA subsidies 68% of Taiwan’s filling stations have installed gasoline vapor
全文: Through three years of EPA subsidies 68% of Taiwan’s filling stations have installed gasoline vapor

編號: 511
標題: Re-investigation of Environmental Complaints Progresses Smoothly
摘要: Recently the EPA has been pushing the re-investigation and follow up of significant environmental co
全文: Recently the EPA has been pushing the re-investigation and follow up of significant environmental co

編號: 535
標題: Testing Procedures Set for Heavy Metal in Batteries
摘要: The EPA has set a differential fee rate for batteries to encourage manufactures to reduce heavy meta
全文: The EPA has set a differential fee rate for batteries to encourage manufactures to reduce heavy meta

編號: 614
標題: Prosecutor Seeks Life Sentences in Kaoping River Pollution Incident
摘要: On August 15 the Kaohsiung Prosecutor’s Office completed its investigation of the recent solvent con
全文: On August 15 the Kaohsiung Prosecutor’s Office completed its investigation of the recent solvent con

編號: 782
標題: EPA to Limit Use of Disposable Utensils in Three Stages
摘要: The EPA under its policy for controlling the use of disposable eating utensils, will gradually intro
全文: The EPA under its policy for controlling the use of disposable eating utensils, will gradually intro

編號: 793
標題: Unlawful Labeling of Bottled Water to be Punished
摘要: The EPA recently released the results of testing conducted on different brands of bottled drinking w
全文: The EPA recently released the results of testing conducted on different brands of bottled drinking w

編號: 111
標題: Drinking Water Quality Standards Announced
摘要: Water Quality  On February 4 1998, drinking water quality standards were announced. All public drink
全文: Water Quality  On February 4 1998, drinking water quality standards were announced. All public drink

編號: 182
標題: Feature Article The History and Performance of the R.O.C.'s EIA System
摘要: Prior to the Environmental Impact Assessment Act becoming law in December 1994, a range of environme
全文: Prior to the Environmental Impact Assessment Act becoming law in December 1994, a range of environme

編號: 669
標題: Recycling of Industrial Styrofoam to Begin in 2002
摘要: Styrofoam. It can't be incinerated doesn't biodegrade, and is generally a government's waste dispos
全文: Styrofoam. It can't be incinerated doesn't biodegrade, and is generally a government's waste dispos

編號: 613
標題: President Chen Commits to Speedy Improvement of Drinking Water in Southern Taiwan
摘要: On August 5 President Chen Shui-bian promised to earmark NT$15 billion between 2001 and 2003 for the
全文: On August 5 President Chen Shui-bian promised to earmark NT$15 billion between 2001 and 2003 for the

編號: 461
標題: EPA Urges Local EPB Labs to Obtain CNLA Certification
摘要: Due to recent controversies over the accuracy of environmental testing data and in order to raise th
全文: Due to recent controversies over the accuracy of environmental testing data and in order to raise th

編號: 619
標題: Edgar Lin Stresses EPA Will Hold It's Ground in Inter-agency Discussions
摘要: During a discussion with environmental groups EPA Administrator Edgar Lin stated that in the past th
全文: During a discussion with environmental groups EPA Administrator Edgar Lin stated that in the past th

編號: 878
標題: We All Have a Responsibility to Defend the Global Environment
摘要: The EPA sponsored “The War to Defend the Earth” at Tahu Park in the Neihu District of Taipei City on
全文: The EPA sponsored “The War to Defend the Earth” at Tahu Park in the Neihu District of Taipei City on

編號: 355
標題: Environmental Police Force to be Established
摘要: The EPA and the National Police Administration hammered out the details on 4 May on an initial plan
全文: The EPA and the National Police Administration hammered out the details on 4 May on an initial plan

編號: 309
標題: Initial Draft of Air Act Enforcement Rules Completed
摘要: The EPA recently completed a thorough review and modification of the Air Pollution Control Act Enfor
全文: The EPA recently completed a thorough review and modification of the Air Pollution Control Act Enfor

編號: 46
標題: First Version of EIA Review Reference Items Completed
摘要: Environmental Impact Assessment  To enhance the efficiency quality, and consistency of the EIA revie
全文: Environmental Impact Assessment  To enhance the efficiency quality, and consistency of the EIA revie

編號: 841
標題: Collection of Soil Pollution Cleanup Fees Initiated in November
摘要: Regulations governing the collection of soil and groundwater cleanup fees namely the Regulations Gov
全文: Regulations governing the collection of soil and groundwater cleanup fees namely the Regulations Gov

行政院環境保護署 的其他資料集

空氣品質小時值_新北市_富貴角站

每1時更新,84

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:11

行政院環境保護署

建檔公廁明細-臺北市

不定期更新更新,198

賴先生 | 04-2252-1718#53686 | 2023-07-27 01:01:55

行政院環境保護署

行政院環境保護署年度施政計畫

不定期更新更新,35

賀先生 | 02-23117722轉2981 | 2023-07-27 01:03:02

行政院環境保護署

重點事業廢棄物-爐碴之處理方式

每月更新更新,132

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:10

行政院環境保護署

全國場址公告與解列情形統計表

每1年更新,118

呂小姐 | 02-2383-2389#8110 | 2023-07-30 01:03:52

行政院環境保護署

自備餐具優惠店家資料

不定期更新更新,155

林先生 | 02-2311-7722#2614 | 2022-01-14 01:24:15

行政院環境保護署

毒化物運作紀錄申報總量

每6月更新,145

許先生 | 02-23257399#55328 | 2023-07-27 01:03:31

行政院環境保護署

環保署書面之公共工程及採購契約

不定期更新,41

許小姐 | (02)23117722#2483 | 2022-01-15 01:10:14

行政院環境保護署

縣市(非直轄市)小時值-每小時

每小時更新更新,111

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:27

行政院環境保護署

EPQSummary_WasteManagement

不定期更新更新,115

郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:53

行政院環境保護署

重點事業廢棄物-有機廢液之處理方式

每月更新更新,175

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:08

行政院環境保護署

環境教育及訓練電子報

不定期更新更新,30

葉小姐 | 03-4020789#607 | 2022-01-15 01:13:29

行政院環境保護署

公害陳情案件數

每1月更新,126

顏先生 | 02-23117722#2109 | 2023-07-27 01:01:15

行政院環境保護署

建檔公廁明細-澎湖縣

不定期更新更新,117

曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:15:15

行政院環境保護署

建檔公廁明細-臺東縣

不定期更新更新,139

賴先生 | 04-2252-1718#53686 | 2023-07-27 01:01:54

行政院環境保護署

環保專案摘要資料

每月更新,97

郭先生 | 02-2311-7722#2399 | 2022-01-15 01:13:31

行政院環境保護署

環境教育設施場所認證資料

每月更新更新,82

蘇小姐 | 03-4020789#628 | 2022-01-15 01:11:14

行政院環境保護署

大甲媽祖遶境即時空品監測成果(感測器#2)

不定期更新更新,115

陳先生 | 02-2311-7722#2341 | 2022-01-14 01:02:35

行政院環境保護署

環保署遊說法辦理情形

不定期更新更新,41

包先生 | 02-23117722 #2223 | 2022-01-15 01:13:30

行政院環境保護署

大甲媽祖遶境即時空品監測成果(E-motor)

不定期更新更新,136

陳先生 | 02-2311-7722#2341 | 2022-01-14 01:02:39

行政院環境保護署

中油三輕環評監督委員會會議紀錄

每季更新更新,46

陳先生 | 04-2252-1718#51207 | 2022-01-14 01:21:55

行政院環境保護署

台灣產品碳足跡資訊

每1月更新,119

陳先生 | 02-23117722#2932 | 2023-07-30 01:02:46

行政院環境保護署

行政院環境保護署環境保護基金附屬單位決算

每1年更新,39

林小姐 | 02-2311-7722#2169 | 2023-08-09 01:05:50

行政院環境保護署

土壤及地下水污染場址列管概況

每1年更新,104

顏先生 | 02-23117722#2109 | 2023-07-30 01:01:02

行政院環境保護署

病媒防治業許可執照資料

每3月更新,104

薛先生 | 02-2325-7399#55413 | 2023-07-27 01:02:57

行政院環境保護署

環境教育設施場所手冊

不定期更新更新,60

蘇小姐 | (03)4020789分機669 | 2022-01-15 01:11:06

行政院環境保護署

日空氣品質指標(AQI)

每日更新更新,115

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:38

行政院環境保護署

道路之開發類別環境影響說明書

每2月更新,71

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:14

行政院環境保護署

空氣品質小時值_桃園市_中壢站

每1時更新,107

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:29

行政院環境保護署

空氣品質小時值_澎湖縣_馬公站

每小時更新更新,141

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:49

行政院環境保護署