Pilot Total Quantity Control District to be Implemented in Central Taiwan
「Pilot Total Quantity Control District to be Implemented in Central Taiwan」於資料集「Environmental Policy Monthly」由單位「行政院環境保護署」的楊先生所提供,聯繫電話是(02)23117722#2217,(02)23117722#2216,最近更新時間為:2022-01-15 01:13:03。 欄位編號的內容是385 , 欄位標題的內容是Pilot Total Quantity Control District to be Implemented in Central Taiwan , 欄位摘要的內容是The EPA recently selected the Central Taiwan Air Quality Region as the initial region for the demonstration program for total quantity control. It is expected that from July implementation will move forward stage-by-stage. In the initial stage, newly established pollution sources must adopt best available control technology (BACT), in the second stage they must comply with allowable pollutant quantity increase limits, and in the final stage pollution sources must obtain adequate pollution credits before an installation permit will be granted.
According to air quality targets set by Taiwan's National Environmental Protection Plan, the percentage of days given a "poor" air quality rating (PSI) should be below 3%, 2%, and 1.5% in the years 2001, 2006 and 2011, respectively. Even though current improvement efforts have been increasing the severity of emissions concentration controls, this approach is not adequate to restrain increasing total pollutant emissions. With this in mind, the Air Pollution Control Act, revised and promulgated January 1 1999 was amended to formally include total quantity control mechanisms.
The newly amended Air Act stipulates that within a given district, limits on total allowable pollution quantities will be set for air pollutants that exceed standards for the district at issue. If existing pollution sources effectively reduce emitted quantities below an indicated amount, the resulting difference in emission quantities may be saved, used as offsets, or traded.
After the legal footing for total quantity controls is firmly established, the EPA will begin to draft regional implementation strategies. Within the next five years and in line with regard to actual need, total quantity controls will be implemented in the Central Taiwan, Kaohsiung-Pintung and Yunlin-Chiayi-Tainan regions, and reduction targets and time frames for various types of pollutants will be conferred upon counties and cities within the jurisdiction of these regions. Due to the high rate of industrial development that will occur in Central Taiwan, this region will provide a relatively well rounded case study for the trial of various measures and the accumulation of operational experience. It is for this reason that Central Taiwan has been chosen for the implementation of a pilot total quantity control demonstration program.
The Central Taiwan Air Quality Region includes Taichung County and City, Changhwa County and Nantou County. EPA officials indicated that the total quantity demonstration program officially commenced in July of this year and will continue until December, 2002. During these three years, the program will be divided into four stages, each with different objectives.
Statistics show that in 1998, the percentage of days with a PSI rating of "poor" was 3.67%. In past years, total suspended particulates (TSP) has been the highest of the major pollutant indicators, but monitoring records show this indicator to be on a downward trend. Ozone, on the other hand, has been increasing over the years. As of 1998, days with "poor" rating for TSP and ozone stood at 59% and 41%, respectively. Within the Central Region, the area with the highest number of "poor" days was Nantou County, and the area where air quality has undergone the largest improvement was Changhwa County.
According to air quality improvement objectives as stated by the National Environmental Protection Plan, the Central Region should lower the % of "poor" air quality days of 2.9%, 1.9% and 1.5% in the years 2001, 2006 and 2011, respectively. Based on pollution statistics for 1997 the EPA set cumulative air pollutant reduction targets for 2001 and 2006, as follows: TSP – 28,062 and 37,718 tons; SOx – 50,100 and 72,580 tons; and, NOx – 21,300 and 67,178 tons.
The EPA further indicated that relevant agencies should set targets for gradual reduction of pollutants emitted by existing pollution sources in total quantity control districts that do not comply with air quality standards. Within these districts, only when total emission quantities are lower than maximum allowable limits can the establishment of new air pollution sources be allowed. In total quantity control districts that do meet air quality standards, allowable emissions quantity increase limits will be set for various pollutants and plans to prevent deterioration of air quality will be established.
In line with EPA plans, installation permit requirements for newly established pollution sources in the Central Region will develop in three stages beginning in 2000. In the first stage, pollution sources must show that they have adopted best available control technology (BACT). In the second stage, pollution sources must demonstrate BACT and perform maximum allowable pollutant quantity increase simulation modeling. Pollution sources must also possess emission quantity reserves or obtain adequate offsets from other sources. Finally, in the third stage, pollution sources must publicly register emission quantities, and after emission credits have been obtained, an installation permit will be granted.
All county and city EPB’s in the Central Taiwan Air Quality Region must actively formulate local air pollution prevention plans and record reported factory emission quantities. The EPA forecasts that after April of next year, all factories will have to begin implementing emission quantity reductions in line with relevant targets. Once the Central Region pilot program matures, total quantity controls will be gradually implemented in other air quality zones. , 欄位全文的內容是The EPA recently selected the Central Taiwan Air Quality Region as the initial region for the demonstration program for total quantity control. It is expected that from July implementation will move forward stage-by-stage. In the initial stage, newly established pollution sources must adopt best available control technology (BACT), in the second stage they must comply with allowable pollutant quantity increase limits, and in the final stage pollution sources must obtain adequate pollution credits before an installation permit will be granted.
According to air quality targets set by Taiwan's National Environmental Protection Plan, the percentage of days given a "poor" air quality rating (PSI) should be below 3%, 2%, and 1.5% in the years 2001, 2006 and 2011, respectively. Even though current improvement efforts have been increasing the severity of emissions concentration controls, this approach is not adequate to restrain increasing total pollutant emissions. With this in mind, the Air Pollution Control Act, revised and promulgated January 1 1999 was amended to formally include total quantity control mechanisms.
The newly amended Air Act stipulates that within a given district, limits on total allowable pollution quantities will be set for air pollutants that exceed standards for the district at issue. If existing pollution sources effectively reduce emitted quantities below an indicated amount, the resulting difference in emission quantities may be saved, used as offsets, or traded.
After the legal footing for total quantity controls is firmly established, the EPA will begin to draft regional implementation strategies. Within the next five years and in line with regard to actual need, total quantity controls will be implemented in the Central Taiwan, Kaohsiung-Pintung and Yunlin-Chiayi-Tainan regions, and reduction targets and time frames for various types of pollutants will be conferred upon counties and cities within the jurisdiction of these regions. Due to the high rate of industrial development that will occur in Central Taiwan, this region will provide a relatively well rounded case study for the trial of various measures and the accumulation of operational experience. It is for this reason that Central Taiwan has been chosen for the implementation of a pilot total quantity control demonstration program.
The Central Taiwan Air Quality Region includes Taichung County and City, Changhwa County and Nantou County. EPA officials indicated that the total quantity demonstration program officially commenced in July of this year and will continue until December, 2002. During these three years, the program will be divided into four stages, each with different objectives.
Statistics show that in 1998, the percentage of days with a PSI rating of "poor" was 3.67%. In past years, total suspended particulates (TSP) has been the highest of the major pollutant indicators, but monitoring records show this indicator to be on a downward trend. Ozone, on the other hand, has been increasing over the years. As of 1998, days with "poor" rating for TSP and ozone stood at 59% and 41%, respectively. Within the Central Region, the area with the highest number of "poor" days was Nantou County, and the area where air quality has undergone the largest improvement was Changhwa County.
According to air quality improvement objectives as stated by the National Environmental Protection Plan, the Central Region should lower the % of "poor" air quality days of 2.9%, 1.9% and 1.5% in the years 2001, 2006 and 2011, respectively. Based on pollution statistics for 1997 the EPA set cumulative air pollutant reduction targets for 2001 and 2006, as follows: TSP – 28,062 and 37,718 tons; SOx – 50,100 and 72,580 tons; and, NOx – 21,300 and 67,178 tons.
The EPA further indicated that relevant agencies should set targets for gradual reduction of pollutants emitted by existing pollution sources in total quantity control districts that do not comply with air quality standards. Within these districts, only when total emission quantities are lower than maximum allowable limits can the establishment of new air pollution sources be allowed. In total quantity control districts that do meet air quality standards, allowable emissions quantity increase limits will be set for various pollutants and plans to prevent deterioration of air quality will be established.
In line with EPA plans, installation permit requirements for newly established pollution sources in the Central Region will develop in three stages beginning in 2000. In the first stage, pollution sources must show that they have adopted best available control technology (BACT). In the second stage, pollution sources must demonstrate BACT and perform maximum allowable pollutant quantity increase simulation modeling. Pollution sources must also possess emission quantity reserves or obtain adequate offsets from other sources. Finally, in the third stage, pollution sources must publicly register emission quantities, and after emission credits have been obtained, an installation permit will be granted.
All county and city EPB’s in the Central Taiwan Air Quality Region must actively formulate local air pollution prevention plans and record reported factory emission quantities. The EPA forecasts that after April of next year, all factories will have to begin implementing emission quantity reductions in line with relevant targets. Once the Central Region pilot program matures, total quantity controls will be gradually implemented in other air quality zones. , 欄位年度的內容是2000 , 欄位月份的內容是3 , 欄位卷的內容是3 , 欄位期的內容是1 , 欄位順序的內容是1 , 欄位倒序的內容是2 , 欄位分類的內容是air , 欄位標題2的內容是Pilot Total Quantity Control District to be Implemented in Central Taiwan , 欄位檔案位置的內容是print/V3/V3-01 。
編號
385
標題
Pilot Total Quantity Control District to be Implemented in Central Taiwan
摘要
The EPA recently selected the Central Taiwan Air Quality Region as the initial region for the demonstration program for total quantity control. It is expected that from July implementation will move forward stage-by-stage. In the initial stage, newly established pollution sources must adopt best available control technology (BACT), in the second stage they must comply with allowable pollutant quantity increase limits, and in the final stage pollution sources must obtain adequate pollution credits before an installation permit will be granted. According to air quality targets set by Taiwan's National Environmental Protection Plan, the percentage of days given a "poor" air quality rating (PSI) should be below 3%, 2%, and 1.5% in the years 2001, 2006 and 2011, respectively. Even though current improvement efforts have been increasing the severity of emissions concentration controls, this approach is not adequate to restrain increasing total pollutant emissions. With this in mind, the Air Pollution Control Act, revised and promulgated January 1 1999 was amended to formally include total quantity control mechanisms. The newly amended Air Act stipulates that within a given district, limits on total allowable pollution quantities will be set for air pollutants that exceed standards for the district at issue. If existing pollution sources effectively reduce emitted quantities below an indicated amount, the resulting difference in emission quantities may be saved, used as offsets, or traded. After the legal footing for total quantity controls is firmly established, the EPA will begin to draft regional implementation strategies. Within the next five years and in line with regard to actual need, total quantity controls will be implemented in the Central Taiwan, Kaohsiung-Pintung and Yunlin-Chiayi-Tainan regions, and reduction targets and time frames for various types of pollutants will be conferred upon counties and cities within the jurisdiction of these regions. Due to the high rate of industrial development that will occur in Central Taiwan, this region will provide a relatively well rounded case study for the trial of various measures and the accumulation of operational experience. It is for this reason that Central Taiwan has been chosen for the implementation of a pilot total quantity control demonstration program. The Central Taiwan Air Quality Region includes Taichung County and City, Changhwa County and Nantou County. EPA officials indicated that the total quantity demonstration program officially commenced in July of this year and will continue until December, 2002. During these three years, the program will be divided into four stages, each with different objectives. Statistics show that in 1998, the percentage of days with a PSI rating of "poor" was 3.67%. In past years, total suspended particulates (TSP) has been the highest of the major pollutant indicators, but monitoring records show this indicator to be on a downward trend. Ozone, on the other hand, has been increasing over the years. As of 1998, days with "poor" rating for TSP and ozone stood at 59% and 41%, respectively. Within the Central Region, the area with the highest number of "poor" days was Nantou County, and the area where air quality has undergone the largest improvement was Changhwa County. According to air quality improvement objectives as stated by the National Environmental Protection Plan, the Central Region should lower the % of "poor" air quality days of 2.9%, 1.9% and 1.5% in the years 2001, 2006 and 2011, respectively. Based on pollution statistics for 1997 the EPA set cumulative air pollutant reduction targets for 2001 and 2006, as follows: TSP – 28,062 and 37,718 tons; SOx – 50,100 and 72,580 tons; and, NOx – 21,300 and 67,178 tons. The EPA further indicated that relevant agencies should set targets for gradual reduction of pollutants emitted by existing pollution sources in total quantity control districts that do not comply with air quality standards. Within these districts, only when total emission quantities are lower than maximum allowable limits can the establishment of new air pollution sources be allowed. In total quantity control districts that do meet air quality standards, allowable emissions quantity increase limits will be set for various pollutants and plans to prevent deterioration of air quality will be established. In line with EPA plans, installation permit requirements for newly established pollution sources in the Central Region will develop in three stages beginning in 2000. In the first stage, pollution sources must show that they have adopted best available control technology (BACT). In the second stage, pollution sources must demonstrate BACT and perform maximum allowable pollutant quantity increase simulation modeling. Pollution sources must also possess emission quantity reserves or obtain adequate offsets from other sources. Finally, in the third stage, pollution sources must publicly register emission quantities, and after emission credits have been obtained, an installation permit will be granted. All county and city EPB’s in the Central Taiwan Air Quality Region must actively formulate local air pollution prevention plans and record reported factory emission quantities. The EPA forecasts that after April of next year, all factories will have to begin implementing emission quantity reductions in line with relevant targets. Once the Central Region pilot program matures, total quantity controls will be gradually implemented in other air quality zones.
全文
The EPA recently selected the Central Taiwan Air Quality Region as the initial region for the demonstration program for total quantity control. It is expected that from July implementation will move forward stage-by-stage. In the initial stage, newly established pollution sources must adopt best available control technology (BACT), in the second stage they must comply with allowable pollutant quantity increase limits, and in the final stage pollution sources must obtain adequate pollution credits before an installation permit will be granted. According to air quality targets set by Taiwan's National Environmental Protection Plan, the percentage of days given a "poor" air quality rating (PSI) should be below 3%, 2%, and 1.5% in the years 2001, 2006 and 2011, respectively. Even though current improvement efforts have been increasing the severity of emissions concentration controls, this approach is not adequate to restrain increasing total pollutant emissions. With this in mind, the Air Pollution Control Act, revised and promulgated January 1 1999 was amended to formally include total quantity control mechanisms. The newly amended Air Act stipulates that within a given district, limits on total allowable pollution quantities will be set for air pollutants that exceed standards for the district at issue. If existing pollution sources effectively reduce emitted quantities below an indicated amount, the resulting difference in emission quantities may be saved, used as offsets, or traded. After the legal footing for total quantity controls is firmly established, the EPA will begin to draft regional implementation strategies. Within the next five years and in line with regard to actual need, total quantity controls will be implemented in the Central Taiwan, Kaohsiung-Pintung and Yunlin-Chiayi-Tainan regions, and reduction targets and time frames for various types of pollutants will be conferred upon counties and cities within the jurisdiction of these regions. Due to the high rate of industrial development that will occur in Central Taiwan, this region will provide a relatively well rounded case study for the trial of various measures and the accumulation of operational experience. It is for this reason that Central Taiwan has been chosen for the implementation of a pilot total quantity control demonstration program. The Central Taiwan Air Quality Region includes Taichung County and City, Changhwa County and Nantou County. EPA officials indicated that the total quantity demonstration program officially commenced in July of this year and will continue until December, 2002. During these three years, the program will be divided into four stages, each with different objectives. Statistics show that in 1998, the percentage of days with a PSI rating of "poor" was 3.67%. In past years, total suspended particulates (TSP) has been the highest of the major pollutant indicators, but monitoring records show this indicator to be on a downward trend. Ozone, on the other hand, has been increasing over the years. As of 1998, days with "poor" rating for TSP and ozone stood at 59% and 41%, respectively. Within the Central Region, the area with the highest number of "poor" days was Nantou County, and the area where air quality has undergone the largest improvement was Changhwa County. According to air quality improvement objectives as stated by the National Environmental Protection Plan, the Central Region should lower the % of "poor" air quality days of 2.9%, 1.9% and 1.5% in the years 2001, 2006 and 2011, respectively. Based on pollution statistics for 1997 the EPA set cumulative air pollutant reduction targets for 2001 and 2006, as follows: TSP – 28,062 and 37,718 tons; SOx – 50,100 and 72,580 tons; and, NOx – 21,300 and 67,178 tons. The EPA further indicated that relevant agencies should set targets for gradual reduction of pollutants emitted by existing pollution sources in total quantity control districts that do not comply with air quality standards. Within these districts, only when total emission quantities are lower than maximum allowable limits can the establishment of new air pollution sources be allowed. In total quantity control districts that do meet air quality standards, allowable emissions quantity increase limits will be set for various pollutants and plans to prevent deterioration of air quality will be established. In line with EPA plans, installation permit requirements for newly established pollution sources in the Central Region will develop in three stages beginning in 2000. In the first stage, pollution sources must show that they have adopted best available control technology (BACT). In the second stage, pollution sources must demonstrate BACT and perform maximum allowable pollutant quantity increase simulation modeling. Pollution sources must also possess emission quantity reserves or obtain adequate offsets from other sources. Finally, in the third stage, pollution sources must publicly register emission quantities, and after emission credits have been obtained, an installation permit will be granted. All county and city EPB’s in the Central Taiwan Air Quality Region must actively formulate local air pollution prevention plans and record reported factory emission quantities. The EPA forecasts that after April of next year, all factories will have to begin implementing emission quantity reductions in line with relevant targets. Once the Central Region pilot program matures, total quantity controls will be gradually implemented in other air quality zones.
年度
2000
月份
3
卷
3
期
1
順序
1
倒序
2
分類
air
標題2
Pilot Total Quantity Control District to be Implemented in Central Taiwan
檔案位置
print/V3/V3-01
「Pilot Total Quantity Control District to be Implemented in Central Taiwan」所屬的資料集:「Environmental Policy Monthly」的其他資料
編號:
546
標題:
EPA to Strengthen Auditing of EIA Violations
摘要:
Statistics from the EPA's Bureau of Comprehensive Planning reveal an increase in the number of EIA v
全文:
Statistics from the EPA's Bureau of Comprehensive Planning reveal an increase in the number of EIA v
編號:
529
標題:
Home Appliance Recycling Fee to be Raised
摘要:
Due to increases in the cost of recycling and processing unwanted home appliances the EPA recently d
全文:
Due to increases in the cost of recycling and processing unwanted home appliances the EPA recently d
編號:
784
標題:
Extension of Compensation for Hog Farmers in Water Source Zones
摘要:
To resolve the problem of pollution of drinking water sources by wastewater from hog farmers which h
全文:
To resolve the problem of pollution of drinking water sources by wastewater from hog farmers which h
編號:
1466
標題:
EIA Standards Revised to Encourage Citizen Participation
摘要:
A new era of citizen participation in environmental impact assessments has dawned. The EPA has annou
全文:
A new era of citizen participation in environmental impact assessments has dawned. The EPA has annou
編號:
175
標題:
Articles in the Public Dispute Settlement Act Enforcement Rules to be Amended
摘要:
Draft amendments to articles in the enforcement guidelines portion of the Act have already been read
全文:
Draft amendments to articles in the enforcement guidelines portion of the Act have already been read
編號:
728
標題:
Draft of Resource Recycling Act Announced
摘要:
The EPA with the aim of making comprehensive improvement to Taiwan's recycling management system, ha
全文:
The EPA with the aim of making comprehensive improvement to Taiwan's recycling management system, ha
編號:
52
標題:
EPA Assesses AmCham Suggestions on Regulatory Affairs
摘要:
International Affairs The American Chamber of Commerce in Taiwan issued a “Taiwan White Paper” in S
全文:
International Affairs The American Chamber of Commerce in Taiwan issued a “Taiwan White Paper” in S
編號:
1098
標題:
EPA Assumes Control Over Methyl Bromide Containers
摘要:
In compliance with revisions to the Air Pollution Control Act the EPA has completed formulation of R
全文:
In compliance with revisions to the Air Pollution Control Act the EPA has completed formulation of R
編號:
3278
標題:
Draft of Operating Principles for Greenhouse Gas Analysis and Auditing Organizations Formulated
摘要:
Draft of Operating Principles for Greenhouse Gas Analysis and Auditing Organizations Formulated
全文:
Draft of Operating Principles for Greenhouse Gas Analysis and Auditing Organizations Formulated
編號:
549
標題:
Premier Siew Makes Farewell Visit to the EPA
摘要:
With the transition to a new cabinet approaching Premier Vincent Siew took an inspection tour of the
全文:
With the transition to a new cabinet approaching Premier Vincent Siew took an inspection tour of the
編號:
939
標題:
Post-WTO Seminar for the Environmental Services Industry
摘要:
The EPA Council of Economic Planning and Development, and Board of Foreign Trade jointly conducted a
全文:
The EPA Council of Economic Planning and Development, and Board of Foreign Trade jointly conducted a
編號:
511
標題:
Re-investigation of Environmental Complaints Progresses Smoothly
摘要:
Recently the EPA has been pushing the re-investigation and follow up of significant environmental co
全文:
Recently the EPA has been pushing the re-investigation and follow up of significant environmental co
編號:
132
標題:
Local Governments Authorized to Delineate Water Source Protection Zones
摘要:
Water Quality According to Article 5 of the Drinking Water Management Statute certain development a
全文:
Water Quality According to Article 5 of the Drinking Water Management Statute certain development a
編號:
894
標題:
Encouraging Citizens to Keep Watch over the Aquatic Environment
摘要:
To promote “River and Waterway Pollution Cleanup Year” and encourage citizens to participate in envi
全文:
To promote “River and Waterway Pollution Cleanup Year” and encourage citizens to participate in envi
編號:
527
標題:
Fei-Tsui Reservoir Pollution Control Plans Proposed
摘要:
Taipei City's major source of water the Fei-Tsui Reservoir, has gradually become more polluted. To s
全文:
Taipei City's major source of water the Fei-Tsui Reservoir, has gradually become more polluted. To s
編號:
876
標題:
Vapor Recovery Controls to Target New Filling Stations
摘要:
The number of filling stations has greatly increased since the government opened the petroleum produ
全文:
The number of filling stations has greatly increased since the government opened the petroleum produ
編號:
589
標題:
EPA Plans Certification Program for Air Quality Monitoring Stations
摘要:
Taiwan has more than 200 continuous air quality monitoring stations islandwide and station density i
全文:
Taiwan has more than 200 continuous air quality monitoring stations islandwide and station density i
編號:
391
標題:
Dioxin Emissions Standards to be Set for Small Incinerators
摘要:
Due to domestic concerns over incinerator dioxin emissions the EPA decided to set dioxin emissions s
全文:
Due to domestic concerns over incinerator dioxin emissions the EPA decided to set dioxin emissions s
編號:
145
標題:
Future Recyclers and Recycling Organizations to be Exempt from Permit Requirements
摘要:
Recycling To encourage participation in recycling work at all levels the EPA amended the Regulatio
全文:
To encourage participation in recycling work at all levels the EPA amended the Regulations Governing
編號:
712
標題:
EPA Immediately Responds to Incident at Third Nuclear Power Plant
摘要:
On March 18 reactor one at the Third Nuclear Power Plant experienced a “3A” nuclear incident. The EP
全文:
On March 18 reactor one at the Third Nuclear Power Plant experienced a “3A” nuclear incident. The EP
編號:
930
標題:
EPA Announces Technical Criteria for Plant Ecology Assessment
摘要:
To prompt developers to pay more attention to ecological assessments while conducting EIA the EPA an
全文:
To prompt developers to pay more attention to ecological assessments while conducting EIA the EPA an
編號:
736
標題:
Professor Juu-En Chang Appointed EPA Deputy Administrator
摘要:
The Executive Yuan recently approved EPA Administrator Hau's decision to appoint Juu-En Chang as EPA
全文:
The Executive Yuan recently approved EPA Administrator Hau's decision to appoint Juu-En Chang as EPA
編號:
776
標題:
Strike Inspections on Unlawful Dischargers of Industrial Wastewater
摘要:
The EPA conducted a day of surprise raids on factories suspected of illegally discharging polluted w
全文:
The EPA conducted a day of surprise raids on factories suspected of illegally discharging polluted w
編號:
675
標題:
EPA Decides to Make Small Change in Subsidy for Electric Scooters
摘要:
Following a commitment by industry representatives to sell 20000 electric scooters in 2001, EPA Admi
全文:
Following a commitment by industry representatives to sell 20000 electric scooters in 2001, EPA Admi
編號:
667
標題:
Taiwan Continues to Closely Follow Trends in COP6
摘要:
The Taiwanese delegation to the Sixth Session of the United Nations Framework Convention on Climate
全文:
The Taiwanese delegation to the Sixth Session of the United Nations Framework Convention on Climate
編號:
655
標題:
EPA Clears the Way for Computers & Clothing Materials to Receive the Green Mark
摘要:
The EPA's Green Mark Review Committee recently cleared the way for four product types to apply for t
全文:
The EPA's Green Mark Review Committee recently cleared the way for four product types to apply for t
編號:
745
標題:
Draft Regulations Governing Soil & Groundwater Control Regions Released
摘要:
The EPA has released a draft of the Regulations Governing Soil and Groundwater Pollution Control Reg
全文:
The EPA has released a draft of the Regulations Governing Soil and Groundwater Pollution Control Reg
編號:
761
標題:
Construction Site Runoff Water Placed Under Regulation
摘要:
The EPA will begin introducing a series of regulations aimed at enterprises that are frequently the
全文:
The EPA will begin introducing a series of regulations aimed at enterprises that are frequently the
編號:
818
標題:
New Draft of Regulations Governing Disease Vector Control Firms
摘要:
The EPA has begun formulating the Draft Revised Regulations Governing Disease Vector Control Firms (
全文:
The EPA has begun formulating the Draft Revised Regulations Governing Disease Vector Control Firms (
編號:
580
標題:
Formosa Plastics to Roll Out Domestic Treatment of Mercury Sludge
摘要:
After repatriating its mercury-tainted sludge from Cambodia Formosa Plastics Corp. has put forth a d
全文:
After repatriating its mercury-tainted sludge from Cambodia Formosa Plastics Corp. has put forth a d
行政院環境保護署 的其他資料集
環保署書面之公共工程及採購契約
不定期更新,44許小姐 | (02)23117722#2483 | 2022-01-15 01:10:14
行政院環境保護署行政院環境保護署環境保護產品申請審查作業規範
每季更新更新,43孫小姐 | 02-23117722#2926 | 2022-01-15 01:13:10
行政院環境保護署空氣品質小時值_屏東縣_恆春站
每小時更新更新,193謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:31
行政院環境保護署貨品通關事前聲明確認作業指引簡報
不定期更新,54金先生 | 23257399#55315 | 2022-01-14 01:22:22
行政院環境保護署應回收廢棄物(廢輪胎類)回收量資料
每年更新更新,52廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:37
行政院環境保護署
建檔公廁明細-連江縣
不定期更新更新,111賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:02
行政院環境保護署中油三輕環境監測資料
每季更新更新,61陳先生 | 04-22521718#51207 | 2022-01-15 01:14:21
行政院環境保護署環境教育人員認證展延 【常見問答】
不定期更新,52蘇小姐 | (03)4020789分機669 | 2022-01-15 01:11:10
行政院環境保護署國內公害糾紛司法案件資料
不定期更新更新,92陳小姐 | (02)2311-7722分機2932 | 2023-07-30 01:03:23
行政院環境保護署環境影響說明書環境敏感區位調查表
每2月更新,140黃先生 | 02-23117722#2748 | 2023-08-06 01:04:02
行政院環境保護署
通過先期測試車機商/系統商
每1月更新,41張小姐 | 02-2325-7399#55219 | 2023-07-27 01:03:51
行政院環境保護署空氣品質小時值_基隆市_基隆站
每1時更新,183陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:28
行政院環境保護署EPQSummary_EnvironmentalInformationSystem
不定期更新更新,156陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:46
行政院環境保護署行政院環境保護署毒物及化學物質局單位決算
不定期更新,45魏小姐 | 02-23257399#55432 | 2022-01-15 01:09:57
行政院環境保護署水庫水質監測點基本資料
不定期更新更新,157郭先生 | 2311-7722#2399 | 2023-08-07 00:59:33
行政院環境保護署
環境影響評估技術顧問機構評鑑成果
2年更新,46劉先生 | 02-23117722#2743 | 2022-01-15 01:12:19
行政院環境保護署焚化廠空污監測資料
每月更新更新,146吳先生 | 04-22521718#53526 | 2022-01-15 01:15:31
行政院環境保護署建檔公廁明細-基隆市
不定期更新更新,271曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:14:53
行政院環境保護署歷年環保署農地營運中含鉛製程事業之土壤污染潛勢調查
不定期更新更新,58詹小姐 | 02-23117722 #8204 | 2022-01-14 01:20:28
行政院環境保護署環保署環境影響評估審查委員會簡報資料
每2月更新,127黃先生 | 02-23117722#2748 | 2023-08-05 01:00:55
行政院環境保護署
水污染實收罰鍰
每年更新更新,113謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:28
行政院環境保護署應回收廢棄物(廢容器類)回收量資料
每1年更新,41廖小姐 | 02-2370-5888#3103 | 2023-07-27 00:59:50
行政院環境保護署環保署工程施工查核小組、問答集
不定期更新更新,37蔡先生 | 04-22521718#51205 | 2023-08-09 01:05:14
行政院環境保護署環境音量監測結果統計(依管制區分)
不定期更新更新,145章小姐 | 02-23712121#6407 | 2023-08-03 01:04:06
行政院環境保護署環保署環境影響評估審查委員會委員名單
每2年更新,88黃先生 | 02-23117722#2748 | 2023-08-05 01:00:47
行政院環境保護署
建檔公廁明細-彰化縣
不定期更新更新,134賴先生 | 04-2252-1718#53686 | 2023-07-27 01:01:58
行政院環境保護署持久性有機污染物斯德哥爾摩公約國家實施計畫成果報告
每年更新更新,43劉小姐 | 23257399#55531 | 2022-01-15 01:10:06
行政院環境保護署經過地質敏感區之環境影響說明書件
每2月更新,179黃先生 | 02-23117722#2748 | 2023-08-06 01:04:09
行政院環境保護署應回收廢棄物受補貼機構(處理業)
每1年更新,161廖小姐 | 02-2370-5888#3103 | 2023-07-27 01:00:04
行政院環境保護署環保署補、捐(獎)助地方政府情形表
每季更新更新,123蘇小姐 | 02-2311-7722#2155 | 2022-01-15 01:09:29
行政院環境保護署