time1: 0 time2: 0 time3: 0 time4: 0 total: 0 ""2009"The possible source and countermeasures for pollution at
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

""2009"The possible source and countermeasures for pollution at

""2009"The possible source and countermeasures for pollution at 」於資料集「EPQSummary_SoilAndGroundwater」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:52。 欄位Project Title的內容是"" , 欄位Project Subject的內容是"The possible source and countermeasures for pollution at the investigation points which are found to be abnormal according to the first soil analysis are summarized in table 4.2-7; in these points, the values detected at the military fuel depot near Junhun Power Generation Plant, Tangqi Village, Beigang Township, Beiao Fuel Depot, Lehua Village, Dongying Township and the gas station near Conglian Camp, Zhongliu Village do not exceed regulatory standards but it is suggested you include the said military fuel depot and Beiao Fuel Depot in the second investigation to clarify the effect of soil pollution control. It is also suggested that the gas station near the Conglian Camp, Zhongliu village, DOngying Township be included in the second investigation to confirm the extent of pollution. The source for the pollution at the shallow soil investigation point setup in standard monitoring well at the downstream of Dianchi Mount, Renai Village might be the site on the mountain about 200 m in the upper wind direction; at this site, the polluted soil has been improved by means of plantation rehabilitation method and manual elimination of pollution source according to your requirement but there are many wasted batteries which are not disposed of by any protective measures (such as covering the soil with impervious cloth), so the site might pose a certain degree of risk to the sensitive recipients near the village; thus it is suggested you may continuously require the entity in charge of this site immediately reduce the soil pollution in accordance with article 8 of the Rules For Implementing The Soil And Water Act to ensure the health and safety of nearby residents. The zinc concentration at the three investigation points including the husbandry site, construction bureau, Qingshui Village, Nangan Township, the Pacific Poultry Farm near the 20th unit, Fuxing Village, Nangang Township and the farmland near pier, Wusha Village, Beigan Township exceeds the crop farmland pollution thresholds; so it is suggested that you keep monitoring the said three sites and further include sites of the same nature into the second pollution source investigation. Two standard groundwater monitoring wells and four simplified groundwater wells were set up from Dec. 11 to 14 2009 and the standard wells conform to the basic specifications. The personnel in charge of the plan, together with hydrological geologists or engineers experienced with such setup supervised the setup of the wells on-site and filled in the “Record of on-site supervision” to assure and control the quality of the wells thus set up; in addition, during the drilling process, the soil drilled by the tools will be collected and sequentially placed on-site to observe the changes in the nature of soil and a geological bar graph will be included in the record. The results from continuously collected soil samples help the hydrological geologists and the engineers on-site determine the possible location of groundwater (depth beneath the surface) to design the proper drilling depth , the length of screening and the ranges of the rigs. After the setup is completed, the coordinates and absolute elevation of the well location is measured by RTK gauge and the obtained data are also used in the estimation of the gradients and flow direction of groundwater in accordance with the parameters posted on US EPA online site; see table 4.3-8 for detailed data. The data on the monitoring wells include groundwater level records, soil sample records, monitoring well configuration records and major on-site event records. As for the groundwater pollution,(1) In the wells of high pollution potential, the conductivity value at the Fuwo Port, Fuwo Village, Nangan Township (a newly setup simplified well/ZWS-12) reaches 47,900μmho/cm (the conductivity of seawater generally ranges between40,000 and 60,000μmho/cm ), t..." , 欄位Project Year的內容是2009 , 欄位Organizer的內容是"Environmental Protection Bureau, Lienchiang County" , 欄位Executive Unit的內容是"亞新工程顧問股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=92807 , 欄位Publish Date的內容是20150701

Project Title

""

Project Subject

"The possible source and countermeasures for pollution at the investigation points which are found to be abnormal according to the first soil analysis are summarized in table 4.2-7; in these points, the values detected at the military fuel depot near Junhun Power Generation Plant, Tangqi Village, Beigang Township, Beiao Fuel Depot, Lehua Village, Dongying Township and the gas station near Conglian Camp, Zhongliu Village do not exceed regulatory standards but it is suggested you include the said military fuel depot and Beiao Fuel Depot in the second investigation to clarify the effect of soil pollution control. It is also suggested that the gas station near the Conglian Camp, Zhongliu village, DOngying Township be included in the second investigation to confirm the extent of pollution. The source for the pollution at the shallow soil investigation point setup in standard monitoring well at the downstream of Dianchi Mount, Renai Village might be the site on the mountain about 200 m in the upper wind direction; at this site, the polluted soil has been improved by means of plantation rehabilitation method and manual elimination of pollution source according to your requirement but there are many wasted batteries which are not disposed of by any protective measures (such as covering the soil with impervious cloth), so the site might pose a certain degree of risk to the sensitive recipients near the village; thus it is suggested you may continuously require the entity in charge of this site immediately reduce the soil pollution in accordance with article 8 of the Rules For Implementing The Soil And Water Act to ensure the health and safety of nearby residents. The zinc concentration at the three investigation points including the husbandry site, construction bureau, Qingshui Village, Nangan Township, the Pacific Poultry Farm near the 20th unit, Fuxing Village, Nangang Township and the farmland near pier, Wusha Village, Beigan Township exceeds the crop farmland pollution thresholds; so it is suggested that you keep monitoring the said three sites and further include sites of the same nature into the second pollution source investigation. Two standard groundwater monitoring wells and four simplified groundwater wells were set up from Dec. 11 to 14 2009 and the standard wells conform to the basic specifications. The personnel in charge of the plan, together with hydrological geologists or engineers experienced with such setup supervised the setup of the wells on-site and filled in the “Record of on-site supervision” to assure and control the quality of the wells thus set up; in addition, during the drilling process, the soil drilled by the tools will be collected and sequentially placed on-site to observe the changes in the nature of soil and a geological bar graph will be included in the record. The results from continuously collected soil samples help the hydrological geologists and the engineers on-site determine the possible location of groundwater (depth beneath the surface) to design the proper drilling depth , the length of screening and the ranges of the rigs. After the setup is completed, the coordinates and absolute elevation of the well location is measured by RTK gauge and the obtained data are also used in the estimation of the gradients and flow direction of groundwater in accordance with the parameters posted on US EPA online site; see table 4.3-8 for detailed data. The data on the monitoring wells include groundwater level records, soil sample records, monitoring well configuration records and major on-site event records. As for the groundwater pollution,(1) In the wells of high pollution potential, the conductivity value at the Fuwo Port, Fuwo Village, Nangan Township (a newly setup simplified well/ZWS-12) reaches 47,900μmho/cm (the conductivity of seawater generally ranges between40,000 and 60,000μmho/cm ), t..."

Project Year

2009

Organizer

"Environmental Protection Bureau, Lienchiang County"

Executive Unit

"亞新工程顧問股份有限公司"

Publish Date

20150701

「""2009"The possible source and countermeasures for pollution at 」所屬的資料集:「EPQSummary_SoilAndGroundwater」的其他資料

Project Title: "Project of Soil and Groundwater Pollution Survey and Investigation in HsinChu Country,2018"
Project Subject: "The total cost of this project is NT $ 10,700,000, and the overall working period ended on December
Project Year: 2018
Organizer: "HsinChu County Environment Protection Bureau"

Project Title: "2018 Filing for and Verification of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject: "To remediate the soil and groundwater pollution in Taiwan, the Environmental Protection Administrat
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "2015 Filing for and Verification of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject: ""
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The audition and review plan on evaluation, investigation and testing results reports of potential
Project Subject: "The purpose of this project is to assist the local Environmental Protection Bureau with the auditin
Project Year: 2016
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Investigation of Persistent Organic Pollutants in Groundwater for Contaminated Sites."
Project Subject: "The target of this plan execution is to test and construct complete sampling and analyzing technolo
Project Year: 2015
Organizer: "Environmental Analysis Laboratory"

Project Title: "107 soil and groundwater pollution investigation and audit project"
Project Subject: "Environmental Protection Bureau, Chiayi City (referred to EPB, CYC) has carried out the soil and gr
Project Year: 2018
Organizer: "Environmental Protection Bureau, Chiayi City"

Project Title: "The Survey of the Soil and Groundwater Contamination in Yunlin County in 2014"
Project Subject: "For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year: 2014
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "Supervision and Inspection Plan for the Quality Assurance of Projects Relevant to Soil and Groundwa
Project Subject: "”Supervision and Inspection Plan for the Quality Assurance of Projects Relevant to Soil and Groundw
Project Year: 2015
Organizer: "Environmental Analysis Laboratory"

Project Title: ""
Project Subject: "The objectives of this study include designing the environmental liability insurance policy for con
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Management and maintenance plan for a contaminated site in Pingtung, Taiwan"
Project Subject: "The plan for the third phase, the management and maintenance for the dominant species within the si
Project Year: 2015
Organizer: "Environmental Protection Bureau, Pingtung County"

Project Title: "The 107 annual plan of supervision, management and checking work relating to China Petrochemical De
Project Subject: "This project was carried out from August 14, 2018 to February 13, 2020 for a total duration of 18 m
Project Year: 2018
Organizer: "Environmental Protection Bureau of Tainan City"

Project Title: "The project for the promotion of the risk-based management for soil and groundwater pollution sites
Project Subject: "The Soil and Groundwater Pollution Remediation Act (SGPRA) included the concept of risk assessment
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Changhua County Agricultural Land Pollution Control Site Appropriate Measure Improvement Plan - 134
Project Subject: "The project goal is to conduct the soil investigation on heavy metal-contaminated farmlands near th
Project Year: 2016
Organizer: "Environmental Protection Bureau Changhua County"

Project Title: "soil and groundwater pollution, Taitung"
Project Subject: "none"
Project Year: 2016
Organizer: "Taitung County Environment Protection Bureau"

Project Title: "Green Innovation Technology Promotion and Technology Verification Demonstration Project in Soil and
Project Subject: " Taiwan Environmental Protection Agency has been keenly supported projects related to Green and S
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Taipei District’s Soil and Groundwater Pollution Investigation and Verification Project"
Project Subject: "In order to prevent soil and groundwater from contamination, the local competent authority must reg
Project Year: 2019
Organizer: "Department of Environmental Protection, Taipei City Government"

Project Title: "Site Assessment and Investigation for Soil and Groundwater Potential Contamination of Abandoned Fac
Project Subject: "The project, “Site Assessment and Investigation for Soil and Groundwater Potential Contamination of
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Project of the Data Analysis and System Management of Soil and Groundwater"
Project Subject: "The Soil and Groundwater Management Information Systems (SGM) is a single portal for managing all s
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "2018 Reexamination of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject: "The main purpose of this project is to improve the management of payers of soil and groundwater pol
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "103 Hsinchu soil and groundwater pollution investigation and verification work program"
Project Subject: "The progress of the work program completed by the work team as of the end of the reporting period i
Project Year: 2014
Organizer: "Bureau of Environmental Protection Hsin-Chu"

Project Title: "Development of Environmental Forensic Techniques in Soil and Groundwater Contamination and Validati
Project Subject: "To effectively determine the fate of spilled fuel in the subsurface environment and successfully id
Project Year: 2016
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: ""
Project Subject: "This project starts from February 23 rd, 2012 to December 31st, 2012. This project is mainly to ass
Project Year: 2012
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "2017 Filing for and Verification of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject: "To remediate the soil and groundwater pollution in Taiwan, the Environmental Protection Administrat
Project Year: 2017
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Program for Managing Contaminated Sediments in Taiwan 2016"
Project Subject: "Sediment could provide habits and food for aquatic wildlife and plays a crucial role in the cycles
Project Year: 2016
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Potential polluting factory investigation, Maintenance of monitoring well, farmland sites sampled f
Project Subject: "For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year: 2015
Organizer: "Environmental Protection Bureau Changhua County"

Project Title: ""
Project Subject: "The main tasks of this project include supervising, verification and providing technical support fo
Project Year: 2014
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: "Research and Pilot Study Project Management for 2015"
Project Subject: "In order to promote and enhance the research and development task for soil, groundwater and sedimen
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: ""
Project Subject: "「Soil and Groundwater affect each other, People and Environment depend each other」, the new proverb
Project Year: 2015
Organizer: "Environmental Protection Bureau, Chiayi City"

Project Title: "Promotion of Soil and Groundwater Pollution Site Remediation and Project Management Plan"
Project Subject: "The implementation period of this plan has been from February 7, 2017 to May 6, 2018. The summary o
Project Year: 2017
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "2015 Land Quality Media Campaigns and Promotion Project"
Project Subject: "Tse Yueh Advertising and Marketing Co., Ltd. (hereinafter referred to as, “Tse Yueh Advertising”) h
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

行政院環境保護署 的其他資料集

面源網格空氣污染排放量(TWD97)

不定期更新更新,227

柏小姐 | 02-23712121#6106 | 2022-01-14 01:05:45

行政院環境保護署

各公告類別事業廢棄物委託或共同處理申報量統計

每月更新更新,176

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:25:40

行政院環境保護署

空氣品質小時值_雲林縣_崙背站

每1時更新,127

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:52

行政院環境保護署

臺東縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,42

程先生 | 02-2311-7722#2833 | 2023-08-09 01:04:06

行政院環境保護署

水庫水質月監測資料

不定期更新更新,107

謝小姐 | 02-23117722#2386 | 2022-01-14 01:23:22

行政院環境保護署

行政院環境保護署環境保護人員訓練所法定預算

每1年更新,39

陳先生 | 03-4020789#580 | 2023-08-09 01:05:49

行政院環境保護署

空氣品質小時值_基隆市_基隆站

每1時更新,163

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:28

行政院環境保護署

環境教育機構認證資料

每1月更新,38

盧小姐 | 03-4020789#606 | 2023-07-27 01:02:47

行政院環境保護署

台灣產品碳足跡資訊

每1月更新,119

陳先生 | 02-23117722#2932 | 2023-07-30 01:02:46

行政院環境保護署

環保專案摘要資料_廢棄物管理

不定期更新更新,164

郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:38

行政院環境保護署

列管毒性化學物質已取得許可業者查核家次

每年更新更新,99

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:54

行政院環境保護署

空氣污染排放量推估結果

不定期更新更新,106

柏小姐 | 02-23712121#6106 | 2022-01-14 01:04:24

行政院環境保護署

二氧化碳-小時值-每小時

每1時更新,222

陳先生 | 02-2311-7722#2386 | 2023-08-07 00:58:21

行政院環境保護署

環境教育人員認證得採計之專業領域課程(ODT)

不定期更新更新,38

盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:24

行政院環境保護署

違規公司與產品消息資料

每1月更新,63

盧小姐 | 02-23117722#2943 | 2023-07-27 01:03:54

行政院環境保護署

垃圾處理場(廠)統計

每半年更新更新,32

掩先生 | (04)2252-1718#53513,#53518,#53522 | 2022-01-14 01:22:10

行政院環境保護署

公害陳情案件數

每1月更新,126

顏先生 | 02-23117722#2109 | 2023-07-27 01:01:15

行政院環境保護署

降雨逕流非點源污染最佳管理技術(BMPs)指引

不定期更新,62

林先生 | 02-2311-7722#2811 | 2022-01-15 01:13:03

行政院環境保護署

各公告類別事業廢棄物再利用申報量統計

每1月更新,100

林先生 | 02-2311-7722#2671 | 2023-08-07 01:01:52

行政院環境保護署

年度環境保護人員訓練計畫

每1年更新,44

湯小姐 | 03-4020789#544 | 2023-08-07 01:01:30

行政院環境保護署

環保署遊說法辦理情形

不定期更新更新,41

包先生 | 02-23117722 #2223 | 2022-01-15 01:13:30

行政院環境保護署

彰濱工業區環境監測資料

每3月更新,47

陳先生 | 04-22521718#51207 | 2023-08-09 01:05:05

行政院環境保護署

行政院環境保護署環境保護產品申請審查作業規範

每季更新更新,36

孫小姐 | 02-23117722#2926 | 2022-01-15 01:13:10

行政院環境保護署

環保專案摘要資料_資源循環

不定期更新更新,51

陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:42

行政院環境保護署

光化測站(潮州)小時值資料

不定期更新更新,132

陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:31

行政院環境保護署

空氣品質小時值_臺南市_新營站

每小時更新更新,109

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:14

行政院環境保護署

公害鑑定單位資料

不定期更新更新,62

潘小姐 | (02)2311-7722分機2931 | 2022-01-14 01:19:48

行政院環境保護署

臺南市水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,38

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:49

行政院環境保護署

列管社區下水道名單

不定期更新,43

洪先生 | 02-2311-7722#2833 | 2022-01-14 01:23:07

行政院環境保護署

全國場址公告與解列情形統計表

每1年更新,118

呂小姐 | 02-2383-2389#8110 | 2023-07-30 01:03:52

行政院環境保護署