time1: 0 time2: 0 time3: 0 time4: 0 total: 0 ""2009"The possible source and countermeasures for pollution at
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

""2009"The possible source and countermeasures for pollution at

""2009"The possible source and countermeasures for pollution at 」於資料集「EPQSummary_SoilAndGroundwater」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:52。 欄位Project Title的內容是"" , 欄位Project Subject的內容是"The possible source and countermeasures for pollution at the investigation points which are found to be abnormal according to the first soil analysis are summarized in table 4.2-7; in these points, the values detected at the military fuel depot near Junhun Power Generation Plant, Tangqi Village, Beigang Township, Beiao Fuel Depot, Lehua Village, Dongying Township and the gas station near Conglian Camp, Zhongliu Village do not exceed regulatory standards but it is suggested you include the said military fuel depot and Beiao Fuel Depot in the second investigation to clarify the effect of soil pollution control. It is also suggested that the gas station near the Conglian Camp, Zhongliu village, DOngying Township be included in the second investigation to confirm the extent of pollution. The source for the pollution at the shallow soil investigation point setup in standard monitoring well at the downstream of Dianchi Mount, Renai Village might be the site on the mountain about 200 m in the upper wind direction; at this site, the polluted soil has been improved by means of plantation rehabilitation method and manual elimination of pollution source according to your requirement but there are many wasted batteries which are not disposed of by any protective measures (such as covering the soil with impervious cloth), so the site might pose a certain degree of risk to the sensitive recipients near the village; thus it is suggested you may continuously require the entity in charge of this site immediately reduce the soil pollution in accordance with article 8 of the Rules For Implementing The Soil And Water Act to ensure the health and safety of nearby residents. The zinc concentration at the three investigation points including the husbandry site, construction bureau, Qingshui Village, Nangan Township, the Pacific Poultry Farm near the 20th unit, Fuxing Village, Nangang Township and the farmland near pier, Wusha Village, Beigan Township exceeds the crop farmland pollution thresholds; so it is suggested that you keep monitoring the said three sites and further include sites of the same nature into the second pollution source investigation. Two standard groundwater monitoring wells and four simplified groundwater wells were set up from Dec. 11 to 14 2009 and the standard wells conform to the basic specifications. The personnel in charge of the plan, together with hydrological geologists or engineers experienced with such setup supervised the setup of the wells on-site and filled in the “Record of on-site supervision” to assure and control the quality of the wells thus set up; in addition, during the drilling process, the soil drilled by the tools will be collected and sequentially placed on-site to observe the changes in the nature of soil and a geological bar graph will be included in the record. The results from continuously collected soil samples help the hydrological geologists and the engineers on-site determine the possible location of groundwater (depth beneath the surface) to design the proper drilling depth , the length of screening and the ranges of the rigs. After the setup is completed, the coordinates and absolute elevation of the well location is measured by RTK gauge and the obtained data are also used in the estimation of the gradients and flow direction of groundwater in accordance with the parameters posted on US EPA online site; see table 4.3-8 for detailed data. The data on the monitoring wells include groundwater level records, soil sample records, monitoring well configuration records and major on-site event records. As for the groundwater pollution,(1) In the wells of high pollution potential, the conductivity value at the Fuwo Port, Fuwo Village, Nangan Township (a newly setup simplified well/ZWS-12) reaches 47,900μmho/cm (the conductivity of seawater generally ranges between40,000 and 60,000μmho/cm ), t..." , 欄位Project Year的內容是2009 , 欄位Organizer的內容是"Environmental Protection Bureau, Lienchiang County" , 欄位Executive Unit的內容是"亞新工程顧問股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=92807 , 欄位Publish Date的內容是20150701

Project Title

""

Project Subject

"The possible source and countermeasures for pollution at the investigation points which are found to be abnormal according to the first soil analysis are summarized in table 4.2-7; in these points, the values detected at the military fuel depot near Junhun Power Generation Plant, Tangqi Village, Beigang Township, Beiao Fuel Depot, Lehua Village, Dongying Township and the gas station near Conglian Camp, Zhongliu Village do not exceed regulatory standards but it is suggested you include the said military fuel depot and Beiao Fuel Depot in the second investigation to clarify the effect of soil pollution control. It is also suggested that the gas station near the Conglian Camp, Zhongliu village, DOngying Township be included in the second investigation to confirm the extent of pollution. The source for the pollution at the shallow soil investigation point setup in standard monitoring well at the downstream of Dianchi Mount, Renai Village might be the site on the mountain about 200 m in the upper wind direction; at this site, the polluted soil has been improved by means of plantation rehabilitation method and manual elimination of pollution source according to your requirement but there are many wasted batteries which are not disposed of by any protective measures (such as covering the soil with impervious cloth), so the site might pose a certain degree of risk to the sensitive recipients near the village; thus it is suggested you may continuously require the entity in charge of this site immediately reduce the soil pollution in accordance with article 8 of the Rules For Implementing The Soil And Water Act to ensure the health and safety of nearby residents. The zinc concentration at the three investigation points including the husbandry site, construction bureau, Qingshui Village, Nangan Township, the Pacific Poultry Farm near the 20th unit, Fuxing Village, Nangang Township and the farmland near pier, Wusha Village, Beigan Township exceeds the crop farmland pollution thresholds; so it is suggested that you keep monitoring the said three sites and further include sites of the same nature into the second pollution source investigation. Two standard groundwater monitoring wells and four simplified groundwater wells were set up from Dec. 11 to 14 2009 and the standard wells conform to the basic specifications. The personnel in charge of the plan, together with hydrological geologists or engineers experienced with such setup supervised the setup of the wells on-site and filled in the “Record of on-site supervision” to assure and control the quality of the wells thus set up; in addition, during the drilling process, the soil drilled by the tools will be collected and sequentially placed on-site to observe the changes in the nature of soil and a geological bar graph will be included in the record. The results from continuously collected soil samples help the hydrological geologists and the engineers on-site determine the possible location of groundwater (depth beneath the surface) to design the proper drilling depth , the length of screening and the ranges of the rigs. After the setup is completed, the coordinates and absolute elevation of the well location is measured by RTK gauge and the obtained data are also used in the estimation of the gradients and flow direction of groundwater in accordance with the parameters posted on US EPA online site; see table 4.3-8 for detailed data. The data on the monitoring wells include groundwater level records, soil sample records, monitoring well configuration records and major on-site event records. As for the groundwater pollution,(1) In the wells of high pollution potential, the conductivity value at the Fuwo Port, Fuwo Village, Nangan Township (a newly setup simplified well/ZWS-12) reaches 47,900μmho/cm (the conductivity of seawater generally ranges between40,000 and 60,000μmho/cm ), t..."

Project Year

2009

Organizer

"Environmental Protection Bureau, Lienchiang County"

Executive Unit

"亞新工程顧問股份有限公司"

Publish Date

20150701

「""2009"The possible source and countermeasures for pollution at 」所屬的資料集:「EPQSummary_SoilAndGroundwater」的其他資料

Project Title: "11:07 張耀文 貼圖 11:26 張耀文 Changhua County Agricultural Land Pollution Control Site Appropriate Measure
Project Subject: "The main purpose of this project was to perform detailed soil surveys and improve the project of C
Project Year: 2016
Organizer: "Environmental Protection Bureau Changhua County"

Project Title: "Experiment and development of agriculture soil and groundwater arsenic removal technology in natura
Project Subject: "The project conducted the domestic and international phytoremediation lietratures collection. Consi
Project Year: 2017
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Groundwater Resources Management and Integration of Taiwan"
Project Subject: "The integrative planning of groundwater quality and monitoring wells management are conducted in th
Project Year: 2016
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Changhua County Agricultural Land Pollution Control Site Appropriate Measure Improvement Plan - 134
Project Subject: "The project goal is to conduct the soil investigation on heavy metal-contaminated farmlands near th
Project Year: 2016
Organizer: "Environmental Protection Bureau Changhua County"

Project Title: ""
Project Subject: "The project was to confirm the degree of heavy metal pollution and to take remediation measures on
Project Year: 2014
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: "Evaluation of effectiveness on Soil and Groundwater Pollution Sites monitoring and Administrative M
Project Subject: "The purpose of this plan is to assess the effectiveness of Soil and Groundwater Pollution Sites Adm
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The 105 annual plan of supervision, management and checking work relating to China Petrochemical De
Project Subject: "This project was carried out from March 3, 2016 to May 2, 2018 for a total duration of 26 months, i
Project Year: 2016
Organizer: "Environmental Protection Bureau of Tainan City"

Project Title: "108 soil and groundwater pollution investigation and audit project"
Project Subject: "Environmental Protection Bureau, Chiayi City (referred to EPB, CYC) has carried out the soil and gr
Project Year: 2019
Organizer: "Environmental Protection Bureau, Chiayi City"

Project Title: "Sediment pollution transfer model technology demonstration project"
Project Subject: "The objectives of this project include using the supplemental investigation data, strengthening the
Project Year: 2016
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "International Cooperation on Soil and Groundwater Remediation 2019"
Project Subject: "The project “2019 International Exchange of Technical Experiences on Remediation for Soil and Groun
Project Year: 2019
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: ""
Project Subject: "During August 2012, we completed control the spread of pollution, Enhanced In-situ Bioremediation(E
Project Year: 2012
Organizer: "Environmental Protection Bureau Kauhsiung City Government"

Project Title: "The Project on Groundwater Contamination Investigation and Response Improvement Plan in Toufen and
Project Subject: "Groundwater contaminations of volatile organic compounds (VOCs) are investigated in this project to
Project Year: 2017
Organizer: "Environmental Protection Bureau Miaoli County Government"

Project Title: "Feasibility Study of the Applicable Treatments for Contaminated Soils"
Project Subject: "Compiling the information regarding the specifications of recycled materials, the products of the r
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Emergency Measures for RCA Former Taoyuan Plant Groundwater Remediation Site"
Project Subject: "TCETVT (hereinafter referred to as RCA) former Taoyuan plant was announced as Groundwater Pollution
Project Year: 2013
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: "Investigation and Determination of the Sources and Pathways of Farmlands Contaminated with Heavy Me
Project Subject: "Farmland soil contamination cases happened in cities and counties continuously, funding of remediat
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Management Project for Pollution Prevention in Farmland"
Project Subject: "The agricultural development was considered as a solid foundation for the industrial transformation
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Prospect of Soil and Underground Water and Excellent Mindset Cultivation Plan"
Project Subject: "In response to large-scale human development and the environmental problems of the over-exploitatio
Project Year: 2020
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Investigation and Verification of Soil and Groundwater Pollution in Tainan City"
Project Subject: "Project AccomplishmentThe project, Investigation and Verification of Soil and Groundwater Contamina
Project Year: 2019
Organizer: "Environmental Protection Bureau of Tainan City"

Project Title: "Investigation of Concern Substances in Groundwater and Analysis of Pollution Control Strategy"
Project Subject: "The purposes of this project is to investigate the groundwater contamination potential of hazardous
Project Year: 2016
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Soil and groundwater, pollution investigation, verification"
Project Subject: "This project continues work in “Soil and Groundwater Investigation and Verification Project” of Tai
Project Year: 2017
Organizer: "Taitung County Environment Protection Bureau"

Project Title: "2015 Reexamination and Auditing of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject: "The main purpose of this project is through the reexamination and site audit to strengthen managing
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Contamination Source Investigation and Mitigation Plan for Industrial Park of High Contamination Po
Project Subject: " In order to assess soil and groundwater qualities in the industrial parks, the Environmental Prote
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Year 2016 Pingtung County Promote Soil and Groundwater Pollution Prevention and Control, Monitor Wo
Project Subject: "This project is based on the provisions of Article 6 of the Soil and Groundwater Pollution Remediat
Project Year: 2016
Organizer: "Environmental Protection Bureau, Pingtung County"

Project Title: "2018 Filing for and Verification of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject: "To remediate the soil and groundwater pollution in Taiwan, the Environmental Protection Administrat
Project Year: 2018
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The project on Investigation and Verificationof Soil and Groundwater Pollution in Yilan County, 201
Project Subject: "In order to prevent soil and groundwater from contamination, the local competent authority must reg
Project Year: 2017
Organizer: "Environmental Protection Bureau of Yi-Lan County"

Project Title: "Implementing the control priority system of Gas Stations and developing control strategy in Taoyuan
Project Subject: "In order to prevent soil and groundwater pollution, ensure the sustainable use of soil and groundwa
Project Year: 2014
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: ""
Project Subject: "Concentrations of organic contaminants in common productive soils based on the total soil mass give
Project Year: 2016
Organizer: "Environmental Analysis Laboratory"

Project Title: "The 2019 Promotion Project for Soil and Groundwater Pollution Affairs"
Project Subject: "People have been getting increasingly aware of environmental protection over the years. Yet, there
Project Year: 2019
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "2019 Filing for and Verification of Statements of Soil and Groundwater Pollution Remediation Fees"
Project Subject: "To remediate the soil and groundwater pollution in Taiwan, the Environmental Protection Administrat
Project Year: 2019
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "shai-Pi Soil Poutllion Plan"
Project Subject: "-"
Project Year: 2014
Organizer: "Environmental Protection Bureau, Chiayi City"

行政院環境保護署 的其他資料集

六輕相關計畫環評監督委員會會議紀錄

每季更新更新,52

陳先生 | 04-22521718#51207 | 2022-01-14 01:21:58

行政院環境保護署

歷年環保署農地_全國重金屬污染潛勢之管制及調查計畫

不定期更新更新,97

謝先生 | (02)23832389*8302 | 2022-01-14 01:20:23

行政院環境保護署

貨品通關事前聲明確認作業指引簡報

不定期更新,52

金先生 | 23257399#55315 | 2022-01-14 01:22:22

行政院環境保護署

監測車(光化)基本資料

不定期更新更新,37

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:19

行政院環境保護署

公害陳情警示區域範圍圖

每6月更新,39

許小姐 | 04-22521718#58709 | 2023-07-27 01:06:07

行政院環境保護署

光化測站(忠明)小時值資料

不定期更新更新,124

陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:29

行政院環境保護署

環境教育機構認證申請書

不定期更新更新,58

盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:26

行政院環境保護署

訴願決定書

每6月更新,40

李先生 | 02-2311-7722#2962 | 2023-07-30 01:05:32

行政院環境保護署

空氣品質小時值_屏東縣_潮州站

每小時更新更新,135

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:31

行政院環境保護署

空氣污染防制區劃分結果

2年更新,149

柏小姐 | 02-23712121#6106 | 2022-01-14 01:05:04

行政院環境保護署

面源網格空氣污染排放量(TWD97)

每2年更新,133

劉小姐 | 02-23117722#6111 | 2023-07-30 01:04:44

行政院環境保護署

金門縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,46

程先生 | 02-2311-7722#2833 | 2023-08-09 01:04:05

行政院環境保護署

公告應回收項目之責任業者列管家數統計

每1年更新,38

廖小姐 | 02-2370-5888#3103 | 2023-07-27 00:59:42

行政院環境保護署

清潔隊員節慶祝活動

每年更新更新,39

蔡先生 | (04)2252-1718#53606 | 2022-01-14 01:18:06

行政院環境保護署

行政院環境保護署會計月報

每月更新更新,46

陳小姐 | 02-2311-7722#2159 | 2022-01-14 01:22:16

行政院環境保護署

焚化廠基本資料

每月更新更新,57

吳先生 | 04-22521718#53526 | 2022-01-15 01:15:18

行政院環境保護署

機關綠色採購績效評核作業要點

不定期更新更新,43

王先生 | 02-23117722#2921 | 2022-01-14 01:18:00

行政院環境保護署

經過飲用水水源水質保護區之環境影響評估報告書

每2月更新,56

黃先生 | 02-23117722#2748 | 2023-08-05 01:00:58

行政院環境保護署

全國工業區年度備查案件狀態統計表

不定期更新更新,106

詹小姐 | 02-2383-2389#8204 | 2022-01-15 01:12:19

行政院環境保護署

環境教育終身學習網影片專區使用人次

每季更新更新,42

李小姐 | 02-23117722#2724 | 2022-01-15 01:10:50

行政院環境保護署

環境督察總隊對污染源裁處資訊

每1月更新,192

蘇先生 | 04-2252-1718#51305 | 2023-04-15 01:01:35

行政院環境保護署

金門縣重要環保統計資料

每月更新更新,115

謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:48

行政院環境保護署

年度環境保護人員訓練計畫

每1年更新,47

湯小姐 | 03-4020789#544 | 2023-08-07 01:01:30

行政院環境保護署

行政院環境保護署環境檢驗所單位預算案

每1年更新,45

莊小姐 | 03-4915818#3003 | 2023-08-09 01:05:42

行政院環境保護署

全國場址目前改善與整治進度

不定期更新更新,63

賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:11

行政院環境保護署

建檔公廁明細-花蓮縣

不定期更新更新,172

曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:14:34

行政院環境保護署

河川水質監測站位置圖

不定期更新更新,37

謝小姐 | 02-2311-7722#2386 | 2022-01-15 01:16:38

行政院環境保護署

空氣品質指標(AQI)概況

每月更新更新,142

謝小姐 | 02-23117722#2103 | 2022-01-14 01:20:51

行政院環境保護署

行政院環境保護署環境檢驗所會計月報

每1月更新,42

鍾小姐 | 03-4915818#3004 | 2023-08-09 01:05:46

行政院環境保護署

縣市清運機具統計資料

每半年更新更新,39

陳小姐 | (04)2252-1718#53406 | 2022-01-14 01:22:13

行政院環境保護署