time1: 0 time2: 0 time3: 0 time4: 0 total: 0 ""2013"This project is a continuous regulatory or control plan.
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

""2013"This project is a continuous regulatory or control plan.

""2013"This project is a continuous regulatory or control plan. 」於資料集「EPQSummary_Air」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:50。 欄位Project Title的內容是"" , 欄位Project Subject的內容是"This project is a continuous regulatory or control plan. The main purpose of the plan was to managethe emission of volatile organic compound air pollutants in accordance with the regulations announced by the Environmental Protection Administration, regulate the CPC Corporation’s Taoyuan refinery as a special project, and provide public- and private-venue consultations within the jurisdiction regarding the installation of continuousemission monitoring systems (CEMS), aswell asassess monitoringresults and transmitted dataaccuracy.This will ensure sufficient understanding of the status of pollutant emissions, and effectively improve the air quality of Taoyuan County.This plan was executed over 12 months from March 24, 2013, to March 23, 2014. The various relevant operations were executed according to a predetermined schedule. These operations included volatile organic compoundregulation, pollution reduction counseling and guidance, inspection and detection operations, special project regulation of the CPC Corporation’s Taoyuan refinery, 3D optical radar monitoring, supervising regular detection and online declaration operations, maintaining and updating the information system of the CEMS, CEMS regulation compliance assessments, and performance of promotional information sessions regarding regulations.The key project tasks and achievements for this year are listed below.(a) Professional regulation of the CPC Corporation Refining Business Division’s Taoyuan refinery, including the monitoring and checking of 9 self-initiated improvement items and pollution reduction strategies and operations related to regulation compliance. Execution achievements for this portion of the plan include the following:(1) Complete reinventorying and establishment by barcode and imaging regarding the equipment components for the 24 manufacturing processes performed in the refinery. The number of total equipment components had increased by approximately 3-fold compared to that for 2009. This information was synchronously transmitted for component declaration operations involving permits, air pollution fees, emissions volumes, and quarterly declarations. Furthermore, forward looking infrared (FLIR)facilities and flame ionization detectors (FIDs) were introduced for equipment component leak selection and detection. Following inspection and regulation, the number of equipment component leaks identified for the manufacturing processes exhibited a declining trend in the subsequent quarterly declaration, volatile organic compounds have been reduced by 70 metric tons(2) Flare exhaust gas recycling and reduction operations were implemented. Online flow monitoring of 11 elevated and low flares has been conducted with the Environmental Protection Bureau. Additionally, 83% of the exhaust emitted by 3 elevated hydrogen sulfide flares is recycled at sulfur factories or recovery units or reused by the fuel system. The construction of 2 flare gas recovery systems (FGRS) for a further 8 carbon-hydrogen elevated and ground flares began on March 9, 2013. (3) Regarding public petitions, a total of 17 cases were recorded between January 1, 2013, and December 31, 2013, which is 6% lower than that in 2012.(b) From the perspective of CEMS regulation, because of the 3 cases of false monitoring data in 2011, a parallel comparison system has been installed,and related trends between parallel comparison data and monitoring data are downloaded and analyzed every quarter as specified by the Environmental Protection Bureau. The analysis results have not highlighted any cases of inconsistent trends. Furthermore, pollutant emission trends do not appear as stable as that in previous years(c) During the current year, inspection and regulation operations were synchronized and integrated with technological instruments, as explained below. (1)The use of 3D optical radar to monitor th..." , 欄位Project Year的內容是2013 , 欄位Organizer的內容是"Taoyuan County Government Environment Protection Bureau" , 欄位Executive Unit的內容是"台灣曼寧工程顧問股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=123251 , 欄位Publish Date的內容是20160901

Project Title

""

Project Subject

"This project is a continuous regulatory or control plan. The main purpose of the plan was to managethe emission of volatile organic compound air pollutants in accordance with the regulations announced by the Environmental Protection Administration, regulate the CPC Corporation’s Taoyuan refinery as a special project, and provide public- and private-venue consultations within the jurisdiction regarding the installation of continuousemission monitoring systems (CEMS), aswell asassess monitoringresults and transmitted dataaccuracy.This will ensure sufficient understanding of the status of pollutant emissions, and effectively improve the air quality of Taoyuan County.This plan was executed over 12 months from March 24, 2013, to March 23, 2014. The various relevant operations were executed according to a predetermined schedule. These operations included volatile organic compoundregulation, pollution reduction counseling and guidance, inspection and detection operations, special project regulation of the CPC Corporation’s Taoyuan refinery, 3D optical radar monitoring, supervising regular detection and online declaration operations, maintaining and updating the information system of the CEMS, CEMS regulation compliance assessments, and performance of promotional information sessions regarding regulations.The key project tasks and achievements for this year are listed below.(a) Professional regulation of the CPC Corporation Refining Business Division’s Taoyuan refinery, including the monitoring and checking of 9 self-initiated improvement items and pollution reduction strategies and operations related to regulation compliance. Execution achievements for this portion of the plan include the following:(1) Complete reinventorying and establishment by barcode and imaging regarding the equipment components for the 24 manufacturing processes performed in the refinery. The number of total equipment components had increased by approximately 3-fold compared to that for 2009. This information was synchronously transmitted for component declaration operations involving permits, air pollution fees, emissions volumes, and quarterly declarations. Furthermore, forward looking infrared (FLIR)facilities and flame ionization detectors (FIDs) were introduced for equipment component leak selection and detection. Following inspection and regulation, the number of equipment component leaks identified for the manufacturing processes exhibited a declining trend in the subsequent quarterly declaration, volatile organic compounds have been reduced by 70 metric tons(2) Flare exhaust gas recycling and reduction operations were implemented. Online flow monitoring of 11 elevated and low flares has been conducted with the Environmental Protection Bureau. Additionally, 83% of the exhaust emitted by 3 elevated hydrogen sulfide flares is recycled at sulfur factories or recovery units or reused by the fuel system. The construction of 2 flare gas recovery systems (FGRS) for a further 8 carbon-hydrogen elevated and ground flares began on March 9, 2013. (3) Regarding public petitions, a total of 17 cases were recorded between January 1, 2013, and December 31, 2013, which is 6% lower than that in 2012.(b) From the perspective of CEMS regulation, because of the 3 cases of false monitoring data in 2011, a parallel comparison system has been installed,and related trends between parallel comparison data and monitoring data are downloaded and analyzed every quarter as specified by the Environmental Protection Bureau. The analysis results have not highlighted any cases of inconsistent trends. Furthermore, pollutant emission trends do not appear as stable as that in previous years(c) During the current year, inspection and regulation operations were synchronized and integrated with technological instruments, as explained below. (1)The use of 3D optical radar to monitor th..."

Project Year

2013

Organizer

"Taoyuan County Government Environment Protection Bureau"

Executive Unit

"台灣曼寧工程顧問股份有限公司"

Publish Date

20160901

「""2013"This project is a continuous regulatory or control plan. 」所屬的資料集:「EPQSummary_Air」的其他資料

Project Title: "2016 Air Quality Management and Implementation Plan of Taipei City"
Project Subject: "1.Analysis of Air Quality and Air Pollutant Emission Trend,Integration of air pollution control str
Project Year: 2016
Organizer: "Department of Environmental Protection, Taipei City Government"

Project Title: ""
Project Subject: "要: Since the original plants have all been washed away due to river flood, the amount of water g
Project Year: 2013
Organizer: "Environmental Protection Bureau Changhua County"

Project Title: "The Control Strategy for Emission Investigation and Monitoring of Toxic Air Pollutants."
Project Subject: "The scope of this project includes: 1) Monitoring for the stationary emission and the ambient envir
Project Year: 2018
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: "Implement of the new model motorcycle certification, C.O.P inspection, the in-used motorcycle recal
Project Subject: "This year, four major tasks were being set as this project’s major work contents which include: fir
Project Year: 2015
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: "107 Hsinchu City Air Pollution Protection Promotion Plan"
Project Subject: "Statistics until December 23, Japan plans to complete three measures to strengthen regional air qua
Project Year: 2018
Organizer: "Bureau of Environmental Protection Hsin-Chu"

Project Title: "The 2015 Taichung City Catering smoke pollution control、Centralized joss paper incineration、Outdoor
Project Subject: "We has inspected and given advices the air pollution control devices of 693 catering industries for
Project Year: 2015
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "Implement of the new model motorcycle certification, C.O.P inspection, the in-used motorcycle recal
Project Subject: "This year, four major tasks were being set as this project’s major work contents which include: fir
Project Year: 2014
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: "Indoor Air Quality Promote Plan in year 2017"
Project Subject: "Indoor Air Quality Project was started on 26 Apr 2017. The project scopes included perform indoor a
Project Year: 2017
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: ""
Project Subject: "The implementation period of the Air Quality Control Plan was from January 21th, 2014 to December 2
Project Year: 2014
Organizer: "Environmental Protection Bureau, Kinmen County"

Project Title: "Performance Evaluation Program of PM10 & PM2.5 Monitors"
Project Subject: "Compared to Taiwan air quality standards, the annual PM10 concentration has been reduced to below 6
Project Year: 2018
Organizer: "Department of Environmental Monitoring & Information Management"

Project Title: "The Indoor Air Quality Audit & Guidance Control Program of Changhua County 2015"
Project Subject: "As always, the government authorities have been significantly concerned about the issue of indoor a
Project Year: 2015
Organizer: "Environmental Protection Bureau Changhua County"

Project Title: "2014 Taoyuan County Low-Carbon & Sustainable Homeland operation and performance assessment program"
Project Subject: "The main working performances of this program includes :1.Assisting on 『Low-Carbon Taoyuan Promotio
Project Year: 2014
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: "The 2014 “Taichung City Specific Pollution Source and Indoor Air Quality Inspection and Control Pro
Project Subject: "Regarding the food and drinking industry, the project has during its implementation period (until 3
Project Year: 2014
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "The 2017 Project of VOC inspection in offshore industrial zones, Yunlin County"
Project Subject: "The major work item of the plan is the project control of volatile organic compounds in the islands
Project Year: 2017
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "Air Quality Maintenance and Integrated Management Plan in 2016."
Project Subject: "In order to continue to achieve the goal of improving air quality, the “Yunlin County Air Quality M
Project Year: 2016
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "The 2014 “Taichung City Stationary Source Inspection and Response Project”."
Project Subject: "This plan was established to assist the Environmental Protection Bureau in the auditing and inspect
Project Year: 2014
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "The Project of Air Pollution Petitions Inspecting Control of Changhua County in 2016"
Project Subject: "“The Project of Air Pollution Petitions Inspecting control of Changhua County in 2016” had begun fr
Project Year: 2016
Organizer: "Environmental Protection Bureau Changhua County"

Project Title: "Micro-pulse lidar operation, maintenance, and data analyzation"
Project Subject: "The objectives and task of this project are: (1) to execute the operation and maintenance of the Mi
Project Year: 2018
Organizer: "Department of Environmental Monitoring & Information Management"

Project Title: ""
Project Subject: "The temporal and spatial variations of PM2.5 concentrations in Yulin, and vicinity, as well as the
Project Year: 2014
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "Low Carbon sustainable home operation system with the implementation of the evaluation plan"
Project Subject: "In recent years, global warming, climate change and greenhouse gas control issues, has become the f
Project Year: 2017
Organizer: "Nantou County Environmental Protection Bureau"

Project Title: "2011 Offshore Island Industrial Zone Total Air Pollution Examination and Permit Control"
Project Subject: "This plan has a 11-month execution period from Apr 1, 2011 to Feb 29, 2012 and includes the main ta
Project Year: 2012
Organizer: "Environmental Protection Bureau Yunlin County"

Project Title: "The 2018 Air Pollution Management Plan"
Project Subject: "Since the announcement of the Air Pollution Control Act on May 23, 1975, the regulatory standards h
Project Year: 2018
Organizer: "Environmental Protection Bureau, Chiayi County"

Project Title: "The project of auditing management and economical incentive policy review for air pollution control
Project Subject: "The Environmental Protection Administration has been collecting the Air Pollution Control Fee from
Project Year: 2016
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: "Penhu County Mobile Sources Audition and Control Project, 2016"
Project Subject: "On motorbike pollution control, according to the data on EPA moter vehicles emission regular test i
Project Year: 2016
Organizer: "Environmental Protection Bureau, Penghu County"

Project Title: "The Project of Taichung City fugitive emissions sources、indoor air quality control and Greenhouse G
Project Subject: "Taichung city which was once known for its clean air quality has taken a dramatic dip since the ris
Project Year: 2017
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "106 Control Strategies for the Fugitive Particulate Source,Chaiyi City"
Project Subject: "The construction project is mainly governed by the Management Regulations for Construction Project
Project Year: 2017
Organizer: "Environmental Protection Bureau, Chiayi City"

Project Title: "Work plan of project to promote the Emission Inspection & Maintenance System for gasoline-fueled ve
Project Subject: " The plan focuses on the research, estimation and establishment of the pollution control strategy
Project Year: 2014
Organizer: "Department of Air Quality Protection & Noise Control"

Project Title: "2017 Annual Hualien County Fugitive pollution source Control Plan"
Project Subject: "An excerpt of the report of the “2017 Annual Hualien County Fugitive pollution source Control Plan”
Project Year: 2017
Organizer: "Environmental Protection Bureau, Hualien County"

Project Title: "Air Quality Purification Zone and Indoor Air Quality Maintenance Plan 2016"
Project Subject: "The period of this project was from June 07, 2016 to June 06, 2017. The main jobs in this project w
Project Year: 2016
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: "Hsinchu City, 106 construction project pollution control plan"
Project Subject: "Hsinchu City, 106 Hsinchu City, the construction of pollution control program final report writing
Project Year: 2017
Organizer: "Bureau of Environmental Protection Hsin-Chu"

行政院環境保護署 的其他資料集

環境用藥查核次(件)數

每年更新更新,221

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:36

行政院環境保護署

環評主管機關受理審查之因應對策

每2月更新,47

黃先生 | 02-23117722#2748 | 2023-08-05 01:01:17

行政院環境保護署

歷年毒性化學物質環境流布調查成果手冊

每年更新更新,44

陳小姐 | 23257399#55337 | 2022-01-14 01:22:52

行政院環境保護署

六輕相關計畫環評監督委員會會議紀錄

每季更新更新,60

陳先生 | 04-22521718#51207 | 2022-01-14 01:21:58

行政院環境保護署

大甲媽祖遶境即時空品監測成果(感測器#2)

不定期更新更新,339

陳先生 | 02-2311-7722#2341 | 2022-01-14 01:02:35

行政院環境保護署

飲用水設備維護管理稽查成果

不定期更新更新,262

黃先生 | 02-23117722-2881 | 2022-01-15 01:10:29

行政院環境保護署

固定污染源戴奧辛、重金屬(鉛、鎘、汞)及氯化氫排放檢測資料

每季更新更新,290

江先生 | 02-23117722#6201 | 2022-01-15 01:12:33

行政院環境保護署

0800資源回收免費專線-一般件問題查詢活動統計

每年更新更新,58

莊先生 | 02-23705888#3108 | 2022-01-14 01:24:29

行政院環境保護署

重點事業廢棄物-生物醫療廢棄物之處理方式

每月更新更新,181

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:07

行政院環境保護署

環境噪音監測站位置圖

不定期更新更新,60

林先生 | 02-23712121#6403 | 2022-01-15 01:16:29

行政院環境保護署

區域性地下水水質測站位置圖

不定期更新更新,61

陳先生 | 02-2311-7722#2386 | 2023-08-07 01:04:32

行政院環境保護署

環境教育活動數

每季更新更新,67

李小姐 | 02-23117722#2724 | 2022-01-15 01:10:44

行政院環境保護署

環保標章驗證機構資料

每1月更新,49

盧小姐 | 02-23117722#2943 | 2023-07-28 11:36:20

行政院環境保護署

毒化物運作紀錄申報總量

每6月更新,179

許先生 | 02-23257399#55328 | 2023-07-27 01:03:31

行政院環境保護署

行政院環境保護署公害糾紛督導處理小組組織規程

不定期更新更新,61

陳小姐 | (02)2311-7722分機2932 | 2023-07-30 01:02:08

行政院環境保護署

環境影響評估報告書附表五:空氣

每2月更新,92

黃先生 | 02-23117722#2748 | 2023-08-06 01:03:58

行政院環境保護署

園區之興建或擴建類別環境影響說明書

每2月更新,51

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:23

行政院環境保護署

水污染源許可及申報資料

每半年更新更新,118

陳先生 | 02-2311-7722#2827 | 2022-01-15 01:12:30

行政院環境保護署

環境影響說明書專案小組初審會議紀錄

不定期更新更新,67

劉先生 | 02-2311-7722#2743 | 2022-01-15 01:12:35

行政院環境保護署

環保標章規格標準

每季更新更新,115

陳先生 | 02-23117722#2936 | 2022-01-14 01:16:50

行政院環境保護署

科技計畫清單

每1年更新,58

賀先生 | 23117722#2981 | 2023-08-09 01:04:27

行政院環境保護署

縣市(彰化縣)小時值-每小時

每1時更新,203

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:50

行政院環境保護署

公民營廢棄物乙級處理機構許可資料

每1月更新,153

盧小姐 | 02-2311-7722#2651 | 2023-07-28 11:35:17

行政院環境保護署

縣市(臺中市)小時值-每小時

每1時更新,220

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:50

行政院環境保護署

Environmental Policy Monthly

不更新更新,230

楊先生 | (02)23117722#2217,(02)23117722#2216 | 2022-01-15 01:13:03

行政院環境保護署

環保標章旅館環境即時通地圖資料

每日更新更新,64

呂小姐 | 02-23117722#2929 | 2022-01-14 01:18:02

行政院環境保護署

花蓮縣重要環保統計資料

每1月更新,162

顏先生 | 02-23117722#2109 | 2023-08-07 01:00:00

行政院環境保護署

補助地方設置巨大廢棄物回收再利用廠一覽

不定期更新更新,50

林小姐 | 04-22521718#53511 | 2023-08-07 00:59:54

行政院環境保護署

環境教育申報單位之有效護照開通率

每3月更新,71

李小姐 | 02-23117722#2724 | 2023-07-27 01:02:54

行政院環境保護署

空氣品質小時值_新竹縣_竹東站

每1時更新,373

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:04

行政院環境保護署