"The 2017 Project of VOC inspection in offshore industrial zones, Yunlin County"
「"The 2017 Project of VOC inspection in offshore industrial zones, Yunlin County"」於資料集「EPQSummary_Air」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:50。 欄位Project Title的內容是"The 2017 Project of VOC inspection in offshore industrial zones, Yunlin County" , 欄位Project Subject的內容是"The major work item of the plan is the project control of volatile organic compounds in the islands district industrial zone of this County. It is needed to supervise the pollutant emissions of volatile organic compounds in the islands district industrial zone, conduct VOC sources of pollution inspections, examinations and follow-up control operations to enhance VOCs checks and the effectiveness in reducing emissions in the islands district industrial zone of this County, thereby maintaining this County’s air quality and reducing the impact on public health.The total amount of work provided herein was completed in accordance with the provisions of the contract. The main results are summarized as follows:(1) To keep up with reduction in recycling, the number of day use was 121 in 2017. Each factory had reduced the number of day use in the exhaust gas flaring tower, and no factory reached 30 days.(2) Checking the pipelines AA01 and AA02 of Nan Ya Haifeng General Plant (Isononyl alcohol) and A001 of Chang Chun Petrochemical Plant, we found that the head fire was extinguished and reported it to the Environmental Protection Bureau for disposition accordingly.(3) It was found in the VOC process check that the exhaust gas treatment capacity of the other scrubbing and absorption towers (AB02, AB03) of the M02 process control equipment at Haifeng Plant (Synthetic Phenol) of Formosa Chemicals & Fiber Corporation was lower than the approved operating range; the exhaust gas treatment capacity of the Nanya Haifeng Plant (MA)M06 process scrubber (AF04) and some phenomena that the ammonia gas charging rates of SCR (AF02) were lower than those permitted by the approved operating range occurred as well. All operators should be demanded to revise the operating range of pollution source equipment in the license. (4) As to the check of the conformity of the internal floating roof tanks, it was found and confirmed that the internal floating roof tank (T206, T208) controlled in the Mailiao Plant 3 (OL-3) of Formosa Petrochemical Corporation had not notified the local competent authority 30 days before the implementation of the tank inspection, and has been submitted to the Environmental Protection Bureau for disposition, of which the detected date in the fourth quarter of 2017 was October 3, 2017. The implementation reported date of the storage tank inspection was September 26, 2017. (5) For the check of the compliance of the external floating roof tank regulations and infrared leak detection, the TRJ1 storage tank in the Naphtha Cracking Mailiao Plant 1 of Formosa Petrochemical Corporation was found to have a measurement result of 50,123.96 ppm; the TR16 storage tank’s measurement result was 8,797.63 ppm, which was submitted to the Environmental Protection Bureau for disposition.(6) In respect of the review of tank clearance report and verification at the trenching site, the reports on the gas reduction operation of the TL10 storage tanks in the Mailiao Plant of Formosa Chemicals & Fiber Corporation (SM1, 2) were not reported to the local supervisors within 15 days after completion of the operation. The agency has submitted the report to the Environmental Protection Bureau.(7) It was found when checking the component repair time of the official retest that, in the manufacturing process at Naphtha Cracking Mailiao Plant 1 of Formosa Petrochemical Corporation (M15), 2 quarterly control components were not repaired within 15 days after the discovery nor were the repair data submitted for extension within 20 days, in the third quarter 2016. It has been reported to the Environmental Protection Bureau.(8) In the GasFindIR screening of equipment components, we found the leakage source (>10,000ppm) at Line 1 above the sampling point in the Mailiao Vinyl Chloride Plant (M11) of Formosa Plastic Group, and it was then reported to the Envi..." , 欄位Project Year的內容是2017 , 欄位Organizer的內容是"Environmental Protection Bureau Yunlin County" , 欄位Executive Unit的內容是"台灣曼寧工程顧問股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=190719 , 欄位Publish Date的內容是20190201 。
Project Title
"The 2017 Project of VOC inspection in offshore industrial zones, Yunlin County"
Project Subject
"The major work item of the plan is the project control of volatile organic compounds in the islands district industrial zone of this County. It is needed to supervise the pollutant emissions of volatile organic compounds in the islands district industrial zone, conduct VOC sources of pollution inspections, examinations and follow-up control operations to enhance VOCs checks and the effectiveness in reducing emissions in the islands district industrial zone of this County, thereby maintaining this County’s air quality and reducing the impact on public health.The total amount of work provided herein was completed in accordance with the provisions of the contract. The main results are summarized as follows:(1) To keep up with reduction in recycling, the number of day use was 121 in 2017. Each factory had reduced the number of day use in the exhaust gas flaring tower, and no factory reached 30 days.(2) Checking the pipelines AA01 and AA02 of Nan Ya Haifeng General Plant (Isononyl alcohol) and A001 of Chang Chun Petrochemical Plant, we found that the head fire was extinguished and reported it to the Environmental Protection Bureau for disposition accordingly.(3) It was found in the VOC process check that the exhaust gas treatment capacity of the other scrubbing and absorption towers (AB02, AB03) of the M02 process control equipment at Haifeng Plant (Synthetic Phenol) of Formosa Chemicals & Fiber Corporation was lower than the approved operating range; the exhaust gas treatment capacity of the Nanya Haifeng Plant (MA)M06 process scrubber (AF04) and some phenomena that the ammonia gas charging rates of SCR (AF02) were lower than those permitted by the approved operating range occurred as well. All operators should be demanded to revise the operating range of pollution source equipment in the license. (4) As to the check of the conformity of the internal floating roof tanks, it was found and confirmed that the internal floating roof tank (T206, T208) controlled in the Mailiao Plant 3 (OL-3) of Formosa Petrochemical Corporation had not notified the local competent authority 30 days before the implementation of the tank inspection, and has been submitted to the Environmental Protection Bureau for disposition, of which the detected date in the fourth quarter of 2017 was October 3, 2017. The implementation reported date of the storage tank inspection was September 26, 2017. (5) For the check of the compliance of the external floating roof tank regulations and infrared leak detection, the TRJ1 storage tank in the Naphtha Cracking Mailiao Plant 1 of Formosa Petrochemical Corporation was found to have a measurement result of 50,123.96 ppm; the TR16 storage tank’s measurement result was 8,797.63 ppm, which was submitted to the Environmental Protection Bureau for disposition.(6) In respect of the review of tank clearance report and verification at the trenching site, the reports on the gas reduction operation of the TL10 storage tanks in the Mailiao Plant of Formosa Chemicals & Fiber Corporation (SM1, 2) were not reported to the local supervisors within 15 days after completion of the operation. The agency has submitted the report to the Environmental Protection Bureau.(7) It was found when checking the component repair time of the official retest that, in the manufacturing process at Naphtha Cracking Mailiao Plant 1 of Formosa Petrochemical Corporation (M15), 2 quarterly control components were not repaired within 15 days after the discovery nor were the repair data submitted for extension within 20 days, in the third quarter 2016. It has been reported to the Environmental Protection Bureau.(8) In the GasFindIR screening of equipment components, we found the leakage source (>10,000ppm) at Line 1 above the sampling point in the Mailiao Vinyl Chloride Plant (M11) of Formosa Plastic Group, and it was then reported to the Envi..."
Project Year
2017
Organizer
"Environmental Protection Bureau Yunlin County"
Executive Unit
"台灣曼寧工程顧問股份有限公司"
Reporting download URL
Publish Date
20190201
「"The 2017 Project of VOC inspection in offshore industrial zones, Yunlin County"」所屬的資料集:「EPQSummary_Air」的其他資料
Project Title:
"2017 Tainan Low-Carbon and Sustainable Homeland Operations and Achievement Evaluation Project"
Project Subject:
"1.Promoting Low Carbon and Sustainable Homeland Ranking EvaluationIn order to comply with the curre
Project Year:
2017
Organizer:
"Environmental Protection Bureau of Tainan City"
Project Title:
"Local Government Greenhouse Gases Inventory and Reduction Consultancy Project"
Project Subject:
"This project has comprehensively reviewed the recent development of global city networks and concen
Project Year:
2015
Organizer:
"Solution integration office"
Project Title:
"2016 Hsinchu County Volatile Organic Substance Audit Control Plan"
Project Subject:
"The area of this County is 1,427.59 square kilometers and the population was 546,934 at the end of
Project Year:
2016
Organizer:
"HsinChu County Environment Protection Bureau"
Project Title:
"Assessment of Greenhouse Gas Management Strategies in Transportation Sector"
Project Subject:
"Our government announced the Greenhouse Gas Reduction and Management Act (hereafter the “GHG Act”)
Project Year:
2018
Organizer:
"Department of Environmental Sanitation & Toxic Substance Management"
Project Title:
"2014~2015 Inspection and Management Plan of Vehicles Emission Inspection Station"
Project Subject:
" "
Project Year:
2014
Organizer:
"Environmental Protection Bureau Kauhsiung City Government"
Project Title:
"2017 Air Quality Monitoring Information System Expansion and Maintenance Plan"
Project Subject:
"The main work of this project is including integrated of the air quality monitoring information pla
Project Year:
2017
Organizer:
"Department of Environmental Monitoring & Information Management"
Project Title:
"Tainan City Project for Intensified Dust Washing and Street Sweeping in Tainan City Project for Int
Project Subject:
"1.Street sweeping and washing118,952.9km of street washing by machine were performed during the pro
Project Year:
2011
Organizer:
"Environmental Protection Bureau of Tainan City"
Project Title:
" Taitung County, the old diesel car removal and installation of soot filter subsidies review progra
Project Subject:
"In order to solve the pollution caused by the mobile pollution source, the plan is to eliminate the
Project Year:
2017
Organizer:
"Taitung County Environment Protection Bureau"
Project Title:
"The Integration Plan of Air Quality to Manintain, Inprove, and Strain"
Project Subject:
""
Project Year:
2015
Organizer:
"Taoyuan County Government Environment Protection Bureau"
Project Title:
"High pollutant vehicle control manager and replace old-motocycle by subsidy, 2014."
Project Subject:
"The project was executed from April 1 to December 31, 2014. The completed rate of this project was
Project Year:
2015
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"Chiayi City promoted the indoor air quality maintenance and management program(2017)"
Project Subject:
"The project has been proposed indoor air quality strategies for assisting the Environmental Protect
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Control of pollutions during constructions in Pingtung county-Year 2017"
Project Subject:
"Pintung county is well-known for its width and beautiful scenery, which bring lots of tourists and
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"The Indoor Air Quality Audit & Control Program of Changhua County 2016"
Project Subject:
"The Indoor Air Quality Management Act was officially passed on November 23, 2011. Since then, the
Project Year:
2016
Organizer:
"Environmental Protection Bureau Changhua County"
Project Title:
""
Project Subject:
"The sources of fugitive particulate emissions in Chiayi city come mostly from constructions. Additi
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Air Quality Maintenance and Integrated Management Plan in 2016."
Project Subject:
"In order to continue to achieve the goal of improving air quality, the “Yunlin County Air Quality M
Project Year:
2016
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Restaurant catering air pollution control and consultation Plan at Pingtung County -Final Report"
Project Subject:
"AAA"
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"New Taipei City Government Environmental Protection Bureau Project Achievements Summary "
Project Subject:
"According to the 2011 demographic statistics of New Taipei City, the population of New Taipei City
Project Year:
2011
Organizer:
"Environmental Protection Bureau, Taipei County"
Project Title:
"Implement of the new model motorcycle certification, C.O.P inspection, the in-used motorcycle recal
Project Subject:
"The project’s main work contents for this year could be divided into four parts: the first is to im
Project Year:
2016
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"Quality Assurance Program for Taiwan Ambient Air Monitoring Network"
Project Subject:
"This project was conducted from May 31th 2016 to May 30th 2015. The main objective of this project
Project Year:
2016
Organizer:
"Department of Environmental Monitoring & Information Management"
Project Title:
"Chiayi City Yisan pollution source inspection control plan"
Project Subject:
"The sources of fugitive particulate emissions in Chiayi city come mostly from constructions. Additi
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Inventory, management and evaluation of air quality purification area, and demonstration of green w
Project Subject:
"Air pollution control is an important part of environmental protection for all mankind, the control
Project Year:
2018
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"The project of volatile organic compounds inspect and management in 2014 and 2015"
Project Subject:
"This project had been implemented on the focus and efforts of applying control measurement since 20
Project Year:
2014
Organizer:
"Environmental Protection Bureau Kauhsiung City Government"
Project Title:
"The project of CEMS installation guidance and enhancement study for the stationary sources"
Project Subject:
"Stationary sources of air pollutants CEMS (Continuous Emission Monitoring System, referred to CEMS)
Project Year:
2015
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
"Volatile organic compounds inspection and control program, Hsinchu City, 2017 "
Project Subject:
"This program is administered the Volatile Organic Compounds(VOCs) emission of stationary emission s
Project Year:
2017
Organizer:
"Bureau of Environmental Protection Hsin-Chu"
Project Title:
"Hazardous substance monitoring and pollution investigation plan in Pingtung County industrial area"
Project Subject:
"The work schedule of this project has been from April 15, 2006 to February 14, 2007.
The implementa
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"The project of stationary sources of air pollution permission and management in 2014 and 2015"
Project Subject:
"“The“ 2014-2015 Stationary Source Permitting and Management Plan (SSPMP)” of Kaohsiung City was exe
Project Year:
2015
Organizer:
"Environmental Protection Bureau Kauhsiung City Government"
Project Title:
"The project catering trade investigate and maintenance management of clean airzones in 2016."
Project Subject:
"The implemented work content of this project included jobs related to Maintenance and management of
Project Year:
2016
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"The project of management for stationary sources permit system and check the receivable of air poll
Project Subject:
"This is a continuity administration control project that was executed in the following 3 part. The
Project Year:
2017
Organizer:
"Taoyuan County Government Environment Protection Bureau"
Project Title:
""
Project Subject:
"The implementation period of the Air Quality Control Plan was from February 19th, 2013 to December
Project Year:
2013
Organizer:
"Environmental Protection Bureau, Kinmen County"
Project Title:
"Evaluate and Control the Total Quantity of Mobile Emission and Survey the Implement Results of City
Project Subject:
" This project has accomplished: estimation and verification of the 2014-2015 mobile source emission
Project Year:
2015
Organizer:
"Department of Air Quality Protection & Noise Control"
行政院環境保護署 的其他資料集
病媒防治業許可執照資料
每3月更新,155薛先生 | 02-2325-7399#55413 | 2023-07-27 01:02:57
行政院環境保護署縣市(南投縣)小時值-每小時
每1時更新,299陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:49
行政院環境保護署行政院環境保護署環境保護基金附屬單位法定預算
每1年更新,55郭小姐 | 02-2311-7722#2164 | 2023-08-09 01:05:43
行政院環境保護署巡守隊明細資料
不定期更新更新,256謝小姐 | 02-2311-7722#2836 | 2022-01-15 01:12:07
行政院環境保護署建檔公廁明細-連江縣
不定期更新更新,154賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:02
行政院環境保護署
噪音陳情管道
不定期更新更新,54王先生 | 02-23712121#6401 | 2022-01-14 01:18:43
行政院環境保護署建檔公廁明細-宜蘭縣
不定期更新更新,220賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:08
行政院環境保護署一般民眾環境教育終身學習護照註冊及開通人數
每季更新更新,93李小姐 | 02-23117722#2724 | 2022-01-15 01:10:43
行政院環境保護署空氣品質監測站基本資料
不定期更新更新,174陳先生 | 02-2311-7722#2386 | 2023-08-07 01:01:47
行政院環境保護署空氣品質小時值_高雄市_美濃站
每1時更新,180陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:44
行政院環境保護署
貨品通關事前聲明確認作業指引折頁
不定期更新,51金先生 | 23257399#55315 | 2022-01-14 01:22:21
行政院環境保護署區域性地下水水質監測井基本資料
不定期更新更新,140謝小姐 | 02-23117722#2386 | 2022-01-14 01:23:17
行政院環境保護署特殊性工業區品保品管後監測值資料檔(一般空氣污染物)
每年更新更新,199丁小姐 | 02-2371-2121#6101 | 2022-01-15 01:06:51
行政院環境保護署列管公廁個數
每年更新更新,221謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:36
行政院環境保護署EPQSummary_ChemicalSubstanceManagement
不定期更新更新,272陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:48
行政院環境保護署
土壤污染管制區範圍圖
不定期更新更新,49賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:16:35
行政院環境保護署環境檢驗測定機構許可資料
每1月更新,222楊先生 | (03)491-5818轉2103 | 2023-07-27 01:01:42
行政院環境保護署二仁溪污染整治小組及再生願景聯繫會報
不定期更新,41黃先生 | 02-2311-7722#2508 | 2022-01-15 01:12:47
行政院環境保護署行政院環境保護署「資料開放諮詢小組」會議資料
不定期更新更新,66林小姐 | 02-2311-7722#2365 | 2022-01-15 01:10:05
行政院環境保護署焚化廠底渣原始檢測資料
每1月更新,308莊先生 | 04-22521718#53523 | 2023-08-07 01:02:33
行政院環境保護署
環境影響評估個案監督次數
每年更新更新,104謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:25
行政院環境保護署空氣品質小時值_高雄市_林園站
每1時更新,143陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:41
行政院環境保護署核能四廠環境監測資料
不定期更新更新,47陳先生 | 04-22521718#51207 | 2022-01-14 01:22:00
行政院環境保護署重金屬污染農地管理及改善技術評析計畫
每6月更新,350黃先生 | 02-23832389#8204 | 2023-07-30 01:01:14
行政院環境保護署毒化物運作紀錄申報總量
每6月更新,199許先生 | 02-23257399#55328 | 2023-07-27 01:03:31
行政院環境保護署
道路之開發類別環境影響說明書
每2月更新,115黃先生 | 02-23117722#2748 | 2023-08-05 01:01:14
行政院環境保護署公害陳情年度統計分析報告
每3月更新,58許小姐 | 04-22521718#58709 | 2023-08-09 01:04:44
行政院環境保護署列管毒性化學物質已取得許可業者查核家次
每年更新更新,205謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:54
行政院環境保護署水肥清運處理狀況
每1月更新,170余小姐 | 04-22521718#53508 | 2023-08-07 01:02:10
行政院環境保護署全國一般廢棄物處理量
每月更新更新,134謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:11
行政院環境保護署