"Supervised planning of Processing, Disposal and Subsequent Usin
「"Supervised planning of Processing, Disposal and Subsequent Usin」於資料集「EPQSummary_WasteManagement」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:53。 欄位Project Title的內容是"Supervised planning of Processing, Disposal and Subsequent Using of the General Waste in 2019." , 欄位Project Subject的內容是"This project contains four main tasks:1.monitor and supervise the quality of reusing recycled aggregates which transported in Yunlin by inspecting it through Toxicity Characteristic Leaching Procedure (TCLP). 2.monitor and supervise the pollution caused by recycled aggregates by testing methods for soil and water quality. 3.arrange and manage the quantity used of recycled aggregates in Yunlin. 4.promote the usage of recycled aggregates in public construction in Yunlin.The implementation progress and results of each work plan are described below.1.The quality testing of incinerated recycled aggregates (using the toxic dissolution procedure,TCLP) has been carried out 48 times, and the current test results have not exceeded the standards set by the Environmental Protection Agency.2.The monitoring of soil and groundwater at the place where the incinerated recycled aggregates are used has reached 23 points. At present, the measured values of soil testing have not exceeded the standards established by the Environmental Protection Agency; and the measured values of groundwater sampling have been compared within the county The water quality monitoring results of the regional groundwater monitoring wells can be presumed that the results of the project's groundwater monitoring ammonia nitrogen, iron and manganese projects are related to the local regional water quality.3.The accumulated amoumt of recycled aggregates which need to be transferred back is approximately 109,000 metric tons, the amount of temporary resumption at each temporary location is about 5 thousand metric tons, and the cumulative usage over the years is about 102,000 metric tons.4. In order to establish the system and regulations related to recycled aggregates in Yunlin County, in May and June, the key points for the use of recycled aggregates by various agencies under the Yunlin County Government and the promotion of deforestation in Yunlin County were established. Reward points for the use of incinerated aggregates; in May and August, the public project of incinerated recycled pellets in Yunlin County was conducted to communicate and coordinate with various bureaus. In addition, a briefing session was held in October to explain to the representatives of the engineering units at all levels in the county the various applications and specifications for using recycled aggregates." , 欄位Project Year的內容是2019 , 欄位Organizer的內容是"Environmental Protection Bureau Yunlin County" , 欄位Executive Unit的內容是"尚竑工程顧問有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=225367 , 欄位Publish Date的內容是20231231 。
Project Title
"Supervised planning of Processing, Disposal and Subsequent Using of the General Waste in 2019."
Project Subject
"This project contains four main tasks:1.monitor and supervise the quality of reusing recycled aggregates which transported in Yunlin by inspecting it through Toxicity Characteristic Leaching Procedure (TCLP). 2.monitor and supervise the pollution caused by recycled aggregates by testing methods for soil and water quality. 3.arrange and manage the quantity used of recycled aggregates in Yunlin. 4.promote the usage of recycled aggregates in public construction in Yunlin.The implementation progress and results of each work plan are described below.1.The quality testing of incinerated recycled aggregates (using the toxic dissolution procedure,TCLP) has been carried out 48 times, and the current test results have not exceeded the standards set by the Environmental Protection Agency.2.The monitoring of soil and groundwater at the place where the incinerated recycled aggregates are used has reached 23 points. At present, the measured values of soil testing have not exceeded the standards established by the Environmental Protection Agency; and the measured values of groundwater sampling have been compared within the county The water quality monitoring results of the regional groundwater monitoring wells can be presumed that the results of the project's groundwater monitoring ammonia nitrogen, iron and manganese projects are related to the local regional water quality.3.The accumulated amoumt of recycled aggregates which need to be transferred back is approximately 109,000 metric tons, the amount of temporary resumption at each temporary location is about 5 thousand metric tons, and the cumulative usage over the years is about 102,000 metric tons.4. In order to establish the system and regulations related to recycled aggregates in Yunlin County, in May and June, the key points for the use of recycled aggregates by various agencies under the Yunlin County Government and the promotion of deforestation in Yunlin County were established. Reward points for the use of incinerated aggregates; in May and August, the public project of incinerated recycled pellets in Yunlin County was conducted to communicate and coordinate with various bureaus. In addition, a briefing session was held in October to explain to the representatives of the engineering units at all levels in the county the various applications and specifications for using recycled aggregates."
Project Year
2019
Organizer
"Environmental Protection Bureau Yunlin County"
Executive Unit
"尚竑工程顧問有限公司"
Reporting download URL
Publish Date
20231231
「"Supervised planning of Processing, Disposal and Subsequent Usin」所屬的資料集:「EPQSummary_WasteManagement」的其他資料
Project Title:
"Promotion Project of Glass Container Recycle and Reward Program"
Project Subject:
"Since the announcement of waste glass container recycling in 1997, the recycling rate had risen con
Project Year:
2014
Organizer:
"Recycling Fund Management Board"
Project Title:
"Maintenance and Application of Industrial Waste Management Information System of 2020"
Project Subject:
"This project assisted the Environmental Protection Administration in promoting activities concernin
Project Year:
2020
Organizer:
"Department of Waste Management"
Project Title:
"0800-085717 toll-free resource recycling service hotline project"
Project Subject:
"In 1998, the Recycling Fund Management Board of EPA established a hotline, “National Recycle Servic
Project Year:
2018
Organizer:
"Recycling Fund Management Board"
Project Title:
"Agricultural and medical waste disposal management project"
Project Subject:
"This project assists the Environmental Protection Agency in conducting surveys and counselling visi
Project Year:
2021
Organizer:
"Department of Waste Management"
Project Title:
"Study on Waste Solvent Recovery and Circular Economy Project"
Project Subject:
"This plan evaluates the goals and strategies of the United Nations Sustainable Development Goals, t
Project Year:
2019
Organizer:
"Department of Waste Management"
Project Title:
"2016 Project of Auditing and Certification System Enhancement for Regulated Recyclable Waste and Su
Project Subject:
"This year’s Project incorporates: “Research and strengthen the auditing and certification system”;
Project Year:
2016
Organizer:
"Recycling Fund Management Board"
Project Title:
"Project of feasibility study for the reuse of rubber with co-firing ash in cement raw materials"
Project Subject:
"Through gathering information from the source of scrap tire, co-firing ash, reuse declaration of ce
Project Year:
2017
Organizer:
"Department of Waste Management"
Project Title:
"Construction Waste Management Project"
Project Subject:
"Construction waste is a kind of stable and harmless resource, and it’s also the main promotion item
Project Year:
2020
Organizer:
"Department of Waste Management"
Project Title:
"2016 Taipei City Project of Recycling Appearance Trasformation and Property Management"
Project Subject:
"2016 Taipei City Project of Recycling Appearance Trasformation and Property Management"
Project Year:
2016
Organizer:
"Department of Environmental Protection, Taipei City Government"
Project Title:
"Upgrade PU waste by hydrothermal carbonization to value-added products"
Project Subject:
"In this project, we used hydrothermal method instead of traditional pyrolysis to transform rigid PU
Project Year:
2020
Organizer:
"Recycling Fund Management Board"
Project Title:
"2016 Promoting Program of Resource Recycling"
Project Subject:
"From the day immediately following the tender decision day, i.e.May 11th, 2016, to October 20th, 20
Project Year:
2016
Organizer:
"Environmental Protection Bureau Kauhsiung City Government"
Project Title:
"A Program for Developing and Promoting Recycling Technologies of LCD Panels"
Project Subject:
"LCDs have replaced CRTs as the main display devices recently. To satisfy the increasing demands, bi
Project Year:
2014
Organizer:
"Recycling Fund Management Board"
Project Title:
"The Industrial Wastes Database Management and Flow Control Administration Project"
Project Subject:
"The Environmental Protection Administration Industrial Wastes Management Center was established for
Project Year:
2004
Organizer:
"Department of Waste Management"
Project Title:
"Toll-free consulting service of industrial waste and maintenance plane of technology equipments"
Project Subject:
"The objective of this project, in industrial waste control centers to assist the EPA in response to
Project Year:
2015
Organizer:
"Department of Waste Management"
Project Title:
"Project of Auditing & Certification Group on Regulated Recyclable Waste (Waste Lead-Acid Batteries
Project Subject:
"For the auditing and certification of waste lead batteries recycling facilities, the main tasks inc
Project Year:
2015
Organizer:
"Recycling Fund Management Board"
Project Title:
"2018 Project Work Plan of the Supervision and Management of Auditing and Certifying Recyclable Wast
Project Subject:
"This year’s project includes “collecting the overseas operation systems of auditing and certificati
Project Year:
2018
Organizer:
"Recycling Fund Management Board"
Project Title:
"2015 Project of Supervision on Auditing and Certification Groups and the Improvement of Auditing an
Project Subject:
"This year’s Project was divided into five parts: 1) reinforcement of the auditing and certification
Project Year:
2015
Organizer:
"Recycling Fund Management Board"
Project Title:
"Resourcelization technology of spent lithium batteries for the production of environmental catalyst
Project Subject:
"This project aimed to study the recycling and reuse of spent lithium-cobalt battery and lithium-iro
Project Year:
2014
Organizer:
"Recycling Fund Management Board"
Project Title:
"Project of Auditing & Certification Group on Regulated Recyclable Waste (Waste Leads-Acid Batteries
Project Subject:
"For the auditing and certification of waste lead batteries recycling facilities, the main tasks inc
Project Year:
2017
Organizer:
"Recycling Fund Management Board"
Project Title:
"Reviewing the application of incentive on waste vehicles recycle project."
Project Subject:
"The government has taken action to reduce the environmental problems that result from improper hand
Project Year:
2020
Organizer:
"Recycling Fund Management Board"
"no"2013"no"
Project Title:
"no"
Project Subject:
"no"
Project Year:
2013
Organizer:
"Nantou County Environmental Protection Bureau"
Project Title:
"2016 Yunlin County Rural “Recycling” Era Resource Recycle Harvest Project"
Project Subject:
" The period of execution of this plan was from July 2 to November 30, 2016, in the main purpose of
Project Year:
2016
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"The planning and promoting project for over-packaging of products and heavy metal source reduction
Project Subject:
"The implementation period of this project is from April 22 to December 31, 2019. Relevant results i
Project Year:
2019
Organizer:
"Department of Waste Management"
Project Title:
"Investigation on Unregistered Responsible Enterprises of Lamps and Batteries in 2015 and 2016"
Project Subject:
"We investigated and tutored suspected unregistered responsible enterprises for lamps and batteries
Project Year:
2016
Organizer:
"Recycling Fund Management Board"
Project Title:
"The Internet Promotional Activities of Recycling in 2017"
Project Subject:
"The Internet Promotional Activities of Recycling in 2017"
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"The auditing and certification project of the regulated recyclable waste (Waste Vehicles)"
Project Subject:
"The performed results of the Project conducted by FTIS during the project period, January 01, 2019
Project Year:
2019
Organizer:
"Recycling Fund Management Board"
Project Title:
"euse of waste tire as green membrane (The second year)"
Project Subject:
"Nowadays, more than 100 thousand waste tires are generated annually in Taiwan. This causes two majo
Project Year:
2015
Organizer:
"Recycling Fund Management Board"
Project Title:
"Glycolysis of waste refrigerator PUR for foam product application"
Project Subject:
"Each year about 6,000 tonnes of rigid polyurethane (PUR) is disposed of due to the dismantling of w
Project Year:
2021
Organizer:
"Recycling Fund Management Board"
Project Title:
"A Strategy and Analysis of E-waste in Taiwan"
Project Subject:
"This Project is to investigate existing status of the E-waste recycling market mechanisms and resou
Project Year:
2016
Organizer:
"Department of Waste Management"
Project Title:
"The Project of Evaluation and Analysis of Sustainable Development for Waste Treatment Facilities in
Project Subject:
"Based on the specific nature of waste disposal in the offshore islets (including Penghu County, Kin
Project Year:
2015
Organizer:
"Bureau of Environmental Inspection"
行政院環境保護署 的其他資料集
行政院環境保護署補助地方政府自行車道路線資料
不定期更新更新,51詹小姐 | 02-23117722#6401 | 2023-08-09 01:05:50
行政院環境保護署國家溫室氣體排放清冊報告
每年更新更新,54張先生 | 02-23117722#2796 | 2022-01-15 01:15:49
行政院環境保護署屏東縣水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,47許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:51
行政院環境保護署環訓所年度年報彙編
每年更新更新,49湯小姐 | 03-4020789#544 | 2022-01-15 01:10:11
行政院環境保護署焚化爐煙囪位置圖
不定期更新更新,55張小姐 | 02-23712121#5907 | 2023-07-27 01:06:06
行政院環境保護署
空氣品質小時值_新北市_富貴角站
每1時更新,127陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:11
行政院環境保護署環保署官等學歷統計資料
每3月更新,36嚴小姐 | 02-23117722分機2133 | 2023-07-30 01:02:11
行政院環境保護署噪音陳情案件數(依音源)
不定期更新更新,50謝先生 | 02-23712121-6403 | 2023-07-27 01:03:47
行政院環境保護署歷年環保署農地_全國重金屬污染潛勢之管制及調查計畫
不定期更新更新,96謝先生 | (02)23832389*8302 | 2022-01-14 01:20:23
行政院環境保護署垃圾處理場(廠)座數
每1年更新,165顏先生 | 02-23117722#2109 | 2023-07-27 01:00:41
行政院環境保護署
水污染防治各項許可申請收費標準
不定期更新更新,39王先生 | 02-2311-7722#2832 | 2022-01-14 01:23:05
行政院環境保護署空氣品質小時值_臺中市_大里站
每1時更新,123陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:59
行政院環境保護署公害陳情年度統計分析報告
每3月更新,47許小姐 | 04-22521718#58709 | 2023-08-09 01:04:44
行政院環境保護署細懸浮微粒資料(PM2.5)
每1時更新,95陳先生 | 02-2311-7722#2386 | 2023-08-08 00:58:48
行政院環境保護署臺中雲林農地作物含重金屬鎘污染成因調查及查證計畫
不更新更新,45吳小姐 | 02-2383-2389#8303 | 2022-01-15 01:12:21
行政院環境保護署
違規公司與產品消息資料
每1月更新,78盧小姐 | 02-23117722#2943 | 2023-07-27 01:03:54
行政院環境保護署行政院環境保護署環境保護人員訓練所單位決算
每1年更新,46江先生 | 03-4020789 #583 | 2023-08-09 01:05:48
行政院環境保護署溫室氣體年排放量
每1年更新,147甘先生 | (02)2311-7722#2771 | 2023-08-02 01:02:55
行政院環境保護署環境教育申報單位之有效護照開通率
每3月更新,52李小姐 | 02-23117722#2724 | 2023-07-27 01:02:54
行政院環境保護署經過水庫集水區之環境影響說明書件
每2月更新,71黃先生 | 02-23117722#2748 | 2023-08-05 01:01:03
行政院環境保護署
空氣品質小時值_高雄市_小港站
每1時更新,189陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:37
行政院環境保護署土壤污染管制區範圍圖
不定期更新更新,36賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:16:35
行政院環境保護署斯德哥爾摩公約出國報告
每年更新更新,41劉小姐 | 23257399#55531 | 2022-01-15 01:10:07
行政院環境保護署環境教育機構認證資料
每1月更新,41盧小姐 | 03-4020789#606 | 2023-07-27 01:02:47
行政院環境保護署環境影響說明書完成審查件數
每年更新更新,87謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:24
行政院環境保護署
空氣品質小時值_高雄市_仁武站
每小時更新更新,125謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:20
行政院環境保護署EPQSummary_EnvironmentalEducation
不定期更新更新,209郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:14:02
行政院環境保護署應回收廢棄物(廢電子電器及廢資訊物品類)回收量資料
每年更新更新,51廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:38
行政院環境保護署環評監督委員會設置要點
不定期更新更新,43陳先生 | 04-22521718#51207 | 2023-08-09 01:05:13
行政院環境保護署空氣品質小時值_南投縣_竹山站
每1時更新,134陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:28
行政院環境保護署