time1: 0 time2: 0 time3: 0 time4: 0 total: 0 ""2008"The investigation for the first phase in the current fisc
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

""2008"The investigation for the first phase in the current fisc

""2008"The investigation for the first phase in the current fisc」於資料集「EPQSummary_SoilAndGroundwater」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:52。 欄位Project Title的內容是"" , 欄位Project Subject的內容是"The investigation for the first phase in the current fiscal year showed that Zn contents for investigation points of Chunghsing Playing Court Battery Hill (1) and Chunghsing Playing Court Battery Hill (2) are over monitoring basis and control standard for soil contamination, Cu contents for investigation point of Kunchiu waste bomb treatment plant (2) is over soil contamination monitoring basis. Additionally, test value of THP contents for for investigation points of Military Oil Depot (1) nearby Soldier Spirit Power Plant and Peiao Oil Depot are over soil contamination control standard.The investigation for the second phase in the current fiscal year showed that Zn contents for investigation points of Chunghsing Playing Court Battery Hill (1) and Chunghsing Playing Court Battery Hill (2) are over monitoring basis and control standard for soil contamination, Cu contents for investigation point of Chunghsing Playing Court Battery Hill (3) is over soil contamination control standard, and Cr contents of investigation point of Shangtsun United Repair Plant (2) is over soil contamination control standard. TPH contents for investigation points of Military Oil Depot (1), Peiao Oil Depot (2) and Peiao Oil Depot (3) are over soil contamination control standard. Additionally, the investigation result for Fuhsing Oil Depot’s pollution showed that TPH-D value on soil sampling point (S5 test point) is over 35.2 times of control standard. In general, it is proposed the Bureau should keep monitoring pollution and request pollution management to not only block the pollution area with warning belt but also cover or shield with water-proof sheet to avoid the secondary pollution. It is proposed the Bureau should request pollution management to promptly remedy soil contamination before the deadline to decrease pollution without expanding according to Soil and Groundwater Remediation Act" , 欄位Project Year的內容是2008 , 欄位Organizer的內容是"Environmental Protection Bureau, Lienchiang County" , 欄位Executive Unit的內容是"亞新工程顧問股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=92806 , 欄位Publish Date的內容是20150701

Project Title

""

Project Subject

"The investigation for the first phase in the current fiscal year showed that Zn contents for investigation points of Chunghsing Playing Court Battery Hill (1) and Chunghsing Playing Court Battery Hill (2) are over monitoring basis and control standard for soil contamination, Cu contents for investigation point of Kunchiu waste bomb treatment plant (2) is over soil contamination monitoring basis. Additionally, test value of THP contents for for investigation points of Military Oil Depot (1) nearby Soldier Spirit Power Plant and Peiao Oil Depot are over soil contamination control standard.The investigation for the second phase in the current fiscal year showed that Zn contents for investigation points of Chunghsing Playing Court Battery Hill (1) and Chunghsing Playing Court Battery Hill (2) are over monitoring basis and control standard for soil contamination, Cu contents for investigation point of Chunghsing Playing Court Battery Hill (3) is over soil contamination control standard, and Cr contents of investigation point of Shangtsun United Repair Plant (2) is over soil contamination control standard. TPH contents for investigation points of Military Oil Depot (1), Peiao Oil Depot (2) and Peiao Oil Depot (3) are over soil contamination control standard. Additionally, the investigation result for Fuhsing Oil Depot’s pollution showed that TPH-D value on soil sampling point (S5 test point) is over 35.2 times of control standard. In general, it is proposed the Bureau should keep monitoring pollution and request pollution management to not only block the pollution area with warning belt but also cover or shield with water-proof sheet to avoid the secondary pollution. It is proposed the Bureau should request pollution management to promptly remedy soil contamination before the deadline to decrease pollution without expanding according to Soil and Groundwater Remediation Act"

Project Year

2008

Organizer

"Environmental Protection Bureau, Lienchiang County"

Executive Unit

"亞新工程顧問股份有限公司"

Publish Date

20150701

「""2008"The investigation for the first phase in the current fisc」所屬的資料集:「EPQSummary_SoilAndGroundwater」的其他資料

Project Title: "Taichung Agricultural Land Pollution Control Site Proper Measures to Improve Project - Improvement
Project Subject: "The plan is based on EPA announcement for 103 annual Taichung agricultural land in appropriate meas
Project Year: 2016
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: "The project for management system of soil and groundwater health risk assessment 2016"
Project Subject: "The main works of the project include the “establishment and operation of Soil and Groundwater Heal
Project Year: 2016
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Changhua County Agricultural Land Pollution Control Site Appropriate Measure Improvement Plan - Eas
Project Subject: "The program A was to confirm the degree of heavy metal pollution and to take remediation measures o
Project Year: 2017
Organizer: "Environmental Protection Bureau Changhua County"

Project Title: "Potential polluting factory investigation, Maintenance of monitoring well, farmland sites sampled f
Project Subject: "For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contaminat
Project Year: 2015
Organizer: "Environmental Protection Bureau Changhua County"

Project Title: "Soil and Groundwater Pollution in HsinChu Country,2019"
Project Subject: "The total cost of this project is NT $ 9,500,000, and the overall working period ended on December
Project Year: 2019
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The Maintenance, and Performance Improvement Plan for the Soil and Groundwater Pollution Remediatio
Project Subject: "Based on current remediation fee system to help authorities control target list and the continued
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Project of review and adjustment on the soil and groundwater pollution remediation fees systems"
Project Subject: "This project attempts to deliver specific and feasible suggestions for the amendment on the soil an
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Soil and Groundwater Investigation and Verification Project"
Project Subject: "The project mainly implements the monitoring and verification of soil and groundwater pollution inv
Project Year: 2012
Organizer: "Environmental Protection Bureau, Taipei County"

Project Title: "The inspection, consultation and auditing of declaration reports for underground storage tanks proj
Project Subject: "Taiwan EPA has promoted UST investigation and pollution prevention over a decade. In order to integ
Project Year: 2013
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "soil and groundwater"
Project Subject: "1. Monitoring Well Management and Groundwater Investigation 2. Manage the site management 3. Manage
Project Year: 2019
Organizer: "Environmental Protection Bureau, Hualien County"

Project Title: "Project on Source Management for Farmland Contamination"
Project Subject: "Taiwan Environmental Protection Administration (EPA) has conducted investigation of farmlands with
Project Year: 2019
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: ""
Project Subject: "The investigation for the first phase in the current fiscal year showed that Zn contents for invest
Project Year: 2008
Organizer: "Environmental Protection Bureau, Lienchiang County"

Project Title: "2018 Project of investigating and verifying contamination for soil and groundwater in Taipei City"
Project Subject: "In order to prevent soil and groundwater from contamination, the local competent authority must reg
Project Year: 2018
Organizer: "Department of Environmental Protection, Taipei City Government"

Project Title: " Investigation and Verification of Soil and Groundwater Pollution in Taoyuan City in 106 Years"
Project Subject: "The tasks of this project consisted of verification of site remediation, groundwater monitoring wel
Project Year: 2017
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: "Evaluation of effectiveness on Soil and Groundwater Pollution Sites monitoring and Administrative M
Project Subject: "The purpose of this plan is to assess the effectiveness of Soil and Groundwater Pollution Sites Adm
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: ""
Project Subject: "The project was to confirm the degree of heavy metal pollution and to take remediation measures on
Project Year: 2014
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: "Tainan City Soil and Groundwater Contamination Demonstration Project"
Project Subject: "Plan origin, Tainan City Government's Environmental Protection Bureau host international water poll
Project Year: 2016
Organizer: "Environmental Protection Bureau of Tainan City"

Project Title: "Year107 Taoyuan City Soil and Groundwater pollution survey and inverstigation plan"
Project Subject: "The tasks of this project consisted of verification of site remediation,groundwater monitoring well
Project Year: 2018
Organizer: "Taoyuan County Government Environment Protection Bureau"

Project Title: "105 Hsinchu City Soil and Groundwater Pollution Exchange and Observation Plan "
Project Subject: "This project has conducted the International Exchange Programmes during Dec.4 ~ Dec.8, 2016.The exc
Project Year: 2016
Organizer: "Bureau of Environmental Protection Hsin-Chu"

Project Title: ""
Project Subject: "The Soil and Groundwater Pollution Remediation Act (SGPRA) included the concept of risk assessment
Project Year: 2013
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Project of Soil and Groundwater Pollution Survey and Investigation in HsinChu Country,2014"
Project Subject: "AbstractThis project has been completed all works with the contract (see table 摘-1). And the result
Project Year: 2014
Organizer: "HsinChu County Environment Protection Bureau"

Project Title: "The development of LA-ICP-MS method for determining the chemical transformation and translocation o
Project Subject: "This three-year project aimed at the development of LA-ICP-MS method in conjunction with X-ray fluo
Project Year: 2018
Organizer: "Environmental Analysis Laboratory"

Project Title: ""
Project Subject: "The objectives of this study include designing the environmental liability insurance policy for con
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Audit and Evaluation of Control and Management of Soil and Groundwater Pollution Remediation Fund A
Project Subject: "The duration of this project was from March 31st, 2014 to March 30th, 2015. This project included 3
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Remediation of Emerging Industry Special Metal"
Project Subject: "This project will be carried out to improve energy crops Sunflower Research and Analysis of heavy m
Project Year: 2015
Organizer: "Office of Sustainable Development"

Project Title: "Soil and Groundwater Contamination Investigation Project in 2016 Environmental Protection Bureau, N
Project Subject: "This project starts from February 25rd, 2016 to December 20st, 2016, which it is mainly to assist E
Project Year: 2016
Organizer: "Nantou County Environmental Protection Bureau"

Project Title: "2019 Project of Sediment Quality Administration"
Project Subject: "The purpose of this project is to assist the Environmental Protection Administration, Executive Yua
Project Year: 2019
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "The demonstrative project of investigating and analyzing the mud core in Sun-Moon Lake"
Project Subject: "This project completed first the works of sonar seismic scan before coring. Then two sites were cho
Project Year: 2015
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Project of Soil and Groundwater Advocacy Business Promotion Plan of 2021"
Project Subject: "The project period is from March 11 to December 31, 2021. The abstract of implementation is as foll
Project Year: 2021
Organizer: "Soil and Groundwater Remediation Fund Management Board"

Project Title: "Research and Pilot Study Project Management for 2014"
Project Subject: "In order to promote and enhance the research and development task for soil, groundwater and sedimen
Project Year: 2014
Organizer: "Soil and Groundwater Remediation Fund Management Board"

行政院環境保護署 的其他資料集

底泥品質檢測資料

每月更新更新,115

張小姐 | 02-2383-2389 #8401 | 2022-01-14 01:20:32

行政院環境保護署

使用中機動車輛噪音檢驗之場所表

不定期更新更新,36

謝先生 | 02-23712121#6403 | 2023-08-07 01:02:18

行政院環境保護署

區域性地下水水質監測資料

每3月更新,122

郭先生 | 2311-7722#2399 | 2023-08-07 01:02:05

行政院環境保護署

各月份場址更新率統計報表

不定期更新更新,97

賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:17

行政院環境保護署

環境教育終身學習有效護照人數

每季更新更新,46

李小姐 | 02-23117722#2724 | 2022-01-15 01:10:48

行政院環境保護署

行政院環境保護署毒物及化學物質局法定預算

每年更新更新,30

魏小姐 | 02-23257399#55432 | 2022-01-15 01:09:49

行政院環境保護署

自來水水質抽驗檢驗結果

每1月更新,97

顏先生 | 02-23117722#2109 | 2023-07-27 01:01:26

行政院環境保護署

紫外線測站位置圖

不定期更新更新,37

陳先生 | 02-2311-7722#2386 | 2023-08-09 01:04:55

行政院環境保護署

全國場址新增列管及解列統計表

不定期更新更新,90

賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:12

行政院環境保護署

環評監督成果統計

不定期更新更新,38

陳先生 | 04-2252-1718#51207 | 2022-01-15 01:13:28

行政院環境保護署

南投縣水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,38

程先生 | 02-2311-7722#2833 | 2023-08-09 01:04:11

行政院環境保護署

空氣品質小時值_苗栗縣_三義站

每小時更新更新,118

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:59

行政院環境保護署

環保證照訓練近期開班訊息

每月更新更新,109

魏小姐 | 03-4020789#603 | 2022-01-15 01:11:05

行政院環境保護署

應回收廢棄物稽核認證行程

每1年更新,117

廖小姐 | 02-2370-5888#3103 | 2023-07-27 01:00:00

行政院環境保護署

縣市(金門縣)小時值-每小時

每1時更新,158

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:36

行政院環境保護署

各公告類別申報事業廢棄物流向統計

每1年更新,106

林先生 | 02-2311-7722#2671 | 2023-08-07 01:02:02

行政院環境保護署

空氣污染防制區劃分結果

2年更新,132

柏小姐 | 02-23712121#6106 | 2022-01-14 01:05:04

行政院環境保護署

桃園市重要環保統計資料

每1月更新,91

顏先生 | 02-23117722#2109 | 2023-08-07 01:00:19

行政院環境保護署

行政院環境保護署毒物及化學物質局單位預算案

每年更新更新,33

魏小姐 | 02-23257399#55432 | 2022-01-15 01:09:48

行政院環境保護署

訴願決定書

每6月更新,35

李先生 | 02-2311-7722#2962 | 2023-07-30 01:05:32

行政院環境保護署

PM2.5日均值(每日提供)

每1日更新,68

陳先生 | 02-2311-7722#2386 | 2023-08-08 00:58:45

行政院環境保護署

重點事業廢棄物-一般污泥之處理方式

每月更新更新,121

陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:13

行政院環境保護署

應回收廢棄物(廢容器類)回收量資料

每1年更新,38

廖小姐 | 02-2370-5888#3103 | 2023-07-27 00:59:50

行政院環境保護署

事業廢棄物共同清除、處理機構許可資料

不定期更新更新,137

何先生 | 02-2311-7722#2653 | 2022-01-14 01:26:04

行政院環境保護署

環境音量監測結果統計(依管制區分)

不定期更新更新,126

章小姐 | 02-23712121#6407 | 2023-08-03 01:04:06

行政院環境保護署

南科樹谷環評監督委員會會議紀錄

不定期更新更新,48

陳先生 | 04-2252-1718#51207 | 2022-01-14 01:21:54

行政院環境保護署

行政院環境保護署會計月報

每月更新更新,44

陳小姐 | 02-2311-7722#2159 | 2022-01-14 01:22:16

行政院環境保護署

環保署書面之公共工程及採購契約

不定期更新,41

許小姐 | (02)23117722#2483 | 2022-01-15 01:10:14

行政院環境保護署

空氣品質小時值_桃園市_平鎮站

每小時更新更新,187

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:51

行政院環境保護署

列管工業區下水道名單

不定期更新更新,37

許先生 | 02-2311-7722#2831 | 2022-01-14 01:23:05

行政院環境保護署