「"Apply Phase II Environmental Site Assessment Process to execute」於資料集「EPQSummary_SoilAndGroundwater」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:52。 欄位Project Title的內容是"Apply Phase II Environmental Site Assessment Process to execute Soil and Groundwater Pollution Potential Sites Investigation Plan" , 欄位Project Subject的內容是"To keep abreast of the soil and groundwater quality in each location with high potential environmental risk, the tasks of this project includes: selecting the locations which have investigated as high contamination potential in Environmental Site Assessment phase I, and other administrative supports like updating and repairing the system, assessing the feasibility of connection and integration, updating the investigation guidelines, and analyzing the land management policy.For the continuation of the historical investigations by EPA for the abandoned factories, considering the incomplete investigations and the update of land using status, there are still 290 locations need to conduct in-situ sampling investigations. About other types of investigations, there are 20 operating factories need to conduct in-situ sampling investigations after the historical environmental site assessment. Based on the goal of this project, requirement of tasks and considerations about contamination potential and environmental risk, this project has planned an investigation list for 99 locations for the current period. The continual period of this project will conduct investigations at other locations without investigation yet.Among all 99 locations in the investigation list, this project has completed investigations in 96 locations (46 locations by Apollo technology, and 50 locations by Stantec). Soil and groundwater are found exceeded the Control Standard in 34 locations among 96 (which is 35.4%). To sort the investigations by factory types, there are 76 abandoned factories and 20 operating factories among the 96 locations. In the 76 abandoned factories, soil or groundwater contamination in 25 locations has exceeded the Control Standard (32.9%), and also in the 20 operating factories, 9 locations was found contaminants exceeded the Control Standard (45%). The contaminants are majorly heavy metal and TPH. There are 27 locations are found with heavy metal exceedance (79.4%), and 4 locations with TPH exceedance (11.8%). 2 locations are found with both heavy metal and TPH exceedances (5.9%). In addition, 1 location is found with VOCs exceedance (2.9%). To support the authority to conduct measures like administrative controlling and contaminants source tracking, this project has provided relevant suggestions based on conditions like the investigations and verifications in each location, operating features of factories, and the Regulations for Delimitation and Announcement of Pollution Range and Controlled area of the Sites from EPA. About the administrative technical support, this project has repaired and updated the Nationwide Soil Quality Management System for Lands of Abandoned Factories, and assessed the connection and functional integration with the operating factories' system. This project has also separated, integrated, and updated the contents of the investigation introduction for abandoned factories. On contrary, this project has collected the existed management strategies for pollution sites inside and outside the country, and suggested initial advices for managing polluted lands. In addition, in the locations with various soil conditions which are not suitable for investigations, this project has suggested to manage the soil pollution by region afterwards." , 欄位Project Year的內容是2017 , 欄位Organizer的內容是"Soil and Groundwater Remediation Fund Management Board" , 欄位Executive Unit的內容是"瑞昶科技股份有限公司" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/project/filedownload.aspx?fid=175100 , 欄位Publish Date的內容是20181101 。
Project Title
"Apply Phase II Environmental Site Assessment Process to execute Soil and Groundwater Pollution Potential Sites Investigation Plan"
Project Subject
"To keep abreast of the soil and groundwater quality in each location with high potential environmental risk, the tasks of this project includes: selecting the locations which have investigated as high contamination potential in Environmental Site Assessment phase I, and other administrative supports like updating and repairing the system, assessing the feasibility of connection and integration, updating the investigation guidelines, and analyzing the land management policy.For the continuation of the historical investigations by EPA for the abandoned factories, considering the incomplete investigations and the update of land using status, there are still 290 locations need to conduct in-situ sampling investigations. About other types of investigations, there are 20 operating factories need to conduct in-situ sampling investigations after the historical environmental site assessment. Based on the goal of this project, requirement of tasks and considerations about contamination potential and environmental risk, this project has planned an investigation list for 99 locations for the current period. The continual period of this project will conduct investigations at other locations without investigation yet.Among all 99 locations in the investigation list, this project has completed investigations in 96 locations (46 locations by Apollo technology, and 50 locations by Stantec). Soil and groundwater are found exceeded the Control Standard in 34 locations among 96 (which is 35.4%). To sort the investigations by factory types, there are 76 abandoned factories and 20 operating factories among the 96 locations. In the 76 abandoned factories, soil or groundwater contamination in 25 locations has exceeded the Control Standard (32.9%), and also in the 20 operating factories, 9 locations was found contaminants exceeded the Control Standard (45%). The contaminants are majorly heavy metal and TPH. There are 27 locations are found with heavy metal exceedance (79.4%), and 4 locations with TPH exceedance (11.8%). 2 locations are found with both heavy metal and TPH exceedances (5.9%). In addition, 1 location is found with VOCs exceedance (2.9%). To support the authority to conduct measures like administrative controlling and contaminants source tracking, this project has provided relevant suggestions based on conditions like the investigations and verifications in each location, operating features of factories, and the Regulations for Delimitation and Announcement of Pollution Range and Controlled area of the Sites from EPA. About the administrative technical support, this project has repaired and updated the Nationwide Soil Quality Management System for Lands of Abandoned Factories, and assessed the connection and functional integration with the operating factories' system. This project has also separated, integrated, and updated the contents of the investigation introduction for abandoned factories. On contrary, this project has collected the existed management strategies for pollution sites inside and outside the country, and suggested initial advices for managing polluted lands. In addition, in the locations with various soil conditions which are not suitable for investigations, this project has suggested to manage the soil pollution by region afterwards."
Project Year
2017
Organizer
"Soil and Groundwater Remediation Fund Management Board"
Executive Unit
"瑞昶科技股份有限公司"
Reporting download URL
Publish Date
20181101
「"Apply Phase II Environmental Site Assessment Process to execute」所屬的資料集:「EPQSummary_SoilAndGroundwater」的其他資料
Project Title:
"Miaoli County Farmland Soil Pollution Control Site Proper Measures Improvement Project ─ Xinqiding
Project Subject:
"Miaoli County Farmland Soil Pollution Control Sites Appropriate Measures to Improve the Project ─ X
Project Year:
2018
Organizer:
"Environmental Protection Bureau Miaoli County Government"
Project Title:
"Developing Integrated analytical modeling and establishing censorship of subsurface contaminated si
Project Subject:
"In order to evaluate the feasibility, development path and blueprint for developing a subsurface en
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Hsinchu City 104 years of soil and groundwater pollution investigation and verification work progra
Project Subject:
"The program is scheduled for December 12, 104 to December 20, As of December 2004, the work team ha
Project Year:
2015
Organizer:
"Bureau of Environmental Protection Hsin-Chu"
Project Title:
"National soil quality properties investigation and management research program."
Project Subject:
"In order to establish the suitable soil pollution control standards, relevant information and regul
Project Year:
2013
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
" Soil and Groundwater Quality Management of National Industrial Parks (phase 3 project)"
Project Subject:
"This project is the third phase of the master plan of the action program of promoting soil and grou
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Program for Managing Contaminated Sediments in Taiwan 2014"
Project Subject:
"Sediment is one of the most important media in the environment. Sediment could provide habits and f
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Taichung City farmland pollution control site appropriate measures to improve the plan - Longjing,
Project Subject:
"The main tasks of the project include supervising, verification and providing technical support for
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
""
Project Subject:
"Because of the illegal mining of sand and gravel, it left about 6 hectares pit-pond on the agricult
Project Year:
2015
Organizer:
"Environmental Protection Bureau Kauhsiung City Government"
Project Title:
"2016 Project of investigating and verifying pollution for Taichung soil and groundwater"
Project Subject:
"Taichung Environmental Protection Bureau (TCEPB) has carried out the work to manage the
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"Research Project of Using Native Species to Apply Sediment Ecological Risk Assessment"
Project Subject:
"The survival of aquatic organisms were threatened by contaminated sediments seriously, and the poll
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Early warning management and mechanism development on Arsenic-rich groundwater and soil in farmland
Project Subject:
"This project has aggregated rice testing data from Taiwan Agriculture Chemicals and Toxic Substance
Project Year:
2020
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Applying Investigation of Soil and Groundwater Pollution Potential in Operating Factories (II)"
Project Subject:
"To avoid soil and groundwater pollution in factories threatening national health and environment, E
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Separation and purification of Europium and Yttrium from fluorescent powder of spent fluorescent li
Project Subject:
"The purpose of this study was to apply the supported liquid membranes with strip dispersion ((SLM-S
Project Year:
2014
Organizer:
"Office of Sustainable Development"
Project Title:
"The survey of pesticides,polycyclic aromatic hydrocarbons,phenols,phthalates,and organotins in soil
Project Subject:
"Pesticides, phenols, phthalates, and organotins were heavily used and polycyclic aromatic hydrocarb
Project Year:
2014
Organizer:
"Environmental Analysis Laboratory"
Project Title:
"Plan of 2014 on auditing and guiding of potential polluted soil evaluation,investigation and testin
Project Subject:
"The purpose of this project was to assist local environmental protection bureaus on reviewing and a
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"The project for management system of soil and groundwater health risk assessment 2016"
Project Subject:
"The main works of the project include the “establishment and operation of Soil and Groundwater Heal
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Project of Soil and Groundwater Advocacy Business Promotion Plan of 2021"
Project Subject:
"The project period is from March 11 to December 31, 2021. The abstract of implementation is as foll
Project Year:
2021
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Aboveground storage tank systems pilot project-pollution prevention management and investigation"
Project Subject:
"The Environmental Protection Administration (EPA) implemented the project to understand the interna
Project Year:
2019
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"The Management Project of Planning and Administrative System of Contaminated Site Redevelopment in
Project Subject:
"Continuing the results from the former project, the condition of the soil was analyzed, and the rel
Project Year:
2016
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Hsinchu City 102 annual soil and groundwater pollution investigation and verification work program"
Project Subject:
"Hsinchu City is located in the northwest of Taiwan, Taiwan is the northern region, between Taipei a
Project Year:
2013
Organizer:
"Bureau of Environmental Protection Hsin-Chu"
Project Title:
"The project for platform planning and system management of soil and groundwater health risk assessm
Project Subject:
"This project contains main parts, including “Planning to construct solid and groundwater health and
Project Year:
2015
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
" The 2019 Project on the Inspection and Verification of Soil and Groundwater Pollution in Pingtung"
Project Subject:
"The project period starts from the contract signing date on January 1, 2019 to December 20, 2019. T
Project Year:
2019
Organizer:
"Environmental Protection Bureau, Pingtung County"
Project Title:
"Application of Environmental Forensics on Investigation of Chlorinated Hydrocarbon Contaminated Sit
Project Subject:
"This project focuses on the chlorinated ethenes (CEs) contaminated sites. Thepurpose was to apply e
Project Year:
2013
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"2019 Taichung city soil and groundwater contaminate investigation and contingency measure project"
Project Subject:
"The “Soil and groundwater contaminate investigation and contingency measure project” of Taichung Ci
Project Year:
2019
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"Insitu Bioremediation for the delineated groundwater pollution use restriction zone in Tung-Guang s
Project Subject:
"This project achieved a number of objectives regarding investigation of groundwater contamination,
Project Year:
2016
Organizer:
"Bureau of Environmental Protection Hsin-Chu"
Project Title:
"The inspection, consultation and auditing of declaration reports for underground storage tanks proj
Project Subject:
"Taiwan EPA has promoted UST investigation and pollution prevention over a decade. In order to integ
Project Year:
2013
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Investigation of Contaminated Farmland Adjacent to Changhua’s East-West Second and Third Irrigation
Project Subject:
"The “2nd Control and Investigation Project for National Agricultural Land with High Potential for H
Project Year:
2014
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"Hsinchu City 101 annual soil and groundwater pollution investigation and verification work program"
Project Subject:
"Hsinchu City is located in the northwest of Taiwan, Taiwan is the northern region, between Taipei a
Project Year:
2012
Organizer:
"Bureau of Environmental Protection Hsin-Chu"
Project Title:
"2015 Land Quality Media Campaigns and Promotion Project"
Project Subject:
"Tse Yueh Advertising and Marketing Co., Ltd. (hereinafter referred to as, “Tse Yueh Advertising”) h
Project Year:
2015
Organizer:
"Soil and Groundwater Remediation Fund Management Board"
Project Title:
"107 Soil and Groundwater Pollution Survey and Verification Project - New Taipei City"
Project Subject:
"Since its inception in 1993, the New North City Environmental Protection Bureau has implemented rel
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Taipei County"
行政院環境保護署 的其他資料集
水污染管制區範圍地理圖資
不定期更新更新,61陳先生 | 02-23117722#2818 | 2023-08-07 01:04:26
行政院環境保護署南科樹谷環評監督委員會會議紀錄
不定期更新更新,50陳先生 | 04-2252-1718#51207 | 2022-01-14 01:21:54
行政院環境保護署事業廢棄物再利用申報量統計
每1月更新,95林先生 | 02-2311-7722#2671 | 2023-08-07 01:02:11
行政院環境保護署廠商獲頒產品數統計(第二類)
每季更新更新,51孫小姐 | 02-23117722#2926 | 2022-01-14 01:17:49
行政院環境保護署酸雨監測值(歷史資料)
每1日更新,178陳先生 | 02-2311-7722#2386 | 2023-08-08 00:58:43
行政院環境保護署
環境教育設施場所認證申請作業指引
不定期更新,36蘇小姐 | (03)4020789分機669 | 2022-01-15 01:11:02
行政院環境保護署沙塵預報資料
不定期更新更新,43陳先生 | 02-2311-7722#2386 | 2023-08-07 01:02:14
行政院環境保護署歷年公共建設計畫執行情形
不定期更新更新,46陳小姐 | 02-2311-7722#2913 | 2022-01-15 01:10:17
行政院環境保護署自來水水質抽驗檢驗結果
每1月更新,113顏先生 | 02-23117722#2109 | 2023-07-27 01:01:26
行政院環境保護署推薦機關(薦舉)環境教育人員認證申請書
不定期更新更新,39盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:27
行政院環境保護署
重點事業廢棄物-爐碴之產出及清理流向
每月更新更新,87陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:19
行政院環境保護署全國場址更新率統計報表
不定期更新更新,159賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:16
行政院環境保護署公害陳情案件分佈位置圖
不定期更新更新,40許小姐 | 04-22521718#58709 | 2022-01-15 01:16:11
行政院環境保護署地方環保局環保罰鍰金額
每1月更新,145顏先生 | 02-23117722#2109 | 2023-07-27 01:01:11
行政院環境保護署空氣品質監測小時值資料(其它測項,每小時更新)
每小時更新更新,169謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:18
行政院環境保護署
中央政府嚴重特殊傳染性肺炎防治及紓困振興特別預算
不定期更新更新,43鄭小姐 | 02-23117722#2156 | 2023-08-09 01:05:37
行政院環境保護署環境教育設施場所手冊
不定期更新更新,66蘇小姐 | (03)4020789分機669 | 2022-01-15 01:11:06
行政院環境保護署焚化廠底渣原始檢測資料
每1月更新,250莊先生 | 04-22521718#53523 | 2023-08-07 01:02:33
行政院環境保護署環境用藥微生物製劑常見菌種特性資料
不定期更新更新,188薛先生 | 02-2325-7399#55413 | 2023-07-27 01:02:59
行政院環境保護署縣市(花蓮縣)小時值-每小時
每小時更新更新,164謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:01:13
行政院環境保護署
大甲媽祖遶境即時空品監測成果(E-motor)
不定期更新更新,201陳先生 | 02-2311-7722#2341 | 2022-01-14 01:02:39
行政院環境保護署廢棄物稽查次數
每1年更新,150顏先生 | 02-23117722#2109 | 2023-07-27 01:00:46
行政院環境保護署嘉義市水量水質自動監測連線傳輸監測紀錄值即時資料集
每小時更新更新,43許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:34
行政院環境保護署獎勵民眾檢舉違反水污染防治法案件指導原則
不定期更新,40簡小姐 | 02-2311-7722#2818 | 2022-01-15 01:13:07
行政院環境保護署環保標章廠商資料
每1月更新,120盧小姐 | 02-23117722#2943 | 2023-07-27 01:01:48
行政院環境保護署
光化測站(潮州)小時值資料
不定期更新更新,163陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:31
行政院環境保護署六輕相關計畫環境監測資料
每季更新更新,44陳先生 | 04-22521718#51207 | 2022-01-15 01:14:25
行政院環境保護署符合噪音管制標準車輛-國產汽油引擎車
不定期更新更新,309章小姐 | 02-23712121#6406 | 2023-07-28 11:37:57
行政院環境保護署公告列管材質回收率統計資料
每1年更新,56廖小姐 | 02-2370-5888#3103 | 2023-07-27 01:00:12
行政院環境保護署底泥申報各類水體數量
不定期更新更新,51張小姐 | 02-2383-2389 #8401 | 2022-01-14 01:20:30
行政院環境保護署