Ambient Air Quality Monitoring Plan in year 20152015This project
「Ambient Air Quality Monitoring Plan in year 20152015This project」於資料集「EPQSummary_NoiseAndVibration」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:50。 欄位Project Title的內容是Ambient Air Quality Monitoring Plan in year 2015 , 欄位Project Subject的內容是This project has been started on August 20, 2015. The project scope included operation, maintenance and calibration of equipment at manual Air Quality Monitoring Station and Meteorological Station, environmental noise monitoring, dust monitoring at sensitive areas around Sixth Naphtha offshore industrial park, check of equipment at Air Quality Monitoring Station belonging to the Sixth Naphtha offshore industrial park check and maintenance of electronic board. The achievements of project were summarized as below:
1)65 Air Quality Monitoring Station were performed scheduled monthly maintenance. All equipment was under normal operation and no overhaul was required during the project period.
2)Flow rate calibrations were completed on 11 September 2015 and 7 March 2016. The result regression coefficient R2 was 0.9999 which comply with the standard. (R2 shall be larger or equal to 0.995)
3)Multi-point calibrations were performed on 22 September 2015, 7 October 2015, 5 January 2016, 28 March 2016, 6 April 2016 and 5 July 2016. The results were fulfill with the standard requirements including flow accuracy shall be less than 5 % difference and regression coefficient R2 shall be larger or equal to 0.995.
4)Every half of the month, one point calibrations were performed before and after sampling at each station. The flow accuracy shall be less than 7% difference.
5)The clock check was performed on 1 September 2015 and fulfilled the standard of less than 2 minutes difference.
6)For TSP monitoring, the highest (61 μg/m3) and lowest (53 μg/m3) average concentration were found at Huwei station and Siluo station. For dust monitoring, the highest concentration 34.6 kg/m2 per month was found at Siluo station in October 2015, while the lowest 0.2 kg/m2 per month was recorded at Huwei station in August 2015.
7)Ambient, highway and high speed rail noise monitoring have been performed 148 days and all results fulfilled the limit. According to historical monitoring data, in ambient noise monitoring, as Dounan station was sensitive to nearby residential activities, some intervals were found a high level of noise. In highway noise monitoring, each station were recorded a relatively steady noise level.
8)12 times maintenances were completed at fixed noise monitoring station. The sources of noise were proposed. During weekdays, the noise would be come from high flow of vehicles at peak periods and operation of machine during gardening. During weekend, the sources would be park visitors and temporary exhibitions.
9)Checking of noise level from vehicles has been performed 35 times and checked 2,198 vehicles. 66 vehicles were requested to perform further noise assessment in which 40 vehicles passed, 15 vehicles unqualified and 15 vehicles unclassified. As selection by police before further assessment, the rate of unqualified was reach 27 % and average exceed 5.6 dB of limit.
10)Ambient electromagnetic field (EMF) measurement was completed 20 pieces of extremely-low frequency and 21 pieces of high frequency. In which, 10 pieces of extremely-low frequency were performed at school area, 10 pieces of extremely-low frequency were performed at Floor type transformers, 21 pieces of high frequency was performed at phone transmitting station. All the results were within the EPA limit.
11)The noise poster design was completed and 500 posters had been printed.
12)24-day monitoring of the mobile air quality monitoring vehicle had been completed. All the results were within the EPA air quality standard.
13)dust monitoring at sensitive areas around Sixth Naphtha offshore industrial park were completed 24 pieces of samples, ranging 23.2 -339 mg/m2 per day in concentration. From November 2016 onwards, the reason for the high value of the measurement has the northeast monsoon caused by the external transmission and bare ground. In addition to the monitoring resu... , 欄位Project Year的內容是2015 , 欄位Organizer的內容是Environmental Protection Bureau Yunlin County , 欄位Executive Unit的內容是捷思環能有限公司 , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=138754&proj_id=1040135064&doc_kind=1 , 欄位Publish Date的內容是20170301 。
Project Title
Ambient Air Quality Monitoring Plan in year 2015
Project Subject
This project has been started on August 20, 2015. The project scope included operation, maintenance and calibration of equipment at manual Air Quality Monitoring Station and Meteorological Station, environmental noise monitoring, dust monitoring at sensitive areas around Sixth Naphtha offshore industrial park, check of equipment at Air Quality Monitoring Station belonging to the Sixth Naphtha offshore industrial park check and maintenance of electronic board. The achievements of project were summarized as below: 1)65 Air Quality Monitoring Station were performed scheduled monthly maintenance. All equipment was under normal operation and no overhaul was required during the project period. 2)Flow rate calibrations were completed on 11 September 2015 and 7 March 2016. The result regression coefficient R2 was 0.9999 which comply with the standard. (R2 shall be larger or equal to 0.995) 3)Multi-point calibrations were performed on 22 September 2015, 7 October 2015, 5 January 2016, 28 March 2016, 6 April 2016 and 5 July 2016. The results were fulfill with the standard requirements including flow accuracy shall be less than 5 % difference and regression coefficient R2 shall be larger or equal to 0.995. 4)Every half of the month, one point calibrations were performed before and after sampling at each station. The flow accuracy shall be less than 7% difference. 5)The clock check was performed on 1 September 2015 and fulfilled the standard of less than 2 minutes difference. 6)For TSP monitoring, the highest (61 μg/m3) and lowest (53 μg/m3) average concentration were found at Huwei station and Siluo station. For dust monitoring, the highest concentration 34.6 kg/m2 per month was found at Siluo station in October 2015, while the lowest 0.2 kg/m2 per month was recorded at Huwei station in August 2015. 7)Ambient, highway and high speed rail noise monitoring have been performed 148 days and all results fulfilled the limit. According to historical monitoring data, in ambient noise monitoring, as Dounan station was sensitive to nearby residential activities, some intervals were found a high level of noise. In highway noise monitoring, each station were recorded a relatively steady noise level. 8)12 times maintenances were completed at fixed noise monitoring station. The sources of noise were proposed. During weekdays, the noise would be come from high flow of vehicles at peak periods and operation of machine during gardening. During weekend, the sources would be park visitors and temporary exhibitions. 9)Checking of noise level from vehicles has been performed 35 times and checked 2,198 vehicles. 66 vehicles were requested to perform further noise assessment in which 40 vehicles passed, 15 vehicles unqualified and 15 vehicles unclassified. As selection by police before further assessment, the rate of unqualified was reach 27 % and average exceed 5.6 dB of limit. 10)Ambient electromagnetic field (EMF) measurement was completed 20 pieces of extremely-low frequency and 21 pieces of high frequency. In which, 10 pieces of extremely-low frequency were performed at school area, 10 pieces of extremely-low frequency were performed at Floor type transformers, 21 pieces of high frequency was performed at phone transmitting station. All the results were within the EPA limit. 11)The noise poster design was completed and 500 posters had been printed. 12)24-day monitoring of the mobile air quality monitoring vehicle had been completed. All the results were within the EPA air quality standard. 13)dust monitoring at sensitive areas around Sixth Naphtha offshore industrial park were completed 24 pieces of samples, ranging 23.2 -339 mg/m2 per day in concentration. From November 2016 onwards, the reason for the high value of the measurement has the northeast monsoon caused by the external transmission and bare ground. In addition to the monitoring resu...
Project Year
2015
Organizer
Environmental Protection Bureau Yunlin County
Executive Unit
捷思環能有限公司
Reporting download URL
https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=138754&proj_id=1040135064&doc_kind=1
Publish Date
20170301
「Ambient Air Quality Monitoring Plan in year 20152015This project」所屬的資料集:「EPQSummary_NoiseAndVibration」的其他資料
Project Title:
Noise Monitoring and Noise Recognition and Control of Motor Vehicles Exhaust Pipes in Tainan City, 2
Project Subject:
1. Project Title: Noise Monitoring and Noise Recognition and Control of Motor Vehicles Exhaust Pipes
Project Year:
2021
Organizer:
Environmental Protection Bureau of Tainan City
Project Title:
Project Subject:
This project aimed to investigate the nuisance petition cases in Tainan noise control zones. It woul
Project Year:
2013
Organizer:
Environmental Protection Bureau of Tainan City
Project Title:
"The project for reporting、joint inspection and control exhaust pipe certification of vehicle noise.
Project Subject:
"This project was mainly to assist the EPA to grasp the results of vehicle noise inspections in vari
Project Year:
2020
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
Motor vehicles emission testing institutions checking project of 2019
Project Subject:
The project was in accordance with「Regulations Governing Motor Vehicle Air Pollutant and Noise Emiss
Project Year:
2019
Organizer:
Project Title:
Non-Ionizing Radiation Management Plan
Project Subject:
The goal of this project was a focus on measurement and analysis of non-ionizing radiation emission
Project Year:
2013
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
The study of traffic and environmental noise control and improvable measures
Project Subject:
This study collected and reviewed the measurement results of traffic and environmental noise from en
Project Year:
2011
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
"Investigation of environmental low-frequency noise and vibration and research projet for improvemen
Project Subject:
"The number of people affected by noise and vibration are increased by the days, and the quality of
Project Year:
2015
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
""
Project Subject:
"This project aimed to investigate the nuisance petition cases in Tainan noise control zones. It wou
Project Year:
2013
Organizer:
"Environmental Protection Bureau of Tainan City"
Project Title:
Aviation Noise Control Project
Project Subject:
This project aims to understand the related laws and regulations, as well as the management practice
Project Year:
2017
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
Implement of the new vehicle type approval with regard to noise, the new vehicle spot check and the
Project Subject:
This project aims to assist EPA in examination of noise certificates for new vehicle types and all a
Project Year:
2016
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
Implement of the new vehicle type approval with regard to diesel vehicle and noise and quality consi
Project Subject:
This project implements motor vehicle noise and diesel vehicle emission inspection and management po
Project Year:
2020
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
Tainan City noise monitoring plan
Project Subject:
This plan is to complete the operation and public pleads in the noise monitoring of Tainan City appl
Project Year:
2010
Organizer:
Environmental Protection Bureau of Tainan City
Project Title:
Project Subject:
This plan intended to accomplish operation of noise mobile environment and traffic sounds monitoring
Project Year:
2012
Organizer:
Environmental Protection Bureau of Tainan City
Project Title:
The project for controlling construction noise and advancing prevention technology of construction n
Project Subject:
This project reviewed the content of noise control regulations and established principles or specifi
Project Year:
2020
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
The Study of Environmental Vibration Improvement Measures
Project Subject:
The study analyzed the reports of vibration in the past three years, and the results showed that the
Project Year:
2019
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
Project for traffic noise control and improving noise abatement projects
Project Subject:
The purpose of this research project is first to collect the literature on the anti-noise measures t
Project Year:
2013
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
2009 Taoyuan area Air noise monitoring, analysis and promotion
Project Subject:
This plan, according to the goal of the plan and demand for the working project, the groundwork cont
Project Year:
2009
Organizer:
Taoyuan County Government Environment Protection Bureau
Project Title:
Investigation of environmental low-frequency noise and vibration and research projet for improvement
Project Subject:
The number of people affected by noise and vibration are increased by the days, and the quality of l
Project Year:
2015
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
2014~2015 Inspection and Management Plan of Vehicles Emission Inspection Station
Project Subject:
Project Year:
2014
Organizer:
Environmental Protection Bureau Kauhsiung City Government
Project Title:
The Deployment of Secondary Noise Meter Monitoring Network Project - Development of Secondary Noise
Project Subject:
The urban area in Taiwan is complex and small, the residential complex mixed commercial area that ca
Project Year:
2022
Organizer:
Project Title:
A project for traffic noise control
Project Subject:
Because of the urban development, traffic are getting more congested. And in order to mitigate the
Project Year:
2015
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
Project Subject:
In order to assist the TaoYuan Government Environmental Protection Bureau executing the environment
Project Year:
2007
Organizer:
Taoyuan County Government Environment Protection Bureau
Project Title:
2022 Research and Management Program on Noise Control Technologies for Air and Ground Transportation
Project Subject:
一、 Air and ground transportation
In terms of aircraft noise, completed suggestion and revision of re
Project Year:
2022
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
"Research on Noise Control and Assessment with Detection Camera System Applied to In-use Motor Vehic
Project Subject:
"Among the petitions submitted in recent years, many have been complaining against the big noise mad
Project Year:
2018
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
Project Subject:
This project aims to: 1. Monitor the mobile environment and traffic noise in Tainan City; 2. Assist
Project Year:
2014
Organizer:
Environmental Protection Bureau of Tainan City
Project Title:
The Noise Control Management Information System and Noise Control
Project Subject:
The goals of this project included system maintenance and data collection of “The Noise Control Mana
Project Year:
2013
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
"Aviation Noise Control Project"
Project Subject:
"This project aims to understand the related laws and regulations, as well as the management practic
Project Year:
2017
Organizer:
"Department of Air Quality Protection & Noise Control"
Project Title:
New physical public nuisance survey and study
Project Subject:
The light pollution phenomenon becomes more obvious due to the increasing of installed lighting faci
Project Year:
2011
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
101 year and 102 year diesel car power station maintenance management plan
Project Subject:
Kaohsiung diesel power station maintenance and management plans were an operation and maintenance of
Project Year:
2012
Organizer:
Environmental Protection Bureau Kauhsiung City Government
Project Title:
"Efficiency Evaluation Plan on the Reduction of Air Pollution, Carbon, and Noise by Applying Modifie
Project Subject:
"1.Research and analysis of the current situation of applying solar panels to acoustic barriers for
Project Year:
2019
Organizer:
"Department of Air Quality Protection & Noise Control"
行政院環境保護署 的其他資料集
空氣品質小時值_新北市_板橋站
每1時更新,92陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:18
行政院環境保護署空氣品質小時值_新北市_淡水站
每小時更新更新,94謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:29
行政院環境保護署河川水質季監測資料
每3月更新,137郭先生 | 2311-7722#2399 | 2023-08-07 01:02:03
行政院環境保護署環保旅店旅館資訊
每1月更新,138林先生 | 02-23117722#2926 | 2023-07-27 01:02:28
行政院環境保護署執行機關一般廢棄物處理量
每1月更新,167顏先生 | 02-23117722#2109 | 2023-07-27 01:01:19
行政院環境保護署
環保專案摘要資料_其他
不定期更新更新,142陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:54
行政院環境保護署應回收廢棄物處理業者(廢輪胎類)最大處理量資料
每年更新更新,46廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:00
行政院環境保護署行政院環境保護署環境保護產品申請審查作業規範
每季更新更新,36孫小姐 | 02-23117722#2926 | 2022-01-15 01:13:10
行政院環境保護署移動污染源空氣污染防制費收費統計
每1月更新,115周小姐 | 02-2311-7722#6304 | 2023-07-28 11:35:52
行政院環境保護署化學物質資料及登錄申請表
不定期更新更新,32金先生 | 23257399#55315 | 2022-01-15 01:13:24
行政院環境保護署
應回收廢棄物處理業者(廢鉛蓄電池類)最大處理量資料
每年更新更新,35廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:23:59
行政院環境保護署MajorEnvironmentalPolicies
每3月更新,162陳小姐 | (02)23117722#2753,(02)23117722#2756 | 2023-07-30 01:03:45
行政院環境保護署中央政府嚴重特殊傳染性肺炎防治及紓困振興特別預算
不定期更新更新,41鄭小姐 | 02-23117722#2156 | 2023-08-09 01:05:37
行政院環境保護署垃圾處理場(廠)座數
每1年更新,145顏先生 | 02-23117722#2109 | 2023-07-27 01:00:41
行政院環境保護署毒性化學物質許可證資料
每6月更新,151許先生 | 02-23257399#55328 | 2023-07-30 00:59:58
行政院環境保護署
金門縣重要環保統計資料
每月更新更新,99謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:48
行政院環境保護署環保專案摘要資料_環境資訊系統
不定期更新更新,86郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:42
行政院環境保護署環保人員數
每月更新更新,89謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:43
行政院環境保護署空氣品質小時值_高雄市_美濃站
每1時更新,132陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:44
行政院環境保護署列管毒性化學物質毒理資料
每年更新更新,94劉先生 | 02-23257399#55427 | 2022-01-14 01:22:55
行政院環境保護署
中油三輕環境監測資料
每季更新更新,57陳先生 | 04-22521718#51207 | 2022-01-15 01:14:21
行政院環境保護署環境影響說明書審查結論
每2月更新,56黃先生 | 02-23117722#2748 | 2023-08-05 00:59:41
行政院環境保護署空氣品質小時值_嘉義縣_新港站
每1時更新,440陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:50
行政院環境保護署空氣品質小時值_新北市_富貴角站
每1時更新,84陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:11
行政院環境保護署環保署廉政會報會議紀錄
不定期更新更新,35張先生 | 02-23117722#2226 | 2022-01-15 01:12:52
行政院環境保護署
空氣品質小時值_花蓮縣_花蓮站
每小時更新更新,96謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:36
行政院環境保護署環保標章產品審查通過及有效數資料(第二類)
每1月更新,41盧小姐 | 02-23117722#2943 | 2023-07-27 01:03:55
行政院環境保護署桃園市重要環保統計資料
每1月更新,91顏先生 | 02-23117722#2109 | 2023-08-07 01:00:19
行政院環境保護署焚化廠飛灰穩定化檢測資料
每月更新更新,112吳先生 | 04-22521718#53526 | 2022-01-15 01:15:34
行政院環境保護署PM2.5日均值(每日提供)
每1日更新,68陳先生 | 02-2311-7722#2386 | 2023-08-08 00:58:45
行政院環境保護署