"Enhanced ELV Recycling Procedure and Reduction of Automobile Sh
「"Enhanced ELV Recycling Procedure and Reduction of Automobile Sh」於資料集「EPQSummary_WasteManagement」由單位「行政院環境保護署」的郭先生所提供,聯繫電話是02-2311-7722 EXT.2399,最近更新時間為:2022-01-15 01:13:53。 欄位Project Title的內容是"Enhanced ELV Recycling Procedure and Reduction of Automobile Shredder Residue (ASR) Strategy Analysis Project 2019" , 欄位Project Subject的內容是"1. Revise levy and subsidy rate and extended vehicle producer responsibility
This project has commented on the reduction of chlorine-containing in vehicles would increase the ASR(Automobile Shredder Residue) energy recovery percentage that could be used as indicator for levy rate, and proposed phased program asked designated responsible enterprises to declare the chlorine-containing materials in the short-term, and carry about new different levy rate indicator in next stage. Completed a draft of subsidy rate for ELV(end-of live vehicle) disposal enterprises, which add two subsidy levels (resource recycling ratio between 82% ~ 89% and greater than 89% , the subsidy fee are 4,400 NTD / ton scrapped iron and 4,800 NTD / ton scrapped iron respectively). Calculation result showed 2018 ELV collecting was 99.07%, the ELV reuse and recycle rate was 86.72%, and reuse and recovery rate was 96.72%. This project had completed capturing 20 responsible enterprises who hadn’t paid the levy fee (about 1.23 million NTD), and the results were submitted to EPA.
2. Enhance ELV management system of ELV
To decrease ASR, this project proposed dismantle component list and fitted into regulated material of Auditing and Certification manned by stage. Teared wheel covers, trunk base partitions, front and rear door pedals, cup holders, whole car waterproofing strips, central armrests and stops Clay tablet in the near future, and teared car storage panels / trim, front and rear windshields, window glass (4 pieces), and instrument panel seats in next stage. This project figured out the relevance between operation scale and cost, moreover, prosed recommendation for ELV recycle system by SWOT analysis. ASR could be recycled in two ways: alternative fuels, raw material substitution. As stated above, the feasible model of ASR disposal facility including process extension in-situ, co-disposal plant, and set up new steam/electricity cogeneration system. Also completed the guideline for applying for ASR disposal facility.
3. Promote classification management of the ELV dismantlers
The project revised the classification management scoring form, and created incentive of ELV recycle issuing form triplicate. Completed 3 educational sessions of ELV’s workshops and presented the issue concerning how to improve the in-situ management (including industrial safety and improve working function), proper ways to recycle refrigerant, and assist participants to familiar with the operation of RRMS. Overall, total 143 people attended these meetings.
4. Visit foreign ELV dismantlers and disposal institutions
This project has studied foreign ELV recycling mechanism paper and proposal implementation domestically. Coordinated EPA need canceled visiting overseas this year, and the project price has completed reduction acceptance affair.
" , 欄位Project Year的內容是2019 , 欄位Organizer的內容是"Recycling Fund Management Board" , 欄位Executive Unit的內容是"財團法人台灣產業服務基金會" , 欄位Reporting download URL的內容是https://epq.epa.gov.tw , 欄位Publish Date的內容是20200331 。
Project Title
"Enhanced ELV Recycling Procedure and Reduction of Automobile Shredder Residue (ASR) Strategy Analysis Project 2019"
Project Subject
"1. Revise levy and subsidy rate and extended vehicle producer responsibility This project has commented on the reduction of chlorine-containing in vehicles would increase the ASR(Automobile Shredder Residue) energy recovery percentage that could be used as indicator for levy rate, and proposed phased program asked designated responsible enterprises to declare the chlorine-containing materials in the short-term, and carry about new different levy rate indicator in next stage. Completed a draft of subsidy rate for ELV(end-of live vehicle) disposal enterprises, which add two subsidy levels (resource recycling ratio between 82% ~ 89% and greater than 89% , the subsidy fee are 4,400 NTD / ton scrapped iron and 4,800 NTD / ton scrapped iron respectively). Calculation result showed 2018 ELV collecting was 99.07%, the ELV reuse and recycle rate was 86.72%, and reuse and recovery rate was 96.72%. This project had completed capturing 20 responsible enterprises who hadn’t paid the levy fee (about 1.23 million NTD), and the results were submitted to EPA. 2. Enhance ELV management system of ELV To decrease ASR, this project proposed dismantle component list and fitted into regulated material of Auditing and Certification manned by stage. Teared wheel covers, trunk base partitions, front and rear door pedals, cup holders, whole car waterproofing strips, central armrests and stops Clay tablet in the near future, and teared car storage panels / trim, front and rear windshields, window glass (4 pieces), and instrument panel seats in next stage. This project figured out the relevance between operation scale and cost, moreover, prosed recommendation for ELV recycle system by SWOT analysis. ASR could be recycled in two ways: alternative fuels, raw material substitution. As stated above, the feasible model of ASR disposal facility including process extension in-situ, co-disposal plant, and set up new steam/electricity cogeneration system. Also completed the guideline for applying for ASR disposal facility. 3. Promote classification management of the ELV dismantlers The project revised the classification management scoring form, and created incentive of ELV recycle issuing form triplicate. Completed 3 educational sessions of ELV’s workshops and presented the issue concerning how to improve the in-situ management (including industrial safety and improve working function), proper ways to recycle refrigerant, and assist participants to familiar with the operation of RRMS. Overall, total 143 people attended these meetings. 4. Visit foreign ELV dismantlers and disposal institutions This project has studied foreign ELV recycling mechanism paper and proposal implementation domestically. Coordinated EPA need canceled visiting overseas this year, and the project price has completed reduction acceptance affair. "
Project Year
2019
Organizer
"Recycling Fund Management Board"
Executive Unit
"財團法人台灣產業服務基金會"
Reporting download URL
Publish Date
20200331
「"Enhanced ELV Recycling Procedure and Reduction of Automobile Sh」所屬的資料集:「EPQSummary_WasteManagement」的其他資料
Project Title:
"Study on the waste glass bottle replaced the silica raw material in cement ingredient"
Project Subject:
"The increasing amount of waste disposal in Taiwan was getting hard to recycle in past decade. The t
Project Year:
2019
Organizer:
"Recycling Fund Management Board"
Project Title:
"The improvement project of general waste disposal and management measures"
Project Subject:
"The project was implemented over the period from March 8, 2016 to December 31, 2016. The purposes o
Project Year:
2016
Organizer:
"Department of Waste Management"
Project Title:
"Environmental Service Industry Cross-Strait Communication-the resource recycling and waste clearanc
Project Subject:
"To popularize the related works of resource recycling and waste management in cross-strait, this pr
Project Year:
2014
Organizer:
"Recycling Fund Management Board"
Project Title:
"Project of Basel Convention Participation and Abroad Visit of Waste Treatment Facilities"
Project Subject:
"The briefly major outcomes of this project are as following: (1) We have joined the OEWG 10 and tak
Project Year:
2016
Organizer:
"Department of Waste Management"
Project Title:
"Cradle-to-Cradle Design Principles Promotion Project – Workplan"
Project Subject:
"The main work items of the project were as follows: (1) Undertaking work related to the promotion o
Project Year:
2017
Organizer:
"Department of Waste Management"
Project Title:
"Chiayi County waste incineration bottom slag re-use plan in 2016"
Project Subject:
"Chiayi County waste incineration bottom slag re-use plan in 2016,adopt an open tender, the minimum
Project Year:
2016
Organizer:
"Environmental Protection Bureau, Chiayi County"
Project Title:
"Project of Resource Recycling Business Reporting and Management System Upgrades and Maintenance "
Project Subject:
"The project implementation period was from January 2013 to December 2014 and the main job was to as
Project Year:
2013
Organizer:
"Recycling Fund Management Board"
Project Title:
"Development of waste LCD glass foaming to be building light aggregate by microwave"
Project Subject:
"The waste LCD glass with small bubbles was studied. The bulk material with pores on the surface and
Project Year:
2016
Organizer:
"Recycling Fund Management Board"
Project Title:
"Waste Treating Permit Management in Public and Private Waste Clearance and Disposal Organizations,
Project Subject:
"This project was carried out from March 31st, 2017 to December 31st, 2017. For the propose of guidi
Project Year:
2017
Organizer:
"Department of Waste Management"
Project Title:
"106 year Chiayi City refined recycle program"
Project Subject:
"In order to encourage the citizens to participate in the recycling activities, expand the scope of
Project Year:
2017
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Development of Post-Consumer Recycled Plastic additives for composite materials"
Project Subject:
"After a series of the classification processes, sorting processes, crushing processes, and washing
Project Year:
2017
Organizer:
"Recycling Fund Management Board"
Project Title:
"Research on Resourciziation and Multiple Applications of Mixed Waste Labels"
Project Subject:
"This project is aimed at innovative research and development technology for waste label processing
Project Year:
2021
Organizer:
"Recycling Fund Management Board"
Project Title:
"High Value-added Application of Recycle Pulps from Waste Paper Containers – Production of Nano Cell
Project Subject:
"Even though a feasible treatment process of waste food containers has been established, only a low
Project Year:
2019
Organizer:
"Recycling Fund Management Board"
Project Title:
""
Project Subject:
"The total amount of kitchen waste in Taiwan is 2,000 tons/day. Usually, kitchen waste was utilized
Project Year:
2014
Organizer:
"Bureau of Environmental Inspection"
Project Title:
"Development of the Separation of Tin/Lead Metals from Waste PCB Solders."
Project Subject:
"This project is focused on the recovery separation of tin-lead solder from waste printed circuit bo
Project Year:
2015
Organizer:
"Recycling Fund Management Board"
"-"2019"-"
Project Title:
"-"
Project Subject:
"-"
Project Year:
2019
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"無"
Project Subject:
"The work items to be implemented in this project include the following: (1) performing inspection o
Project Year:
2018
Organizer:
"Environmental Protection Bureau, Chiayi City"
Project Title:
"Counseling and disposing of derivative of wastes plastic containers after treatment plan"
Project Subject:
"Many incinerator plants in Taiwan are being renovated, so incineration capacity is insufficient in
Project Year:
2019
Organizer:
"Recycling Fund Management Board"
Project Title:
"Management of Industrial Waste and Evaluation of Strategies for Resource Recycling"
Project Subject:
"The problems of promoting resource recycling in Taiwan mainly lie in production, consumption, waste
Project Year:
2021
Organizer:
"Department of Waste Management"
Project Title:
"General Waste Clean Strategy and Legislation Planning Project 2015."
Project Subject:
"This project was implemented over the period between February 26, 2015 and the end of December 2015
Project Year:
2015
Organizer:
"Department of Waste Management"
Project Title:
"To Establish the Final Disposal of Waste Substance Measures Plan"
Project Subject:
" Following past results of land reclamation using wastes, the Project has sought to study related c
Project Year:
2015
Organizer:
"Department of Waste Management"
Project Title:
"Evaluation on Industrial Waste Disposal Management, 2020 "
Project Subject:
"The project included five major work items, the following described each parts results of the work.
Project Year:
2020
Organizer:
"Department of Waste Management"
Project Title:
"Launches Waste Reduction, Recycling and Subsidy Program at Taichung in 2019."
Project Subject:
"The Completion of this project has reached 100% since the contract date from August 23, to December
Project Year:
2019
Organizer:
"Environmental Protection Bureau, Taichung City"
Project Title:
"Project of Auditing & Certification Group on Regulated Recyclable Waste(Waste Electronic and Electr
Project Subject:
"For the recycled items audit recognized organization (recycled electronic items and wasteful materi
Project Year:
2015
Organizer:
"Recycling Fund Management Board"
Project Title:
"Project for Management and Appraisal Work of Refuse Incineration Plants and Public-owned Landfills"
Project Subject:
"A.Refuse Incineration Plant Portion
In order to ensure the effective supervision of the management
Project Year:
2018
Organizer:
"Bureau of Environmental Inspection"
Project Title:
"Technology development for recycling of plastic lampshade from waste LED lighting sources"
Project Subject:
" Compared with traditional illumination light sources, LED lighting sources are more environmen
Project Year:
2021
Organizer:
"Recycling Fund Management Board"
Project Title:
"Project for Management and Appraisal Work of Refuse Incineration Plants and Public-owned Landfills"
Project Subject:
"A. Refuse Incineration Plant Portion
In order to ensure the effective supervision of the management
Project Year:
2019
Organizer:
"Bureau of Environmental Inspection"
Project Title:
"The Inspection and Certification Third Party on Due Recycled Waste(Non-Plastic Waste Containers)"
Project Subject:
"The project period was from Jan 01, 2013 to Dec 31, 2014. According to the results of auditing and
Project Year:
2013
Organizer:
"Recycling Fund Management Board"
Project Title:
""
Project Subject:
"Over the years, agriculture, fishery, and animal industry have been the major industry in Yulin Cou
Project Year:
2014
Organizer:
"Environmental Protection Bureau Yunlin County"
Project Title:
"Development of high efficiency waste tire rubber recycling technology"
Project Subject:
"Around the world it was estimated that about 30 million tons of tyre waste were generated per year,
Project Year:
2017
Organizer:
"Recycling Fund Management Board"
行政院環境保護署 的其他資料集
空氣品質小時值_連江縣_馬祖站
每1時更新,508陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:24
行政院環境保護署乾電池汞、鎘含量確認文件資料
不定期更新更新,169張先生 | 02-23117722#2615 | 2022-01-14 01:26:10
行政院環境保護署空氣品質小時值_臺南市_安南站
每小時更新更新,235謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:16
行政院環境保護署環保署毒物及化學物質局補、捐(獎)助團體及個人情形表
每季更新更新,71陳小姐 | 02-23257399#55434,02-23257399#55432 | 2022-01-15 01:09:58
行政院環境保護署執行機關資源回收量
每月更新更新,232謝小姐 | 02-23117722#2103 | 2022-01-14 01:21:18
行政院環境保護署
建檔公廁明細-新竹市
不定期更新更新,214曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:15:00
行政院環境保護署非甲烷碳氫化合物(NMHC)監測小時值
每1日更新,190陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:33
行政院環境保護署桃園市水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,56許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:41
行政院環境保護署焚化廠底渣原始檢測資料
每1月更新,316莊先生 | 04-22521718#53523 | 2023-08-07 01:02:33
行政院環境保護署屏東縣水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,58許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:51
行政院環境保護署
毒性化學物質釋放量公開資訊
不定期更新更新,132李小姐 | (02)23257399#55318 | 2023-07-27 01:00:19
行政院環境保護署苗栗縣重要環保統計資料
每1月更新,218顏先生 | 02-23117722#2109 | 2023-08-07 01:00:15
行政院環境保護署焚化廠營運年報
每1年更新,156莊先生 | 04-22521718#53523 | 2023-08-07 01:02:34
行政院環境保護署環境影響差異分析報告專案小組審查會議紀錄
每2月更新,133黃先生 | 02-23117722#2748 | 2023-08-06 01:02:18
行政院環境保護署地下水污染物監測及管制標準
不定期更新更新,138陳小姐 | 02-2383-2389#8207 | 2022-01-14 01:20:11
行政院環境保護署
新竹市水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,58許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:43
行政院環境保護署重點事業廢棄物-有機廢液之產出及清理流向
每月更新更新,249陳先生 | 02-2311-7722#2682 | 2022-01-14 01:24:22
行政院環境保護署建檔公廁明細-彰化縣
不定期更新更新,176賴先生 | 04-2252-1718#53686 | 2023-07-27 01:01:58
行政院環境保護署環境教育人員認證資料
每1月更新,75盧小姐 | 03-4020789#606 | 2023-07-27 01:04:48
行政院環境保護署使用中機動車輛噪音資料-機車
不定期更新更新,346謝先生 | 02-23712121#6403 | 2023-07-30 01:03:30
行政院環境保護署
PM10日均值(每日提供)
每日更新更新,102謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:15
行政院環境保護署公告應回收項目之責任業者列管資料
每年更新更新,64廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:26:07
行政院環境保護署EPQSummary_NoiseAndVibration
不定期更新更新,249陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:50
行政院環境保護署空氣品質小時值_高雄市_橋頭站
每1時更新,448陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:43
行政院環境保護署監測車(光化)基本資料
不定期更新更新,49謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:19
行政院環境保護署
河川水質季監測資料
每3月更新,193郭先生 | 2311-7722#2399 | 2023-08-07 01:02:03
行政院環境保護署環境教育講習件數統計資料
每季更新更新,62李小姐 | 02-23117722#2724 | 2022-01-15 01:10:41
行政院環境保護署旅館或觀光旅館之興建或擴建類別環境影響說明書
每2月更新,74黃先生 | 02-23117722#2748 | 2023-08-05 01:01:08
行政院環境保護署行政院環境保護署環境保護基金附屬單位決算
每1年更新,55林小姐 | 02-2311-7722#2169 | 2023-08-09 01:05:50
行政院環境保護署環評監督委員會監督委員名單
2年更新,50陳先生 | 04-2252-1718#51207 | 2022-01-15 01:13:16
行政院環境保護署