Urban area noise mapping project2008From April 18 2007, this pro
「Urban area noise mapping project2008From April 18 2007, this pro」於資料集「EPQSummary_ChemicalSubstanceManagement」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:48。 欄位Project Title的內容是Urban area noise mapping project , 欄位Project Subject的內容是From April 18 2007, this project has been implemented and the
scheduled progress has been achieved. The following is the brief
presentation of primary achievements:
First, the latest applicable specifications and codes widely used in
EU and USA, and the information regarding the making of urban noise
maps that have been carried out in EU countries, USA and Asia cities
were collected for data summarization. The status of implementation in
these countries is presented here in terms of the difficulties during the
implementation, features of the implementation and its advantages and
drawbacks as well for the reference of EPA and fellow environmental
protection agencies in future operations. Secondly, make a brief
description of common Urban Noise Mapping software in our country.
Also, the methods of data conversion for major factors of influence, such
as road noises, buildings, and noise meas urement, are provided. At the
same time, the project is described the costs and benefits analysis of
implement Noise Mapping and provided the noise control policy and
noise mapping plans.
Next, the project had been finished 50 points environmental noise
monitoring, each points has monitored for 24 hours, as input source data
for noise mapping used. Then, a practical noise map making and
planning was carried out at a south Kaohsiung area. In this project, a
2D simulation urban noise map was carried out on a n area of 111 km2 of
North Kaohsiung and an area of 245 km2 in all Kaohsiung City and 3D
simulation of 10 km2 in Kaohsiung City.
Including Ciangjhen; Lingya; Cining and Sianogang etc., district. The
simulation software LIMA was introduced in the urban noise map
simulation based on several scenarios, including freeways, expressways,
regional roads, major city roads, general city road s, all roads and city
blocks with buildings. Moreover, the simulation has incorporated
variety of parameters, for example, daytime noise level(Ld), evening
noise level(Le), nighttime noise level (Ln),all day equivalent continuous
sound level(Leq)and day-evening- night noise level (Lden), and GIS was
employed for graphic data processing. The results were summarized
and posted on EPA website for the reference of local administrations.
For the results of simulation executed in this project, also made the
ana lysis for simulation effects, noise contour area influences, and effect
of fixed receipt points.
So far two noise counseling meetings have been held to present the
achievement of this project, and in the meetings the relevant
specifications and codes of EU regarding noise map making were
introduced for exchanges of experience and suggestion and for the
reference of EPA and fellow environmental agencies. Also, another
conference of noise operation reviews and achievement discussion was
held for the simulation results of this project. , 欄位Project Year的內容是2008 , 欄位Organizer的內容是Department of Air Quality Protection & Noise Control , 欄位Executive Unit的內容是台灣思百吉股份有限公司 , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=856&proj_id=SXROCYQELW&doc_kind=1 , 欄位Publish Date的內容是20090301 。
Project Title
Urban area noise mapping project
Project Subject
From April 18 2007, this project has been implemented and the scheduled progress has been achieved. The following is the brief presentation of primary achievements: First, the latest applicable specifications and codes widely used in EU and USA, and the information regarding the making of urban noise maps that have been carried out in EU countries, USA and Asia cities were collected for data summarization. The status of implementation in these countries is presented here in terms of the difficulties during the implementation, features of the implementation and its advantages and drawbacks as well for the reference of EPA and fellow environmental protection agencies in future operations. Secondly, make a brief description of common Urban Noise Mapping software in our country. Also, the methods of data conversion for major factors of influence, such as road noises, buildings, and noise meas urement, are provided. At the same time, the project is described the costs and benefits analysis of implement Noise Mapping and provided the noise control policy and noise mapping plans. Next, the project had been finished 50 points environmental noise monitoring, each points has monitored for 24 hours, as input source data for noise mapping used. Then, a practical noise map making and planning was carried out at a south Kaohsiung area. In this project, a 2D simulation urban noise map was carried out on a n area of 111 km2 of North Kaohsiung and an area of 245 km2 in all Kaohsiung City and 3D simulation of 10 km2 in Kaohsiung City. Including Ciangjhen; Lingya; Cining and Sianogang etc., district. The simulation software LIMA was introduced in the urban noise map simulation based on several scenarios, including freeways, expressways, regional roads, major city roads, general city road s, all roads and city blocks with buildings. Moreover, the simulation has incorporated variety of parameters, for example, daytime noise level(Ld), evening noise level(Le), nighttime noise level (Ln),all day equivalent continuous sound level(Leq)and day-evening- night noise level (Lden), and GIS was employed for graphic data processing. The results were summarized and posted on EPA website for the reference of local administrations. For the results of simulation executed in this project, also made the ana lysis for simulation effects, noise contour area influences, and effect of fixed receipt points. So far two noise counseling meetings have been held to present the achievement of this project, and in the meetings the relevant specifications and codes of EU regarding noise map making were introduced for exchanges of experience and suggestion and for the reference of EPA and fellow environmental agencies. Also, another conference of noise operation reviews and achievement discussion was held for the simulation results of this project.
Project Year
2008
Organizer
Department of Air Quality Protection & Noise Control
Executive Unit
台灣思百吉股份有限公司
Reporting download URL
https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=856&proj_id=SXROCYQELW&doc_kind=1
Publish Date
20090301
「Urban area noise mapping project2008From April 18 2007, this pro」所屬的資料集:「EPQSummary_ChemicalSubstanceManagement」的其他資料
Project Title:
The Promotion to Chemical Dialogue of Asia-Pacific Economic Cooperation 2022
Project Subject:
This study is to implement the plan of the third year of the APEC Chemical Dialogue of the Toxic and
Project Year:
2022
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
"The Establishment of Taiwan Environmental Vector and Pest Monitoring and Control Technology Plan 20
Project Subject:
"The first step of pest control is the sanitary improvement, but the goal cannot be achieved in a sh
Project Year:
2020
Organizer:
"Toxic and Chemical Substances Bureau"
Project Title:
A supporting to air quality modeling and control strategy
Project Subject:
1. Introduction
According to Article 6, Paragraphs 2 and 3 of the Air Pollution Control Act, those n
Project Year:
2009
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
A Study of Definition to Waste Recycling Items and Impact Factors of Fee Settings
Project Subject:
Guided by the principles of integrated research, this project undertakes a comprehensive examination
Project Year:
2005
Organizer:
Recycling Fund Management Board
Project Title:
"2017 development of public health pesticide formulation standard"
Project Subject:
"This study aims to create a consistent and unified standard for the registration and control of pub
Project Year:
2017
Organizer:
"Toxic and Chemical Substances Bureau"
Project Title:
""
Project Subject:
"Recycling and Grant Review Related Works: Until December 31, 2013, the recurrent funding of 2013 ha
Project Year:
2013
Organizer:
"Recycling Fund Management Board"
Project Title:
Inspecting and Analyzing the Collection and Recycling systems of Waste Batteries and Waste Lamps, an
Project Subject:
The project period was from Jan 18, 2011 to Dec 31, 2011. The tasks included enhancing the collectio
Project Year:
2011
Organizer:
Recycling Fund Management Board
Project Title:
A Study of Investigation for Recycling and Treatment Cost for Waste Recycling Items and Disposal Fee
Project Subject:
Guided by the principles of integrated research, this project undertakes a comprehensive examination
Project Year:
2006
Organizer:
Recycling Fund Management Board
Project Title:
Ping Tung County Waste Recycling Inspection and Promotion on the Responsible Businesses and Shops
Project Subject:
For the purpose of increasing recycling rate of Ping Tung County, Ping Tung Environmental Protection
Project Year:
2007
Organizer:
Environmental Protection Bureau, Pingtung County
Project Title:
The project of international convention and international exchange for promoting the management of c
Project Subject:
The achievements of the project include: 1) The latest information on the Stockholm Convention and i
Project Year:
2019
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
Research and analyze the promotion of the scrap tire-based asphalt-rubber technique
Project Subject:
The project covers three dimensions: (1) Research and analyze the promotion of the scrap tire-based
Project Year:
2012
Organizer:
Recycling Fund Management Board
Project Title:
Plan for the Center Region of Taiwan Emergency Response Team for Environmental Toxic Chemical Incide
Project Subject:
Our Emergency Response Teams (ERTs) in the central Taiwan have continued our operation in 2013 at tw
Project Year:
2013
Organizer:
Department of Environmental Sanitation & Toxic Substance Management
Project Title:
An Assessment of Integrated Strategies incorporating Energy, Economics and Environment(II)
Project Subject:
Under the background of Kyoto Protocol, Taiwan’s non-nuclear policy and its strong commitment to sus
Project Year:
2006
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
Noise Management System and Noise Control Information Web Update and Maintenance Project
Project Subject:
This project had developed many results this year in the maintenance of the noise management system.
Project Year:
2009
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
Project of Assessment and Management of Toxic Chemical Substances
Project Subject:
The primary goal of this plan, which was implemented from March 16, 2012 to December 31, 2012, was t
Project Year:
2012
Organizer:
Department of Environmental Sanitation & Toxic Substance Management
Project Title:
The Measurement of Air Pollutant Emissions from Petrochemical Industrial Parks by Using Fourier Tran
Project Subject:
The measurement of eight petrochemical factories indicates potential leaks in four factories. Of the
Project Year:
2005
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
Evaluation of the uptake rate of benzene and formaldehyde by common tree plants in Taiwan
Project Subject:
The purpose of this project is to evaluate the uptake rate of benzene and formaldehyde by common tre
Project Year:
2007
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
Project for Expansion of Chemical Substances Registration System and Promotion of Relevant Affairs (
Project Subject:
The project period dates from 6th March to 15st December, 2019. The main tasks include sustaining th
Project Year:
2019
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
Promotion of the Toxic Chemical Substances Flow Tracking Management Project and Manpower Extension P
Project Subject:
本計畫執行期間106年1月1日至2月20日,圓滿達成計畫預期之成效,除全力配合環保署化學局之要求外,對於本計畫各項工作均全力以赴,以求達到計畫執行目標,以下為本計畫之執行成果結論。
一、支援中央及縣市
Project Year:
2017
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
Planning on emergency response system of toxic chemicals
Project Subject:
Production and use of chemicals improves the convenience of the livelihood and the development of sc
Project Year:
2012
Organizer:
Department of Environmental Sanitation & Toxic Substance Management
Project Title:
The Evaluation and Analysis of Subsidized Scopes for Resource Recycling Facility
Project Subject:
The project was conducted from Jan. 18 2013 to Dec. 31 2013.
The achievements for three main tasks w
Project Year:
2013
Organizer:
Recycling Fund Management Board
Project Title:
The project of integreting toxic material incidents management information and enhancing emergency
Project Subject:
The establishment of a unified toxic chemical accident prevention and response platform and improvem
Project Year:
2012
Organizer:
Department of Environmental Sanitation & Toxic Substance Management
Project Title:
Promoting professional and technical service project of consulting,monitoring and hazard prevention
Project Subject:
The Environmental Accident Consulting and Monitoring Center operates 24 hours a day year-round handl
Project Year:
2018
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
Performance of the project of vehicle noise type approval, conformity of product and vehicle noise c
Project Subject:
The purpose of this project is to assist EPA in dealing with the tasks of vehicle noise control and
Project Year:
2008
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
Special Implementation Project for New Diesel Vehicle Model Certification, Conformity of Production
Project Subject:
The number of motor vehicles in Taiwan area was over 22 million according to the 2006.09 statistics
Project Year:
2006
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
The Inspection and Certification Third Party on Due Recycled Waste(Non-Plastic Waste Containers and
Project Subject:
The execution results of the Project conducted by FTIS during the project period, April 01, 2005 to
Project Year:
2005
Organizer:
Recycling Fund Management Board
Project Title:
Estimate the Total Quantity of Automobile Emission、Plan the Strategy of Automobile Emission Control
Project Subject:
This project accomplished: estimation and verification of mobile source emissions for year 2009; est
Project Year:
2010
Organizer:
Department of Air Quality Protection & Noise Control
Project Title:
"Strengthening Toxic Chemicals Flowing Management and information system Project"
Project Subject:
"The project for this year covered 4 major scopes and a total of 42 jobs, specifically, helping the
Project Year:
2018
Organizer:
"Toxic and Chemical Substances Bureau"
Project Title:
The investigation of environmental pollution on tetrachloroethylene and hydrocarbonic solvent in dry
Project Subject:
There are three major objectives in this project. 1. To collect and compile Taiwan’s and internation
Project Year:
2016
Organizer:
Toxic and Chemical Substances Bureau
Project Title:
Project of inspection and certification on the recycling waste vehicle (Northern district of Taiwan)
Project Subject:
行政院環境保護署95年度委辦計畫英文摘要
Project of inspection and certification on the recycling waste vehicle (Norther
Project Year:
2006
Organizer:
Recycling Fund Management Board
行政院環境保護署 的其他資料集
特殊性工業區人工操作監測值資料檔
每1年更新,105劉小姐 | 02-2311-7722#6111 | 2023-07-27 01:04:59
行政院環境保護署事業廢棄物共同清除、處理機構許可資料
不定期更新更新,160何先生 | 02-2311-7722#2653 | 2022-01-14 01:26:04
行政院環境保護署固定污染源設備元件揮發性有機物洩漏檢測申報資料
每3月更新,268戴先生 | 02-2311-7722#6208 | 2023-08-07 01:02:40
行政院環境保護署新竹市重要環保統計資料
每1月更新,183顏先生 | 02-23117722#2109 | 2023-08-07 00:59:59
行政院環境保護署符合噪音管制標準車輛-國產機車
不定期更新更新,287章小姐 | 02-23712121#6407 | 2023-07-27 01:03:42
行政院環境保護署
建檔公廁明細-嘉義市
不定期更新更新,230賴先生 | 04-2252-1718#53686 | 2023-07-27 01:01:59
行政院環境保護署環保署環境影響評估審查委員會會議資料
每2月更新,75黃先生 | 02-23117722#2748 | 2023-08-05 01:00:47
行政院環境保護署各公告類別事業廢棄物自行處理申報量統計
每月更新更新,151陳先生 | 02-2311-7722#2682 | 2022-01-14 01:25:33
行政院環境保護署環保署官等學歷統計資料
每3月更新,39嚴小姐 | 02-23117722分機2133 | 2023-07-30 01:02:11
行政院環境保護署應回收廢棄物處理業者(廢家電資訊類)最大處理量資料
每年更新更新,51廖小姐 | 02-2370-5888#3103 | 2022-01-14 01:24:01
行政院環境保護署
建檔公廁明細-宜蘭縣
不定期更新更新,184賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:08
行政院環境保護署花蓮縣重要環保統計資料
每1月更新,145顏先生 | 02-23117722#2109 | 2023-08-07 01:00:00
行政院環境保護署空氣品質小時值_嘉義市_嘉義站
每1時更新,115陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:48
行政院環境保護署空氣品質小時值_新北市_淡水站
每小時更新更新,165謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:03:29
行政院環境保護署環保專案摘要資料_區域環境管理
不定期更新更新,95陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:57
行政院環境保護署
場址勘查紀錄表
不定期更新更新,128賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:17
行政院環境保護署臺北港物流倉儲區環境監測結果
不定期更新更新,92許先生 | 02-2311-7722#2641 | 2022-01-15 01:12:24
行政院環境保護署環境影響調查報告書專案小組審查會議紀錄
每2月更新,73黃先生 | 02-23117722#2748 | 2023-08-06 01:02:15
行政院環境保護署機車排氣檢驗站執行機車排氣檢驗業務費用
每1月更新,37李先生 | 02-23117722#6314 | 2023-07-27 01:03:50
行政院環境保護署道路交通音量監測結果統計(依時段分)
每季更新更新,104林先生 | 02-23712121#6403 | 2022-01-14 01:18:42
行政院環境保護署
紫外線即時監測資料
每1時更新,262陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:05
行政院環境保護署經濟部事業廢棄物再利用機構資料
每年更新更新,116李小姐 | 02-2311-7722#2633 | 2022-01-14 01:26:11
行政院環境保護署固定污染源空氣污染防制費收費統計
每年更新更新,94黃先生 | 02-23712121#6210 | 2022-01-15 01:09:43
行政院環境保護署執行機關一般廢棄物處理量
每1月更新,186顏先生 | 02-23117722#2109 | 2023-07-27 01:01:19
行政院環境保護署巡守隊明細資料
不定期更新更新,210謝小姐 | 02-2311-7722#2836 | 2022-01-15 01:12:07
行政院環境保護署
建檔公廁明細-嘉義縣
不定期更新更新,199曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:15:04
行政院環境保護署EPQSummary_PublicNuisanceDispute
不定期更新更新,130陳先生 | 02-2311-7722#2386 | 2023-07-27 01:02:16
行政院環境保護署道路交通音量監測結果統計(依管制區分)
每季更新更新,154林先生 | 02-23712121#6403 | 2022-01-14 01:18:41
行政院環境保護署已公告之飲用水水源水質保護區一覽表
不定期更新更新,70黃先生 | 02-23117722#2881 | 2022-01-15 01:10:25
行政院環境保護署0800資源回收免費專線-查詢廢乾電池、照明光源統計
每年更新更新,50莊先生 | 02-23705888#3108 | 2022-01-14 01:24:28
行政院環境保護署