time1: 0 time2: 0 time3: 0 time4: 0 total: 0 Medium and Long Term Plans for Waste Disposal Facilities in the Works
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

Medium and Long Term Plans for Waste Disposal Facilities in the Works

Medium and Long Term Plans for Waste Disposal Facilities in the Works」於資料集「Environmental Policy Monthly」由單位「行政院環境保護署」的楊先生所提供,聯繫電話是(02)23117722#2217,(02)23117722#2216,最近更新時間為:2022-01-15 01:13:03。 欄位編號的內容是428 , 欄位標題的內容是Medium and Long Term Plans for Waste Disposal Facilities in the Works , 欄位摘要的內容是The EPA is drafting the Medium and Long Term Plans for the Construction of Public Waste Disposal Facilities for the next ten years. The plan aims by 2010 to raise proper treatment rates for trash to 90% industrial waste to 90% and trash recycling rates to over 45%. Goals for the next four years (until 2004) include raising proper trash treatment rates to 88%. To implement these policies the EPA has requested all counties and cities to propose plan names and budgets necessary to meet the goals laid out for the next four years. To come up with comprehensive plans for the use of limited public construction resources, the various departments of the Executive Yuan are in the process of putting together the Medium and Long Term Public Construction Plans. The plans contain separate construction goals set for the next four and ten years. For this, the EPA called a meeting of all units on September 7 to draft future construction plans for trash disposal from 2001 to 2004. The EPA noted that current incineration rates are at 24.6%, proper trash disposal rates at 75%, and that several township trash landfills hit capacity each year. To solve these problems, the EPA will rely mainly on the trash disposal program drafted by the Bureau of Solid Waste Management. In the future most trash disposal will be based on incineration, and according to plans, within the next couple of years 21 large incinerators, 15 BOT and BOO incinerators and 10 small incinerators will be completed. For this reason, current trash disposal has concentrated on incinerator construction projects and ash residue treatment facilities. Medium and Long Term Construction Goals for Public Trash Disposal Target Year 1999 2000 2001 2002 2003 2004 2010 Trash Disposal Rates (%) 85 85 85 86 87 88 90 Incineration Rates (%) 44.6 57.9 70 80 90 Recycling (thousand tons) 600 700 750 800 800 800 *Provided by Taiwan EPA According to a draft of the Medium and Long Term Plans for the Construction of Public Waste Disposal Facilities formulated by the EPA, the ten year goals (until 2010) include raising proper disposal rates for trash to 90%, industrial waste to 90%, and raising trash recycling to above 45%. Four year goals include raising proper trash disposal rates to 88% by 2004, and the completion of 16 public incinerators before the year 2000, (including those already in operation), and another five before 2004. The four year plan also aims to complete 15 BOT and BOO incinerators before the year 2004. To implement the above stated policy goals, after internal discussions the EPA decided to again request that county and city governments propose the names of necessary plans and budgets based on the four year goals. An EPA official pointed out that in the past public construction plans were limited to hard construction or machinery purchases. But because the Executive Yuan has already passed this resolution, at present as long as a measure is clearly effective it can be incorporated into the Medium and Long Term Public Construction Plans. , 欄位全文的內容是The EPA is drafting the Medium and Long Term Plans for the Construction of Public Waste Disposal Facilities for the next ten years. The plan aims by 2010 to raise proper treatment rates for trash to 90% industrial waste to 90% and trash recycling rates to over 45%. Goals for the next four years (until 2004) include raising proper trash treatment rates to 88%. To implement these policies the EPA has requested all counties and cities to propose plan names and budgets necessary to meet the goals laid out for the next four years. To come up with comprehensive plans for the use of limited public construction resources, the various departments of the Executive Yuan are in the process of putting together the Medium and Long Term Public Construction Plans. The plans contain separate construction goals set for the next four and ten years. For this, the EPA called a meeting of all units on September 7 to draft future construction plans for trash disposal from 2001 to 2004. The EPA noted that current incineration rates are at 24.6%, proper trash disposal rates at 75%, and that several township trash landfills hit capacity each year. To solve these problems, the EPA will rely mainly on the trash disposal program drafted by the Bureau of Solid Waste Management. In the future most trash disposal will be based on incineration, and according to plans, within the next couple of years 21 large incinerators, 15 BOT and BOO incinerators and 10 small incinerators will be completed. For this reason, current trash disposal has concentrated on incinerator construction projects and ash residue treatment facilities. Medium and Long Term Construction Goals for Public Trash Disposal Target Year 1999 2000 2001 2002 2003 2004 2010 Trash Disposal Rates (%) 85 85 85 86 87 88 90 Incineration Rates (%) 44.6 57.9 70 80 90 Recycling (thousand tons) 600 700 750 800 800 800 *Provided by Taiwan EPA According to a draft of the Medium and Long Term Plans for the Construction of Public Waste Disposal Facilities formulated by the EPA, the ten year goals (until 2010) include raising proper disposal rates for trash to 90%, industrial waste to 90%, and raising trash recycling to above 45%. Four year goals include raising proper trash disposal rates to 88% by 2004, and the completion of 16 public incinerators before the year 2000, (including those already in operation), and another five before 2004. The four year plan also aims to complete 15 BOT and BOO incinerators before the year 2004. To implement the above stated policy goals, after internal discussions the EPA decided to again request that county and city governments propose the names of necessary plans and budgets based on the four year goals. An EPA official pointed out that in the past public construction plans were limited to hard construction or machinery purchases. But because the Executive Yuan has already passed this resolution, at present as long as a measure is clearly effective it can be incorporated into the Medium and Long Term Public Construction Plans. , 欄位年度的內容是2000 , 欄位月份的內容是3 , 欄位卷的內容是3 , 欄位期的內容是4 , 欄位順序的內容是1 , 欄位倒序的內容是2 , 欄位分類的內容是waste , 欄位標題2的內容是Medium and Long Term Plans for Waste Disposal Facilities in the Works , 欄位檔案位置的內容是print/V3/V3-04

編號

428

標題

Medium and Long Term Plans for Waste Disposal Facilities in the Works

摘要

The EPA is drafting the Medium and Long Term Plans for the Construction of Public Waste Disposal Facilities for the next ten years. The plan aims by 2010 to raise proper treatment rates for trash to 90% industrial waste to 90% and trash recycling rates to over 45%. Goals for the next four years (until 2004) include raising proper trash treatment rates to 88%. To implement these policies the EPA has requested all counties and cities to propose plan names and budgets necessary to meet the goals laid out for the next four years. To come up with comprehensive plans for the use of limited public construction resources, the various departments of the Executive Yuan are in the process of putting together the Medium and Long Term Public Construction Plans. The plans contain separate construction goals set for the next four and ten years. For this, the EPA called a meeting of all units on September 7 to draft future construction plans for trash disposal from 2001 to 2004. The EPA noted that current incineration rates are at 24.6%, proper trash disposal rates at 75%, and that several township trash landfills hit capacity each year. To solve these problems, the EPA will rely mainly on the trash disposal program drafted by the Bureau of Solid Waste Management. In the future most trash disposal will be based on incineration, and according to plans, within the next couple of years 21 large incinerators, 15 BOT and BOO incinerators and 10 small incinerators will be completed. For this reason, current trash disposal has concentrated on incinerator construction projects and ash residue treatment facilities. Medium and Long Term Construction Goals for Public Trash Disposal Target Year 1999 2000 2001 2002 2003 2004 2010 Trash Disposal Rates (%) 85 85 85 86 87 88 90 Incineration Rates (%) 44.6 57.9 70 80 90 Recycling (thousand tons) 600 700 750 800 800 800 *Provided by Taiwan EPA According to a draft of the Medium and Long Term Plans for the Construction of Public Waste Disposal Facilities formulated by the EPA, the ten year goals (until 2010) include raising proper disposal rates for trash to 90%, industrial waste to 90%, and raising trash recycling to above 45%. Four year goals include raising proper trash disposal rates to 88% by 2004, and the completion of 16 public incinerators before the year 2000, (including those already in operation), and another five before 2004. The four year plan also aims to complete 15 BOT and BOO incinerators before the year 2004. To implement the above stated policy goals, after internal discussions the EPA decided to again request that county and city governments propose the names of necessary plans and budgets based on the four year goals. An EPA official pointed out that in the past public construction plans were limited to hard construction or machinery purchases. But because the Executive Yuan has already passed this resolution, at present as long as a measure is clearly effective it can be incorporated into the Medium and Long Term Public Construction Plans.

全文

The EPA is drafting the Medium and Long Term Plans for the Construction of Public Waste Disposal Facilities for the next ten years. The plan aims by 2010 to raise proper treatment rates for trash to 90% industrial waste to 90% and trash recycling rates to over 45%. Goals for the next four years (until 2004) include raising proper trash treatment rates to 88%. To implement these policies the EPA has requested all counties and cities to propose plan names and budgets necessary to meet the goals laid out for the next four years. To come up with comprehensive plans for the use of limited public construction resources, the various departments of the Executive Yuan are in the process of putting together the Medium and Long Term Public Construction Plans. The plans contain separate construction goals set for the next four and ten years. For this, the EPA called a meeting of all units on September 7 to draft future construction plans for trash disposal from 2001 to 2004. The EPA noted that current incineration rates are at 24.6%, proper trash disposal rates at 75%, and that several township trash landfills hit capacity each year. To solve these problems, the EPA will rely mainly on the trash disposal program drafted by the Bureau of Solid Waste Management. In the future most trash disposal will be based on incineration, and according to plans, within the next couple of years 21 large incinerators, 15 BOT and BOO incinerators and 10 small incinerators will be completed. For this reason, current trash disposal has concentrated on incinerator construction projects and ash residue treatment facilities. Medium and Long Term Construction Goals for Public Trash Disposal Target Year 1999 2000 2001 2002 2003 2004 2010 Trash Disposal Rates (%) 85 85 85 86 87 88 90 Incineration Rates (%) 44.6 57.9 70 80 90 Recycling (thousand tons) 600 700 750 800 800 800 *Provided by Taiwan EPA According to a draft of the Medium and Long Term Plans for the Construction of Public Waste Disposal Facilities formulated by the EPA, the ten year goals (until 2010) include raising proper disposal rates for trash to 90%, industrial waste to 90%, and raising trash recycling to above 45%. Four year goals include raising proper trash disposal rates to 88% by 2004, and the completion of 16 public incinerators before the year 2000, (including those already in operation), and another five before 2004. The four year plan also aims to complete 15 BOT and BOO incinerators before the year 2004. To implement the above stated policy goals, after internal discussions the EPA decided to again request that county and city governments propose the names of necessary plans and budgets based on the four year goals. An EPA official pointed out that in the past public construction plans were limited to hard construction or machinery purchases. But because the Executive Yuan has already passed this resolution, at present as long as a measure is clearly effective it can be incorporated into the Medium and Long Term Public Construction Plans.

年度

2000

月份

3

3

4

順序

1

倒序

2

分類

waste

標題2

Medium and Long Term Plans for Waste Disposal Facilities in the Works

檔案位置

print/V3/V3-04

「Medium and Long Term Plans for Waste Disposal Facilities in the Works」所屬的資料集:「Environmental Policy Monthly」的其他資料

編號: 656
標題: EPA Encourages Private Enterprise to Establish Industrial Waste Final Disposal Sites
摘要: To resolve the difficult lack of industrial waste final disposal sites the EPA invited a number of c
全文: To resolve the difficult lack of industrial waste final disposal sites the EPA invited a number of c

編號: 843
標題: EPA Clamps Down on Farmland Polluters
摘要: The EPA initiated investigations of factories suspected of being pollution sources near agricultural
全文: The EPA initiated investigations of factories suspected of being pollution sources near agricultural

編號: 205
標題: Controls on General Waste Recyclers to be Relaxed
摘要: On August 5 the EPA formally announced an amendment to a portion of articles in the Public and Priva
全文: On August 5 the EPA formally announced an amendment to a portion of articles in the Public and Priva

編號: 208
標題: EIA Air Quality Modeling Requirements Announced
摘要: According to Article 49 of the Development Activity EIA Work Procedures the EPA set the scope of mod
全文: According to Article 49 of the Development Activity EIA Work Procedures the EPA set the scope of mod

編號: 268
標題: Scope of Industrial and Sewer Effluent Reporting Broadened
摘要: On October 23 an amendment to the Industrial and Sewer System Wastewater Effluent Reporting Guidelin
全文: On October 23 an amendment to the Industrial and Sewer System Wastewater Effluent Reporting Guidelin

編號: 969
標題: EPA Announces Water Quality Testing Results from Swimming Beaches
摘要: Seeking to protect the health and safety of people who wish to enjoy water fun in the summer the EPA
全文: Seeking to protect the health and safety of people who wish to enjoy water fun in the summer the EPA

編號: 629
標題: New Dioxin Standards Set for Small and Medium Incinerators
摘要: The EPA has completed formulation of the Draft Dioxin Control Standards for Small and Medium-sized W
全文: The EPA has completed formulation of the Draft Dioxin Control Standards for Small and Medium-sized W

編號: 359
標題: EPA Readies Secure Internet Reporting Mechanisms
摘要: The EPA launched access to electronic service by PIN on 30 April. As of that date members of the pub
全文: The EPA launched access to electronic service by PIN on 30 April. As of that date members of the pub

編號: 250
標題: New Plan to Encourage Retirement of Older Motorcycles Readied
摘要: The EPA recently finalized the compensation details of a new scheme to encourage the retirement of o
全文: The EPA recently finalized the compensation details of a new scheme to encourage the retirement of o

編號: 339
標題: Guidelines for Applying to Handle and Use Bituminous Coal and Petroleum Coke to be Announced
摘要: The EPA has completed the draft guideline for obtaining handling and use permits for bituminous coal
全文: The EPA has completed the draft guideline for obtaining handling and use permits for bituminous coal

編號: 99
標題: Environmental Impact Assessment Work Standards for Development Activities Announced
摘要: Environmental Impact Assessment  A regulation entitled Work Procedures for the Environmental Impact
全文: Environmental Impact Assessment  A regulation entitled Work Procedures for the Environmental Impact

編號: 805
標題: PET Bottle Refunds to Remain Until Year End
摘要: EPA Administrator Lung-Bin Hau announced on the 7th of August that out of consideration for those un
全文: EPA Administrator Lung-Bin Hau announced on the 7th of August that out of consideration for those un

編號: 379
標題: EPA Study Reveals Heavy Metal Content of Incinerator Air Emissions is Minute
摘要: In a six-month air pollution study begun in December 1998 the EPA focused on the heavy metal content
全文: In a six-month air pollution study begun in December 1998 the EPA focused on the heavy metal content

編號: 955
標題: Marine Pollution Emergency Response System Activated Due to Disabled Oil Tanker
摘要: Having suffered mechanical problems in Japanese waters on May 2 an oil tanker fully loaded with crud
全文: Having suffered mechanical problems in Japanese waters on May 2 an oil tanker fully loaded with crud

編號: 668
標題: Study Shows Recycling Gains in Popularity
摘要: Recycling has become something of a national pastime in Taiwan. According to the results of the EPA’
全文: Recycling has become something of a national pastime in Taiwan. According to the results of the EPA’

編號: 787
標題: More Recycling Collection Points Announced
摘要: The EPA-announced Regulations Governing the Registration of Product or Packaged Good Vendors and Man
全文: The EPA-announced Regulations Governing the Registration of Product or Packaged Good Vendors and Man

編號: 1520
標題: Industry Boosts Investment in Environmental R&D
摘要: Statistics of last year’s environmental expenditures show green spending in domestic production incr
全文: Statistics of last year’s environmental expenditures show green spending in domestic production incr

編號: 737
標題: Recycling of Fluorescent Light Tubes to Begin in 2002
摘要: For the last several years large volumes of waste fluorescent light tubes have been disposed of in l
全文: For the last several years large volumes of waste fluorescent light tubes have been disposed of in l

編號: 446
標題: R.O.C. – U.S. Energy Star Program Exchange Passed by the Executive Yuan
摘要: On September 20 the Executive Yuan passed the R.O.C. - U.S Energy Star Program Exchange proposed by
全文: On September 20 the Executive Yuan passed the R.O.C. - U.S Energy Star Program Exchange proposed by

編號: 39
標題: A Word from the Bureau of Air Quality p and Noise Control: Air Pollution Control Fees for Fixed Sou
摘要: Air Quality  Beginning July 1 1995, the EPA began collecting fees for fixed source emissions generat
全文: Air Quality  Beginning July 1 1995, the EPA began collecting fees for fixed source emissions generat

編號: 213
標題: EPA Steps Up Groundwater Remediation Efforts
摘要: In response to the public’s increasing concern over groundwater contamination the EPA has accelerate
全文: In response to the public’s increasing concern over groundwater contamination the EPA has accelerate

編號: 994
標題: Reporting of Toxic Chemical Substances Allowed over Internet
摘要: The online reporting of toxic chemical substances allowed by the EPA since July 1, will not only mak
全文: The online reporting of toxic chemical substances allowed by the EPA since July 1, will not only mak

編號: 583
標題: Remote Sensing Technology for Marine Oil Pollution Developed
摘要: On June 18 the EPA announced the results of an R&D project to develop remote sensing technology for
全文: On June 18 the EPA announced the results of an R&D project to develop remote sensing technology for

編號: 24
標題: A Word from the Bureau of Comprehensive Planning: Trends in Taiwan's Environmental Impact Assessment
摘要: General Policy  General Policy  Taiwan's environmental impact assessment (EIA) system began to take
全文: General Policy  Taiwan's environmental impact assessment (EIA) system began to take shape in 1984 an

編號: 368
標題: Provincial EPB to be Reorganized as EPA Central Taiwan Office
摘要: Initial plans called for the Taiwan Provincial Dept. of Environmental Protection (DEP) and its three
全文: Initial plans called for the Taiwan Provincial Dept. of Environmental Protection (DEP) and its three

編號: 44
標題: Executive Yuan Passes Amendments to Air Pollution Act
摘要: Air Quality  The Air Pollution Control Act was last revised in February 1992, more than five years a
全文: Air Quality  The Air Pollution Control Act was last revised in February 1992, more than five years a

編號: 427
標題: Local Governments Urged to Strengthen Permit System for Stationary Pollution Sources
摘要: Near the end of last year the work of performing air pollution permit reviews was transferred from t
全文: Near the end of last year the work of performing air pollution permit reviews was transferred from t

編號: 774
標題: Guidelines for the Establishment of Industrial Parks Pass Policy EIA Review
摘要: Following the passage of its first EIA review of government policy in April the EPA Environmental Im
全文: Following the passage of its first EIA review of government policy in April the EPA Environmental Im

編號: 619
標題: Edgar Lin Stresses EPA Will Hold It's Ground in Inter-agency Discussions
摘要: During a discussion with environmental groups EPA Administrator Edgar Lin stated that in the past th
全文: During a discussion with environmental groups EPA Administrator Edgar Lin stated that in the past th

編號: 187
標題: Study Recommends Strengthening EMS Incentives
摘要: In addition to implementing research and discussion on EMS related policies the EPA has contracted
全文: In addition to implementing research and discussion on EMS related policies the EPA has contracted

行政院環境保護署 的其他資料集

道路交通音量監測結果統計(依時段分)

每季更新更新,153

林先生 | 02-23712121#6403 | 2022-01-14 01:18:42

行政院環境保護署

行政院環境保護署單位決算

每1年更新,44

何先生 | 02-23117722#2158 | 2023-08-09 01:04:28

行政院環境保護署

環境影響說明書附表五:施工階段

每2月更新,159

黃先生 | 02-23117722#2748 | 2023-08-05 01:00:54

行政院環境保護署

總碳氫化合物(THC)監測小時值(每小時提供)

每小時更新更新,141

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:09

行政院環境保護署

廠商獲頒產品數統計(第二類)

每季更新更新,62

孫小姐 | 02-23117722#2926 | 2022-01-14 01:17:49

行政院環境保護署

0800資源回收免費專線-查詢事業廢棄物統計

每年更新更新,55

莊先生 | 02-23705888#3108 | 2022-01-14 01:24:31

行政院環境保護署

空氣品質小時值_桃園市_大園站

每1時更新,125

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:08

行政院環境保護署

宜蘭縣重要環保統計資料

每1月更新,249

顏先生 | 02-23117722#2109 | 2023-08-07 01:00:20

行政院環境保護署

縣市(嘉義市)小時值-每小時

每小時更新更新,243

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:59

行政院環境保護署

行政院環境保護署環境保護產品管理作業規範

每季更新更新,58

孫小姐 | 02-23117722#2926 | 2022-01-15 01:13:10

行政院環境保護署

核能一廠用過核燃料中期貯存計畫環境監測資料

不定期更新更新,66

陳先生 | 04-22521718#51207 | 2022-01-14 01:21:59

行政院環境保護署

空氣污染防制區範圍圖

不定期更新更新,48

周小姐 | 02-23117722#6102 | 2023-07-27 01:06:03

行政院環境保護署

噪音稽查次數

每年更新更新,120

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:41

行政院環境保護署

環保新聞

每3日更新,289

陳小姐 | 02-2311-7722#2343 | 2023-07-30 00:59:20

行政院環境保護署

水污染防治各項許可申請收費標準

不定期更新更新,50

王先生 | 02-2311-7722#2832 | 2022-01-14 01:23:05

行政院環境保護署

國內已制訂之碳足跡產品類別規則文件清單

不定期更新更新,48

陳先生 | 02-23117722#2932 | 2023-08-09 01:05:36

行政院環境保護署

建檔公廁明細-連江縣

不定期更新更新,150

賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:02

行政院環境保護署

新竹市水量水質自動監測連線傳輸監測紀錄值即時資料集

不定期更新更新,57

許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:43

行政院環境保護署

核能四廠環境監測資料

不定期更新更新,47

陳先生 | 04-22521718#51207 | 2022-01-14 01:22:00

行政院環境保護署

空氣品質小時值_連江縣_馬祖站

每1時更新,493

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:24

行政院環境保護署

環境教育人員認證得採計之專業領域課程(ODT)

不定期更新更新,52

盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:24

行政院環境保護署

環保專案摘要資料_區域環境管理

不定期更新更新,115

陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:57

行政院環境保護署

固定污染源-煙道基本參數檔

不定期更新更新,120

陳小姐 | 02-2371-2121#6216 | 2022-01-14 01:02:45

行政院環境保護署

縣市(直轄市)小時值-每小時

每小時更新更新,180

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:00:23

行政院環境保護署

空氣品質小時值_南投縣_竹山站

每1時更新,369

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:28

行政院環境保護署

環境教育(行政)人員(專長)認證申請書

不定期更新更新,50

盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:29

行政院環境保護署

交通事業廢棄物再利用機構資料

每1年更新,82

李小姐 | 02-2311-7722#2626 | 2023-07-27 00:59:36

行政院環境保護署

酸雨成份分析值

每6月更新,197

許小姐 | 02-23117722#6113 | 2023-07-28 18:51:41

行政院環境保護署

酸雨監測小時值(每小時提供)

每小時更新更新,96

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:05:11

行政院環境保護署

土壤319公頃_一公頃一採樣點位置圖

不更新更新,55

謝先生 | (02)23832389*8302 | 2022-01-15 01:15:53

行政院環境保護署