「Initial Draft of Air Act Enforcement Rules Completedair1999」於資料集「Environmental Policy Monthly」由單位「行政院環境保護署」的楊先生所提供,聯繫電話是(02)23117722#2217,(02)23117722#2216,最近更新時間為:2022-01-15 01:13:03。 欄位編號的內容是309 , 欄位標題的內容是Initial Draft of Air Act Enforcement Rules Completed , 欄位摘要的內容是The EPA recently completed a thorough review and modification of the Air Pollution Control Act Enforcement Rules and submitted the draft to the Executive Yuan at the end of February. Amendments to other related regulations will be finished by the end of March. Also the EPA estimates that control area plans will be completed by June this year, at the earliest, or by the end of the year at the latest. As for implementing TPQC areas, SOX and NOX will the first pollutants targeted.
This year, the Air Pollution Control Act underwent its third amendment process. These changes integrated strategies for total pollutant quantity control (TPQC) and clean fuels, and established the system of total air pollution control zones. Because of these sweeping revisions, related regulatory systems must also undergo major modifications. Of these, the Air Pollution Control Act Enforcement Rules had the most urgent need for amendment. The EPA recently completed revisions to the enforcement rules, the key points of which include the following:
1. The scope of control of toxic air pollutants was expanded.
2. Pollution source classification principles were modified in order to further clarify the scope of mobile and stationary pollution sources.
3. Following the downsizing of the Taiwan Provincial Government, adjustments were made to the jurisdictional limits of each level of competent authority; and regulations were reviewed for their suitability to current needs.
4. Stipulate the methodology to determine whether air pollution control zones or TPQC areas comply with air quality standards; and, establish the basis for classifying these zones and areas.
5. Stipulate the content of central competent authority plans for setting TPQCs; and, stipulate the content of air pollution control plans as set by local-level government agencies.
6. Revise the principles for determining the location and number of general air quality monitoring stations.
7. Set requirements for stationary pollution sources to install continuous emissions monitoring equipment; and set time requirements and other regulations for real-time reporting to competent authorities.
8. Require stationary pollution sources to include pollutant emission concentrations and operating conditions in submitted emissions monitoring records, and set relevant requirements for operation.
9. Amend regulations concerning visual inspection of automobile emissions.
10.Stipulate methods for performing periodic automobile emissions testing.
11.Stipulate requirements for extending improvement deadlines, defining improvement plan contents, receiving agency, tracking of implementation status, and establishing methods for determining improvements that have not been implemented. These changes will unify enforcement activities and clarify for firms their rights and responsibilities.
As for implementation timeframe, the EPA submitted the draft to the Executive Yuan for review at the end of February. Control area planning will go into effect at the end of June this year, at the earliest, and by the end of the year at the latest. Due to the necessity of complying with EIA reviews and other requirements such as allowable emission increase amounts, additional support measures will be added at the end of the year, depending on degree of urgency.
As for the implementation of TPQCs, the central air quality zone will be used as a pilot demonstration area. And, because the tools for controlling relevant SOX and NOX pollutants are relatively mature, TPQC activities will likely first focus on these two pollutants. , 欄位全文的內容是The EPA recently completed a thorough review and modification of the Air Pollution Control Act Enforcement Rules and submitted the draft to the Executive Yuan at the end of February. Amendments to other related regulations will be finished by the end of March. Also the EPA estimates that control area plans will be completed by June this year, at the earliest, or by the end of the year at the latest. As for implementing TPQC areas, SOX and NOX will the first pollutants targeted.
This year, the Air Pollution Control Act underwent its third amendment process. These changes integrated strategies for total pollutant quantity control (TPQC) and clean fuels, and established the system of total air pollution control zones. Because of these sweeping revisions, related regulatory systems must also undergo major modifications. Of these, the Air Pollution Control Act Enforcement Rules had the most urgent need for amendment. The EPA recently completed revisions to the enforcement rules, the key points of which include the following:
1. The scope of control of toxic air pollutants was expanded.
2. Pollution source classification principles were modified in order to further clarify the scope of mobile and stationary pollution sources.
3. Following the downsizing of the Taiwan Provincial Government, adjustments were made to the jurisdictional limits of each level of competent authority; and regulations were reviewed for their suitability to current needs.
4. Stipulate the methodology to determine whether air pollution control zones or TPQC areas comply with air quality standards; and, establish the basis for classifying these zones and areas.
5. Stipulate the content of central competent authority plans for setting TPQCs; and, stipulate the content of air pollution control plans as set by local-level government agencies.
6. Revise the principles for determining the location and number of general air quality monitoring stations.
7. Set requirements for stationary pollution sources to install continuous emissions monitoring equipment; and set time requirements and other regulations for real-time reporting to competent authorities.
8. Require stationary pollution sources to include pollutant emission concentrations and operating conditions in submitted emissions monitoring records, and set relevant requirements for operation.
9. Amend regulations concerning visual inspection of automobile emissions.
10.Stipulate methods for performing periodic automobile emissions testing.
11.Stipulate requirements for extending improvement deadlines, defining improvement plan contents, receiving agency, tracking of implementation status, and establishing methods for determining improvements that have not been implemented. These changes will unify enforcement activities and clarify for firms their rights and responsibilities.
As for implementation timeframe, the EPA submitted the draft to the Executive Yuan for review at the end of February. Control area planning will go into effect at the end of June this year, at the earliest, and by the end of the year at the latest. Due to the necessity of complying with EIA reviews and other requirements such as allowable emission increase amounts, additional support measures will be added at the end of the year, depending on degree of urgency.
As for the implementation of TPQCs, the central air quality zone will be used as a pilot demonstration area. And, because the tools for controlling relevant SOX and NOX pollutants are relatively mature, TPQC activities will likely first focus on these two pollutants. , 欄位年度的內容是1999 , 欄位月份的內容是2 , 欄位卷的內容是2 , 欄位期的內容是9 , 欄位順序的內容是1 , 欄位倒序的內容是2 , 欄位分類的內容是air , 欄位標題2的內容是Initial Draft of Air Act Enforcement Rules Completed , 欄位檔案位置的內容是print/V2/V2-09 。
編號
309
標題
Initial Draft of Air Act Enforcement Rules Completed
摘要
The EPA recently completed a thorough review and modification of the Air Pollution Control Act Enforcement Rules and submitted the draft to the Executive Yuan at the end of February. Amendments to other related regulations will be finished by the end of March. Also the EPA estimates that control area plans will be completed by June this year, at the earliest, or by the end of the year at the latest. As for implementing TPQC areas, SOX and NOX will the first pollutants targeted. This year, the Air Pollution Control Act underwent its third amendment process. These changes integrated strategies for total pollutant quantity control (TPQC) and clean fuels, and established the system of total air pollution control zones. Because of these sweeping revisions, related regulatory systems must also undergo major modifications. Of these, the Air Pollution Control Act Enforcement Rules had the most urgent need for amendment. The EPA recently completed revisions to the enforcement rules, the key points of which include the following: 1. The scope of control of toxic air pollutants was expanded. 2. Pollution source classification principles were modified in order to further clarify the scope of mobile and stationary pollution sources. 3. Following the downsizing of the Taiwan Provincial Government, adjustments were made to the jurisdictional limits of each level of competent authority; and regulations were reviewed for their suitability to current needs. 4. Stipulate the methodology to determine whether air pollution control zones or TPQC areas comply with air quality standards; and, establish the basis for classifying these zones and areas. 5. Stipulate the content of central competent authority plans for setting TPQCs; and, stipulate the content of air pollution control plans as set by local-level government agencies. 6. Revise the principles for determining the location and number of general air quality monitoring stations. 7. Set requirements for stationary pollution sources to install continuous emissions monitoring equipment; and set time requirements and other regulations for real-time reporting to competent authorities. 8. Require stationary pollution sources to include pollutant emission concentrations and operating conditions in submitted emissions monitoring records, and set relevant requirements for operation. 9. Amend regulations concerning visual inspection of automobile emissions. 10.Stipulate methods for performing periodic automobile emissions testing. 11.Stipulate requirements for extending improvement deadlines, defining improvement plan contents, receiving agency, tracking of implementation status, and establishing methods for determining improvements that have not been implemented. These changes will unify enforcement activities and clarify for firms their rights and responsibilities. As for implementation timeframe, the EPA submitted the draft to the Executive Yuan for review at the end of February. Control area planning will go into effect at the end of June this year, at the earliest, and by the end of the year at the latest. Due to the necessity of complying with EIA reviews and other requirements such as allowable emission increase amounts, additional support measures will be added at the end of the year, depending on degree of urgency. As for the implementation of TPQCs, the central air quality zone will be used as a pilot demonstration area. And, because the tools for controlling relevant SOX and NOX pollutants are relatively mature, TPQC activities will likely first focus on these two pollutants.
全文
The EPA recently completed a thorough review and modification of the Air Pollution Control Act Enforcement Rules and submitted the draft to the Executive Yuan at the end of February. Amendments to other related regulations will be finished by the end of March. Also the EPA estimates that control area plans will be completed by June this year, at the earliest, or by the end of the year at the latest. As for implementing TPQC areas, SOX and NOX will the first pollutants targeted. This year, the Air Pollution Control Act underwent its third amendment process. These changes integrated strategies for total pollutant quantity control (TPQC) and clean fuels, and established the system of total air pollution control zones. Because of these sweeping revisions, related regulatory systems must also undergo major modifications. Of these, the Air Pollution Control Act Enforcement Rules had the most urgent need for amendment. The EPA recently completed revisions to the enforcement rules, the key points of which include the following: 1. The scope of control of toxic air pollutants was expanded. 2. Pollution source classification principles were modified in order to further clarify the scope of mobile and stationary pollution sources. 3. Following the downsizing of the Taiwan Provincial Government, adjustments were made to the jurisdictional limits of each level of competent authority; and regulations were reviewed for their suitability to current needs. 4. Stipulate the methodology to determine whether air pollution control zones or TPQC areas comply with air quality standards; and, establish the basis for classifying these zones and areas. 5. Stipulate the content of central competent authority plans for setting TPQCs; and, stipulate the content of air pollution control plans as set by local-level government agencies. 6. Revise the principles for determining the location and number of general air quality monitoring stations. 7. Set requirements for stationary pollution sources to install continuous emissions monitoring equipment; and set time requirements and other regulations for real-time reporting to competent authorities. 8. Require stationary pollution sources to include pollutant emission concentrations and operating conditions in submitted emissions monitoring records, and set relevant requirements for operation. 9. Amend regulations concerning visual inspection of automobile emissions. 10.Stipulate methods for performing periodic automobile emissions testing. 11.Stipulate requirements for extending improvement deadlines, defining improvement plan contents, receiving agency, tracking of implementation status, and establishing methods for determining improvements that have not been implemented. These changes will unify enforcement activities and clarify for firms their rights and responsibilities. As for implementation timeframe, the EPA submitted the draft to the Executive Yuan for review at the end of February. Control area planning will go into effect at the end of June this year, at the earliest, and by the end of the year at the latest. Due to the necessity of complying with EIA reviews and other requirements such as allowable emission increase amounts, additional support measures will be added at the end of the year, depending on degree of urgency. As for the implementation of TPQCs, the central air quality zone will be used as a pilot demonstration area. And, because the tools for controlling relevant SOX and NOX pollutants are relatively mature, TPQC activities will likely first focus on these two pollutants.
年度
1999
月份
2
卷
2
期
9
順序
1
倒序
2
分類
air
標題2
Initial Draft of Air Act Enforcement Rules Completed
檔案位置
print/V2/V2-09
「Initial Draft of Air Act Enforcement Rules Completedair1999」所屬的資料集:「Environmental Policy Monthly」的其他資料
編號:
542
標題:
Environment Opened as Alternative to Military Service
摘要:
As a means to shore up environmental protection human resources environmental protection has been sp
全文:
As a means to shore up environmental protection human resources environmental protection has been sp
編號:
48
標題:
Regulations Governing Incinerator Privatization Amended
摘要:
Waste Management To provide county and city level governments in Taiwan with the legal guidelines f
全文:
Waste Management To provide county and city level governments in Taiwan with the legal guidelines f
編號:
33
標題:
First Stage Tamshui River Basin Cleanup Plan to Undergo Trial Run
摘要:
Water Quality After ten years of construction the first-stage project of the Tamshui River Basin Cl
全文:
Water Quality After ten years of construction the first-stage project of the Tamshui River Basin Cl
編號:
47
標題:
Premier Orders Quick Resolution to Garbage Disposal Problems
摘要:
Waste Management Shortly after taking office Premier Vincent Siew, paid a visit to the EPA on Septe
全文:
Waste Management Shortly after taking office Premier Vincent Siew, paid a visit to the EPA on Septe
編號:
379
標題:
EPA Study Reveals Heavy Metal Content of Incinerator Air Emissions is Minute
摘要:
In a six-month air pollution study begun in December 1998 the EPA focused on the heavy metal content
全文:
In a six-month air pollution study begun in December 1998 the EPA focused on the heavy metal content
編號:
782
標題:
EPA to Limit Use of Disposable Utensils in Three Stages
摘要:
The EPA under its policy for controlling the use of disposable eating utensils, will gradually intro
全文:
The EPA under its policy for controlling the use of disposable eating utensils, will gradually intro
編號:
113
標題:
Environmental Services Sector to be APEC Target for Liberalization
摘要:
International Affairs Early voluntary liberalization was one of the most actively promoted APEC pol
全文:
International Affairs Early voluntary liberalization was one of the most actively promoted APEC pol
編號:
157
標題:
Amendments to Air Pollution Fee Regulations Announced
摘要:
Air Quality According to a draft amendment to the Regulations Governing the Collection of Air Poll
全文:
Air Quality According to a draft amendment to the Regulations Governing the Collection of Air Poll
編號:
634
標題:
80 Uses for Toxic Chemical Substances Eliminated
摘要:
The EPA currently has listed 252 substances as toxic chemicals (161 categories) and promulgated rest
全文:
The EPA currently has listed 252 substances as toxic chemicals (161 categories) and promulgated rest
編號:
961
標題:
Revised Air Pollution Control Act Simplifies Permit Procedures
摘要:
The revised Air Pollution Control Act passed by the Legislative Yuan on May 21, authorizes the EPA t
全文:
The revised Air Pollution Control Act passed by the Legislative Yuan on May 21, authorizes the EPA t
編號:
110
標題:
Drinking Water Management Enforcement Rules Announced
摘要:
Water Quality The Enforcement Rules for Drinking Water Management Provisions were announced on Febr
全文:
Water Quality The Enforcement Rules for Drinking Water Management Provisions were announced on Febr
編號:
270
標題:
5-River Remediation Plan Passes
摘要:
The Executive Yuan recently passed the EPA's plan to remediate the catchment basins of 5 rivers incl
全文:
The Executive Yuan recently passed the EPA's plan to remediate the catchment basins of 5 rivers incl
編號:
472
標題:
Energy Star Certifications to Begin in July
摘要:
Based on an ROC-US cooperative agreement the USEPA has entrusted the ROC with plans for carrying out
全文:
Based on an ROC-US cooperative agreement the USEPA has entrusted the ROC with plans for carrying out
編號:
750
標題:
Explosion Leads to First Activation of Toxic Chemical Disaster Response System
摘要:
The explosion of a boiler and the resulting fire at the Fukuo Company in Hsinchu County led the EPA
全文:
The explosion of a boiler and the resulting fire at the Fukuo Company in Hsinchu County led the EPA
編號:
29
標題:
EPA Announces the Results of EIA Consultant Evaluation
摘要:
Environmental Impact Assessment Quality of service among Taiwan's EIA consulting bodies varies wide
全文:
Environmental Impact Assessment Quality of service among Taiwan's EIA consulting bodies varies wide
編號:
439
標題:
Earthquake Reconstruction Projects Exempted from EIAs
摘要:
The EPA called a meeting of the Environmental Impact Assessment Committee to discuss principles for
全文:
The EPA called a meeting of the Environmental Impact Assessment Committee to discuss principles for
編號:
408
標題:
Glass Shards to be Cleared for Reuse in Public Construction Projects
摘要:
To further the recycling of glass the EPA on August 6 invited relevant units to discuss opening the
全文:
To further the recycling of glass the EPA on August 6 invited relevant units to discuss opening the
編號:
125
標題:
Controls on IC Industry Air Emissions to be Tightened
摘要:
Air Quality The Union Chemical Laboratories (UCL) of the Industrial Technology Research Institute (
全文:
Air Quality The Union Chemical Laboratories (UCL) of the Industrial Technology Research Institute (
編號:
576
標題:
EPA Lists Industry BACT Guidelines in Support of Total Emission Quantity Controls
摘要:
Taiwan’s emissions total quantity control (TQC) policy is slated to take effect in the near future.
全文:
Taiwan’s emissions total quantity control (TQC) policy is slated to take effect in the near future.
編號:
643
標題:
Feature: Executive Yuan Calls for Halt to Construction of the 4th Nuclear Power Plant
摘要:
The Executive Yuan has officially called for a halt to construction of the Fourth Nuclear Power Plan
全文:
The Executive Yuan has officially called for a halt to construction of the Fourth Nuclear Power Plan
編號:
515
標題:
Soil and Groundwater Testing to be Strengthened
摘要:
After passage of the Soil and Groundwater Pollution Remediation Act the need for soil and groundwat
全文:
After passage of the Soil and Groundwater Pollution Remediation Act the need for soil and groundwat
編號:
598
標題:
Recycling Industry Contributes NT$35 Billion Annually In Value Added
摘要:
Everyone knows that recycling helps the environment but it is less well known that recycling directl
全文:
Everyone knows that recycling helps the environment but it is less well known that recycling directl
編號:
770
標題:
EPA Provides Full Oversight in Chinmien Creek Pollution Incident
摘要:
Chinmien Creek suffered pollution on May 27 after unknown chemical substances were dumped in the cre
全文:
Chinmien Creek suffered pollution on May 27 after unknown chemical substances were dumped in the cre
編號:
585
標題:
Consensus Reached on Adjustment to Computer Recycling Fee Rates
摘要:
The current recycling rate for computers is below that originally anticipated when the computer recy
全文:
The current recycling rate for computers is below that originally anticipated when the computer recy
編號:
904
標題:
Small Alcohol Producers Exempt from Air Permits
摘要:
The EPA announced in a policy revision on February 4 that only alcohol producers with an annual outp
全文:
The EPA announced in a policy revision on February 4 that only alcohol producers with an annual outp
編號:
976
標題:
New Warning Pictograms for Environmental Sanitation Agents
摘要:
The EPA implemented its new regulations for the labeling of environmental sanitation agents on July
全文:
The EPA implemented its new regulations for the labeling of environmental sanitation agents on July
編號:
14
標題:
EPA Announces General Container Recycling Label
摘要:
Recycling The EPA has publicly announced the official design of the recycling label to be displayed
全文:
Recycling The EPA has publicly announced the official design of the recycling label to be displayed
編號:
664
標題:
Subsidy for Landfill Methane to Energy in Jeopardy
摘要:
The EPA recently discussed the status of plans for landfill methane gas to energy in Taiwan. As of
全文:
The EPA recently discussed the status of plans for landfill methane gas to energy in Taiwan. As of
編號:
98
標題:
Enforcement Rules for Environmental Agents Control Act Submitted to Executive Yuan
摘要:
Toxic Substancet On January 9 1998, a draft version of the Environmental Agents Control Act Enforce
全文:
Toxic Substance Management On January 9 1998, a draft version of the Environmental Agents Control A
編號:
180
標題:
EPA Announces “Responsible Toxics Use Award” Regulations
摘要:
In October the EPA formally announced the Toxic Chemical Substances Responsible Use Award Regulation
全文:
In October the EPA formally announced the Toxic Chemical Substances Responsible Use Award Regulation
行政院環境保護署 的其他資料集
列管社區下水道名單
不定期更新,51洪先生 | 02-2311-7722#2833 | 2022-01-14 01:23:07
行政院環境保護署全國一般廢棄物產生量
每1月更新,129顏先生 | 02-23117722#2109 | 2023-07-27 01:01:24
行政院環境保護署公告應回收廢物品及容器回收量
每1月更新,67顏先生 | 02-23117722#2109 | 2023-07-30 01:00:53
行政院環境保護署貨品通關事前聲明確認作業指引簡報
不定期更新,54金先生 | 23257399#55315 | 2022-01-14 01:22:22
行政院環境保護署垃圾處理場(廠)座數
每1年更新,170顏先生 | 02-23117722#2109 | 2023-07-27 01:00:41
行政院環境保護署
特殊性工業區品保品管後監測值資料檔(一般空氣污染物)
每年更新更新,152丁小姐 | 02-2371-2121#6101 | 2022-01-15 01:06:51
行政院環境保護署公文統計資料
不定期更新更新,60賴先生 | 02-2311-7722#2347 | 2022-01-14 01:22:15
行政院環境保護署列管公共污水下水道名單
不定期更新更新,35羅先生 | 02-2311-7722#2831 | 2023-08-09 01:04:19
行政院環境保護署空氣品質小時值_臺中市_忠明站
每1時更新,269陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:58
行政院環境保護署噪音陳情案件數(依音源)
不定期更新更新,54謝先生 | 02-23712121-6403 | 2023-07-27 01:03:47
行政院環境保護署
鹽水溪污染整治小組及再生願景聯繫會報
不定期更新,39汪先生 | 02-23117722-2849 | 2022-01-15 01:12:51
行政院環境保護署環境檢驗測定機構許可資料
每1月更新,178楊先生 | (03)491-5818轉2103 | 2023-07-27 01:01:42
行政院環境保護署建檔公廁明細-桃園市
不定期更新更新,185曾小姐 | (02)2311-7722#2760,(02)2311-7722#2894 | 2022-01-15 01:14:45
行政院環境保護署空氣品質小時值_嘉義市_嘉義站
每1時更新,115陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:48
行政院環境保護署苗栗縣重要環保統計資料
每1月更新,150顏先生 | 02-23117722#2109 | 2023-08-07 01:00:15
行政院環境保護署
經過山坡地之環境影響說明書件
每2月更新,231黃先生 | 02-23117722#2748 | 2023-08-05 01:01:01
行政院環境保護署綠色消費暨環境保護產品推動使用作業要點
每季更新更新,46孫小姐 | 02-23117722#2926 | 2022-01-15 01:13:09
行政院環境保護署交通事業廢棄物再利用機構資料
每1年更新,75李小姐 | 02-2311-7722#2626 | 2023-07-27 00:59:36
行政院環境保護署綠色商店基本資料
每季更新更新,104邱小姐 | 02-23117722#2924 | 2022-01-15 01:16:43
行政院環境保護署廢棄物實收罰鍰
每1年更新,131顏先生 | 02-23117722#2109 | 2023-08-03 01:00:26
行政院環境保護署
機場之開發類別環境影響評估報告書
每2月更新,43黃先生 | 02-23117722#2748 | 2023-08-05 01:01:08
行政院環境保護署空氣品質小時值_臺中市_沙鹿站
每小時更新更新,185謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:04:01
行政院環境保護署室內空品公告場所
不定期更新更新,127謝先生 | 02-23117722#6410 | 2022-01-14 01:04:13
行政院環境保護署彰化縣水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,54許先生 | 02-2311-7722#2831 | 2022-01-18 01:24:46
行政院環境保護署環境荷爾蒙管理計畫執行成果
不定期更新更新,36黃先生 | 02-23257399#55532 | 2023-07-27 01:02:28
行政院環境保護署
空氣品質小時值_基隆市_基隆站
每1時更新,183陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:28
行政院環境保護署空氣品質小時值_高雄市_橋頭站
每1時更新,383陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:43
行政院環境保護署新竹縣水量水質自動監測連線傳輸監測紀錄值即時資料集
不定期更新更新,44程先生 | 02-2311-7722#2833 | 2023-08-09 01:04:14
行政院環境保護署全國場址新增列管及解列統計表
不定期更新更新,128賴小姐 | 02-2383-2389#8102 | 2022-01-15 01:12:12
行政院環境保護署環保署毒物及化學物質局補、捐(獎)助團體及個人情形表
每季更新更新,52陳小姐 | 02-23257399#55434,02-23257399#55432 | 2022-01-15 01:09:58
行政院環境保護署